CN217188591U - Heatstroke prevention dust removal watering device for construction - Google Patents

Heatstroke prevention dust removal watering device for construction Download PDF

Info

Publication number
CN217188591U
CN217188591U CN202220126423.8U CN202220126423U CN217188591U CN 217188591 U CN217188591 U CN 217188591U CN 202220126423 U CN202220126423 U CN 202220126423U CN 217188591 U CN217188591 U CN 217188591U
Authority
CN
China
Prior art keywords
cylinder
wall
communicating pipe
dust removal
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220126423.8U
Other languages
Chinese (zh)
Inventor
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220126423.8U priority Critical patent/CN217188591U/en
Application granted granted Critical
Publication of CN217188591U publication Critical patent/CN217188591U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model relates to a watering technical field especially relates to a heatstroke prevention dust removal watering device for construction. The technical scheme comprises the following steps: communicating pipe, shower nozzle and cylinder, the lower surface welding of cylinder has the ring flange, the activity is pegged graft on the ring flange has the installation nail, the lower extreme of shower nozzle is rotated and is installed and rotate the seat, it has a screw thread section of thick bamboo to rotate the welding on the seat, screw thread section of thick bamboo screw thread is installed at the upper end inner wall of cylinder, the bottom intermediate position department of shower nozzle is equipped with the fixing base, peg graft in the cylinder communicating pipe, the connector is installed to the one end of communicating pipe, the connector activity is pegged graft in the fixing base, be fixed with the chock on communicating pipe, the chock passes through the fastening bolt and fixes the inner wall bottom at the cylinder. The utility model discloses a cooperation between the structure is convenient for when installing, and the effectual diffusion that hinders the building site dust satisfies personnel's user demand.

Description

Heatstroke prevention dust removal watering device for construction
Technical Field
The utility model relates to a watering technical field especially relates to a heatstroke prevention dust removal watering device for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
Through retrieval, publication number CN214634963U discloses a construction watering dust collector, belongs to construction technical field. The technical scheme is as follows: the utility model provides a building construction watering dust collector, comprising a base plate, be in the department directly over the bottom plate, and through a plurality of connecting rods of perpendicular setting on the bottom plate top surface and bottom plate fixed connection's upper plate, the setting is on the bottom plate top surface, be in under the upper plate, and be equipped with the water tank of immersible pump in, the bottom sets up the telescopic regulation structure that department was used for vertical regulation at the top surface central point of upper plate, be located the regulation structure top, through revolution mechanic with adjust structure normal running fit's watering dish, the setting is at the water spray pipe of watering dish slant top to the top, and be used for connecting the water pipe of watering dish and immersible pump.
In the process of building construction, a large amount of dust is generated, the dust is scattered everywhere, the pollution to the surrounding environment is caused, and the use requirements of personnel can not be met.
Therefore, the heatstroke prevention dust removal water spraying device for building construction is provided to solve the existing problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a heatstroke prevention dust removal watering device for construction to the problem that exists among the background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a heatstroke prevention dust removal watering device for construction, includes communicating pipe, shower nozzle and cylinder, the lower surface welding of cylinder has the ring flange, the activity is pegged graft on the ring flange has the installation nail, the lower extreme of shower nozzle is rotated and is installed and rotate the seat, it has a screw thread section of thick bamboo to rotate the seat, screw thread section of thick bamboo screw thread is installed at the upper end inner wall of cylinder, the bottom intermediate position department of shower nozzle is equipped with the fixing base, peg graft in the cylinder communicating pipe, the connector is installed to the one end of communicating pipe, the connector activity is pegged graft in the fixing base, be fixed with the chock on communicating pipe, the chock passes through the fastening bolt and fixes the inner wall bottom at the cylinder.
Communicating pipe passes through the chock to be fixed in the post, then pass through the installation nail with the post and fix on building site enclosure all around, then rotate the rotation seat of shower nozzle below, make it rotate to rotate the seat and drive the screw thread section of thick bamboo, through the meshing effect between screw thread section of thick bamboo and the post upper end inside, make it move down to rotate the seat and drive the shower nozzle, the fixing base contact connector of shower nozzle bottom, along with rotating the continuous rotation of seat, drive the progressively extrusion connector of fixing base, fill in the fixing base completely until the connector, thereby accomplish the installation operation of shower nozzle, can establish ties a plurality of this structures around the guardrail of building site, through communicating pipe and external high pressure water pipe interconnect, rivers are from the shower nozzle atomizing blowout, thereby stop the dust that the building site produced and waft out construction range, can play the effect that reduces ambient temperature simultaneously in summer.
Preferably, the middle position of the outer wall of the rotating seat is welded with an annular edge, and the annular edge is glued with a rubber pad. Through the design of the annular edge, the friction force between the rotating seat and a human body is increased, so that the force application to the rotating seat is facilitated.
Preferably, the inner wall of the upper end of the column body is provided with a thread groove matched with the outer wall of the thread cylinder, and the outer wall of the thread cylinder is meshed with the thread groove. The position of the spray head is fixed by the action of the threaded engagement.
Preferably, the inner wall of the fixing seat is designed to be an inclined plane, and the outer conical surface of the connector is matched with the inner conical surface of the fixing seat. The design of the conical surface ensures the tightness of the connecting position of the two.
Preferably, the outer wall of connector is inlayed and is installed the sealing washer, the sealing washer is in close contact with the inner wall of fixing base. Through the design of sealing washer, ensure the installation leakproofness between fixing base, the connector.
Preferably, the number of the mounting nails is four, and the positions of the four mounting nails are distributed on the flange plate in a rectangular array. The device may be secured in place by mounting pegs.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the heatstroke prevention, dust removal and water sprinkling device for building construction is characterized in that a communicating pipe is fixed in a cylinder body through a plug block during use, then the cylinder body is fixed on a surrounding of a construction site through a mounting nail, a rotating seat below a spray head is rotated to drive a threaded cylinder to rotate, the rotating seat drives the spray head to move downwards through the meshing action between the threaded cylinder and the inner part of the upper end of the cylinder body, a fixed seat at the bottom end of the spray head is contacted with a connector, the fixed seat is driven to gradually extrude the connector along with the continuous rotation of the rotating seat until the connector is completely plugged in the fixed seat, thereby completing the installation operation of the spray head, a plurality of structures can be connected in series around a guardrail of the construction site, the water flow is atomized and sprayed out from the spray head through the communicating pipe, thereby preventing dust generated by the construction site from floating out of a construction range, and simultaneously playing a role of reducing the environmental temperature in summer, this use is novel, when being convenient for install, and the effectual diffusion that hinders the building site dust satisfies personnel's user demand.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is an enlarged schematic structural diagram of fig. 1 according to the present invention.
Reference numerals: 1. installing a nail; 2. fastening bolts; 3. a communicating pipe; 4. encircling; 5. a spray head; 6. a rotating seat; 7. a cylinder; 8. a chock block; 9. a flange plate; 10. a fixed seat; 11. a connector; 12. a seal ring; 13. a threaded barrel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "provided," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example one
As shown in fig. 1-3, the utility model provides a heatstroke prevention dust removal watering device for construction, including communicating pipe 3, shower nozzle 5 and cylinder 7, the lower surface welding of cylinder 7 has ring flange 9, the movable grafting has installation nail 1 on the ring flange 9, the lower extreme of shower nozzle 5 is rotated and is installed and rotate seat 6, it has threaded cylinder 13 to rotate the welding on the seat 6, threaded cylinder 13 screw thread is installed at the upper end inner wall of cylinder 7, the bottom intermediate position department of shower nozzle 5 is equipped with fixing base 10, 3 pegs graft in cylinder 7 communicating pipe, connector 11 is installed to the one end of communicating pipe 3, connector 11 activity is pegged graft in fixing base 10, be fixed with chock 8 on communicating pipe 3, chock 8 passes through fastening bolt 2 to be fixed in the inner wall bottom of cylinder 7.
The working principle based on the embodiment 1 is as follows: fix cylinder 7 on building site enclosure all around through installation nail 1, can establish ties a plurality of these structures around the guardrail on building site, through communicating pipe 3 and external high pressure water pipe interconnect, rivers are followed 5 atomizing blowout of shower nozzle to stop the dust that the building site produced and fly out construction scope.
Example two
As shown in fig. 1-3, the utility model provides a heatstroke prevention dust removal watering device for building construction compares in embodiment one, and this embodiment still includes: the middle position of the outer wall of the rotating seat 6 is welded with the annular edge 4, the annular edge 4 is glued with a rubber pad, and the friction force between the rotating seat 6 and a human body is increased through the design of the annular edge 4, so that the force application to the rotating seat 6 is facilitated.
The inner wall of the upper end of the column body 7 is provided with a thread groove matched with the outer wall of the thread cylinder 13, the outer wall of the thread cylinder 13 is meshed with the thread groove, and the position of the spray head 5 is fixed under the action of thread meshing.
The inner wall of fixing base 10 is the inclined plane design, the outer conical surface of connector 11 and the mutual adaptation of the interior conical surface of fixing base 10, and the sealing washer 12 is installed to the outer wall of connector 11 is inlayed, and sealing washer 12 and the inner wall in close contact with of fixing base 10, and the installation nail 1 totally is four, and the position of four installation nails 1 is the rectangular array and distributes on ring flange 9, through the design of sealing washer 12, ensures the installation leakproofness between fixing base 10, the connector 11.
The above embodiments are merely some preferred embodiments of the present invention, and those skilled in the art can make various alternative modifications and combinations to the above embodiments based on the technical solution of the present invention and the related teachings of the above embodiments.
The working principle is as follows: the utility model discloses in the use of heatstroke prevention dust removal watering device for construction, communicating pipe 3 passes through chock 8 to be fixed in cylinder 7, then cylinder 7 passes through installation nail 1 to be fixed on the enclosure around the building site, then rotate the rotation seat 6 below shower nozzle 5, make rotation seat 6 drive screw thread section of thick bamboo 13 and rotate, through the meshing effect between screw thread section of thick bamboo 13 and the inside of cylinder 7 upper end, make rotation seat 6 drive shower nozzle 5 and move down, fixing base 10 contact connector 11 of shower nozzle 5 bottom, with the continuous rotation of rotation seat 6, drive fixing base 10 and progressively extrude connector 11, until connector 11 is totally plugged in fixing base 10, thereby accomplish the installation operation of shower nozzle 5, can establish ties a plurality of this structure around the guardrail of building site, through communicating pipe 3 and external high-pressure water pipe interconnect, rivers are from shower nozzle 5 atomizing blowout, thereby block that the dust that the building site produced from drifting out the construction scope, meanwhile, the device can play a role in reducing the ambient temperature in summer.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a heatstroke prevention dust removal watering device for construction, includes communicating pipe (3), shower nozzle (5) and cylinder (7), its characterized in that: the lower surface welding of cylinder (7) has ring flange (9), the activity is pegged graft on ring flange (9) and is had installation nail (1), the lower extreme of shower nozzle (5) is rotated and is installed and rotate seat (6), it has screw thread section of thick bamboo (13) to rotate to go up welding on seat (6), the upper end inner wall at cylinder (7) is installed to screw thread section of thick bamboo (13) screw thread, the bottom intermediate position department of shower nozzle (5) is equipped with fixing base (10), peg graft in cylinder (7) communicating pipe (3), connector (11) are installed to the one end of communicating pipe (3), connector (11) activity is pegged graft in fixing base (10), be fixed with chock (8) on communicating pipe (3), chock (8) are fixed in the inner wall bottom of cylinder (7) through fastening bolt (2).
2. The heatstroke prevention, dust removal and water spray device for building construction according to claim 1, characterized in that: the middle position of the outer wall of the rotating seat (6) is welded with a ring edge (4), and a rubber pad is glued on the ring edge (4).
3. The heatstroke prevention, dust removal and water spray device for building construction according to claim 1, characterized in that: the inner wall of the upper end of the column body (7) is provided with a thread groove matched with the outer wall of the thread cylinder (13), and the outer wall of the thread cylinder (13) is meshed with the thread groove.
4. The heatstroke prevention, dust removal and water spray device for building construction according to claim 1, characterized in that: the inner wall of the fixed seat (10) is designed to be an inclined plane, and the outer conical surface of the connector (11) is matched with the inner conical surface of the fixed seat (10).
5. The heatstroke prevention, dust removal and water spray device for building construction according to claim 1, characterized in that: the outer wall of connector (11) is inlayed and is installed sealing washer (12), sealing washer (12) and the inner wall in close contact with of fixing base (10).
6. The heatstroke prevention, dust removal and water spray device for building construction according to claim 1, characterized in that: the number of the mounting nails (1) is four, and the positions of the four mounting nails (1) are distributed on the flange plate (9) in a rectangular array.
CN202220126423.8U 2022-01-18 2022-01-18 Heatstroke prevention dust removal watering device for construction Active CN217188591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220126423.8U CN217188591U (en) 2022-01-18 2022-01-18 Heatstroke prevention dust removal watering device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220126423.8U CN217188591U (en) 2022-01-18 2022-01-18 Heatstroke prevention dust removal watering device for construction

Publications (1)

Publication Number Publication Date
CN217188591U true CN217188591U (en) 2022-08-16

Family

ID=82792085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220126423.8U Active CN217188591U (en) 2022-01-18 2022-01-18 Heatstroke prevention dust removal watering device for construction

Country Status (1)

Country Link
CN (1) CN217188591U (en)

Similar Documents

Publication Publication Date Title
CN217188591U (en) Heatstroke prevention dust removal watering device for construction
CN110575724B (en) Dust fall system for construction
CN211025579U (en) Green construction intelligent spraying dust suppression system
CN214345262U (en) Dust device for construction
CN214883350U (en) Civil engineering is with on-spot dust collector
CN219754237U (en) Spray fence device for construction site
CN211948198U (en) Water spraying device for constructional engineering
CN216379776U (en) Water storage device for constructional engineering
CN111778859A (en) Bridge high mound watering health preserving device
CN218980911U (en) Building construction dust device
CN213825451U (en) Roof heatstroke prevention spray set for construction
CN216457771U (en) Dust collector that construction removed dust and used
CN215742589U (en) Spraying dust device for road and bridge construction
CN215506080U (en) Dust device is used in civil engineering construction
CN218741025U (en) Building engineering dust device
CN219836274U (en) Environment-friendly mechanical air dust removal environment-friendly device
CN219399465U (en) Environment-friendly dust removal device for building decoration
CN220635481U (en) Supervisory equipment fixer for building engineering
CN218459017U (en) Dust fall equipment is used in municipal administration public works construction
CN219241554U (en) Environment-friendly engineering construction fence
CN215138089U (en) Dust exhausting fan for construction engineering
CN217616284U (en) Building engineering environment monitoring device
CN220405171U (en) Dust fall device for building construction
CN219894126U (en) Spray irrigation device
CN214696900U (en) Wall watering device for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant