CN217168992U - Cement mortar test mold maintenance device - Google Patents

Cement mortar test mold maintenance device Download PDF

Info

Publication number
CN217168992U
CN217168992U CN202220678191.7U CN202220678191U CN217168992U CN 217168992 U CN217168992 U CN 217168992U CN 202220678191 U CN202220678191 U CN 202220678191U CN 217168992 U CN217168992 U CN 217168992U
Authority
CN
China
Prior art keywords
box
connecting pipe
layer board
cement mortar
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220678191.7U
Other languages
Chinese (zh)
Inventor
任正旭
曹智聪
王礼平
蔡能彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuyue Testing Technology Co ltd
Original Assignee
Jiangsu Yuyue Testing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuyue Testing Technology Co ltd filed Critical Jiangsu Yuyue Testing Technology Co ltd
Priority to CN202220678191.7U priority Critical patent/CN217168992U/en
Application granted granted Critical
Publication of CN217168992U publication Critical patent/CN217168992U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model relates to a cement mortar examination mould curing means uses in the detection area, and it includes the box, be provided with the chamber door on the box, be equipped with the support frame in the box, be equipped with the layer board on the support frame, be equipped with on the layer board and place the box, be equipped with the slider on the layer board, set up the first spout that matches with the slider on the support frame, the slider slides and connects in first spout, be equipped with on the layer board and be used for carrying out the closure subassembly fixed to the layer board, the technological effect that this application has is: slide the layer board along the spout that matches with the slider for the layer board carries out position control along the spout, thereby makes the layer board place the distance increase between face and the support frame, has reached the effect of being convenient for place the cement test body of different thickness.

Description

Cement mortar examination mould curing means
Technical Field
The application relates to the technical field of cement curing equipment, in particular to a cement mortar mould testing curing device.
Background
The curing device is equipment for curing a concrete test piece and a cement test body at constant temperature and humidity.
The curing box is a common curing means, mainly used is to the concrete test piece, the cement specimen carries out the maintenance of constant temperature and humidity, the curing box can adjust the inside temperature and humidity of box through heating and watered mode, so that to the inside concrete test piece of box, the cement specimen carries out the maintenance of constant temperature and humidity, to the concrete test piece, before the maintenance that the cement specimen carries out constant temperature and humidity, need be with the concrete test piece, the cement specimen is put into and is placed the box, will place the box again and put on the layer board of fixed mounting in the box.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology: when the existing curing box is used for curing the cement test bodies, the supporting plates in the box body are not convenient to adjust, so that the cement test bodies with different thicknesses are not convenient to place.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that the cement test body of different thickness is not convenient for to place, the application provides a cement mortar examination mould curing means adopts following technical scheme: the utility model provides a cement mortar examination mould curing means, includes the box, be provided with the chamber door on the box, be equipped with the support frame in the box, be equipped with the layer board on the support frame, be equipped with on the layer board and place the box, be equipped with the slider on the layer board, set up the first spout that matches with the slider on the support frame, the slider slides and connects in first spout, a plurality of first slots have been seted up on the support frame, be equipped with on the layer board and be used for carrying out the locking subassembly fixed to the layer board.
Through above-mentioned technical scheme, slide the layer board along the spout that matches with the slider for the layer board carries out position control along the spout, thereby the staff of being convenient for adjusts the distance between face and the support frame is placed to the layer board, has reached the effect of being convenient for place the cement test body of different thickness.
Optionally, the locking assembly includes a first connecting plate disposed on the supporting plate, the first connecting plate is provided with a first connecting hole, a first inserting rod penetrates through the first connecting hole, the first inserting rod is matched with the first slots, and the first inserting rod is inserted into one of the first slots.
Through above-mentioned technical scheme, when the position control of layer board was accomplished, the staff carries out the closure to the layer board in with inserted bar along first connecting hole grafting to first slot to the effect of fixing is carried out the layer board has been reached.
Optionally, a second slot is formed in a hole wall of the first connection hole, a second connection hole matched with the second slot is formed in the first insertion rod, a third connection hole matched with the second connection hole is formed in the first connection plate, a second insertion rod penetrates through the third connection hole, and the second insertion rod penetrates through the second connection hole and is correspondingly inserted into the second slot.
Through the technical scheme, the second inserting rod is moved along the hole wall of the third connecting hole by a worker, so that the second inserting rod penetrates through the second connecting hole and is correspondingly inserted into the second slot, the first inserting rod is locked, the condition that the first inserting rod is separated from the first slot due to the action of external force is reduced, and the supporting plate is more stably fixed by the first inserting rod.
Optionally, a stop block is arranged on the outer edge of the first insertion rod, a second sliding groove matched with the stop block is formed in the hole wall of the first connection hole, and the stop block is connected in the second sliding groove in a sliding manner.
Through the technical scheme, the staff drives the stop block to slide along the second sliding groove through the first inserted bar, and meanwhile, the stop block limits the first inserted bar, so that the situation that the first inserted bar rotates when sliding and the first connecting hole is not aligned with the second slot is reduced, the staff is convenient to wear the second inserted bar to arrange the second connecting hole and correspondingly insert in the second slot, and therefore the efficiency of fixing the first inserted bar by the staff is improved.
Optionally, a fourth connecting hole is formed in the sliding block, a guide rod is arranged in the fourth connecting hole in a penetrating mode along the sliding direction of the sliding block, and the guide rod is connected with the groove wall of the first sliding groove.
Through above-mentioned technical scheme, the staff drives the slider through removing the layer board and slides along guide bar and spout, carries on spacingly through the guide bar to the slider simultaneously to make the slider more stable slide along the spout.
Optionally, a water pump is arranged in the box, a first connecting pipe is arranged at the output end of the water pump, a wastewater tank is arranged on the box, the first connecting pipe is communicated with the wastewater tank, a second connecting pipe is arranged at the input end of the water pump, a first hose is communicated with the second connecting pipe, a third connecting pipe is communicated with the first hose, the third connecting pipe extends into the placing box, a second hose is communicated with the third connecting pipe, a fourth connecting pipe is communicated with the second hose, and a driving assembly used for driving the third connecting pipe to rotate is arranged in the box.
Through the technical scheme, when the water pump starts, through the second connecting pipe, first hose, the third connecting pipe, in second hose and the fourth connecting pipe will place the sewage suction water pump in the box, the waste water tank is carried with sewage through first connecting pipe to the water pump simultaneously, thereby make and carry out the automatic discharge to placing the sewage in the box, the effect of automatic drainage has been realized, after automatic drainage, start drive assembly drive third connecting pipe and rotate to the top of placing the box, so that the staff can be convenient get put placing the box.
Optionally, the driving assembly comprises a fourth connecting plate arranged on the inner wall of the box body, a motor is arranged on the fourth connecting plate, a fifth connecting plate is arranged at the output end of the motor, and the fifth connecting plate is connected with the outer edge of the third connecting pipe.
Through the technical scheme, when the driving mechanism is started, the motor drives the fifth connecting plate and the third connecting pipe to rotate together, so that the effect of automatic rotation of the third connecting pipe is achieved.
Optionally, the end face, deviating from the second hose, of the fourth connecting pipe is rotatably connected with a plurality of rollers.
Through above-mentioned technical scheme, drive the gyro wheel through the third connecting pipe and remove for the gyro wheel rolls on placing the box, thereby makes the motor drive fifth connecting plate more smoothly and rotates together with the third connecting pipe.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the staff slides the layer board along the spout that matches with the slider for the layer board carries out position control along the spout, thereby makes the layer board place the distance increase between face and the support frame, has reached the effect of being convenient for place the cement examination body of different thickness.
2. When the water pump starts, through the second connecting pipe, the first hose, the third connecting pipe, in the sewage suction water pump in the box will be placed to second hose and fourth connecting pipe, the waste water tank is carried with sewage through first connecting pipe to the water pump simultaneously, thereby make and carry out automatic discharge to placing the sewage in the box, the effect of automatic drainage has been realized, after automatic drainage, start drive assembly drive third connecting pipe and rotate to the top of placing the box, so that the staff can be convenient get put placing the box.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
FIG. 2 is a schematic cross-sectional view of a connection relationship between a supporting plate and a supporting frame according to an embodiment of the present disclosure.
Fig. 3 is a schematic cross-sectional structure diagram for embodying a roller according to an embodiment of the present application.
Fig. 4 is an enlarged schematic view at a in fig. 3.
Reference numerals: 1. a box body; 2. a box door; 3. a support frame; 4. a support plate; 5. placing the box; 6. a slider; 7. a first chute; 8. a first slot; 9. a locking assembly; 10. a first connecting plate; 11. a first connection hole; 12. a first plunger; 13. a second slot; 14. a second connection hole; 15. a third connecting hole; 16. a second plunger; 17. a stopper; 18. a second chute; 19. a fourth connection hole; 20. a guide bar; 21. a water pump; 22. a first connecting pipe; 23. a wastewater tank; 24. a second connecting pipe; 25. a first hose; 26. a third connecting pipe; 27. a second hose; 28. a fourth connecting pipe; 29. a drive assembly; 30. a fourth connecting plate; 31. a motor; 32. a fifth connecting plate; 33. and a roller.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses cement mortar examination mould curing means.
As shown in fig. 1 and 2, cement mortar examination mold maintenance device includes box 1, be equipped with chamber door 2 on the 1 front side of box, chamber door 2 can be the glass door, and 2 quantity of chamber door can be two, fixed mounting has a plurality of support frames 3 on the box 1, and a plurality of support frames 3 are located 2 inboards of chamber door, install a plurality of layer boards 4 on the support frame 3, place box 5 has been placed on layer board 4 top, fixed mounting has a plurality of sliders 6 on layer board 4 is close to the both sides of chamber door 2, slider 6 can be T type slider 6, set up a plurality of first spouts 7 with slider 6 assorted along vertical direction on the support frame 3, slider 6 slides and connects in first spout 7, a plurality of first slots 8 have been seted up on the support frame 3 is close to the terminal surface of layer board 4, the symmetry is equipped with a plurality of closure subassemblies 9 that are used for fixing layer board 4 on the terminal surface that layer board 4 is close to chamber door 2. Therefore, when needing to adjust layer board 4, the staff promotes layer board 4 and slides along vertical direction, and when locking assembly 9 and a plurality of first slot 8 one of them were aligned, locking assembly 9 carried out the closure to layer board 4 for the completion was adjusted layer board 4 position, thereby the staff of being convenient for adjusts the distance between face and the support frame 3 is placed to layer board 4, has reached the effect of being convenient for place the cement test body of different thickness.
As shown in fig. 2, the locking assembly 9 specifically includes a first connecting plate 10 fixedly mounted on the supporting plate 4, a first connecting hole 11 is formed in the first connecting plate 10, a first inserting rod 12 penetrates through the first connecting hole 11, the first inserting rod 12 is a round rod, the first inserting rod 12 is matched with the plurality of first slots 8, the first slots 8 are not overlapped with the first sliding grooves 7, and the first inserting rod 12 is inserted into one of the first slots 8. Therefore, when the position of the supporting plate 4 is adjusted, the worker can push the first inserting rod 12, so that the first inserting rod 12 is inserted into one of the first inserting grooves 8, the first inserting rod 12 is used for fixing the supporting plate 4 in the vertical direction, and the effect that the worker fixes the supporting plate 4 is achieved.
As shown in fig. 1 and 2, in order to enhance the effect of the locking assembly 9 fixing the supporting plate 4, a second slot 13 is formed on the hole wall of the first connecting hole 11, a second connecting hole 14 matched with the second slot 13 is formed on the first inserting rod 12, a third connecting hole 15 matched with the second connecting hole 14 is formed on the end surface of the first connecting plate 10 close to the box door 2, a second inserting rod 16 penetrates through the third connecting hole 15, and the second inserting rod 16 penetrates through the second connecting hole 14 and is correspondingly inserted into the second slot 13. Therefore, the staff can move the second inserting rod 16 along the hole wall of the third connecting hole 15, so that the second inserting rod 16 passes through the second connecting hole 14 and is correspondingly inserted into the second slot 13, the second inserting rod 16 fixes the first inserting rod 12, the first inserting rod 12 is more stable, and the effect of fixing the supporting plate 4 by the first inserting rod 12 is further enhanced.
As shown in fig. 3 and 4, in consideration of the fact that the second connection hole 14 on the first insertion rod 12 may not be aligned with the second slot 13 and the third connection hole 15, a stop 17 is disposed on a side wall of the first insertion rod 12, a second sliding slot 18 matched with the stop 17 is disposed on a hole wall of the first connection hole 11, the stop 17 is slidably connected in the second sliding slot 18, and at this time, the second connection hole 14 on the first insertion rod 12 is aligned with the second slot 13 and the third connection hole 15 at the same time. Consequently, the staff can slide along second spout 18 through driving dog 17 with first inserted bar 12, simultaneously because dog 17 carries on spacingly to first inserted bar 12, reduce first inserted bar 12 and take place to rotate when sliding and lead to the condition that first connecting hole 11 and second slot 13 are unaligned, the staff of being convenient for wears to establish second connecting hole 14 and corresponds the grafting in second slot 13 with second inserted bar 16 to improve the efficiency that the staff carries out fixing to first inserted bar 12.
As shown in fig. 2, in order to improve the stability of the sliding block 6 during sliding, a fourth connecting hole 19 is formed in the sliding block 6, a guide rod 20 arranged along the sliding direction of the sliding block 6 penetrates through the fourth connecting hole 19, and two ends of the guide rod 20 are fixedly connected with the groove wall of the first sliding groove 7. Consequently, the staff drives slider 6 through removing layer board 4 and slides along guide bar 20 and first spout 7, carries on spacingly through guide bar 20 to slider 6 simultaneously for slider 6 is more stable in first spout 7, thereby improves the stability when slider 6 slides.
As shown in fig. 3, in consideration of the situation that the water in the placing box 5 affects the next maintenance of the cement test piece after the maintenance of the cement test piece is finished, the worker needs to discharge the water in the placing box 5, in order to automatically discharge water in the placing box 5, a water pump 21 is fixedly mounted on the inner wall of the support frame 3, an output end of the water pump 21 is communicated with a first connecting pipe 22, a waste water tank 23 is fixedly mounted on the box body 1, one end, far away from the water pump 21, of the first connecting pipe 22 is communicated with the waste water tank 23, an input end of the water pump 21 is communicated with a second connecting pipe 24, one end, far away from the water pump 21, of the second connecting pipe 24 is communicated with a first hose 25, one end, far away from the second connecting pipe 24, of the first hose 25 is communicated with a third connecting pipe 26, the third connecting pipe 26 extends into the placing box 5, the third connecting pipe 26 is communicated with a second hose 27, and the second hose 27 is communicated with a fourth connecting pipe 28.
As shown in fig. 3, a driving assembly 29 for driving the third connection pipe 26 to rotate is provided in the case 1. Therefore, when the cement test piece is detected, the third connecting pipe 26, the second hose 27 and the fourth connecting pipe 28 are all positioned above the placing box 5, when the cement test piece is detected, the driving assembly 29 is started to drive the third connecting pipe 26, the second hose 27 and the fourth connecting pipe 28 to rotate together into the placing box 5, then the water pump 21 is started, the input end of the water pump 21 pumps water in the placing box 5 into the water pump 21 through the second connecting pipe 24, the first hose 25 and the third connecting pipe 26, and meanwhile, the water pump 21 conveys sewage into the waste water tank 23 through the first connecting pipe 22, thereby make and carry out automatic the discharge to placing the sewage in the box 5, after automatic drainage, start drive assembly 29 drive third connecting pipe 26, second hose 27 and fourth connecting pipe 28 and rotate to the top of placing box 5 together to the staff can be convenient get put placing box 5.
It should be further noted that, when the placing box 5 is adjusted upward to be close to the top of the supporting frame 3, the actuating driving assembly 29 drives the third connecting pipe 26, the second hose 27 and the fourth connecting pipe 28 to rotate together into the placing box 5, the second hose 27 is bent due to the blocking of the bottom of the placing box 5, and the water inlet of the fourth connecting pipe 28 faces the side wall of the placing box 5, the roller 33 is in contact with the bottom of the placing box 5, when the placing box 5 is adjusted downward to be close to the bottom of the supporting frame 3, the actuating driving assembly 29 drives the third connecting pipe 26, the second hose 27 and the fourth connecting pipe 28 to rotate together into the placing box 5, at this time, under the action of gravity, the second hose 27 is vertically downward, and the water inlet of the fourth connecting pipe 28 faces the bottom of the placing box 5, and the roller 33 is in contact with the bottom of the placing box 5.
As shown in fig. 3, the driving assembly 29 includes a fourth connecting plate 30 disposed on the inner wall of the supporting frame 3, a motor 31 is fixedly mounted on the fourth connecting plate 30, the motor 31 may be a waterproof motor, an output end of the motor 31 is fixedly connected with a fifth connecting plate 32, and the fifth connecting plate 32 is fixedly connected with an outer edge of the third connecting pipe 26. Therefore, when the driving mechanism is started, the fifth connecting plate 32 and the third connecting pipe 26 are driven by the motor 31 to rotate together, so that the effect that the motor 31 drives the third connecting pipe 26 to rotate is achieved.
As shown in fig. 3, a plurality of rollers 33 are rotatably connected to the end surface of the fourth connecting pipe 28 facing away from the second hose 27. Therefore, the third connecting pipe 26 is used for driving, the second hose 27, the fourth connecting pipe 28 and the roller 33 are moved together, the roller 33 rolls on the placing box 5, the motor 31 can drive the fifth connecting plate 32 and the third connecting pipe 26 to rotate together more smoothly, meanwhile, the roller 33 is arranged, a distance is kept between the pipe orifice of the fourth connecting pipe 28 and the inner wall of the placing box 5, the situation that the water discharging of the fourth connecting pipe 28 is not smooth due to the fact that the pipe orifice of the fourth connecting pipe 28 is attached to the inner wall of the placing box 5 is reduced, and the water discharging effect of the fourth connecting pipe 28 is improved.
The implementation principle of the embodiment of the application is as follows: the slide block 6 is driven to slide along the first sliding groove 7 by moving the supporting plate 4, the first inserting rod 12 is aligned with one of the first slots 8, the position of the supporting plate 4 is adjusted, the first inserting rod 12 penetrates through the first connecting hole 11 and is correspondingly inserted into the first slot 8, the supporting plate 4 is fixed, the second inserting rod 16 moves along the hole wall of the third connecting hole 15, the second inserting rod 16 penetrates through the second connecting hole 14 and is correspondingly inserted into the second slot 13, the first inserting rod 12 is fixed, the placing box 5 containing the cement test body and the water is placed on the supporting plate 4, the box door 2 is closed for maintenance, when the maintenance is finished, the starting motor 31 drives the third connecting pipe 26, the second hose 27 and the fourth connecting pipe 28 to rotate together into the placing box 5, the water pump 21 is started, the input end of the water pump 21 passes through the second connecting pipe 24, the first connecting pipe 11 and the second connecting pipe 28, First hose 25 and third connecting pipe 26 will place the water suction in the box 5 to the water pump 21 in, the output of water pump 21 carries waste water 23 through first connecting pipe 22 in with sewage simultaneously to make and carry out automatic discharge to the sewage of placing in the box 5, after automatic drainage, starter motor 31 drive third connecting pipe 26, second hose 27 and fourth connecting pipe 28 rotate together to the top of placing box 5, thereby the staff can be convenient take out place box 5.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a cement mortar examination mould curing means which characterized in that: including box (1), be provided with chamber door (2) on box (1), be equipped with support frame (3) in box (1), be equipped with layer board (4) on support frame (3), be equipped with on layer board (4) and place box (5), be equipped with slider (6) on layer board (4), set up first spout (7) that match with slider (6) on support frame (3), slider (6) slide and connect in first spout (7), a plurality of first slots (8) have been seted up on support frame (3), be equipped with on layer board (4) and be used for carrying out fixed closure subassembly (9) to layer board (4).
2. The cement mortar molding maintenance device according to claim 1, characterized in that: the locking assembly (9) comprises a first connecting plate (10) arranged on the supporting plate (4), a first connecting hole (11) is formed in the first connecting plate (10), a first inserting rod (12) penetrates through the first connecting hole (11), the first inserting rod (12) is matched with the first slots (8), and the first inserting rod (12) is inserted into one of the first slots (8).
3. The cement mortar pattern-testing maintenance device according to claim 2, characterized in that: the wall of the first connecting hole (11) is provided with a second slot (13), the first inserting rod (12) is provided with a second connecting hole (14) matched with the second slot (13), the first connecting plate (10) is provided with a third connecting hole (15) matched with the second connecting hole (14), the third connecting hole (15) is internally provided with a second inserting rod (16), and the second inserting rod (16) is arranged in the second connecting hole (14) in a penetrating manner and is correspondingly inserted into the second slot (13).
4. The cement mortar pattern maintenance device according to claim 3, characterized in that: a stop block (17) is arranged on the outer edge of the first insertion rod (12), a second sliding groove (18) matched with the stop block (17) is formed in the hole wall of the first connecting hole (11), and the stop block (17) is connected in the second sliding groove (18) in a sliding mode.
5. The cement mortar molding maintenance device according to claim 1, characterized in that: a fourth connecting hole (19) is formed in the sliding block (6), a guide rod (20) arranged along the sliding direction of the sliding block (6) penetrates through the fourth connecting hole (19), and the guide rod (20) is connected with the groove wall of the first sliding groove (7).
6. The cement mortar molding maintenance device according to claim 1, characterized in that: be equipped with water pump (21) in box (1), the output of water pump (21) is equipped with first connecting pipe (22), be equipped with waste water tank (23) on box (1), first connecting pipe (22) are linked together with waste water tank (23), the input of water pump (21) is equipped with second connecting pipe (24), the intercommunication has first hose (25) on second connecting pipe (24), the intercommunication has third connecting pipe (26) on first hose (25), third connecting pipe (26) extend to in placing box (5), the intercommunication has second hose (27) on third connecting pipe (26), the intercommunication has fourth connecting pipe (28) on second hose (27), be equipped with in box (1) and be used for driving third connecting pipe (26) pivoted drive assembly (29).
7. The cement mortar molding maintenance device according to claim 6, characterized in that: the driving assembly (29) comprises a fourth connecting plate (30) arranged on the inner wall of the box body (1), a motor (31) is arranged on the fourth connecting plate (30), a fifth connecting plate (32) is arranged at the output end of the motor (31), and the fifth connecting plate (32) is connected with the outer edge of the third connecting pipe (26).
8. The cement mortar pattern maintenance device according to claim 7, characterized in that: and a plurality of rollers (33) are rotatably connected to the end surface of the fourth connecting pipe (28) deviating from the second hose (27).
CN202220678191.7U 2022-03-25 2022-03-25 Cement mortar test mold maintenance device Active CN217168992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220678191.7U CN217168992U (en) 2022-03-25 2022-03-25 Cement mortar test mold maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220678191.7U CN217168992U (en) 2022-03-25 2022-03-25 Cement mortar test mold maintenance device

Publications (1)

Publication Number Publication Date
CN217168992U true CN217168992U (en) 2022-08-12

Family

ID=82746752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220678191.7U Active CN217168992U (en) 2022-03-25 2022-03-25 Cement mortar test mold maintenance device

Country Status (1)

Country Link
CN (1) CN217168992U (en)

Similar Documents

Publication Publication Date Title
WO2022143241A9 (en) Wall building mortar multistage mixing apparatus for repairing ancient buildings
CN217168992U (en) Cement mortar test mold maintenance device
CN111958771B (en) Energy-concerving and environment-protective type building apparatus for producing of laying bricks
CN211245663U (en) Plate-and-frame filter press for sludge dewatering
CN114856134A (en) Building wall plastering equipment and construction method thereof
CN213683091U (en) Automatic plastering machine convenient to clout is retrieved
CN203622631U (en) Wallboard production line
CN209615911U (en) High-pressure slip-casting production system for conjoined toilet
CN113306283A (en) Textile fabric processing is with automatic high-efficient stamp device that printing is effectual
CN114131791B (en) Energy-saving and environment-friendly waste PET material crushing and recycling equipment
CN219196016U (en) Active anti-floating precipitation integrated system for basement
CN215801454U (en) Stainless steel gate special for water plant
CN220836095U (en) Flotation liquid level detection device
CN220097597U (en) Anti-blocking mechanism for chute of belt conveyor
CN220482069U (en) Concrete pole production feeding device
CN218149560U (en) Plastering machine capable of controlling plastering thickness
CN220848782U (en) Grouting device
CN217192450U (en) Sand mould mold processing device of well lid base
CN115306124B (en) Vertical automatic wall brick sticking machine for building construction
CN219525597U (en) Material distributing device for quartz sand production
CN216031738U (en) Gypsum line dust fall formula cutting device
CN213918985U (en) Unloader is used in concrete production
CN219445451U (en) Building block forming equipment
CN219430855U (en) River bottom dredging device
CN220645105U (en) Building wall auxiliary construction tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant