CN217232517U - Stone dry-hanging connecting component - Google Patents

Stone dry-hanging connecting component Download PDF

Info

Publication number
CN217232517U
CN217232517U CN202220409009.8U CN202220409009U CN217232517U CN 217232517 U CN217232517 U CN 217232517U CN 202220409009 U CN202220409009 U CN 202220409009U CN 217232517 U CN217232517 U CN 217232517U
Authority
CN
China
Prior art keywords
stone
ear
adjusting screw
keel
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220409009.8U
Other languages
Chinese (zh)
Inventor
张策
常付帅
张�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Xian Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Xian Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Xian Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN202220409009.8U priority Critical patent/CN217232517U/en
Application granted granted Critical
Publication of CN217232517U publication Critical patent/CN217232517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a stone material hangs connecting elements futilely, including main joist, secondary joist, stone material, adjusting screw one, aluminium angle sign indicating number, backing plate, percussive back of the body bolt, ear type pendant and adjusting screw two. The beneficial effects of the utility model are that: the bottom horizontal end of the aluminum corner brace is provided with a strip-shaped through groove for passing through an adjusting screw I, so that the mounting position of the aluminum corner brace can be adjusted, and the verticality of the hung stone can be adjusted; the upper end of the ear-shaped hanging piece is clamped at the upper end of the aluminum corner brace in a U-shaped clamping groove shape, a threaded hole is formed in the ear-shaped hanging piece and penetrates through the adjusting screw II, after the ear-shaped hanging piece is hung on the aluminum corner brace, the adjusting screw II is rotated to adjust the distance between the ear-shaped hanging piece and the aluminum corner brace, and then the hung stone can be horizontally adjusted; the manufacturing process is simple, the field installation is simple and convenient, the safety and the stability are realized, the forming quality effect of the dry-hanging stone is good, the construction efficiency is high, and the purpose of controlling the quality safety of the stone structure is achieved.

Description

Stone dry-hanging connecting component
Technical Field
The utility model relates to a stone material connecting elements specifically is a stone material hangs connecting elements futilely, belongs to construction technical field.
Background
In the building construction, the forming quality and stability of the dry-hanging stone during the decoration construction become the stubborn quality of the engineering entity, and with the continuous improvement of the technology and the further requirement on the construction efficiency, the materials used in the construction process in the building industry are gradually changed from the traditional grouting and pasting method to the current stone dry-hanging method construction and the like.
The volume of the stone is also greatly larger than that of the prior art, but for the construction of larger stones, the construction by using the traditional grouting and pasting method is slow and difficult to operate, the bearing force of the corner brace is limited during the construction by using the ordinary stone dry-hanging method, the safety of the corner brace is not favorable, and the construction efficiency of workers is limited to a certain extent during the construction of larger stones.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a stone material is hung connecting elements futilely for the solution problem, under the prerequisite of guaranteeing firmly, stable, reach the purpose of quality of assurance, save time.
The utility model discloses a following technical scheme realizes above-mentioned purpose: a stone dry-hanging connecting component comprises
The keel assembly forms a supporting structure of the connecting component and comprises a main keel vertically arranged and a secondary keel connected to the side surface of the main keel;
the stone is vertically arranged and connected to the outer side face of the keel assembly;
coupling assembling, its connection be in between stone material and the fossil fragments subassembly, and its include with secondary joist fixed connection's aluminium angle sign indicating number, with stone material dorsal surface fixed connection's ear type pendant, just carry out fixed connection through adjusting screw two between aluminium angle sign indicating number and the ear type pendant.
As a further aspect of the present invention: the main joist and the secondary joist are galvanized angle steels and are L-shaped, and the vertical ends of the secondary joist are welded and fixed with the main joist.
As a further aspect of the present invention: the back side surface of the stone is fixedly connected with the vertical surface of the ear-shaped hanging piece through the knocking type back bolt.
As a further aspect of the present invention: the bottom horizontal end of aluminium angle sign indicating number with be the L form the laminating of secondary joist's horizontal end links together, the bottom horizontal end upper surface of aluminium angle sign indicating number has laid the backing plate, and passes the backing plate through two adjusting screw one and carries out fixed connection to the junction.
As the utility model discloses further scheme again: the bottom horizontal end of the aluminum corner connector is provided with a strip-shaped through groove used for penetrating through the first adjusting screw, and the lower plate of the base plate is in a sawtooth shape.
As a further aspect of the present invention: the upper end of the ear-shaped hanging piece is in a U-shaped clamping groove shape and is clamped at the upper end of the aluminum corner connector, and a threaded hole is formed in the ear-shaped hanging piece and penetrates through the second adjusting screw in a threaded mode.
The utility model has the advantages that:
1. the bottom horizontal end of the aluminum corner connector is provided with a strip-shaped through groove for passing through an adjusting screw I, the lower plate of the backing plate is in a sawtooth shape, the mounting position of the aluminum corner connector can be adjusted when the aluminum corner connector is mounted, so that the verticality of the hung stone can be adjusted, and after the adjusting screw I is fastened, the backing plate and the aluminum corner connector are meshed together in a concave-convex position, so that the mounting position is prevented from shaking;
2. the upper end of the ear-shaped hanging piece is clamped at the upper end of the aluminum corner brace in a U-shaped clamping groove shape, a threaded hole is formed in the ear-shaped hanging piece and penetrates through the adjusting screw II, after the ear-shaped hanging piece is hung on the aluminum corner brace, the adjusting screw II is rotated to adjust the distance between the ear-shaped hanging piece and the aluminum corner brace, and then the hung stone can be horizontally adjusted;
3. the device improves the labor conditions of constructors to a certain extent, reduces the labor intensity, accelerates the project progress, greatly improves the safety, and has important research significance and application value for improving the decoration efficiency and the safety.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the connection assembly of the present invention;
fig. 3 is a schematic view of the aluminum corner connector of the present invention.
In the figure: 1. the main joist, 2, the secondary joist, 3, the stone material, 4, adjusting screw one, 5, aluminium angle sign indicating number, 6, backing plate, 7, knock type back of the body bolt, 8, ear type pendant, 9, adjusting screw two.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to FIGS. 1 to 3, a stone dry-hanging connecting member comprises
The keel assembly forms a supporting structure of the connecting member and comprises a main keel 1 arranged vertically and a secondary keel 2 connected to the side surface of the main keel 1;
the stone 3 is vertically arranged and connected to the outer side face of the keel assembly;
coupling assembling, its connection be in between stone material 3 and the fossil fragments subassembly, and its include with 2 fixed connection's of secondary joist aluminium angle sign indicating number 5, with 3 dorsal surface fixed connection's of stone material ear type pendant 8, just carry out fixed connection through adjusting screw two 9 between aluminium angle sign indicating number 5 and the ear type pendant 8.
The embodiment of the utility model provides an in, main joist 1 is the galvanized angle steel with secondary joist 2, and is the L form the vertical end of secondary joist 2 is in the same place with 1 welded fastening of main joist, ensures the support intensity of fossil fragments subassembly, is difficult for taking place deformation after hanging stone material 3.
The embodiment of the utility model provides an in, the dorsal aspect of stone material 3 carries out fixed connection through the vertical face of knocking type back of the body bolt 7 with ear type pendant 8, can ensure that the fastness of junction is difficult not hard up, the construction operation of also being convenient for simultaneously.
The embodiment of the utility model provides an in, the bottom horizontal end of aluminium angle sign indicating number 5 with be the L form the laminating of the horizontal end of secondary joist 2 is in the same place, backing plate 6 has been laid to the bottom horizontal end upper surface of aluminium angle sign indicating number 5, and passes backing plate 6 through two adjusting screw one 4 and carry out fixed connection, improve the fastness of junction to the junction.
Example two
Referring to FIGS. 1 to 3, a stone dry-hanging connecting member comprises
The keel assembly forms a supporting structure of the connecting member and comprises a main keel 1 arranged vertically and a secondary keel 2 connected to the side surface of the main keel 1;
the stone 3 is vertically arranged and connected to the outer side face of the keel assembly;
coupling assembling, its connection be in between stone material 3 and the fossil fragments subassembly, and its include with 2 fixed connection's of secondary joist aluminium angle sign indicating number 5, with 3 dorsal aspect fixed connection's of stone material ear type pendant 8, just carry out fixed connection through adjusting screw two 9 between aluminium angle sign indicating number 5 and the ear type pendant 8.
The embodiment of the utility model provides an in, the rectangular form that is used for passing adjusting screw 4 is seted up to aluminium angle sign indicating number 5's bottom horizontal end leads to the groove, just the cockscomb structure is personally submitted to the hypoplastron of backing plate 6, can adjust aluminium angle sign indicating number 5's mounted position when the installation to hang stone material 3's straightness that hangs down and adjust, and after fastening adjusting screw 4, make backing plate 6 be unsmooth interlock together with aluminium angle sign indicating number 5, prevent rocking of mounted position.
The embodiment of the utility model provides an in, the upper end of ear type pendant 8 is U type draw-in groove form card and puts in the upper end of aluminium angle sign indicating number 5, just set up the screw hole that screw thread passed two 9 on the ear type pendant 8, can be with ear type pendant 8 hang back on aluminium angle sign indicating number 5, through rotating the interval between two 9 with regulation ear type pendant 8 and aluminium angle sign indicating number 5 of adjusting screw, and then can carry out the level (l) ing to the stone material 3 of hanging.
The working principle is as follows: firstly, the back bolt hanging piece is installed on the stone, the aluminum corner connector is installed on the secondary keel, the back bolt hanging piece and the aluminum corner connector are installed in a combined mode, and the verticality and the levelness of the stone are controlled through adjusting and adjusting screws.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (6)

1. The utility model provides a stone material hangs connecting elements futilely which characterized in that: comprises that
The keel assembly forms a supporting structure of the connecting component and comprises a main keel (1) which is vertically arranged and a secondary keel (2) which is connected to the side surface of the main keel (1);
the stone (3) is vertically arranged and connected to the outer side surface of the keel component;
coupling assembling, its connect between stone material (3) and the fossil fragments subassembly, and its include with secondary joist (2) fixed connection's aluminium angle sign indicating number (5), with stone material (3) dorsal surface fixed connection's ear type pendant (8), just carry out fixed connection through adjusting screw two (9) between aluminium angle sign indicating number (5) and ear type pendant (8).
2. The stone dry-hang connecting component as claimed in claim 1, wherein: the main keel (1) and the secondary keel (2) are galvanized angle steel and are L-shaped, and the vertical end of the secondary keel (2) is welded and fixed with the main keel (1).
3. The stone dry-hang connecting component as claimed in claim 1, wherein: the back side surface of the stone (3) is fixedly connected with the vertical surface of the ear-shaped hanging piece (8) through the knocking type back bolt (7).
4. The stone dry-hang connecting component as claimed in claim 1, wherein: the bottom horizontal end of aluminium angle sign indicating number (5) with be the L form the laminating of the horizontal end of secondary joist (2) is linked together, backing plate (6) have been laid to the bottom horizontal end upper surface of aluminium angle sign indicating number (5), and pass backing plate (6) through two adjusting screw one (4) and carry out fixed connection to the junction.
5. The stone dry-hang connecting component as claimed in claim 4, wherein: the bottom horizontal end of the aluminum corner connector (5) is provided with a strip-shaped through groove used for penetrating through the adjusting screw I (4), and the lower plate of the base plate (6) is in a sawtooth shape.
6. The stone dry-hang connecting component as claimed in claim 1, wherein: the upper end of the ear-shaped hanging piece (8) is in a U-shaped clamping groove shape and is clamped at the upper end of the aluminum corner connector (5), and a threaded hole with a thread penetrating through the second adjusting screw (9) is formed in the ear-shaped hanging piece (8).
CN202220409009.8U 2022-02-28 2022-02-28 Stone dry-hanging connecting component Active CN217232517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220409009.8U CN217232517U (en) 2022-02-28 2022-02-28 Stone dry-hanging connecting component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220409009.8U CN217232517U (en) 2022-02-28 2022-02-28 Stone dry-hanging connecting component

Publications (1)

Publication Number Publication Date
CN217232517U true CN217232517U (en) 2022-08-19

Family

ID=82835375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220409009.8U Active CN217232517U (en) 2022-02-28 2022-02-28 Stone dry-hanging connecting component

Country Status (1)

Country Link
CN (1) CN217232517U (en)

Similar Documents

Publication Publication Date Title
CN211974027U (en) Adaptor convenient to GRG jib is adjusted location
CN217232517U (en) Stone dry-hanging connecting component
CN208072731U (en) A kind of building curtain wall
CN212318381U (en) Special connecting and fixing frame for large industrial ceiling fan
CN212034040U (en) Roof single bolt mounting fixture structure of photovoltaic support
CN210201764U (en) A photovoltaic support for various steel tile roof back of body shady face
CN210917759U (en) Construction locking device for building steel structure
CN204089700U (en) A kind of solar panels supporting structure
CN207892173U (en) A kind of stull no-welding structure that stone material back of the body bolt is cladding
CN216587225U (en) Stone hanging device for curtain wall construction
CN218405948U (en) Connecting node for back bolt type curtain wall panel and cross beam
CN213979718U (en) Multi-curved-surface grindstone suspension structure
CN214884726U (en) Rear-mounted steel support of high-rise building curtain wall
CN214329534U (en) Fixing piece for light steel keel hanging rod piece
CN219710577U (en) Connection structure of economical assembled curtain wall
CN211572381U (en) Connecting piece convenient to stone material panel installation
CN215802504U (en) A connection structure for glass curtain wall
CN221193879U (en) Bearing device for building curtain wall engineering components
CN217924306U (en) Stone curtain wall hanging installation structure
CN214034831U (en) Hoisting structure of large glass rib
CN210563337U (en) Portable postposition embedded part capable of replacing hanging basket counterweight
CN211714286U (en) Building curtain wall convenient to installation and dismantlement
CN219386791U (en) Supporting structure of curtain wall
CN211775240U (en) Steel structure stair for assembly type building
CN214834324U (en) A anchor clamps that is used for hanging stone material roughness survey and regulate futilely

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant