CN217299087U CN202220207366.6U CN202220207366U CN217299087U CN 217299087 U CN217299087 U CN 217299087U CN 202220207366 U CN202220207366 U CN 202220207366U CN 217299087 U CN217299087 U CN 217299087U
Authority
CN
China
Prior art keywords
frame
storing
road engineering
ditch
deepening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220207366.6U
Other languages
Chinese (zh)
Inventor
张顺明
张力
张忠明
张超
徐响生
张鹏
张奇华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Lixuan Construction Engineering Co ltd
Original Assignee
Guangxi Lixuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Lixuan Construction Engineering Co ltd filed Critical Guangxi Lixuan Construction Engineering Co ltd
Priority to CN202220207366.6U priority Critical patent/CN217299087U/en
Application granted granted Critical
Publication of CN217299087U publication Critical patent/CN217299087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a road engineering is with deepening ditch construction equipment, including storing the frame, the bottom both sides of storing the frame all are provided with electronic lift post, the bottom of electronic lift post all is provided with removes supporting component, the bottom of storing the frame link up and is provided with the draft tube, the top of storing the frame inside runs through the draft tube and rotates and install the spiral reamer, a side surface of storing the frame has seted up the discharge gate, the outside surface of discharge gate is provided with sealed protection component. This road engineering is with deepening ditch construction equipment, the ditch depth that can deepen according to actual need is different, carries out altitude mixture control through electronic lift post, makes spiral reamer and ditch carry out the contact excavation deepening, smashes silt and debris through spiral reamer simultaneously to leading-in to storing frame inside through the draft tube and storing concentrated the clearance, avoid causing the pollution to the road surface and be difficult to the clearance, replaced the manual work simultaneously and deepened the efficiency that has improved the construction.

Description

Road engineering is with deepening ditch construction equipment
Technical Field
The utility model relates to a road engineering technical field specifically is a road engineering is with deepening ditch construction equipment.
Background
Road engineering refers to the whole process of planning, designing, constructing, maintaining and managing work performed on roads and the engineering entity engaged in the whole process, and like civil engineering of any other types of door, the road engineering has obvious characteristics in the aspects of technology, economy and management, and the road engineering needs to dig ditches in the construction process and needs to be properly deepened through the ditches in some cases.
At present mainly deepen the ditch through the manual work in real time, it is lower to have wasted manpower and materials and lead to efficiency, and some current deepening instruments are bulky simultaneously, operate the inconvenience very in the use, and the overall cost of use is higher, and can't will deepen the in-process and produce silt debris and collect in real time, lead to having caused the pollution to the road surface and be difficult to the clearance.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road engineering is with deepening ditch construction equipment to solve the present main ditch that deepens in real time through the manual work that provides among the above-mentioned background, it is lower to have wasted manpower and materials and lead to efficiency, some that have now deepened the instrument volume simultaneously are great, the inconvenience very in the operation use, the overall cost of use is higher, and can't will deepen the in-process and produce silt debris and carry out real-time collection, lead to causing the problem that the pollution is difficult to the clearance to the road surface.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a road engineering is with deepening ditch construction equipment, is including storing the frame, the bottom both sides of storing the frame all are provided with electronic lift post, the bottom of electronic lift post all is provided with removes supporting component, the bottom of storing the frame link up and is provided with the draft tube, the inside top of storing the frame is run through the draft tube and is rotated and install the spiral reamer, a side surface of storing the frame has seted up the discharge gate, the outside surface of discharge gate is provided with sealed protection component.
Preferably, the top fixed mounting who stores the frame has the support frame, one side fixed mounting of support frame has the motor, and the output of motor runs through to store the frame and be connected with the top of spiral reamer.
Preferably, the sealing protection assembly comprises inserting ports which are arranged at the discharge port and are close to four corners, inserting columns are movably arranged on the inner sides of the inserting ports, end covers are arranged at the outer ends of the inserting columns, and pull rings are arranged on the outer sides of the end covers.
Preferably, remove supporting component and include the supporting seat of fixed mounting in electric lift column bottom, the rotation groove has all been seted up on the both sides surface of supporting seat, the inboard movable mounting that rotates the groove has the dwang, and the surface of dwang all overlaps and is equipped with the gyro wheel.
Preferably, the surface of the electric lifting column on one side of the bottom of the storage frame is fixedly provided with a storage battery, and the output end of the storage battery is electrically connected with the input end of the electric lifting column through a lead.
Preferably, the surface of the electric lifting column on the other side of the bottom of the storage frame is fixedly provided with a control button, and the output end of the control button is electrically connected with the input end of the electric lifting column through a wire.
Compared with the prior art, the beneficial effects of the utility model are that:
this road engineering is with deepening ditch construction equipment, in-process carrying out daily use, the ditch depth that can deepen according to actual need is different, carry out real-time altitude mixture control through electronic lift post, make spiral reamer and ditch carry out the contact excavation deepen, smash silt and debris in real time through spiral reamer simultaneously, and lead to the inside concentrated clearance of storing in real time that link up of storage frame through the draft tube, avoid causing the pollution to the road surface and be difficult to the clearance, replaced the manual work simultaneously and deepened the efficiency that has improved the construction.
This road engineering is with deepening ditch construction equipment, carrying out the in-process of daily use, compare in current ditch and deepen this device volume of instrument littleer, it is simpler and convenient that the removal operation gets up, greatly reduced the whole degree of difficulty and the cost of use operation.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic view of the connection structure of the draft tube and the storage frame of the present invention;
FIG. 3 is a schematic view of a part of the movable support assembly of the present invention;
fig. 4 is a schematic structural view of the sealing protection assembly of the present invention.
In the figure: 1. a support frame; 2. a storage frame; 3. a seal protection assembly; 4. a storage battery; 5. moving the support assembly; 6. a rotating groove; 7. a roller; 8. a supporting seat; 9. a helical reamer; 10. a control button; 11. a draft tube; 12. an electric lifting column; 13. an end cap; 14. a pull ring; 15. a motor; 16. a discharge port; 17. an interface; 18. rotating the rod; 19. and (5) inserting the columns.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a deepened ditch construction device for road engineering comprises a storage frame 2, wherein electric lifting columns 12 are arranged on two sides of the bottom of the storage frame 2, real-time height adjustment is carried out by starting and controlling the electric lifting columns 12, movable supporting components 5 are arranged at the bottoms of the electric lifting columns 12, a guide cylinder 11 is arranged at the bottom of the storage frame 2 in a penetrating manner, a spiral reamer 9 is rotatably arranged at the top end inside the storage frame 2 in a penetrating manner through the guide cylinder 11, sludge and sundries are crushed in real time through the spiral reamer 9 and are guided into the through storage frame 2 through the guide cylinder 11 to be stored and cleaned in a centralized manner in real time, pollution on a road surface is avoided and difficult to clean, a discharge port 16 is formed in one side surface of the storage frame 2, the sludge and sundries stored in the storage frame 2 can be conveniently and led out in real time, a sealing protection component 3 is arranged on the outer side surface of the discharge port 16, a supporting frame 1 is fixedly arranged at the top of the storage frame 2, one side fixed mounting of support frame 1 has motor 15, and the output of motor 15 runs through to store frame 2 and is connected with the top of spiral reamer 9, drives spiral reamer 9 through motor 15 and rotates in real time, makes spiral reamer 9 and ditch carry out the contact excavation deepening.
The sealing protection component 3 comprises insertion ports 17 which are arranged at the discharge port 16 and are close to four corners, insertion columns 19 are movably arranged on the inner sides of the insertion ports 17, the end covers 13 and the discharge port 16 can be inserted and limited in real time, sludge and sundries are prevented from leaking due to automatic falling off in the using process, the end covers 13 are arranged at the outer ends of the insertion columns 19, pull rings 14 are arranged on the outer sides of the end covers 13, the end covers 13 can be conveniently separated from the discharge port 16 in real time through manually holding the pull rings 14, sludge and sundries stored in the storage frame 2 can be guided out and cleaned in real time, the movable support component 5 comprises a support seat 8 which is fixedly arranged at the bottom of an electric lifting column 12, rotating grooves 6 are formed in the surfaces of two sides of the support seat 8, rotating rods 18 are movably arranged on the inner sides of the rotating grooves 6, rollers 7 are sleeved on the surfaces of the rotating rods 18, and the whole device can be conveniently moved to ditch positions needing to be deepened according to actual needs, the flexibility that the device used has been improved greatly, store the electric lift post 12 fixed surface of 2 bottom one sides of frame and install battery 4, and battery 4's output passes through the wire and the input electric connection of electric lift post 12, can provide independent and sufficient electric power energy for the operation of electric lift post 12, store the electric lift post 12 fixed surface of 2 bottom opposite sides of frame and install control button 10, and control button 10's output passes through the wire and the input electric connection of electric lift post 12, can conveniently carry out real-time lift adjustment through manual control electric lift post 12, the degree of depth to the ditch deepening is carried out real-time handle control, the accuracy nature of ditch deepening has been improved greatly.
The working principle is as follows: when the device is used for ditch deepening, firstly, the traction mechanism can be used for driving the roller 7 to rotate and move to the ditch to be deepened, the spiral reamer 9 is aligned right above the ditch, the whole device is manually limited and fixed in real time, the electric lifting column 12 can be started and controlled by the control button 10 to adjust the height in real time according to the deepening depth of the ditch, and the motor 15 is started to drive the spiral reamer 9 to rotate in real time, so that the spiral reamer 9 is in contact with a ditch to dig deeper, and simultaneously the spiral reamer 9 is used for crushing sludge and sundries in real time, and leading-in 2 inside storage frame that link up through guide cylinder 11 stores in real time and concentrates the clearance, avoids causing the pollution to the road surface and is difficult to the clearance, and it is littleer to compare in current ditch deepen this device volume of instrument, and it is simpler and convenient that the removal operation gets up.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a road engineering is with deepening ditch construction equipment which characterized in that: storage frame (2) including the level setting, the bottom both sides of storing frame (2) all are provided with electronic lift post (12), the bottom of electronic lift post (12) all is provided with removes supporting component (5), the central authorities bottom of storing frame (2) link up and is provided with draft tube (11), the top of storing frame (2) inside is run through draft tube (11) and is rotated and install spiral reamer (9) one side surface of storing frame (2) has seted up discharge gate (16), the outside surface of discharge gate (16) is provided with sealed protection component (3).
2. The deepened ditch construction device for road engineering according to claim 1, wherein: the top fixed mounting who stores frame (2) has support frame (1), one side fixed mounting of support frame (1) has motor (15), and the output of motor (15) runs through the top of storing frame (2) and spiral reamer (9) and be connected.
3. The deepened ditch construction device for road engineering according to claim 1, wherein: the sealing protection assembly (3) comprises inserting ports (17) which are arranged at a discharge port (16) and are close to four corners, inserting columns (19) are movably mounted on the inner sides of the inserting ports (17), end covers (13) are arranged at the outer ends of the inserting columns (19), and pull rings (14) are arranged on the outer sides of the end covers (13).
4. The deepened ditch construction device for road engineering according to claim 1, characterized in that: remove supporting component (5) including supporting seat (8) of fixed mounting in electric lift post (12) bottom, the both sides surface of supporting seat (8) has all been seted up and has been rotated groove (6), the inboard movable mounting that all rotates groove (6) has dwang (18), and the surface of dwang (18) all overlaps and is equipped with gyro wheel (7).
5. The deepened ditch construction device for road engineering according to claim 1, wherein: the storage frame is characterized in that a storage battery (4) is fixedly mounted on the surface of the electric lifting column (12) on one side of the bottom of the storage frame (2), and the output end of the storage battery (4) is electrically connected with the input end of the electric lifting column (12) through a wire.
6. The deepened ditch construction device for road engineering according to claim 1, characterized in that: the surface of the electric lifting column (12) on the other side of the bottom of the storage frame (2) is fixedly provided with a control button (10), and the output end of the control button (10) is electrically connected with the input end of the electric lifting column (12) through a wire.
CN202220207366.6U 2022-01-25 2022-01-25 Road engineering is with deepening ditch construction equipment Active CN217299087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220207366.6U CN217299087U (en) 2022-01-25 2022-01-25 Road engineering is with deepening ditch construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220207366.6U CN217299087U (en) 2022-01-25 2022-01-25 Road engineering is with deepening ditch construction equipment

Publications (1)

Publication Number Publication Date
CN217299087U true CN217299087U (en) 2022-08-26

Family

ID=82927352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220207366.6U Active CN217299087U (en) 2022-01-25 2022-01-25 Road engineering is with deepening ditch construction equipment

Country Status (1)

Country Link
CN (1) CN217299087U (en)

Similar Documents

Publication Publication Date Title
CN212359741U (en) Portable groundwater sampling device
CN214784321U (en) Efficient water conservancy construction sediment removal device
CN212872460U (en) Silt mixes backfill compactness detection sampling device
CN111155586B (en) Treatment device and method for improving water quality of reservoir
CN217299087U (en) Road engineering is with deepening ditch construction equipment
CN113557897B (en) Agricultural is with multi-functional integrated plastic film laying device
CN212506691U (en) Water storage device for landscaping
CN213481782U (en) Water environment treatment auxiliary sampling device
CN212190453U (en) Be used for hydraulic engineering desilting device
CN212866296U (en) Municipal administration pipeline drainage device
CN213682270U (en) Silt clearing device with loosening mechanism
CN211927338U (en) Earthwork sampling device for water conservancy construction
CN112729959A (en) Groundwater sampling device for sampling water body samples of different depths
CN209741954U (en) Ditching device for municipal construction
CN218597337U (en) Old tubular well desilting mud machine of municipal construction
CN215926113U (en) Rural running water pipe laying is with ditching equipment
CN220781757U (en) Automatic ash scraping device of intelligent drilling machine
CN219732132U (en) Channel dredging device
CN217053286U (en) River course device of decontaminating for environmental engineering
CN220977859U (en) Water conservancy construction guiding device
CN213868015U (en) Intelligent sedimentation tank dredging device
CN218458890U (en) Waste reduction construction equipment for municipal engineering
CN220658625U (en) Cleaning device for heat supply pipeline with ultra-long large diameter
CN214741084U (en) Perforating device of intelligent regulation angle of punching for road construction
CN214584257U (en) Groundwater sampling device for sampling water body samples of different depths

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant