CN217150854U - Building photovoltaic integration roofing metal installation - Google Patents

Building photovoltaic integration roofing metal installation Download PDF

Info

Publication number
CN217150854U
CN217150854U CN202220660439.7U CN202220660439U CN217150854U CN 217150854 U CN217150854 U CN 217150854U CN 202220660439 U CN202220660439 U CN 202220660439U CN 217150854 U CN217150854 U CN 217150854U
Authority
CN
China
Prior art keywords
roofing
photovoltaic
roof
square matrix
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220660439.7U
Other languages
Chinese (zh)
Inventor
范广飞
沙立冬
杨波
武晨
周娜
周涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Xinhao Electronic Engineering Co ltd
Original Assignee
Shenyang Xinhao Electronic Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Xinhao Electronic Engineering Co ltd filed Critical Shenyang Xinhao Electronic Engineering Co ltd
Priority to CN202220660439.7U priority Critical patent/CN217150854U/en
Application granted granted Critical
Publication of CN217150854U publication Critical patent/CN217150854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a building photovoltaic integration roofing metal device, including roofing, photovoltaic square matrix and riser, the top of roofing is provided with a plurality of photovoltaic square matrix, the riser is all installed to the both sides of roofing bottom, the montant is installed to the bottom of photovoltaic square matrix, the surface threaded connection of montant has first fastening bolt, the surface connection of montant has fixed cover, the inside of fixed cover is provided with a set of extrusion piece, the inside wall of extrusion piece is provided with the rigidity spring, the top of extrusion piece is provided with the connecting rod, the bottom of connecting rod is provided with first activity and presss from both sides, the movable rod has been cup jointed on the surface of first activity clamp. The utility model discloses a collocation use of montant, fixed cover, rigid spring, connecting rod, first activity clamp, lifting board and fixed block for photovoltaic square matrix is convenient for install fast fixedly, and follow-up damage convenient to detach can save certain installation time to a certain extent simultaneously, accelerates the progress of work.

Description

Building photovoltaic integration roofing metal installation
Technical Field
The utility model relates to a building photovoltaic integration technical field specifically is a building photovoltaic integration roofing metal device.
Background
The photovoltaic building integration is a technology for integrating a solar power generation product into a building, and simply means that a solar photovoltaic power generation matrix is installed on the outer surface of an envelope structure of the building to provide power.
The building integrated photovoltaic roof in the prior art has the following defects:
the existing photovoltaic integrated device for part of buildings is inconvenient for workers to rapidly install and detach the photovoltaic integrated device, so that the workers delay certain working time when installing a photovoltaic matrix, and are difficult to detach the photovoltaic integrated device in time after subsequent damage, and certain limitation is realized when the photovoltaic integrated device is used.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building photovoltaic integration roofing metal device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the purpose, the utility model provides the following technical scheme, a building photovoltaic integrated roof metal device comprises a roof, photovoltaic square matrixes and vertical plates, wherein a plurality of photovoltaic square matrixes are arranged above the roof, and the vertical plates are arranged on two sides of the bottom of the roof;
the montant is installed to the bottom of photovoltaic square matrix, the surperficial threaded connection of montant has first fastening bolt, the surface connection of montant has fixed cover, the inside of fixed cover is provided with a set of extrusion piece, the inside wall of extrusion piece is provided with rigid spring, the top of extrusion piece is provided with the connecting rod, the bottom of connecting rod is provided with first activity and presss from both sides, the movable rod has been cup jointed on the surface that first activity pressed from both sides, the second activity is pressed from both sides has been run through to the inside of movable rod, the top of riser inside wall is provided with the third activity and presss from both sides, the surface that the third activity pressed from both sides has cup jointed the board that lifts.
Preferably, the bottom of the lifting plate is provided with a fixed block, and the inside of the fixed block is in threaded connection with a second fastening bolt.
Preferably, a group of fixing strips is installed at the top of the roof, and a group of through holes are formed in the top of the fixing strips.
Preferably, a plurality of inserting holes are formed in the top of the roof, and the surface of the vertical rod penetrates through the inside of the inserting holes.
Preferably, the bottom of the photovoltaic square matrix is provided with a group of insertion rods, and the surfaces of the insertion rods penetrate through the through holes.
Preferably, the inside of roofing is provided with first strengthening rib, the inside of roofing is provided with the second strengthening rib.
Preferably, the inside of roofing is provided with the acoustic celotex board, the inside of acoustic celotex board is provided with soundproof cotton.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a collocation use of montant, fixed cover, rigid spring, connecting rod, movable rod, first activity clamp, lifting board and fixed block for photovoltaic square matrix is convenient for install fast fixedly, and follow-up damage convenient to detach simultaneously, the flexibility is higher, can save certain installation time to a certain extent, accelerates the progress of work.
2. The utility model discloses a collocation use of first strengthening rib, second strengthening rib, acoustic celotex board and soundproof cotton for the bearing capacity of roofing obtains further improvement, provides powerful holding power for the installation of follow-up photovoltaic square matrix, and acoustic celotex board and soundproof cotton can block the noise that external and photovoltaic square matrix during operation produced simultaneously.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of the movable rod structure of the present invention;
FIG. 3 is a schematic structural view of the fixing strip of the present invention;
FIG. 4 is a schematic view of the connecting rod structure of the present invention;
fig. 5 is a schematic diagram of the structure of the lifting plate of the present invention;
fig. 6 is a schematic structural view of the sound insulation board of the present invention.
In the figure: 1. a roof; 2. a photovoltaic square matrix; 3. a vertical plate; 4. a vertical rod; 5. a first fastening bolt; 6. fixing a sleeve; 7. a rigid spring; 8. a connecting rod; 9. a first movable clip; 10. a movable rod; 11. a second movable clamp; 12. a third movable clamp; 13. lifting the plate; 14. a fixed block; 15. a second fastening bolt; 16. a fixing strip; 17. a through hole; 18. inserting holes; 19. a plug rod; 20. a first reinforcing rib; 21. a second reinforcing rib; 22. an acoustical panel.
Detailed Description
Referring to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5, a building integrated photovoltaic roofing metal device;
the solar energy roof comprises a roof 1, photovoltaic square matrixes 2 and vertical plates 3, wherein a plurality of photovoltaic square matrixes 2 are arranged above the roof 1, the vertical plates 3 are arranged on two sides of the bottom of the roof 1, vertical rods 4 are arranged at the bottom of the photovoltaic square matrixes 2, first fastening bolts 5 are connected to the surfaces of the vertical rods 4 in a threaded manner, fixed sleeves 6 are connected to the surfaces of the vertical rods 4, a group of extrusion blocks are arranged inside the fixed sleeves 6, rigid springs 7 are arranged on the inner side walls of the extrusion blocks, connecting rods 8 are arranged at the tops of the extrusion blocks, first movable clamps 9 are arranged at the bottom ends of the connecting rods 8, movable rods 10 are sleeved on the surfaces of the first movable clamps 9, second movable clamps 11 penetrate through the inner parts of the movable rods 10, third movable clamps 12 are arranged at the top ends of the inner side walls of the vertical plates 3, lifting plates 13 are sleeved on the surfaces of the third movable clamps 12, fixed blocks 14 are arranged at the bottoms of the lifting plates 13, and second fastening bolts 15 are connected to the inner threads of the fixed blocks 14, a set of fixing strips 16 are installed on the top of the roof 1, a set of through holes 17 are formed in the top of the fixing strips 16, a plurality of inserting holes 18 are formed in the top of the roof 1, the surface of each vertical rod 4 penetrates through the inside of each inserting hole 18, a set of inserting rods 19 are arranged at the bottom of each photovoltaic square matrix 2, the surface of each inserting rod 19 penetrates through the inside of each through hole 17, each photovoltaic square matrix 2 is placed above the corresponding fixing strip 16, each inserting rod 19 is aligned to the inside of each through hole 17 at the bottom, each photovoltaic square matrix 2 is initially stabilized, meanwhile, the surface of each vertical rod 4 penetrates through the inside of each inserting hole 18, a worker screws the first fastening bolt 5 into the inside of each vertical rod 4, meanwhile, the surface thread of each first fastening bolt 5 penetrates through the inside of the corresponding fixing sleeve 6, the corresponding fixing sleeve 6 is fixed, at the moment, the worker pulls the lifting plate 13 downwards through the third movable clamp 12, the movable rod 10 pulls the connecting rod 8 outwards through the first movable clamp 9 and the second movable clamp 11, make connecting rod 8 drive the rigid spring 7 of its bottom to the outside pulling, the bottom and the 3 inside walls of riser of lift board 13 keep parallel state, the staff screws into the inside of fixed block 14 with second fastening bolt 15 this moment, and the surface screw thread of second fastening bolt 15 runs through in the inside of riser 3 simultaneously for rigid spring 7 provides a decurrent pulling force with montant 4, makes photovoltaic square matrix 2 obtain firmly.
Referring to fig. 1 and 6, a building integrated photovoltaic roofing metal installation;
roofing 1's inside is provided with first strengthening rib 20, roofing 1's inside is provided with second strengthening rib 21, roofing 1's inside is provided with acoustic celotex board 22, acoustic celotex board 22's inside is provided with soundproof cotton, in advance with first strengthening rib 20, roofing 1's inside is put into to second strengthening rib 21 and acoustic celotex board 22, make it obtain fixed back, install other devices again, make roofing 1's bearing capacity and firmness stronger through first strengthening rib 20 and second strengthening rib 21, guarantee follow-up photovoltaic square matrix 2's stable the placing, can block the noise that partial photovoltaic square matrix 2 during operation produced through acoustic celotex board 22 and soundproof cotton simultaneously, avoid causing unnecessary influence to indoor personnel.
The working principle is that the photovoltaic square matrix 2 is placed above the fixing strip 16, the insertion rod 19 is aligned to the inside of the through hole 17 at the bottom, the photovoltaic square matrix 2 is preliminarily stabilized, meanwhile, the surface of the vertical rod 4 penetrates through the inside of the insertion hole 18, a worker screws the first fastening bolt 5 into the inside of the vertical rod 4, meanwhile, the surface thread of the first fastening bolt 5 penetrates through the inside of the fixing sleeve 6, the fixing sleeve 6 is fixed, at the moment, the worker pulls the lifting plate 13 downwards through the third movable clamp 12, the movable rod 10 pulls the connecting rod 8 outwards through the first movable clamp 9 and the second movable clamp 11, the connecting rod 8 drives the rigid spring 7 at the bottom end of the lifting plate to be pulled outwards until the bottom of the lifting plate 13 and the inner side wall of the vertical plate 3 are kept in a parallel state, at the moment, the worker screws the second fastening bolt 15 into the inside of the fixing block 14, and simultaneously, the surface thread of the second fastening bolt 15 penetrates through the inside of the vertical plate 3, make rigidity spring 7 provide a decurrent pulling force with montant 4, make photovoltaic square matrix 2 obtain firmly, in advance with first strengthening rib 20, the inside of roofing 1 is put into to second strengthening rib 21 and acoustic celotex board 22, make it obtain fixed back, install other devices again, make roofing 1's bearing capacity and sturdiness stronger through first strengthening rib 20 and second strengthening rib 21, guarantee the stable of follow-up photovoltaic square matrix 2 and place, can block the noise that partial photovoltaic square matrix 2 during operation produced through acoustic celotex board 22 and soundproof cotton simultaneously, avoid causing the unnecessary influence to indoor personnel.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a building photovoltaic integration roofing metal installation, includes roofing (1), photovoltaic square matrix (2) and riser (3), its characterized in that: a plurality of photovoltaic square matrixes (2) are arranged above the roof (1), and vertical plates (3) are arranged on two sides of the bottom of the roof (1);
montant (4) are installed to the bottom of photovoltaic square matrix (2), the surperficial threaded connection of montant (4) has first fastening bolt (5), the surface of montant (4) is connected with fixed cover (6), the inside of fixed cover (6) is provided with a set of extrusion piece, the inside wall of extrusion piece is provided with rigidity spring (7), the top of extrusion piece is provided with connecting rod (8), the bottom of connecting rod (8) is provided with first activity and presss from both sides (9), movable rod (10) have been cup jointed on the surface of first activity clamp (9), the inside of movable rod (10) is run through and is had the second activity to press from both sides (11), the top of riser (3) inside wall is provided with the third activity and presss from both sides (12), the surface that the third activity pressed from both sides (12) has cup jointed and has lifted board (13).
2. The building integrated photovoltaic roofing metal installation of claim 1, wherein: the bottom of the lifting plate (13) is provided with a fixed block (14), and the inside of the fixed block (14) is in threaded connection with a second fastening bolt (15).
3. The building integrated photovoltaic roofing metal installation of claim 1, wherein: a set of fixed strip (16) is installed at the top of roofing (1), a set of through-hole (17) has been seted up at the top of fixed strip (16).
4. The building integrated photovoltaic roofing metal installation of claim 1, wherein: a plurality of plug holes (18) are formed in the top of the roof (1), and the surfaces of the vertical rods (4) penetrate through the plug holes (18).
5. The building integrated photovoltaic roofing metal installation of claim 1, wherein: the bottom of the photovoltaic square matrix (2) is provided with a group of insertion rods (19), and the surfaces of the insertion rods (19) penetrate through the inside of the through holes (17).
6. The building integrated photovoltaic roofing metal device of claim 1, wherein: the roof is characterized in that a first reinforcing rib (20) is arranged inside the roof (1), and a second reinforcing rib (21) is arranged inside the roof (1).
7. The building integrated photovoltaic roofing metal installation of claim 1, wherein: the interior of roofing (1) is provided with acoustic celotex board (22), the inside of acoustic celotex board (22) is provided with soundproof cotton.
CN202220660439.7U 2022-03-24 2022-03-24 Building photovoltaic integration roofing metal installation Active CN217150854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220660439.7U CN217150854U (en) 2022-03-24 2022-03-24 Building photovoltaic integration roofing metal installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220660439.7U CN217150854U (en) 2022-03-24 2022-03-24 Building photovoltaic integration roofing metal installation

Publications (1)

Publication Number Publication Date
CN217150854U true CN217150854U (en) 2022-08-09

Family

ID=82696223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220660439.7U Active CN217150854U (en) 2022-03-24 2022-03-24 Building photovoltaic integration roofing metal installation

Country Status (1)

Country Link
CN (1) CN217150854U (en)

Similar Documents

Publication Publication Date Title
CN217150854U (en) Building photovoltaic integration roofing metal installation
CN213509665U (en) Auxiliary device for mounting curtain wall
CN214941332U (en) Partition factory building goods lift room partition wall plate structure convenient to installation
CN218561044U (en) A operation platform for installing template
CN213329907U (en) Thin plastering construction tool
CN210418936U (en) Hoisting member of assembly type building
CN206267386U (en) A kind of curtain wall panel of hanging type curtain wall
CN216202269U (en) Be used for a building electromechanical installation gallows
CN215549859U (en) Novel building engineering drilling support
CN219909951U (en) Building construction template anchor clamps
CN219794292U (en) Connecting device and photovoltaic building
CN220954075U (en) Energy-saving curtain wall convenient to install
CN214302423U (en) Stable in structure's quick-mounting formula building curtain connection structure
CN221275085U (en) High panel hoist device
CN217975296U (en) Constructional engineering steel construction support frame
CN221194224U (en) Wall-attached support mounting device for climbing frame
CN114183004B (en) Auxiliary device for erecting support frame of power transmission and transformation line tower body and construction method
CN210820064U (en) Reinforced concrete shaping vibrating device
CN220868537U (en) Water batch plate for metal curtain wall
CN220395139U (en) Building lifting hanging basket
CN217892646U (en) Steel beam temporary protection structure with good stability
CN214994659U (en) Steel construction removal board house of convenient dismantlement and being convenient for remove
CN214780466U (en) Supporting pile and outer wall structure hoisting device
CN220998883U (en) Hoisting node of steel frame modular structure
CN214531309U (en) Assembled steel structure outer wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant