CN214883350U - Civil engineering is with on-spot dust collector - Google Patents

Civil engineering is with on-spot dust collector Download PDF

Info

Publication number
CN214883350U
CN214883350U CN202120274369.7U CN202120274369U CN214883350U CN 214883350 U CN214883350 U CN 214883350U CN 202120274369 U CN202120274369 U CN 202120274369U CN 214883350 U CN214883350 U CN 214883350U
Authority
CN
China
Prior art keywords
water
pipeline
water tank
gear
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120274369.7U
Other languages
Chinese (zh)
Inventor
任利刚
赵记辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120274369.7U priority Critical patent/CN214883350U/en
Application granted granted Critical
Publication of CN214883350U publication Critical patent/CN214883350U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a civil engineering is with on-spot dust collector, including water tank and the base of setting in the water tank bottom, water tank bottom intermediate position is provided with the wash-out pipe, water tank one side top is provided with the water injection pipeline, water tank top one side is provided with out the water connector, it is provided with the backup pad to go out water connector top, backup pad top intermediate position is provided with conduit, conduit both sides outer wall is provided with water pipe. The utility model discloses a first gear, drive assembly, conduit, water guide pipeline, water distribution pipeline, atomizer that set up make the device can realize the omnidirectional and spray dust fall work, and then have increased the dust fall area that sprays of device to improved the result of use of device, and make the user spray highly the regulation to the atomizing of device as required through backup pad, cylinder and the guide bar that sets up, thereby improved the convenience that the device used.

Description

Civil engineering is with on-spot dust collector
Technical Field
The utility model relates to a relevant technical field of equipment for the civil engineering specifically is a field dust collector for civil engineering.
Background
Civil engineering, that is, the construction of civil engineering works, covers buildings such as houses, roads, railways, and the like in various areas such as the ground, the underground, the land, the water, and the underwater, and in order to reduce the influence of dust generated during the construction process on constructors and the environment, a dust removing device is used to remove dust generated during the construction process.
The defects of the prior art are as follows: the dust collector who adopts at present stage mostly realizes the settlement to the dust through spraying to the water resource, but the water spray dust collector's that adopts at present stage water spray mechanism and water tank all adopt fixed connection, and then lead to the device can only spray dust fall work to a direction, and then reduced the dust fall scope that the device used to the result in the result of use of device relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a field dust collector is used in civil engineering, the water spray mechanism who has solved the water spray dust collector who adopts at present stage all adopts fixed connection with the water tank, and then leads to the device can only spray dust fall work to a direction, and then has reduced the dust fall scope that the device used to lead to the relatively poor problem of result of use of device.
In order to achieve the above object, the utility model provides a following technical scheme: an on-site dust removal device for civil construction comprises a water tank and a base arranged at the bottom of the water tank, wherein a water drain pipe is arranged at the middle position of the bottom of the water tank, a water injection pipeline is arranged at the top of one side of the water tank, a water outlet connector is arranged at one side of the top of the water tank, a supporting plate is arranged at the top of the water outlet connector, a water delivery pipeline is arranged at the middle position of the top of the supporting plate, water guide pipelines are arranged on the outer walls of the two sides of the water delivery pipeline, one end of each water guide pipeline is connected with a water distribution pipeline, an atomization spray nozzle is arranged on the outer wall of one side of the water distribution pipeline, the bottom of the water delivery pipeline penetrates through the supporting plate to be connected with a connecting pipeline, a water discharge pipeline is arranged at one side of the connecting pipeline, a water pump is connected with one side of the water discharge pipeline, and one end of the bottom of the water pump is connected with the water outlet connector, the top of the supporting plate is provided with a first gear, the first gear is fixedly connected with the outer wall of the water conveying pipeline, and one side of the first gear is provided with a driving assembly.
Preferably, the driving assembly consists of a motor and a second gear, the motor is arranged at the bottom of the supporting plate, an output shaft of the motor penetrates through the top of the supporting plate to be connected with the second gear, and the second gear is in meshed connection with the first gear.
Preferably, it is connected with the pipeline that draws water to go out water connector bottom, the pipeline setting that draws water is inside the water tank, just it is connected with the cover of drawing water to draw water the pipeline bottom.
Preferably, the inner wall of the bottom of the water pipeline is provided with a bearing, and the top of the connecting pipeline is connected with the inner wall of the water pipeline through the bearing.
Preferably, the top and the bottom of the bearing are both provided with a sealing element, the sealing element is fixedly connected with the inner wall of the water pipeline, and the sealing element is sleeved and connected with the outer wall of the connecting pipeline.
Preferably, both sides of the bottom of the supporting plate are provided with air cylinders, the bottom of each air cylinder is fixedly connected with the bottom of the water tank, and an output shaft of each air cylinder is fixedly connected with the bottom of the supporting plate.
Preferably, the cylinder is kept away from conduit one side and all is provided with the guide bar, the guide bar bottom all runs through water tank top inner wall and is connected with the limiting plate, just the limiting plate sets up inside the water tank.
Preferably, a through hole is formed in the position, where the water pipeline penetrates through the support plate, of the support plate, a connecting bearing is arranged inside the through hole, and the water pipeline is connected with the inner wall of the through hole through the connecting bearing.
The utility model provides a civil engineering is with on-spot dust collector possesses following beneficial effect:
(1) the utility model discloses a set up first gear, drive assembly, water pipeline, water conduit, water distribution pipeline, atomizer, when the device sprays the dust fall operation, the user can be through opening the motor, make the motor rotate through output shaft drive second gear, and then can make first gear drive water conduit rotate under the rotation of second gear, and then make the water conduit of water conduit top both sides can carry out the rotation work at the uniform velocity, thereby make the atomizer of water distribution pipeline one side outer wall can realize the omnidirectional and spray dust fall work under the water conduit effect, and then increased the dust fall area that sprays of device, thereby the result of use of device has been improved.
(2) The utility model discloses a set up the backup pad, cylinder and guide bar, when using, the user can be through opening the cylinder, make the cylinder can drive the backup pad through the output shaft and remove, and then can make water distribution pipeline and the atomizer of conduit top one side carry out high adjustment under the backup pad drive effect, and the spacing direction that can pass through the guide bar at the in-process that the backup pad removed remains stable, and then make the user spray highly the regulation to the atomizing of device as required, thereby the convenience that the device used has been improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the water tank of the present invention;
fig. 3 is an enlarged view of the structure at a in fig. 1 according to the present invention;
fig. 4 is a schematic view of the installation structure of the connecting pipeline of the present invention.
In the figure: 1. a water tank; 2. a base; 3. a drain pipe; 4. a water injection pipeline; 5. a water outlet connector; 6. a support plate; 7. a water delivery pipeline; 8. a water guide pipeline; 9. a water distribution pipeline; 10. an atomizing spray head; 11. connecting a pipeline; 12. a water discharge pipeline; 13. a water pump; 14. a telescopic pipeline; 15. a first gear; 16. a motor; 17. a second gear; 18. a water pumping pipeline; 19. a bearing; 20. a seal member; 21. a cylinder; 22. a guide bar; 23. a limiting plate; 24. and penetrates through the through hole.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: an on-site dust removal device for civil construction comprises a water tank 1 and a base 2 arranged at the bottom of the water tank 1, wherein a water drain pipe 3 is arranged at the middle position of the bottom of the water tank 1, a water injection pipeline 4 is arranged at the top of one side of the water tank 1, a water outlet connector 5 is arranged at one side of the top of the water tank 1, a support plate 6 is arranged at the top of the water outlet connector 5, a water delivery pipeline 7 is arranged at the middle position of the top of the support plate 6, water guide pipelines 8 are arranged on the outer walls of two sides of the water delivery pipeline 7, one end of the water guide pipeline 8 is connected with a water distribution pipeline 9, an atomizing nozzle 10 is arranged on the outer wall of one side of the water distribution pipeline 9, the bottom of the water delivery pipeline 7 penetrates through the support plate 6 and is connected with a connecting pipeline 11, a water drainage pipeline 12 is arranged at one side of the connecting pipeline 11, one end of the drainage pipeline 12 is connected with a water pump 13, one side of the water pump 13, which is far away from the drainage pipeline 12, is connected with a telescopic pipeline 14, one end of the bottom of the telescopic pipeline 14 is connected with the water outlet connector 5, a first gear 15 is arranged at the top of the supporting plate 6, the first gear 15 is fixedly connected with the outer wall of the water pipeline 7, and a driving assembly is arranged on one side of the first gear 15.
Furthermore, the driving assembly is composed of a motor 16 and a second gear 17, the motor 16 is arranged at the bottom of the supporting plate 6, an output shaft of the motor 16 penetrates through the top of the supporting plate 6 to be connected with the second gear 17, the second gear 17 is meshed with the first gear 15, and the rotation of the water pipeline 7 is facilitated through the arranged driving assembly, so that the dust fall area used by the device is enlarged.
Further, it 18 to draw water to be connected with in the bottom of the connector of going out water 5, it sets up inside water tank 1 to draw water pipeline 18, just it is connected with the cover of drawing water to draw water pipeline 18 bottom.
Further, a bearing 19 is arranged on the inner wall of the bottom of the water pipeline 7, and the top of the connecting pipeline 11 is connected with the inner wall of the water pipeline 7 through the bearing 19.
Further, sealing elements 20 are arranged at the top and the bottom of the bearing 19, the sealing elements 20 are fixedly connected with the inner wall of the water pipeline 7, the sealing elements 20 are sleeved and connected with the outer wall of the connecting pipeline 11, and the sealing effect of the connection of the connecting pipeline 11 and the water pipeline 7 is guaranteed due to the arrangement of the sealing elements 20.
Further, both sides of the bottom of the supporting plate 6 are provided with air cylinders 21, the bottom of each air cylinder 21 is fixedly connected with the bottom of the water tank 1, and an output shaft of each air cylinder 21 is fixedly connected with the bottom of the supporting plate 6. The provision of the air cylinder 21 facilitates the user's control over the spray height of the device.
Further, the cylinder 21 is kept away from conduit 7 one side and all is provided with guide bar 22, the guide bar 22 bottom all runs through 1 top inner wall connection of water tank and has limiting plate 23, just limiting plate 23 sets up inside water tank 1. The provision of the guide rods 22 ensures stability of the movement of the support plate 6.
Furthermore, a through hole 24 is formed in the position, where the water pipeline 7 penetrates through the support plate 6, a connecting bearing is arranged inside the through hole 24, and the water pipeline 7 is connected with the inner wall of the through hole 24 through the connecting bearing.
The working principle is as follows: when the water supply device is used, a user can inject water into the water tank 1 through the water injection pipeline 4, then the device is moved to a position to be used, the water pump 13 is turned on to enable the water pump 13 to pump water out through the water pumping pipeline 18 and the telescopic pipeline 14, then the water is injected into the water conveying pipeline 7 through the water discharge pipeline 12 and the connecting pipeline 11, water resources are then sprayed through the water distribution pipeline 9 at one end of the water conveying pipeline 8 of the water conveying pipeline 7 and finally sprayed through the atomizing spray head 10, in the using process of the water conveying pipeline 7, the user can turn on the motor 16 to enable the motor 16 to drive the second gear 17 to rotate through the output shaft, further the first gear 15 can drive the water conveying pipeline 7 to rotate under the rotating action of the second gear 17, and further the water guide pipelines 8 on two sides of the top of the water conveying pipeline 7 can rotate at a uniform speed, therefore, the atomizing nozzle 10 on the outer wall of one side of the water distribution pipeline 9 can realize all-around spraying and dust falling under the action of the water guide pipeline 8.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a civil engineering is with on-spot dust collector, includes water tank (1) and sets up base (2) in water tank (1) bottom, its characterized in that: a water drain pipe (3) is arranged at the middle position of the bottom of the water tank (1), a water injection pipeline (4) is arranged at the top of one side of the water tank (1), a water outlet connector (5) is arranged at one side of the top of the water tank (1), a supporting plate (6) is arranged at the top of the water outlet connector (5), a water delivery pipeline (7) is arranged at the middle position of the top of the supporting plate (6), water guide pipelines (8) are arranged on the outer walls of the two sides of the water delivery pipeline (7), a water distribution pipeline (9) is connected to one end of each water guide pipeline (8), an atomizing nozzle (10) is arranged on the outer wall of one side of each water distribution pipeline (9), a connecting pipeline (11) is connected to the bottom of the water delivery pipeline (7) by penetrating through the supporting plate (6), a water drainage pipeline (12) is arranged on one side of the connecting pipeline (11), and a water pump (13) is connected to one end of the drainage pipeline (12), water pump (13) keep away from drainage pipe (12) one side and be connected with flexible pipeline (14), flexible pipeline (14) bottom one end with go out water connector (5) and be connected, backup pad (6) top is provided with first gear (15), first gear (15) with conduit (7) outer wall fixed connection, first gear (15) one side is provided with drive assembly.
2. The site dust removing device for civil engineering construction according to claim 1, wherein: the driving assembly is composed of a motor (16) and a second gear (17), the motor (16) is arranged at the bottom of the supporting plate (6), an output shaft of the motor (16) penetrates through the top of the supporting plate (6) to be connected with the second gear (17), and the second gear (17) is meshed with the first gear (15).
3. The site dust removing device for civil engineering construction according to claim 1, wherein: the water outlet connector (5) is connected with a water pumping pipeline (18) at the bottom, the water pumping pipeline (18) is arranged inside the water tank (1), and the water pumping pipeline (18) is connected with a water pumping cover at the bottom.
4. The site dust removing device for civil engineering construction according to claim 1, wherein: the inner wall of the bottom of the water pipeline (7) is provided with a bearing (19), and the top of the connecting pipeline (11) is connected with the inner wall of the water pipeline (7) through the bearing (19).
5. The site dust removing device for civil engineering construction according to claim 4, wherein: sealing elements (20) are arranged at the top and the bottom of the bearing (19), the sealing elements (20) are fixedly connected with the inner wall of the water pipeline (7), and the sealing elements (20) are connected with the outer wall of the connecting pipeline (11) in a sleeved mode.
6. The site dust removing device for civil engineering construction according to claim 1, wherein: both sides of the bottom of the supporting plate (6) are provided with air cylinders (21), the bottom of each air cylinder (21) is fixedly connected with the bottom of the water tank (1), and an output shaft of each air cylinder (21) is fixedly connected with the bottom of the supporting plate (6).
7. The site dust removing device for civil engineering construction according to claim 6, wherein: the air cylinder (21) is far away from one side of the water conveying pipeline (7) and is provided with a guide rod (22), the bottom of the guide rod (22) penetrates through the inner wall of the top of the water tank (1) and is connected with a limiting plate (23), and the limiting plate (23) is arranged inside the water tank (1).
8. The site dust removing device for civil engineering construction according to claim 1, wherein: the water conveying pipeline (7) is provided with a through hole (24) at the position where the water conveying pipeline penetrates through the supporting plate (6), a connecting bearing is arranged inside the through hole (24), and the water conveying pipeline (7) is connected with the inner wall of the through hole (24) through the connecting bearing.
CN202120274369.7U 2021-01-30 2021-01-30 Civil engineering is with on-spot dust collector Expired - Fee Related CN214883350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120274369.7U CN214883350U (en) 2021-01-30 2021-01-30 Civil engineering is with on-spot dust collector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120274369.7U CN214883350U (en) 2021-01-30 2021-01-30 Civil engineering is with on-spot dust collector

Publications (1)

Publication Number Publication Date
CN214883350U true CN214883350U (en) 2021-11-26

Family

ID=78860832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120274369.7U Expired - Fee Related CN214883350U (en) 2021-01-30 2021-01-30 Civil engineering is with on-spot dust collector

Country Status (1)

Country Link
CN (1) CN214883350U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749272A (en) * 2022-09-09 2023-03-07 杭州市城建设计研究院有限公司 Energy-saving and environment-friendly building construction site dust removal device and dust removal method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749272A (en) * 2022-09-09 2023-03-07 杭州市城建设计研究院有限公司 Energy-saving and environment-friendly building construction site dust removal device and dust removal method thereof

Similar Documents

Publication Publication Date Title
CN206150055U (en) Gardens afforesting and maintenance intelligence device
CN214883350U (en) Civil engineering is with on-spot dust collector
CN112889639B (en) Controllable square spraying device and using method thereof
CN211411445U (en) A earthwork dust device for building construction site
CN213358481U (en) A earthwork dust device for building construction site
CN215233012U (en) Building engineering construction dust collector
CN215311078U (en) Energy-saving dust device for building site
CN206686818U (en) A kind of novel garden water injector
CN211898116U (en) On-spot dust device of earth excavation
CN208145658U (en) A kind of construction dust guard
CN221131513U (en) But construction is with angle modulation's dust suppression device
CN220276593U (en) Dust collector of building engineering
CN221452093U (en) Road construction presses down dirt spraying equipment
CN213662940U (en) Municipal works are with park vegetation equipment of watering
CN221155924U (en) Spray set for dust fall
CN207846423U (en) A kind of deep foundation ditch combination supporting scheme whitewashing tube head
CN219596978U (en) Concrete water spray curing machine
CN215085765U (en) Dust falling device
CN220942531U (en) Heavy metal contaminated mine soil restoration device
CN210509271U (en) Atomizing water curtain dust device for tunnel construction
CN220696255U (en) Construction site construction dust fall device
CN216825457U (en) Rotary fog pile capable of effectively improving environment of mixing plant
CN220686985U (en) Be applied to municipal construction scene's dust device
CN221536094U (en) Dust fall equipment with spray range adjustable structure
CN219894126U (en) Spray irrigation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126

CF01 Termination of patent right due to non-payment of annual fee