CN217151391U - Assembled truss plate returns roof-rack - Google Patents

Assembled truss plate returns roof-rack Download PDF

Info

Publication number
CN217151391U
CN217151391U CN202220862056.8U CN202220862056U CN217151391U CN 217151391 U CN217151391 U CN 217151391U CN 202220862056 U CN202220862056 U CN 202220862056U CN 217151391 U CN217151391 U CN 217151391U
Authority
CN
China
Prior art keywords
steel
backup pad
movable rod
fixedly connected
stopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220862056.8U
Other languages
Chinese (zh)
Inventor
吴镝
杨欢
李玲
徐宝全
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202220862056.8U priority Critical patent/CN217151391U/en
Application granted granted Critical
Publication of CN217151391U publication Critical patent/CN217151391U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled truss plate returns roof-rack, including two girder steels, two erect channel-section steel and horizontal steel, it is located between two relative one sides of girder steel to erect channel-section steel and horizontal steel, the bottom swing joint of horizontal steel has the backup pad, the equal swing joint in both sides at backup pad top has the clamp splice, the bottom fixedly connected with stopper of clamp splice, the spacing groove that uses with the stopper cooperation is seted up to the inside of backup pad, the inside swing joint of backup pad has the movable rod, the both sides on movable rod surface are seted up threadedly, the thread groove that uses with screw-thread fit is seted up to the inside of stopper, the bottom fixedly connected with of backup pad hangs the rope, hang the bottom fixedly connected with light of rope. The utility model discloses a set up the light, the user is fixed the light on horizontal steel when installing the truss plate and returning the roof-rack, like this only need the user open the light when the construction can, reached construction site light sufficient for construction speed's advantage.

Description

Assembled truss plate returns roof-rack
Technical Field
The utility model belongs to the technical field of the truss plate returns the roof-rack, especially, relate to an assembled truss plate returns roof-rack.
Background
Steel construction steel bar truss building carrier plate construction often because the girder steel surpasss to stride needs to arrange interim support, and the steel pipe scaffold frame that all adopts at present backs most, topples when the floor height is higher very easily, and the scaffold frame is set up and has enough to meet the need comparatively trouble, influences construction period, to sum up, the problem that prior art exists is: the lighting of the truss plate back to the top frame construction site is insufficient, so that the construction period is influenced by the fact that light rays are dark during construction.
SUMMERY OF THE UTILITY MODEL
Problem to prior art existence, the utility model provides an assembled truss plate returns roof-rack possesses the good advantage of construction place illuminating effect, has solved because the truss plate returns the illumination of roof-rack construction place not enough, leads to the darker problem that influences construction period of a project of light when the construction.
The utility model discloses a realize like this, an assembled truss plate returns roof-rack, including two girder steels, two perpendicular channel-section steels and horizontal steel, it is located between two relative one sides of girder steel to erect channel-section steel and horizontal steel, the bottom swing joint of horizontal steel has the backup pad, the equal swing joint in both sides at backup pad top has the clamp splice, the bottom fixedly connected with stopper of clamp splice, the spacing groove that uses with the stopper cooperation is seted up to the inside of backup pad, the inside swing joint of backup pad has the movable rod, the both sides on movable rod surface are seted up threadedly, the thread groove that uses with the screw-thread fit is seted up to the inside of stopper, the bottom fixedly connected with of backup pad hangs the rope, hang the bottom fixedly connected with light of rope.
As the utility model discloses it is preferred, the right side fixedly connected with commentaries on classics piece of movable rod, the right side of movable rod runs through to the outside of backup pad and the left side fixed connection who changes the piece.
As the utility model discloses it is preferred, the equal fixedly connected with slider in both sides of stopper, the spout that uses with the slider cooperation is seted up to the inside of backup pad, and the slider is located the inside slip of spout.
As the utility model discloses preferred, the inner wall fixedly connected with blotter of clamp splice, and the shape of clamp splice is seven fonts.
As the utility model discloses preferred, the screw thread on movable rod surface is opposite spiral, the left side swing joint of movable rod has the pivot, the inner wall swing joint of pivot and backup pad is passed through in the left side of movable rod.
As the utility model discloses it is preferred, the girder steel passes through the bolt and erects channel-section steel fixed mounting, horizontal steel passes through welded mounting and erects the channel-section steel.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the light, the user is fixed the light on horizontal steel when installing the truss plate and returning the roof-rack, like this only need the user open the light when the construction can, reached construction site light sufficient for construction speed's advantage.
2. The utility model discloses a set up and changeed the piece, made things convenient for the user to rotate the movable rod, only need the user to rotate and change the piece and just can drive the movable rod and rotate, make the spacing block on movable rod surface remove.
3. The utility model discloses a cooperation that sets up slider and spout is used, has increased the stability when stopper removes, provides the movement track when stopper removes.
4. The utility model discloses a set up blotter and seven font clamp splices, the user can make the clamp splice press from both sides on the surface of channel-section steel through rotating the movable rod, makes the light can not take place to remove when using, and the blotter buffer memory the pressure between clamp splice and the horizontal steel.
5. The utility model discloses a set up the pivot, because of the screw thread on activity pole surface is opposite shape, the spacing piece can remove simultaneously when the user rotates the activity pole.
6. The utility model discloses a set up girder steel, bolt and the cooperation of erecting the channel-section steel and use, in time welded connection layer board on the girder steel after the girder steel installation is accomplished to it is fixed to erect the channel-section steel through construction bolt, and two erect the channel-section steel through welding and horizontal steel fixed connection, only need when dismantling the connecting plate cut off can, possessed easy dismounting, adjustable, have quick installation, do not produce building rubbish, recoverable used cyclically advantage.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a schematic perspective view of a structure provided by an embodiment of the present invention;
fig. 3 is a front cross-sectional view of a support plate according to an embodiment of the present invention.
In the figure: 1. a steel beam; 2. erecting channel steel; 3. transverse steel; 4. a support plate; 5, hanging a rope; 6. an illuminating lamp; 7. a movable rod; 8. a thread; 9. a clamping block; 10. a thread groove; 11. rotating the block; 12. a limiting groove; 13. a slider; 14. a chute; 15. a cushion pad; 16. a rotating shaft; 17. and a limiting block.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, the embodiment of the utility model provides a pair of assembled truss plate returns roof-rack, including two girder steels 1, two erect channel-section steel 2 and horizontal steel 3, it is located between two relative one sides of girder steel 1 to erect channel-section steel 2 and horizontal steel 3, the bottom swing joint of horizontal steel 3 has backup pad 4, the equal swing joint in both sides at backup pad 4 top has clamp splice 9, the bottom fixedly connected with stopper 17 of clamp splice 9, spacing groove 12 that uses with stopper 17 cooperation is seted up to backup pad 4's inside, the inside swing joint of backup pad 4 has movable rod 7, screw thread 8 has been seted up to the both sides on movable rod 7 surface, thread groove 10 that uses with screw thread 8 cooperation is seted up to stopper 17's inside, the bottom fixedly connected with of backup pad 4 hangs rope 5, hang rope 5's bottom fixedly connected with light 6.
Referring to fig. 3, a rotating block 11 is fixedly connected to the right side of the movable rod 7, and the right side of the movable rod 7 penetrates to the outer side of the support plate 4 and is fixedly connected to the left side of the rotating block 11.
Adopt above-mentioned scheme: through setting up the commentaries on classics piece 11, made things convenient for the user to rotate movable rod 7, only need the user to rotate commentaries on classics piece 11 and just can drive movable rod 7 and rotate, make the stopper 17 on movable rod 7 surface remove.
Referring to fig. 3, the two sides of the limiting block 17 are fixedly connected with sliding blocks 13, sliding grooves 14 matched with the sliding blocks 13 for use are formed in the supporting plate 4, and the sliding blocks 13 slide in the sliding grooves 14.
Adopt above-mentioned scheme: through the cooperation that sets up slider 13 and spout 14 and use, stability when having increased stopper 17 and having removed provides the motion trail when stopper 17 removes.
Referring to fig. 3, a buffer pad 15 is fixedly connected to an inner wall of the clamping block 9, and the clamping block 9 is shaped like a Chinese character 'qi'.
Adopt above-mentioned scheme: through setting up blotter 15 and seven font clamp splices 9, the user can make clamp splice 9 press from both sides on the surface of channel-section steel through rotating movable rod 7, makes light 6 can not take place to remove when using, and blotter 15 has cached the pressure between clamp splice 9 and the horizontal steel 3.
Referring to fig. 3, the threads 8 on the surface of the movable rod 7 are in opposite spiral, the left side of the movable rod 7 is movably connected with a rotating shaft 16, and the left side of the movable rod 7 is movably connected with the inner wall of the supporting plate 4 through the rotating shaft 16.
Adopt above-mentioned scheme: by providing the pivot 16, the stop block 17 can be moved simultaneously when the user rotates the movable lever 7, due to the opposite shape of the thread 8 on the surface of the movable lever 7.
Referring to fig. 1, a steel beam 1 is fixedly installed with a vertical channel steel 2 through bolts, and a horizontal steel 3 is installed in the vertical channel steel 2 through welding.
Adopt above-mentioned scheme: through setting up girder steel 1, bolt and the cooperation of erecting channel-section steel 2 and using, timely welded connection layer board on girder steel 1 after 1 installation of girder steel is accomplished to will erect channel-section steel 2 through construction bolt and fix, and two erect channel-section steel 2 through welding and 3 fixed connection of horizontal steel, only need when dismantling the connecting plate cut off can, possessed easy dismounting, adjustable, have quick installation, do not produce building rubbish, recoverable used repeatedly's advantage.
The utility model discloses a theory of operation:
when the steel beam jacking frame is used and needs to be assembled, after the steel beam 1 is installed, the supporting plate is welded on the steel beam 1 in time, the vertical channel steel 2 is fixed through the installation bolt, the two vertical channel steel 2 are fixedly connected with the transverse steel 3 through welding, then a user takes up the supporting plate 4, the movement of the supporting plate 4 drives the hanging rope 5, the hanging rope 5 drives the illuminating lamp 6 to move, the user realizes that the rotating block 11 is rotated, the two clamping blocks 9 move to the opposite side, then the user puts the clamping blocks 9 on the transverse steel 3 to rotate the rotating block 11, the two clamping blocks 9 relatively move to clamp the two sides of the transverse steel 3, the illuminating lamp 6 is prevented from moving, when the steel beam jacking frame is disassembled, the user rotates the rotating block 11, the rotating block 11 drives the movable rod 7 to move, the movable rod 7 is connected with the movable rod 7 through the thread groove 10 and the thread 8, the movable rod 7 drives the limiting block 17 to move, two stopper 17 move to opposite side along with the orbit of screw thread 8 and thread groove 10, when the clamp splice 9 breaks away from the horizontal steel 3 centre gripping, the user takes out backup pad 4, then through cutting the connecting plate to erect channel steel 2 and horizontal steel 3 dismantle can, accomplish the operation.
In summary, the following steps: the fabricated truss plate back-jacking frame is characterized in that a steel beam 1, a vertical channel steel 2, a transverse steel 3 and a support plate 4 are arranged; hang rope 5, light 6, movable rod 7, screw thread 8, clamp splice 9, thread groove 10, commentaries on classics piece 11, spacing groove 12, slider 13, spout 14, blotter 15, pivot 16 and stopper 17 cooperation and use, solved because the truss plate returns the illumination of roof truss construction place not enough, lead to the darker problem that influences construction period of a project of light when the construction.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an assembled truss plate returns roof-rack, includes two girder steels (1), two perpendicular channel-section steels (2) and horizontal steel (3), its characterized in that: erect channel-section steel (2) and violently steel (3) and be located between two relative one sides of girder steel (1), the bottom swing joint of violently steel (3) has backup pad (4), the equal swing joint in both sides at backup pad (4) top has clamp splice (9), the bottom fixedly connected with stopper (17) of clamp splice (9), spacing groove (12) that use with stopper (17) cooperation are seted up to the inside of backup pad (4), the inside swing joint of backup pad (4) has movable rod (7), screw thread (8) have been seted up to the both sides on movable rod (7) surface, thread groove (10) that use with screw thread (8) cooperation are seted up to the inside of stopper (17), the bottom fixedly connected with of backup pad (4) hangs rope (5), hang bottom fixedly connected with light (6) of rope (5).
2. A fabricated truss panel return frame as defined in claim 1 wherein: the right side fixedly connected with of movable rod (7) changes piece (11), the right side of movable rod (7) runs through to the outside of backup pad (4) and the left side fixed connection who changes piece (11).
3. A fabricated truss panel return frame as defined in claim 1 wherein: the equal fixedly connected with slider (13) in both sides of stopper (17), spout (14) that use with slider (13) cooperation are seted up to the inside of backup pad (4), and slider (13) are located the inside slip of spout (14).
4. A fabricated truss panel return frame as defined in claim 1 wherein: the inner wall of the clamping block (9) is fixedly connected with a cushion pad (15), and the clamping block (9) is in a seven-shaped shape.
5. A fabricated truss panel return frame as defined in claim 1 wherein: screw thread (8) on movable rod (7) surface are opposite spiral, the left side swing joint of movable rod (7) has pivot (16), the inner wall swing joint of pivot (16) and backup pad (4) is passed through in the left side of movable rod (7).
6. A fabricated truss panel return frame as defined in claim 1 wherein: girder steel (1) through bolt and perpendicular channel-section steel (2) fixed mounting, horizontal steel (3) are installed at perpendicular channel-section steel (2) through the welding.
CN202220862056.8U 2022-04-13 2022-04-13 Assembled truss plate returns roof-rack Expired - Fee Related CN217151391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220862056.8U CN217151391U (en) 2022-04-13 2022-04-13 Assembled truss plate returns roof-rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220862056.8U CN217151391U (en) 2022-04-13 2022-04-13 Assembled truss plate returns roof-rack

Publications (1)

Publication Number Publication Date
CN217151391U true CN217151391U (en) 2022-08-09

Family

ID=82699758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220862056.8U Expired - Fee Related CN217151391U (en) 2022-04-13 2022-04-13 Assembled truss plate returns roof-rack

Country Status (1)

Country Link
CN (1) CN217151391U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220431A (en) * 2023-04-26 2023-06-06 山西路桥景泰房地产开发有限公司 Building roof beam strutting arrangement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220431A (en) * 2023-04-26 2023-06-06 山西路桥景泰房地产开发有限公司 Building roof beam strutting arrangement

Similar Documents

Publication Publication Date Title
CN109175081B (en) Positioning and punching device for building aluminum template
CN217151391U (en) Assembled truss plate returns roof-rack
CN204609447U (en) Flexible tent
CN212056853U (en) Lighting device for construction
CN210849001U (en) Large-scale stainless steel welding H shaped steel assembly welding positioner
CN108390625B (en) Portable solar photovoltaic support
CN210712619U (en) Guideboard support convenient to change guideboard
CN218990199U (en) Track traffic piping lane foundation ditch supporting device
CN216430712U (en) Horizontal support module for smoke exhaust pipeline reconstruction construction
CN114682985B (en) Opposite-opening positioning device suitable for welding large-diameter steel pipes
CN212734228U (en) Steel construction drilling equipment
CN211899728U (en) Installation device for large-span inclined roof floating awning curtain wall
CN212835002U (en) Be used for cable-stay bridge cable beam anchor block template device that can slide
CN212802716U (en) Civil engineering construction supporting structure
CN211992812U (en) Oil-resistant pipe assembling platform with multi-stage height adjusting platform
CN211037926U (en) Support for integrated building
CN209849777U (en) Steel reinforcement cage welding equipment that tubular pile processing was used
CN108691413B (en) Single-side reducing sliding film construction device of pressure regulating tower
CN217760252U (en) Anti-wind and anti-seismic steel structure house
CN220228130U (en) Pipe pouring device for filling pipeline
CN113075072B (en) Bridge concrete structure detection device
CN220565774U (en) Top beam supporting structure for house building
CN213709789U (en) Municipal administration drainage pipeline hole groove supporting construction
CN209635848U (en) A kind of rail of lifter bracket that stability is high
CN216551608U (en) Box girder template for municipal administration road bridge construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220809

CF01 Termination of patent right due to non-payment of annual fee