CN217105650U - Wallboard mounting structure of steel construction factory building - Google Patents
Wallboard mounting structure of steel construction factory building Download PDFInfo
- Publication number
- CN217105650U CN217105650U CN202220167624.2U CN202220167624U CN217105650U CN 217105650 U CN217105650 U CN 217105650U CN 202220167624 U CN202220167624 U CN 202220167624U CN 217105650 U CN217105650 U CN 217105650U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- factory building
- mounting bracket
- mounting
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 61
- 239000010959 steel Substances 0.000 title claims abstract description 61
- 238000010276 construction Methods 0.000 title abstract description 14
- 239000000428 dust Substances 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 12
- 230000008093 supporting effect Effects 0.000 abstract description 9
- 238000012544 monitoring process Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 description 7
- 238000005273 aeration Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a wallboard mounting structure of steel construction factory building, including the mounting bracket, the mounting bracket is installed on the outside surface of external support steel column, and the both sides of mounting bracket are seted up the bolt hole and are installed first bolt, and external wallboard is installed in the front side of mounting bracket through first bolt, and the middle part of mounting bracket front side surface has seted up the holding tank, and the holding tank corresponds with the clearance between the adjacent wallboard; the wallboard mounting structure that this scheme provided under mutually supporting of each part, through the inflation of bar gasbag, realized carrying out the effect of shutoff to the clearance between the adjacent wallboard to make inside external moisture, rainwater or wind can't enter into the factory building through this clearance, and the miniature manometer of accessible monitors the inside pressure of bar gasbag, and carry out gaseous replenishment to the bar gasbag according to the monitoring result, thereby promoted the practicality of bar gasbag.
Description
Technical Field
The utility model relates to a steel construction factory building technical field especially relates to a wallboard mounting structure of steel construction factory building.
Background
The steel structure factory building mainly means that main bearing components are made of steel. Including supporting the steel column, the girder steel, steel construction basis, steel roof truss, steel roof, because the steel member factory building has that the building quality is light, intensity is high, and the span is big, construction period is short, corresponding reduction investment cost moves multiple use advantages such as convenient, the recovery is pollution-free, its steel member factory building uses more extensively.
And the steel member factory building is according to specific user demand installation wallboard in its outside when using, and current wallboard mainly adopts bolted connection's mode to fix the wallboard in the support steel column outside of steel construction when the installation, and then forms sealedly to the steel structure factory building through the concatenation of polylith wallboard, provides the effect of keeping out the wind and keeping out the rain to steel structure factory building inside promptly.
However, the existing steel structure factory building is lack of a wallboard mounting structure, so that gaps between adjacent wallboards cannot be plugged in the wallboard mounting process, and therefore in the subsequent use process, external moisture, rainwater or wind and the like can enter the factory building through the gaps between the wallboards, namely, the internal environment of the factory building is influenced; therefore, in order to solve the above technical problems, we propose a wall panel installation structure of a steel structure factory building.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a wallboard mounting structure of a steel structure factory building.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the wallboard mounting structure of the steel structure factory building comprises a mounting frame, wherein the mounting frame is mounted on the outer side surface of an external support steel column, bolt holes are formed in two sides of the mounting frame, first bolts are mounted on the two sides of the mounting frame, and an external wallboard is mounted on the front side of the mounting frame through the first bolts;
the holding tank has been seted up at the middle part of mounting bracket front side surface, the clearance between holding tank and the adjacent wallboard is corresponding, just the internally mounted of holding tank has the bar gasbag, the intake pipe is installed to the lower extreme of bar gasbag, the other end of intake pipe runs through to the outside rear side that supports the steel column and installs the air cock.
Preferably, the air inlet pipe is provided with a miniature pressure gauge on the pipe body between the external support steel column and the air tap.
Preferably, a plurality of threaded holes are formed in the surface, facing the outside, of one side of the steel column supporting the mounting frame, second bolts are meshed with the mounting frame through the threaded holes, and the mounting frame is connected with the outside supporting steel column through the second bolts.
Preferably, the middle part of mounting bracket surface in the front and the inner wall of holding tank have been seted up and have been inlayed the groove, it has the sticking strip to inlay inslot portion, the rear side surface of bar gasbag is connected with the mounting bracket through sticking the strip.
Preferably, the two sides of the front side surface of the mounting frame are provided with sealing gaskets, and the sealing gaskets are positioned between the wall plate and the mounting frame.
Preferably, the welding has a plurality of diaphragms on the support body of mounting bracket both sides, seted up a plurality of through-holes and be equipped with the third bolt on the plate body of diaphragm, the diaphragm is connected with external wallboard through the third bolt.
Preferably, the end of the air tap is provided with a dust cap.
The utility model provides a pair of wallboard mounting structure of steel construction factory building, beneficial effect lies in: this scheme is in the use, install the wallboard in the outside of supporting the steel column in proper order through a plurality of mounting brackets to form sealed effect to the steel construction factory building, after the wallboard installation is accomplished, personnel input gas in to the bar gasbag through external aeration equipment, and then the bar gasbag is along with gaseous entering and expanding constantly, during further bar gasbag inflation earlier closely laminate with the wallboard, and finally extend to in the clearance between the adjacent wallboard, just realized carrying out the effect of shutoff to the clearance between the adjacent wallboard from this.
Consequently, the wallboard mounting structure that this scheme provided is under the mutually supporting of each part, inflation through bar gasbag, the effect of shutoff is carried out to the clearance between the adjacent wallboard has been realized, when the wallboard was installed through mounting structure promptly, clearance between the adjacent wallboard receives the shutoff of bar gasbag and forms encapsulated situation, thereby make external moisture, rainwater or wind can't enter into the factory building through this clearance inside, and the inside pressure of accessible miniature manometer to the bar gasbag monitors, and carry out gaseous replenishment to the bar gasbag according to the monitoring result, thereby bar gasbag's practicality has been promoted.
Drawings
Fig. 1 is an assembly schematic view of a wallboard mounting structure of a steel structure factory building provided by the utility model;
fig. 2 is an enlarged schematic view of a place a of the wallboard mounting structure of the steel structure factory building provided by the utility model;
fig. 3 is an axonometric view of a wallboard installation structure of a steel structure factory building provided by the utility model;
fig. 4 is an enlarged schematic view of a wall plate mounting structure of a steel structure factory building at the position B of the utility model;
fig. 5 is a schematic structural view of a wallboard installation structure of a steel structure factory building provided by the utility model;
fig. 6 is the utility model provides a strip gasbag and mounting bracket split schematic diagram of wallboard mounting structure of steel construction factory building.
In the figure: 1. a mounting frame; 2. a first bolt; 3. a strip-shaped air bag; 4. an air inlet pipe; 5. an air tap; 6. a miniature pressure gauge; 7. a second bolt; 8. a bonding strip; 9. a gasket; 10. a transverse plate; 11. a third bolt; 12. a dust cap.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-6, a wallboard mounting structure of steel construction factory building, includes mounting bracket 1, and mounting bracket 1 installs the outside surface at external support steel column, and the bolt hole has been seted up and first bolt 2 is installed to mounting bracket 1's both sides, and external wallboard passes through first bolt 2 to be installed at the front side of mounting bracket 1.
The holding tank has been seted up at the middle part of 1 front side surface of mounting bracket, the clearance between holding tank and the adjacent wallboard is corresponding, and the internally mounted of holding tank has bar gasbag 3, intake pipe 4 is installed to the lower extreme of bar gasbag 3, the other end of intake pipe 4 runs through to the outside rear side that supports the steel column and installs air cock 5, dust cap 12 is installed to the tip of air cock 5, dust cap 12 set up can play the protection effect to air cock 5.
Intake pipe 4 is located and installs miniature manometer 6 on the external body that supports between steel column and the air cock 5, mounting bracket 1 is equipped with a plurality of screw holes towards the external side surface that supports the steel column, mounting bracket 1 has second bolt 7 through the screw hole meshing, mounting bracket 1 is connected with external support steel column through second bolt 7, miniature manometer 6's setting, can monitor the pressure of 3 inside strip gasbags, thereby ensure that strip gasbags 3 are better to the shutoff effect in clearance between the wallboard, and second bolt 7's setting, make to be between mounting bracket 1 and the external support steel column and to dismantle the connection status, thereby when making the wallboard demolish or the steel construction factory building demolish, the dismantlement that its mounting bracket 1 can be convenient, be favorable to mounting bracket 1's reuse promptly.
The middle part of the surface of mounting bracket 1 front side and the inner wall of holding tank have been seted up and have been inlayed the groove, it inlays to have paste strip 8 to inlay inslot portion, the rear side surface of bar gasbag 3 is connected with mounting bracket 1 through pasting strip 8, the both sides of the surface of mounting bracket 1 front side are equipped with sealed pad 9, sealed pad 9 is located between wallboard and the mounting bracket 1, paste the setting of strip 8, make bar gasbag 3 can closely laminate in the holding tank under the non-inflation state, thereby make the holding tank of mounting bracket 1 can provide the protection effect to bar gasbag 3, and the setting of sealed pad 9, then the sealed effect between wallboard and the mounting bracket 1 has been promoted.
The welding has a plurality of diaphragms 10 on the support body of mounting bracket 1 both sides, has seted up a plurality of through-holes and has been equipped with third bolt 11 on the plate body of diaphragm 10, and diaphragm 10 is connected with external wallboard through third bolt 11, and diaphragm 10 and third bolt 11's setting for mounting bracket 1 provides certain supporting effect to the middle part of wallboard, has more promoted the fastness when the wallboard is installed.
The use principle and the advantages are as follows: the utility model discloses in the use, the personnel fix the preceding side surface at external support steel column through second bolt 7 to mounting bracket 1, and then are connected external wallboard with mounting bracket 1 through first bolt 2, and further install the wallboard in proper order in the outside of supporting the steel column through a plurality of mounting brackets 1 to form sealed effect to the steel construction factory building.
After the wallboard installation is accomplished, the personnel are connected air cock 5 with external aeration equipment, external aeration equipment is gaseous through air cock 5 and 4 inputs in to bar gasbag 3 of intake pipe promptly, and then bar gasbag 3 expands along with gaseous constantly getting into, earlier closely laminate with the wallboard when further bar gasbag 3 expands, and finally extend to in the clearance between the adjacent wallboard, from this just realized carrying out the effect of shutoff to the clearance between the adjacent wallboard, the wallboard is in the use promptly, external moisture, rainwater or wind just can't enter into the factory building through the clearance between the wallboard inside.
Further personnel are to the gaseous in-process of 3 inside impact of bar gasbags, and 3 internal pressure of bar gasbags are observed to the miniature manometer 6 of accessible to ensure that 3 internal pressure of bar gasbags are in safe range, avoided 3 internal pressure of bar gasbags too big and the phenomenon of damage, and in follow-up use, personnel can regularly patrol miniature manometer 6, thereby according to 6 readings of miniature manometer to the appropriate make-up gas of bar gasbags 3.
Consequently, the wallboard mounting structure that this scheme provided is under the mutually supporting of each part, inflation through bar gasbag 3, the effect of shutoff is carried out in the clearance between the adjacent wallboard to having realized, when the wallboard is installed through mounting structure promptly, clearance between the adjacent wallboard receives bar gasbag 3's shutoff and forms encapsulated situation, thereby make external moisture, rainwater or wind can't enter into the factory building through this clearance inside, and the inside pressure of accessible miniature manometer 6 pair bar gasbag 3 monitors, and carry out gaseous replenishment to bar gasbag 3 according to the monitoring result, thereby bar gasbag 3's practicality has been promoted.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The wallboard mounting structure of the steel structure factory building comprises a mounting frame (1), and is characterized in that the mounting frame (1) is mounted on the outer side surface of an external support steel column, bolt holes are formed in two sides of the mounting frame (1) and provided with first bolts (2), and an external wallboard is mounted on the front side of the mounting frame (1) through the first bolts (2);
the holding tank has been seted up at the middle part of mounting bracket (1) front side surface, the clearance between holding tank and the adjacent wallboard is corresponding, just the internally mounted of holding tank has bar gasbag (3), intake pipe (4) are installed to the lower extreme of bar gasbag (3), the other end of intake pipe (4) runs through to the rear side of external support steel column and installs air cock (5).
2. The wall plate mounting structure of a steel structure factory building according to claim 1, wherein a micro pressure gauge (6) is mounted on the pipe body of the air inlet pipe (4) between the external support steel column and the air nozzle (5).
3. The wallboard mounting structure of a steel structure factory building according to claim 1, wherein a side surface of the mounting bracket (1) facing an external support steel column is provided with a plurality of threaded holes, the mounting bracket (1) is engaged with a second bolt (7) through the threaded holes, and the mounting bracket (1) is connected with the external support steel column through the second bolt (7).
4. The wallboard mounting structure of a steel structure factory building according to claim 1, characterized in that, the middle part of mounting bracket (1) front side surface and the inner wall of holding tank have seted up and have inlayed the groove, it has paste strip (8) to inlay inslot portion, the rear side surface of bar gasbag (3) is connected with mounting bracket (1) through pasting strip (8).
5. The wall panel mounting structure of a steel structure factory building according to claim 1, characterized in that, the both sides of the front side surface of the mounting frame (1) are provided with gaskets (9), and the gaskets (9) are positioned between the wall panel and the mounting frame (1).
6. The wallboard mounting structure of steel structure factory building according to claim 1, characterized in that, the welding has a plurality of diaphragm (10) on the support body of mounting bracket (1) both sides, seted up a plurality of through-holes and be equipped with third bolt (11) on the plate body of diaphragm (10), diaphragm (10) are connected with external wallboard through third bolt (11).
7. The wall plate mounting structure of a steel structure factory building according to claim 1, wherein the end of the air nozzle (5) is provided with a dust cap (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220167624.2U CN217105650U (en) | 2022-01-21 | 2022-01-21 | Wallboard mounting structure of steel construction factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220167624.2U CN217105650U (en) | 2022-01-21 | 2022-01-21 | Wallboard mounting structure of steel construction factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217105650U true CN217105650U (en) | 2022-08-02 |
Family
ID=82596847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220167624.2U Active CN217105650U (en) | 2022-01-21 | 2022-01-21 | Wallboard mounting structure of steel construction factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217105650U (en) |
-
2022
- 2022-01-21 CN CN202220167624.2U patent/CN217105650U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202284352U (en) | Ceramic thin-plate curtain-wall node | |
CN202945719U (en) | Intelligent glass curtain wall with sunshade function | |
CN217105650U (en) | Wallboard mounting structure of steel construction factory building | |
CN203022176U (en) | Large span steel structure exposed framing glass curtain wall | |
CN102425255A (en) | Assembled unit frame glass curtain wall system | |
CN116815974A (en) | Unit type metal composite heat-insulation curtain wall system | |
CN203347070U (en) | Decorative molding of glass curtain wall | |
CN214461232U (en) | Steel mesh frame conversion layer connecting device | |
CN205792394U (en) | Solar photovoltaic assembly scalable installs briquetting | |
CN208633310U (en) | A kind of precast facade of embedded solar collector plate | |
CN210395774U (en) | Box type integral assembling building curtain wall | |
CN209723349U (en) | A kind of light gauge cold-formed steel shape coagulation local soil type mould assembly superstructure with lower flume | |
CN201309399Y (en) | Skylight structure | |
CN218758131U (en) | Steel keel stone-imitated photovoltaic panel power generation system | |
CN217581150U (en) | A climb a wall support backing plate that attaches for integration heat preservation outer wall | |
CN2646854Y (en) | A wind pressure switch | |
CN213741814U (en) | Keel framework for large-area combined curtain wall system | |
CN219638190U (en) | Building engineering external decoration curtain wall | |
CN205063112U (en) | Latent frame glass curtain wall | |
CN214556130U (en) | Water accumulation and snow accumulation preventing glass sealing cover | |
CN110107003B (en) | Dysmorphism metal curtain wall strengthening rib structure | |
CN211873468U (en) | Stone curtain wall system | |
CN221597814U (en) | Frame structure of photovoltaic board | |
CN211817264U (en) | Building curtain wall capable of being rapidly disassembled | |
CN217870965U (en) | Waterproof assembly type building steel structure splicing piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |