CN217272368U - Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled - Google Patents

Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled Download PDF

Info

Publication number
CN217272368U
CN217272368U CN202220259352.9U CN202220259352U CN217272368U CN 217272368 U CN217272368 U CN 217272368U CN 202220259352 U CN202220259352 U CN 202220259352U CN 217272368 U CN217272368 U CN 217272368U
Authority
CN
China
Prior art keywords
channel steel
steel group
channel
concrete
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220259352.9U
Other languages
Chinese (zh)
Inventor
车海宝
王昊淼
刘腾
杨冠
王翠
范智浩
陈涛
张中发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN202220259352.9U priority Critical patent/CN217272368U/en
Application granted granted Critical
Publication of CN217272368U publication Critical patent/CN217272368U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a can install trailer concrete pump pipe fastener of dismantlement fast, two isometric channel-section steels are parallel notch each other upwards, its adjacent leg face is laminated each other, along its leg face vertically running through the through-hole fit-in of two channel-section steel leg faces installing the split bolt, fastening nut constitutes channel-section steel group, concrete subaerial rigid coupling and concrete wall face vertically horizontal channel-section steel group outside the building of concrete placement high-rise building main part or building, its channel-section steel groove face cooperatees with ground, lower extreme and horizontal channel-section steel group inner end matched with channel-section steel group upright channel-section steel group are being rigid coupled to the rigid coupling on the concrete wall, its channel-section steel groove face and concrete wall face cooperate, it is horizontal, U-shaped staple bolt that the U-section steel group that upright passes through respectively is being equipped with the pump line admittedly, two sets of diagonal braces are being connected on horizontal channel-section steel group and the upright both sides channel-section steel leg face between the group. The utility model discloses rational in infrastructure, ann tears pump line part device open fast, the transportation of being convenient for reduces workman's intensity of labour, improves work efficiency, saves the cost.

Description

Trailer concrete pump pipe fastening device capable of being quickly assembled and disassembled
Technical Field
The utility model belongs to construction can be used for installing the auxiliary device of trailer concrete pump pipe, especially a trailer concrete pump pipe fastener that can install fast and dismantle.
Background
At present, after construction projects of a building construction project are constructed to 10 layers of a main body, an automobile pump cannot be fully poured. When the trailer pump is used, a large amount of manual work is needed to set up the scaffold to fix the pump pipe, and the steel pipe scaffold is configured according to different sizes in the building, so that great invariance is brought to construction operators.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can install trailer concrete pump pipe fastener who dismantles fast, its is rational in infrastructure, and is easy and simple to handle, can install fast and dismantle pump line part device, and the transportation of being convenient for can reduce workman's intensity of labour, improves work efficiency, saves the cost.
The purpose of the utility model is realized like this: a trailer concrete pump pipe fastening device capable of being quickly assembled and disassembled comprises a right-angle pump pipe connected with a trailer concrete pump, two equal-length channel steels are mutually parallel, the notches of the two equal-length channel steels are upward, the adjacent leg surfaces of the two equal-length channel steels are mutually attached, a first pair of pull bolts are arranged in through holes which are longitudinally and uniformly distributed along the leg surfaces of the two channel steels and transversely penetrate through the leg surfaces of the two channel steels in a matching manner, fastening nuts form a channel steel group, a horizontal channel steel group vertical to a concrete wall surface is fixedly connected to the concrete ground inside or outside a building of a concrete-poured high-rise building main body, the waist surface of the channel steel is matched with the ground, an upright channel steel group with the inner end of the horizontal channel steel group at the lower end is fixedly connected to the concrete wall surface, the waist surface of the channel steel is matched with the concrete wall surface, the horizontal channel steel group and the upright channel steel group are fixedly connected to the corresponding concrete ground and the concrete wall surface through expansion bolts, the right-angle pump pipe is fixedly connected to the horizontal channel steel group and upright channel steel group through U-shaped hoops uniformly distributed, two groups of parallel diagonal braces are connected to leg surfaces of the channel steels on two sides between the horizontal channel steel group and the vertical channel steel group through second counter-pulling bolts respectively.
The utility model discloses a combination such as channel-section steel, 14 counter-pull screw rod, nut, 3 thickness steel sheets, 12 inflation screws, U type staple bolts forms, and pump line part device is torn open to ann fast, and process ann such as reinforcement tears the convenience open, and repeatedly usable.
The utility model discloses construction flow:
research and manufacture of reinforcing part
And (5) purchasing the drawn drawings in advance and guiding manufacturers to carry out processing and manufacturing. (in the manufacturing process, the channel steel punched holes ⇢ penetrate through the split screw ⇢, and the nuts are installed to form a channel steel group ⇢, and the inclined stay bars with punched holes are installed on the split screw ⇢ and fixed by butterfly buckles.
(II) mounting of reinforcing members
1. The mounting position of the bracket is determined according to the field condition (the fixing bolt can adopt an expansion bolt and an embedded steel bar).
2. After the position is determined, the horizontal channel steel group and the vertical channel steel group are respectively installed and fixed, and the split screw rod component is installed (after a hole is formed in the side wall of the channel steel, the split screw rod is introduced from the hole, and is fastened by a butterfly buckle).
3. The pump pipe is installed and fixed by a U-shaped hoop.
4. After the installation, the project reporting technology is responsible for the project and the commercial concrete supplier technology is responsible for the use after the acceptance.
The application effect is as follows:
1. convenient to mount and dismount and outstanding in transportation effect
The utility model discloses can replace the method of setting up of original conventional steel pipe scaffold, adopt and to have enough to meet the need the part, the part can be installed in building (outer) concrete face optional position, reserves the hole according to the channel-section steel and assembles. The assembly and disassembly operations are simple.
2. Saving material, being able to be reused and reducing engineering cost
Each solid part is simple and convenient to manufacture, the channel steel, the U-shaped clamp, the harness cord screw, the steel plate and the expansion wire are used, the combined part can be completed, the material of the part can be repeatedly used among engineering projects, the labor and the construction material cost are saved, and the cost is reduced.
The utility model discloses rational in infrastructure, realized that ann tears pump line part device open fast, the transportation of being convenient for has reduced workman's intensity of labour, has improved work efficiency, has saved the cost.
Drawings
The present invention will be further described with reference to the accompanying drawings, and fig. 1 is a schematic perspective view of the present invention.
Detailed Description
A trailer concrete pump pipe fastening device capable of being quickly mounted and dismounted comprises a right-angle pump pipe 3 connected with a trailer concrete pump, two equal-length channel steels are mutually parallel, the notches are upward, the adjacent leg surfaces are mutually attached, a first pair of pull bolts 2 are arranged in through holes which are longitudinally and uniformly distributed along the leg surfaces and transversely penetrate through the leg surfaces of the two channel steels in a matching manner, fastening nuts form a channel steel group, a horizontal channel steel group 6 vertical to a concrete wall surface 4 is fixedly connected to a concrete ground 7 in or out of a building of a concrete-poured high-rise building main body, the waist surface of the channel steel is matched with the ground, an upright channel steel group 1 with the lower end matched with the inner end of the horizontal channel steel group 6 is fixedly connected to the concrete wall surface 4, the waist surface of the channel steel group 6 and the upright channel steel group 1 are respectively fixedly connected to the corresponding concrete ground 7 and the concrete wall surface 4 through expansion bolts, the right-angle pump pipes 3 are fixedly installed on the horizontal channel steel group 6 and the vertical channel steel group 1 through the uniformly distributed U-shaped hoops 8 respectively, and two groups of parallel diagonal brace rods 9 are connected to the leg surfaces of the channel steels on the two sides between the horizontal channel steel group 6 and the vertical channel steel group 1 through second diagonal bolts 5 respectively. The distance between the two groups of inclined supporting rods 9 is 20-30mm, the included angle between the inclined supporting rods 9 and the groove surface of the horizontal channel steel group 6 is 45 degrees, and the inclined supporting rods 9 are made of flat steel with the width of 50-80mm and the thickness of 3 mm. The channel steel forming the horizontal and vertical channel steel groups 6 and 1 is 25C channel steel.

Claims (3)

1. The utility model provides a trailer concrete pump pipe fastener that can install fast and dismantle, includes right angle shape pump line (3) that trailer concrete pump is connected, characterized by: two equilong channel steels are mutually parallel, the notches are upward, the adjacent leg surfaces are mutually attached, a first pair of pull bolts (2) are arranged in through holes which are longitudinally and uniformly distributed along the leg surfaces and transversely penetrate through the leg surfaces of the two channel steels in a matched manner, fastening nuts form channel steel groups, a horizontal channel steel group (6) which is vertical to a concrete wall surface (4) is fixedly connected to a concrete ground (7) in or out of a building of a concrete pouring high-rise building main body, the waist surface of the channel steel is matched with the ground, an upright channel steel group (1) with the lower end matched with the inner end of the horizontal channel steel group (6) is fixedly connected to the concrete wall surface (4), the waist surface of the channel steel is matched with the concrete wall surface (4), the horizontal channel steel group (6) and the upright channel steel group (1) are fixedly connected to the corresponding concrete ground (7) and concrete wall surface (4) through expansion bolts respectively, and the horizontal channel steel group and the upright channel steel group (6) are arranged on the upright channel steel group (6), 1) The right-angle pump pipes (3) are fixedly installed on the horizontal channel steel group (6) and the vertical channel steel group (1) through uniformly distributed U-shaped anchor ears (8), and two groups of parallel inclined support rods (9) are connected to leg surfaces of the channel steels on two sides between the horizontal channel steel group (6) and the vertical channel steel group (1) through second split bolts (5).
2. The quick-to-mount/dismount trailer concrete pump pipe fastening device as claimed in claim 1, wherein: the distance between the two groups of diagonal braces (9) is 20-30mm, the included angle between the diagonal braces (9) and the groove surface of the horizontal channel steel group (6) is 45 degrees, and the diagonal braces (9) are made of flat steel with the width of 50-80mm and the thickness of 3 mm.
3. The quick-to-mount/dismount trailer concrete pump pipe fastening device as claimed in claim 1, wherein: the channel steel forming the horizontal and vertical channel steel groups (6, 1) is 25C channel steel.
CN202220259352.9U 2022-02-09 2022-02-09 Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled Active CN217272368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220259352.9U CN217272368U (en) 2022-02-09 2022-02-09 Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220259352.9U CN217272368U (en) 2022-02-09 2022-02-09 Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled

Publications (1)

Publication Number Publication Date
CN217272368U true CN217272368U (en) 2022-08-23

Family

ID=82905543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220259352.9U Active CN217272368U (en) 2022-02-09 2022-02-09 Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled

Country Status (1)

Country Link
CN (1) CN217272368U (en)

Similar Documents

Publication Publication Date Title
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN217272368U (en) Trailer concrete pump pipe fastening device capable of being quickly installed and disassembled
CN109318349B (en) Prefabricated component general combination side form, mould
CN111877752B (en) Reinforcing system of building template and construction method thereof
CN209891717U (en) Adjustable steel wire rope truss device for reinforcing column formwork
CN111350345A (en) Pull-rod-free template reinforcing system for outer wall of buried sewage treatment plant and installation method
CN110821147A (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN212984631U (en) Plate lowering hanging die
CN212773459U (en) Wall pouring template applied to expansion joint side
CN212002269U (en) Concrete beam side form reinforcing apparatus
CN88201062U (en) Fixed form combination shuttering
CN209686924U (en) A kind of large volume arc concrete steel lattice supporting framework
CN220621053U (en) Novel template reinforcing and supporting tool
CN219648607U (en) Reserved steel bar platform of precast box girder both sides panel
CN220550857U (en) Modularized cast-in-place concrete mold
CN219773630U (en) Back edge adaptable to screw fastening position
CN218061424U (en) Fish-bellied profile steel supporting beam mold supporting system for cast-in-place floor
CN216552530U (en) Single-face laminated slab concrete shear wall structure with detachable formwork
CN221095598U (en) Steel structure beam clamp
CN213683202U (en) Beam mold clamp
CN219654264U (en) Adjustable quick detach formula channel-section steel column hoop
CN213709077U (en) Concrete steel mould bearing structure
CN219931604U (en) Arc-circle combined special-shaped concrete member template reinforcing device
CN218028994U (en) Combined triangular bracket for reinforcing lower hanging beam/plate structure of aluminum alloy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant