CN217267592U - Portable bridge pile foundation steel reinforcement cage location making devices - Google Patents

Portable bridge pile foundation steel reinforcement cage location making devices Download PDF

Info

Publication number
CN217267592U
CN217267592U CN202220845647.4U CN202220845647U CN217267592U CN 217267592 U CN217267592 U CN 217267592U CN 202220845647 U CN202220845647 U CN 202220845647U CN 217267592 U CN217267592 U CN 217267592U
Authority
CN
China
Prior art keywords
jig
location bed
location
positioning
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220845647.4U
Other languages
Chinese (zh)
Inventor
胡贝
田文胜
梅磊
李嘉欣
饶星焱
王贝
夏卫俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Tianlong Supervision Co Ltd
Wuhan Hanyang Municipal Construction Group Co Ltd
Original Assignee
Wuhan Tianlong Supervision Co Ltd
Wuhan Hanyang Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Tianlong Supervision Co Ltd, Wuhan Hanyang Municipal Construction Group Co Ltd filed Critical Wuhan Tianlong Supervision Co Ltd
Priority to CN202220845647.4U priority Critical patent/CN217267592U/en
Application granted granted Critical
Publication of CN217267592U publication Critical patent/CN217267592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a steel reinforcement cage location technical field especially relates to a portable bridge pile foundation steel reinforcement cage location making devices. The utility model provides a portable bridge pile foundation steel reinforcement cage location making devices, includes location bed-jig base, pulley and fixed connector, fixed connector fixed mounting is in the bottom of location bed-jig base, the pulley is connected with the help of fixed connector and location bed-jig base, the fixed surface of location bed-jig base installs location bed-jig substructure, the top block of location bed-jig substructure has two location bed-jig superstructure. The utility model discloses a set up location bed-jig superstructure, location bed-jig substructure, support head, arc recess isotructure, make things convenient for the steel reinforcement cage preparation, it is inconvenient to have solved reinforcing bar weight and remove greatly, need long-time artificial support at the reinforcement in-process, and is convenient inadequately, and it is long to occupy the process cycle time, and the mounting dimension is difficult to guarantee, influences the problem of ligature efficiency, precision.

Description

Portable bridge pile foundation steel reinforcement cage location making devices
Technical Field
The utility model relates to a steel reinforcement cage location technical field especially relates to a portable bridge pile foundation steel reinforcement cage location making devices.
Background
Along with the rapid development of the building industry, the bridge is very important in highway construction, and the bridge pile foundation is great as the bearing basis of bridge, and a large amount and diameter have increased the preparation degree of difficulty of steel reinforcement cage, and common location bed-jig arc length on the market, some can 360 degrees location owner muscle intervals but the installation is dismantled complicacy, and the strengthening rib still needs artifical the righting to weld, and has the angle of rightting and not to leading to the strengthening rib slope, influences the risk of steel reinforcement cage quality. One part is only one third of the circumference of the reinforcement cage, the main reinforcement interval can be controlled, and the reinforcement cage needs to be turned over in the reinforcement binding process, which is very tedious.
The existing reinforcement cage is complex in manufacturing process, heavy in weight of the steel bars and inconvenient to move, long-time artificial support is needed in the reinforcement binding process, the convenience is not enough, the cycle time of the occupied process is long, the installation size is difficult to guarantee, and the binding efficiency and precision are influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a portable bridge pile foundation steel reinforcement cage location making devices, it is loaded down with trivial details to have solved among the prior art steel reinforcement cage process of manufacture, and reinforcing bar weight removes inconveniently greatly, and needs long-time artificial support at the reinforcement in-process, and is convenient inadequately, occupies that the process cycle time is long, and the mounting dimension is difficult to guarantee, influences the problem of ligature efficiency, precision.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a portable bridge pile foundation steel reinforcement cage location making devices, includes location bed-jig base, pulley and fixed connector, fixed connector fixed mounting is in the bottom of location bed-jig base, the pulley is connected with the help of fixed connector and location bed-jig base, the fixed surface of location bed-jig base installs location bed-jig substructure, the top block of location bed-jig substructure has two location bed-jig superstructure, the surface of location bed-jig substructure is provided with two fixed knot constructs, two location bed-jig superstructure is connected with the help of two fixed knot constructs and location bed-jig substructure respectively, two the surface of location bed-jig superstructure all is provided with circular limit structure, the arc recess has all been seted up on the surface of location bed-jig superstructure and the surface of location bed-jig substructure.
Preferably, the surface of the positioning jig frame base is provided with a fixing nut, and the lower structure of the positioning jig frame is fixedly connected with the positioning jig frame base through the fixing nut.
Preferably, the surface of the upper structure of the two positioning jig frames is fixedly provided with a supporting head, the top end of the lower structure of the positioning jig frames is provided with two clamping grooves, and the upper structure of the two positioning jig frames is clamped with the lower structure of the positioning jig frames by means of the supporting head and the clamping grooves.
Preferably, the lower structure of the positioning jig frame is provided with an insertion rod which penetrates through the two clamping grooves in a sliding manner, the surface of the supporting head is provided with an insertion hole matched with the insertion rod in size, a pull ring is fixedly installed at a port of the insertion rod, a spring is sleeved on the surface of the insertion rod, and two ends of the spring are fixedly connected with the pull ring and the lower structure of the positioning jig frame respectively.
Preferably, the upper structure of the positioning jig frame is a 90-degree right-angle circular arc, a round hole is formed in the surface of the upper structure of the positioning jig frame, and a round limiting structure is rotatably connected inside the round hole.
Preferably, the circular limiting structure penetrates through a circular hole of the upper structure of the positioning jig frame in a C shape.
The utility model discloses possess following beneficial effect at least:
through setting up location bed-jig superstructure, location bed-jig substructure, support head, arc recess isotructure, make things convenient for the steel reinforcement cage preparation, it is inconvenient to have solved reinforcing bar heavy big removal, needs long-time artificial support at the reinforcement in-process, and is convenient inadequately, and it is long to occupy the process cycle time, and the erection dimension is difficult to guarantee, influences the problem of ligature efficiency, precision.
The utility model discloses still possess following beneficial effect:
through setting up inserted bar, spring and pull ring isotructure, the convenience is further fixed location bed-jig superstructure on location bed-jig substructure, conveniently dismantles moreover and installs, makes fixed effect more stable.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of the structure of the supporting head of the present invention;
FIG. 3 is a schematic structural view of the lower part of the positioning jig of the present invention;
fig. 4 is a schematic structural diagram of a portion a in fig. 3 according to the present invention.
In the figure: 1. positioning a bed-jig base; 2. fixing the connecting piece; 3. a pulley; 4. fixing a nut; 5. positioning a lower structure of the jig frame; 6. positioning the upper structure of the jig frame; 7. an arc-shaped groove; 8. a circular limiting structure; 9. a rod is inserted; 10. a spring; 11. a pull ring; 12. and supporting the head.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-4, the movable bridge pile foundation reinforcement cage positioning and manufacturing device comprises a positioning jig frame base 1, pulley 3 and fixed connector 2, fixed connector 2 fixed mounting is in the bottom of location bed-jig base 1, pulley 3 is connected with the help of fixed connector 2 and location bed-jig base 1, the fixed surface of location bed-jig base 1 installs location bed-jig substructure 5, the top block of location bed-jig substructure 5 has two location bed-jig superstructure 6, the surface of location bed-jig substructure 5 is provided with two fixed knot constructs, two location bed-jig superstructure 6 are connected with the help of two fixed knot constructs and location bed-jig substructure 5 respectively, the surface of two location bed-jig superstructure 6 all is provided with circular limit structure 8, arc recess 7 has all been seted up on the surface of location bed-jig superstructure 6 and the surface of location bed-jig substructure 5.
The scheme has the following working processes:
starting at least two devices, sliding the devices to a certain distance, fixing the pulleys 3 at the same time, placing vertical reinforcing steel bars of a lower structure 5 of a positioning jig frame, directly placing stiffening stirrups on the lower structure 5 of the positioning jig frame, fixing the lower structures 5 of the positioning jig frame at the left side and the right side, then placing an upper structure 6 of the positioning jig frame on the lower structure 5 of the positioning jig frame, directly inserting support heads 12 at the left side and the right side of the upper structure 6 of the positioning jig frame into clamping grooves of the lower structure 5 of the positioning jig frame, bearing the vertical stress of the upper structure 6 of the positioning jig frame and playing a certain fixing role at the same time, clamping the stiffening stirrups by a vertical round limiting structure 8 on the surface of the upper structure 6 of the rotating positioning jig frame, forming a horizontal support of the upper structure of the jig frame, so that the positioning jig frame is stable, and respectively placing the vertical reinforcing steel bars of the upper structure 6 of the two positioning jig frames, at this moment, the bar worker carries out reinforcement work, this process need not other people and assists fixedly, and is convenient, after reinforcement, rotatory vertical circular limit structure 8 is to certain angle, push away the location bed-jig backward and can take off the location bed-jig, and is convenient, slides the device to the position of next stiffening stirrup again, step more than continuing, until accomplishing whole steel reinforcement cage preparation, the device can also play the effect of transportation steel reinforcement cage, reduces crane operating time, improve whole efficiency of construction.
According to the working process, the following steps are known:
through setting up location bed-jig superstructure 6, location bed-jig substructure 5, support head 12, arc recess 7 isotructure, make things convenient for the steel reinforcement cage preparation, it is inconvenient to have solved reinforcing bar weight big removal, need artificially support for a long time at the reinforcement in-process, and is convenient inadequately, and it is long to occupy the process cycle time, and mounting dimension is difficult to guarantee, influences the problem of ligature efficiency, precision.
Further, the surface of location bed-jig base 1 is provided with fixation nut 4, and location bed-jig substructure 5 utilizes fixation nut 4 to fix a position 5 fixed mounting of bed-jig substructure on location bed-jig base 1 on the help of fixation nut 4 and location bed-jig base 1 fixed connection, conveniently operates.
Further, the equal fixed mounting in surface of two location bed-jig superstructure 6 has support head 12, and two draw-in grooves have been seted up on the top of location bed-jig substructure 5, and two location bed-jig superstructure 6 all utilize to support head 12 and draw-in groove and location bed-jig substructure 5 looks block with the help of supporting head 12, and the utilization is supported head 12 and draw-in groove and is conveniently tentatively fixed location bed-jig superstructure 6.
Further, the position of location bed-jig substructure 5 for two draw-in grooves all slides to run through has inserted bar 9, support the surface of head 12 and set up the jack with the 9 size looks adaptations of inserted bar, the port fixed mounting of inserted bar 9 has pull ring 11, the surface cover of inserted bar 9 has spring 10, the both ends of spring 10 respectively with pull ring 11 and location bed-jig substructure 5 fixed connection, utilize inserted bar 9 will support head 12 and location bed-jig substructure 5 and carry out the secondary and fix, utilize spring 10 to conveniently strengthen fixed stability, utilize pull ring 11 to conveniently draw out inserted bar 9, conveniently dismantle.
Further, location bed-jig superstructure 6 is 90 degrees right angle circular arcs, and the round hole has been seted up on the surface of location bed-jig superstructure 6, and the inside rotation of round hole is connected with circular limit structure 8.
Furthermore, the circular limiting structure 8 penetrates through a circular hole of the positioning jig frame upper structure 6 in a C shape.
In conclusion, at least two devices are started, after the devices are slid to a certain distance, the pulleys 3 are fixed, the vertical reinforcing steel bars of the lower structure 5 of the positioning jig frame are placed, the stiffening stirrups are directly placed on the lower structure 5 of the positioning jig frame, the lower structures 5 of the positioning jig frame on the left side and the right side are fixed, then the upper structure 6 of the positioning jig frame is placed on the lower structure 5 of the positioning jig frame, the supporting heads 12 on the left side and the right side of the upper structure 6 of the positioning jig frame are directly inserted into the clamping grooves of the lower structure 5 of the positioning jig frame, the vertical stress of the upper structure 6 of the positioning jig frame is borne, a certain fixing effect is achieved at the same time, the stiffening stirrups are clamped by the vertical circular limiting structures 8 on the surface of the upper structure 6 of the rotating positioning jig frame, the stiffening stirrups also form horizontal supports of the upper structure of the jig frame, so that the positioning jig frame is stable, and the vertical reinforcing steel bars of the upper structures 6 of the two positioning jig frame are respectively placed, at the moment, a steel bar worker carries out steel bar binding work, the process does not need other people to assist in fixing, the operation is convenient and fast, after the steel bar binding is finished, the vertical circular limiting structure 8 is rotated to a certain angle, the positioning jig frame can be taken down by pushing the positioning jig frame backwards, the operation is convenient and fast, the device is slid to the position of the next stiffening stirrup, the steps are continued, the whole steel bar cage manufacturing is carried out until the whole steel bar cage manufacturing is finished, the device can also play a role in transporting the steel bar cage, the working time of a crane is reduced, the whole construction efficiency is improved, the steel bar cage manufacturing is facilitated by arranging the upper structure 6 of the positioning jig frame, the lower structure 5 of the positioning jig frame, the support heads 12, the arc-shaped grooves 7 and other structures, the problems that the steel bar is heavy and inconvenient to move, long-time artificial support is needed in the steel bar binding process, the occupation is inconvenient, the cycle time is long, the installation size is difficult to guarantee, and the binding efficacy is influenced, The problem of accuracy.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that all the embodiments and descriptions are provided in the present invention, and that various changes and modifications can be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a portable bridge pile foundation steel reinforcement cage location making devices, includes location bed-jig base (1), pulley (3) and fixed connector (2), fixed connector (2) fixed mounting is in the bottom of location bed-jig base (1), pulley (3) are connected with location bed-jig base (1) with the help of fixed connector (2), its characterized in that, the fixed surface of location bed-jig base (1) installs location bed-jig substructure (5), the top block of location bed-jig substructure (5) has two location bed-jig superstructure (6), the surface of location bed-jig substructure (5) is provided with two fixed knot constructs, two location bed-jig superstructure (6) are connected with the help of two fixed knot constructs and location bed-jig substructure (5) respectively, two the surface of location bed-jig superstructure (6) all is provided with circular limit structure (8), arc-shaped grooves (7) are formed in the surface of the upper positioning jig frame structure (6) and the surface of the lower positioning jig frame structure (5).
2. The movable bridge pile foundation reinforcement cage positioning and manufacturing device according to claim 1, characterized in that a fixing nut (4) is arranged on the surface of the positioning jig frame base (1), and the positioning jig frame substructure (5) is fixedly connected with the positioning jig frame base (1) through the fixing nut (4).
3. The movable bridge pile foundation reinforcement cage positioning and manufacturing device according to claim 1, characterized in that a support head (12) is fixedly mounted on the surface of each of the two positioning jig frame upper structures (6), two clamping grooves are formed in the top end of each of the positioning jig frame lower structures (5), and each of the two positioning jig frame upper structures (6) is clamped with the positioning jig frame lower structure (5) through the support head (12) and the clamping groove.
4. The movable bridge pile foundation reinforcement cage positioning and manufacturing device according to claim 3, characterized in that an insert rod (9) penetrates through the positioning jig frame substructure (5) in a sliding manner relative to the two clamping grooves, an insertion hole matched with the size of the insert rod (9) is formed in the surface of the support head (12), a pull ring (11) is fixedly installed at a port of the insert rod (9), a spring (10) is sleeved on the surface of the insert rod (9), and two ends of the spring (10) are respectively and fixedly connected with the pull ring (11) and the positioning jig frame substructure (5).
5. The movable bridge pile foundation reinforcement cage positioning and manufacturing device according to claim 1, characterized in that the positioning jig frame upper structure (6) is a 90-degree right-angle circular arc, a circular hole is formed in the surface of the positioning jig frame upper structure (6), and a circular limiting structure (8) is rotatably connected to the inside of the circular hole.
6. The movable bridge pile foundation reinforcement cage positioning and manufacturing device according to claim 5, characterized in that the circular limiting structure (8) penetrates through a circular hole of the positioning jig frame upper structure (6) in a C shape.
CN202220845647.4U 2022-04-13 2022-04-13 Portable bridge pile foundation steel reinforcement cage location making devices Active CN217267592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220845647.4U CN217267592U (en) 2022-04-13 2022-04-13 Portable bridge pile foundation steel reinforcement cage location making devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220845647.4U CN217267592U (en) 2022-04-13 2022-04-13 Portable bridge pile foundation steel reinforcement cage location making devices

Publications (1)

Publication Number Publication Date
CN217267592U true CN217267592U (en) 2022-08-23

Family

ID=82873513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220845647.4U Active CN217267592U (en) 2022-04-13 2022-04-13 Portable bridge pile foundation steel reinforcement cage location making devices

Country Status (1)

Country Link
CN (1) CN217267592U (en)

Similar Documents

Publication Publication Date Title
CN217267592U (en) Portable bridge pile foundation steel reinforcement cage location making devices
CN213359377U (en) Building templates support frame
CN215443111U (en) Strenghthened type building bamboo wood template for beam column
CN214329911U (en) Civil engineering fundamental mode mounting fixture
CN112160612B (en) Groove type embedded part installation elastic tool and construction method thereof
CN212583264U (en) Support device and building frame with same
CN210768144U (en) Civil engineering encloses fender connecting device
CN210888975U (en) Positioning device for welding I-steel and steel backing plate of supporting steel arch frame
CN210887997U (en) Building scaffold with adjustable height
CN209407297U (en) Reinforcing bar mobile hydraulic binding clamping fixture
CN218029169U (en) Square column reinforcement convenient to installation
CN218509172U (en) Electric power tower convenient to personnel install fast
CN219561247U (en) Movable positioning jig frame for manufacturing large building foundation pile reinforcement cage
CN207419521U (en) Integral movable type rack template in underground pipe gallery construction
CN213648163U (en) Auxiliary pipe cutting device for large-diameter reinforced concrete pipe
CN220719292U (en) Spliced pile foundation reinforcement cage storage rack
CN215631666U (en) Anti-tilting device for building construction template
CN110756945A (en) Prefabricated post reinforcing bar frame welding set
CN214462771U (en) High-efficient assembled building element
CN218715074U (en) Steel structure support for building
CN111691592B (en) High-limit formwork fixing device for multi-ribbed formwork and installation method
CN219344017U (en) Template support frame
CN221236393U (en) Auxiliary equipment for reinforcing building construction
CN220285334U (en) Template supporting structure for building engineering construction
CN220226228U (en) Concrete placement structure for engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant