CN207419521U - Integral movable support template in underground comprehensive pipe gallery construction - Google Patents
Integral movable support template in underground comprehensive pipe gallery construction Download PDFInfo
- Publication number
- CN207419521U CN207419521U CN201721209169.3U CN201721209169U CN207419521U CN 207419521 U CN207419521 U CN 207419521U CN 201721209169 U CN201721209169 U CN 201721209169U CN 207419521 U CN207419521 U CN 207419521U
- Authority
- CN
- China
- Prior art keywords
- mould bases
- steel
- interior wall
- secondary beam
- honeycomb steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims description 82
- 239000010959 steel Substances 0.000 claims description 82
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 239000000969 carrier Substances 0.000 abstract 1
- 238000009415 formwork Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 238000000465 moulding Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses an integral moving formula support template in utility tunnel construction underground is including inboard die carrier and outside die carrier, and inboard die carrier is formed by roof die carrier, two sets of interior wall die carriers and the concatenation of inboard support. The inner side die carrier is hung into the pit after the field and outside assembly is finished, so that the complex formwork support erection operation is avoided, the inner side die carrier and the outer side die carrier are moved and positioned through the walking frame, and then the subsequent die assembly and reinforcement are carried out, the construction period is shortened, and the construction cost is reduced; the utility model discloses an inboard die carrier supports and consolidates through the inboard support, has guaranteed the overall stability of inboard die carrier structure.
Description
Technical field
The utility model is related to underground pipe gallery construction fields, are specifically a kind of be applied in underground pipe gallery construction
Integral movable type rack template.
Background technology
With the development of economy, the expansion of city size and the continuous improvement of up-to-dateness, Urban Buried Pipeline Network are also got over
Come huger, intensive, species is also more and more various.Compared with the fast development of Urban Buried Pipeline Network, to City Buried Pipeline
Management but seem hysteresis, do not adapt to the increased requirement of pipe network business, and largely constrain city hair
Exhibition.More ground such as Guangxi, Shandong, Sichuan start underground pipe gallery construction project at present, and China's underground pipe gallery construction, which has been stepped into, to be added
The fast phase.
At present, in underground pipe gallery is built, main structure construction is mostly carried out using the lumps of wood, template cooperation steel pipe support system
Construction, and common templates rack construction process is various, the assembling and disassembling time is long, and steel pipe support hiring cost is higher, plank sheathing week
Its construction quality is difficult to ensure that after turning repeatedly.
Utility model content
The technical problem to be solved by the present invention is to provide the whole shiftings in a kind of construction applied to underground pipe gallery
Dynamic formula rack template can quickly and easily carry out Pipe rack construction operation, to shorten the construction period and cost-effective.
The technical solution of the utility model is:
A kind of integral movable type rack template in construction applied to underground pipe gallery, includes inside mould bases and outside
Mould bases, the inside mould bases include top plate mould bases, two groups of interior wall mould bases and medial cradle;
The medial cradle include the more montants being vertically arranged, more it is horizontally disposed and be connected to adjacent montant it
Between cross bar, be connected to montant bottom inside walker and multigroup side stay adjuster;Two groups of interior wall mould bases include
Have the interior wall being vertically arranged waterproof clamping plate, more be connected on interior wall waterproof clamping plate inner face and be arranged in parallel from top to bottom interior
Wall steel secondary beam and more interior wall honeycomb steel being fixedly connected on the inside of interior wall steel secondary beam and with interior wall steel secondary beam are arranged at, more
Interior wall honeycomb steel is vertically arranged and is mutually perpendicular to interior wall steel secondary beam, the interior wall waterproof clamping plate inner end of described two groups of interior wall mould bases
Face is oppositely arranged;The top plate mould bases include horizontally disposed top waterproof clamping plate, more be connected to top waterproof clamping plate
The top steel secondary beam that is arranged in parallel on lower face and from left to right and be arranged at below the steel secondary beam of top and with top steel secondary beam
More horizontal honeycomb steel being fixedly connected, more horizontal honeycomb steel are horizontally disposed with and are mutually perpendicular to more top steel secondary beams;Institute
The top for the medial cradle montant stated is fixedly connected with corresponding horizontal honeycomb steel;Every group of side stay adjuster is worn there are one including
Excessive root montant and the horizontal brace rod being fixedly connected with more montants and two external thread rods, the both ends of horizontal brace rod are set
There is internal thread hole, the outer end of two external thread rods is respectively fixedly connected on the interior wall honeycomb steel of two groups of interior wall mould bases, and two outer
The inner end of threaded rod is screwed together respectively with the both ends of horizontal brace rod;
The outside mould bases include the external wall waterproof clamping plate being vertically arranged, more be connected to external wall waterproof clamping plate outer end
The exterior wall steel secondary beam that is arranged in parallel on face and from top to bottom is arranged on the outside of exterior wall steel secondary beam and is fixedly connected with exterior wall steel secondary beam
More exterior wall honeycomb steel and be connected to the outside walker of exterior wall honeycomb steel bottom, the more exterior wall honeycomb steel erect
It is straight to set and be mutually perpendicular to more exterior wall steel secondary beams.
The interior wall honeycomb steel of two groups of interior wall mould bases is two;The horizontal honeycomb steel of the top plate mould bases is
Two;The exterior wall honeycomb steel of the outside mould bases is two.
The medial cradle further includes the more bracing pieces for being obliquely installed and being connected between adjacent montant.
More montant tops of the medial cradle are both provided with jacking, and each jacking and corresponding horizontal honeycomb steel are equal
It is attached by two C-type clamps and I-beam, one of C-type clamp carries out the upper horizontal part of horizontal honeycomb steel and I-beam
It is fixedly connected, the lower horizontal part of jacking and I-beam is fixedly connected by another C-type clamp.
The inside walker includes supporting frame, is slidably connected to positioning sleeve moving up and down on supporting frame
The traveling wheel of supporting frame bottom is managed and is connected to, the bottom of the montant is set in locating sleeve and connects with locating sleeve
It connects.
Multiple external mold reinforcing devices are connected on the outside of the exterior wall honeycomb steel, each external mold reinforcing device includes mutually
The inner sleeve and outer tube of socket, the inner end of inner sleeve are fixed on exterior wall honeycomb steel, and the outer end of inner sleeve is set in housing
The inner ring of pipe inner end is simultaneously fixedly connected.
Top of the both ends of the top plate mould bases respectively with corresponding interior wall mould bases is attached by corner connector.
The advantages of the utility model:
Lift into hole after the completion of the inside mould bases of the utility model is assembled outside the venue, avoid cumbersome falsework
Operation is set up, and inside mould bases and outside mould bases carry out running fix by walker, then carry out subsequent molding and add
Gu shortening the duration, construction cost is reduced;The inside mould bases of the utility model is supported and is reinforced by medial cradle,
It ensure that the overall stability of inside die carrier structure;The erection of the utility model outer side mold is equipped with external mold reinforcing device, ensure that outside
The stability of mould bases fixed structure.
Description of the drawings
Fig. 1 is the structure diagram of mould bases on the inside of the utility model.
Fig. 2 is the structure diagram of the utility model interior wall mould bases inner face.
Fig. 3 is the A portions enlarged drawing in Fig. 1.
Fig. 4 is the B portions enlarged drawing in Fig. 1.
Fig. 5 is the C portions enlarged drawing in Fig. 1.
Fig. 6 is the structure diagram of mould bases on the outside of the utility model.
Fig. 7 is the D portions enlarged drawing in Fig. 6.
Fig. 8 is the E portions enlarged drawing in Fig. 6.
Fig. 9 is the structure diagram of walker on the inside of the utility model.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
See Fig. 1-Fig. 9, the integral movable type rack template in a kind of construction applied to underground pipe gallery includes inside
Mould bases and outside mould bases, inside mould bases include top plate mould bases, two groups of interior wall mould bases and medial cradle, the both ends point of top plate mould bases
Top not with corresponding interior wall mould bases is attached by corner connector 21;
Medial cradle include the more montants being vertically arranged 1, more it is horizontally disposed and be connected between adjacent montant 1
Cross bar 2, the more bracing pieces 3 for being obliquely installed and being connected between adjacent montant 1, the inside walker for being connected to 1 bottom of montant
4th, the jacking 5 on every 1 top of montant and multigroup side stay adjuster are arranged at;
Two groups of interior wall mould bases include the interior wall waterproof clamping plate 6 being vertically arranged, more be connected in interior wall waterproof clamping plate 6
The interior wall steel secondary beam 7 that is arranged in parallel on end face and from top to bottom and be arranged at 7 inside of interior wall steel secondary beam and with interior wall steel secondary beam
7 two interior wall honeycomb steel 8 being fixedly connected, two interior wall honeycomb steel 8 are vertically arranged and are mutually perpendicular to interior wall steel secondary beam 7, two
6 inner face of interior wall waterproof clamping plate of group interior wall mould bases is oppositely arranged;
Top plate mould bases include horizontally disposed top waterproof clamping plate 9, more be connected on 9 lower face of top waterproof clamping plate
And the top steel secondary beam 10 that is from left to right arranged in parallel and it is arranged at 10 lower section of top steel secondary beam and solid with top steel secondary beam 10
Surely the two horizontal honeycomb steel 11 connected, two horizontal honeycomb steel 11 are horizontally disposed and mutually hang down with more top steel secondary beams 10
Directly, each jacking 5 of medial cradle and corresponding horizontal honeycomb steel 11 are connected by two C-type clamps 12 and I-beam 13
It connects, the upper horizontal part of horizontal honeycomb steel 11 and I-beam 13 is fixedly connected by one of C-type clamp 12, another C-type clamp
12 are fixedly connected jacking 5 and the lower horizontal part of I-beam 13;
Every group of side stay adjuster is included there are one the level for passing through more montants 1 and being fixedly connected with more montants 1 even
Extension bar 14 and two external thread rods 15, horizontal brace rod 14 are provided at both ends with internal thread hole, the outer end of two external thread rods 15
Be respectively fixedly connected on the interior wall honeycomb steel 8 of two groups of interior wall mould bases, the inner ends of two external thread rods 15 respectively with horizontal connection
The both ends of bar 14 are screwed together;
Outside mould bases include the external wall waterproof clamping plate 16 being vertically arranged, more be connected to 16 outer end face of external wall waterproof clamping plate
It is upper and be arranged in parallel from top to bottom exterior wall steel secondary beam 17, be arranged at 17 outside of exterior wall steel secondary beam and fixed with exterior wall steel secondary beam 17
Two exterior wall honeycomb steel 18 of connection are connected to the outside walker 19 of 18 bottom of exterior wall honeycomb steel and are connected to exterior wall honeycomb steel
Multiple external mold reinforcing devices 20 in 18 outsides, two exterior wall honeycomb steel 18 are vertically arranged and mutually hang down with more exterior wall steel secondary beams 17
Directly, each external mold reinforcing device 20 includes the inner sleeve 201 being mutually socketed and outer tube 202, and the inner end of inner sleeve 201 is fixed
In on exterior wall honeycomb steel 18, the outer end of inner sleeve 201 is set in the inner ring of 202 inner end of outer tube and is fixedly connected.
Wherein, inside walker 4 include supporting frame 41, be slidably connected to it is moving up and down fixed on supporting frame 41
Position casing 42 and the traveling wheel 43 for being connected to 41 bottom of supporting frame, the bottom of montant 1 are set in locating sleeve 42 and with determining
Position casing 42 connects, when locating sleeve 42 moves up and down, so as to which the top plate mould bases on medial cradle top be driven to carry out rising-falling tone
Section.
A kind of construction method of integral movable type rack template, has specifically included following steps:
(1), assembled good medial cradle is lifted into foundation pit, and pass through inside walker 4 to be moved to piping lane corresponding
Position;
(2), adjust the height of inside walker locating sleeve 42, the top plate mould bases on medial cradle top is made to reach corresponding
Highly;
(3), adjust the position of corner connector 21, extend out two groups of interior wall mould bases to being sized, then adjust interior wall mould bases
Verticality, after interior wall mould bases is made to be placed in corresponding position, finally by two outer spiral shells on horizontal brace rod 14 and interior wall mould bases
Rasp bar 15 is screwed together, and completes the reinforcing of interior wall mould bases;
(4), by step(1)-(3)It continuously installs successively and adjusts the interior wall mould bases of each unit, complete the conjunction of interior wall mould bases
Mould is with reinforcing;
(5), lifting outside mould bases on the guide rail 23 pre-set, outside walker 19 is moved along corresponding guide rail 22
Outside mould bases is moved to corresponding position.
(6), using external mold reinforcing device 20 adjust outside mould bases, make outside mould bases adjust to corresponding position keep it is vertical and add
It fastens real;
(7), the outside mould bases continuously installing successively and adjust each unit, complete the molding and reinforcing of outside mould bases;
(8), in rack template casting concrete, after treating that concreting is completed and conserves detachable intensity,
Start to remove outside mould bases, unclamp external mold reinforcing device 20 first, outside mould bases is moved to next segment along guide rail 22, complete
The movement of outside mould bases.
(9), horizontal brace rod 14 removed, and adjust the position of corner connector 21, inside contract interior wall mould bases, and adjust
The height of inside walker locating sleeve 42 lowers the top plate mould bases height on medial cradle top, completes two groups of interior wall mould bases
With inside contracting for top plate mould bases.
(10), inside walker 4 move inside mould bases to next segment along corresponding guide rail 22, completion interior wall mould bases
It is mobile.
(11), repeat the above steps(1)-(10)Complete the construction of underground pipe gallery agent structure.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of integral movable type rack template in construction applied to underground pipe gallery, it is characterised in that:Include inside
Mould bases and outside mould bases, the inside mould bases include top plate mould bases, two groups of interior wall mould bases and medial cradle;
The medial cradle include the more montants being vertically arranged, more it is horizontally disposed and be connected between adjacent montant
Cross bar, the inside walker for being connected to montant bottom and multigroup side stay adjuster;Two groups of interior wall mould bases include perpendicular
The interior wall waterproof clamping plate that directly sets, more be connected to the interior wall steel being arranged in parallel on interior wall waterproof clamping plate inner face and from top to bottom
Secondary beam and it is arranged at more interior wall honeycomb steel being fixedly connected on the inside of interior wall steel secondary beam and with interior wall steel secondary beam, more interior walls
Honeycomb steel is vertically arranged and is mutually perpendicular to interior wall steel secondary beam, the interior wall waterproof clamping plate inner face phase of described two groups of interior wall mould bases
To setting;The top plate mould bases include horizontally disposed top waterproof clamping plate, more be connected to top waterproof clamping plate lower end
It the top steel secondary beam that is arranged in parallel on face and from left to right and is arranged at below the steel secondary beam of top and is fixed with top steel secondary beam
The horizontal honeycomb steel of more of connection, more horizontal honeycomb steel are horizontally disposed with and are mutually perpendicular to more top steel secondary beams;Described
The top of medial cradle montant is fixedly connected with corresponding horizontal honeycomb steel;Every group of side stay adjuster includes more there are one passing through
Root montant and the horizontal brace rod being fixedly connected with more montants and two external thread rods, being provided at both ends with for horizontal brace rod are interior
Threaded hole, the outer ends of two external thread rods are respectively fixedly connected on the interior wall honeycomb steel of two groups of interior wall mould bases, two external screw threads
The inner end of bar is screwed together respectively with the both ends of horizontal brace rod;
The outside mould bases include the external wall waterproof clamping plate being vertically arranged, more be connected on external wall waterproof clamping plate outer end face
And be arranged in parallel from top to bottom exterior wall steel secondary beam, be arranged on the outside of exterior wall steel secondary beam and be fixedly connected with exterior wall steel secondary beam more
Root exterior wall honeycomb steel and the outside walker for being connected to exterior wall honeycomb steel bottom, the more exterior wall honeycomb steel are set vertically
It puts and is mutually perpendicular to more exterior wall steel secondary beams.
2. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 1,
It is characterized in that:The interior wall honeycomb steel of two groups of interior wall mould bases is two;The horizontal honeycomb steel of the top plate mould bases is equal
For two;The exterior wall honeycomb steel of the outside mould bases is two.
3. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 1,
It is characterized in that:The medial cradle further includes the more bracing pieces for being obliquely installed and being connected between adjacent montant.
4. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 1,
It is characterized in that:More montant tops of the medial cradle are both provided with jacking, each jacking and corresponding horizontal honeycomb steel
Be attached by two C-type clamps and I-beam, one of C-type clamp by the upper horizontal part of horizontal honeycomb steel and I-beam into
Row is fixedly connected, and the lower horizontal part of jacking and I-beam is fixedly connected by another C-type clamp.
5. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 1,
It is characterized in that:The inside walker includes supporting frame, is slidably connected to positioning moving up and down on supporting frame
Casing and the traveling wheel for being connected to supporting frame bottom, the bottom of the montant is set in locating sleeve and and locating sleeve
Connection.
6. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 5,
It is characterized in that:Multiple external mold reinforcing devices are connected on the outside of the exterior wall honeycomb steel, each external mold reinforcing device includes phase
The inner sleeve and outer tube being mutually socketed, the inner end of inner sleeve are fixed on exterior wall honeycomb steel, and the outer end of inner sleeve is set in outside
The inner ring of casing inner end is simultaneously fixedly connected.
7. the integral movable type rack template in a kind of construction applied to underground pipe gallery according to claim 6,
It is characterized in that:Top of the both ends of the top plate mould bases respectively with corresponding interior wall mould bases is attached by corner connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721209169.3U CN207419521U (en) | 2017-09-20 | 2017-09-20 | Integral movable support template in underground comprehensive pipe gallery construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721209169.3U CN207419521U (en) | 2017-09-20 | 2017-09-20 | Integral movable support template in underground comprehensive pipe gallery construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207419521U true CN207419521U (en) | 2018-05-29 |
Family
ID=62313675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721209169.3U Active CN207419521U (en) | 2017-09-20 | 2017-09-20 | Integral movable support template in underground comprehensive pipe gallery construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207419521U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107460889A (en) * | 2017-09-20 | 2017-12-12 | 中铁四局集团有限公司 | Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof |
-
2017
- 2017-09-20 CN CN201721209169.3U patent/CN207419521U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107460889A (en) * | 2017-09-20 | 2017-12-12 | 中铁四局集团有限公司 | Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107460889A (en) | Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof | |
CN207143755U (en) | A kind of adjustable bracket for No. 0 block of bridge pier | |
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN203961285U (en) | Concrete cylindrical regularization forming panel | |
CN104088461B (en) | Y type cast-in-situ concrete columns template system and construction method thereof | |
CN203961284U (en) | A kind of concrete cylindrical regularization constructing structure | |
CN105220626A (en) | Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled | |
CN114481874B (en) | Prefabricated door type frame assembled box culvert and construction method | |
BR102015027603A2 (en) | Method for installing a hollow concrete tower made of more than one segment and hollow concrete tower | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN103255866B (en) | Roof circular arc-shaped dome structure and manufacturing method | |
CN205100119U (en) | Steel form device in self -propelled | |
CN207419521U (en) | Integral movable support template in underground comprehensive pipe gallery construction | |
CN208293613U (en) | A kind of city integrated piping lane Quick Release die set device of running type | |
CN108972842A (en) | A kind of rollover hot-die platform system and its application method | |
CN110748156B (en) | Sliding positioning top supporting structure of large silo and construction method thereof | |
CN104500106A (en) | Tunnel inverted arch construction die carrier and tunnel inverted arch construction process | |
CN204687050U (en) | A kind of mould of precast concrete rectangular beam | |
CN105019657A (en) | Building construction system | |
CN202185966U (en) | Novel hydraulic internal mold for U-shaped beam | |
CN213836746U (en) | Large-section multi-cabin cast-in-place comprehensive pipe gallery top plate formwork construction system | |
CN115233562A (en) | Formwork supporting system for pouring of highway bridge engineering cover beam and construction method | |
CN205521875U (en) | Whole shaping die carrier of case breast web reinforcing bar | |
CN206607606U (en) | A kind of combined type piping lane moving lifting support day face die plate | |
CN112376612A (en) | Large-section multi-cabin cast-in-place comprehensive pipe gallery top plate formwork construction system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023 Co-patentee after: THE FIRST ENGINEERING CO., LTD. OF CTCE Group Patentee after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd. Address before: 230023 technical center of China Railway four Bureau, No. 96 Wangjiang East Road, Anhui, 618, Hefei Co-patentee before: THE FIRST ENGINEERING CO., LTD. OF CTCE Group Patentee before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd. |