CN217104857U - Highway is handed over along line and is installed and execute quick installation device - Google Patents

Highway is handed over along line and is installed and execute quick installation device Download PDF

Info

Publication number
CN217104857U
CN217104857U CN202220762594.XU CN202220762594U CN217104857U CN 217104857 U CN217104857 U CN 217104857U CN 202220762594 U CN202220762594 U CN 202220762594U CN 217104857 U CN217104857 U CN 217104857U
Authority
CN
China
Prior art keywords
block
fixed
rod
slider
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220762594.XU
Other languages
Chinese (zh)
Inventor
石嘉
王莹
吉瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220762594.XU priority Critical patent/CN217104857U/en
Application granted granted Critical
Publication of CN217104857U publication Critical patent/CN217104857U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a highway is handed over along the line and is installed quick installation device of executing, which comprises a supporting column, support column one side is equipped with the installation component, the installation component includes installation piece, connecting block, connecting plate, buffer board, first slider, second slider, gag lever post and connecting rod. The utility model belongs to the technical field of guardrail equipment, specifically provide a practicality is high, and is simple to use, is convenient for assemble through the installation component, has buffer function, saves time for the construction progress is used manpower sparingly, all has fine anticollision effect simultaneously, absorbs the kinetic energy of accident vehicle striking, reduces accident loss's highway along the line and hands over and install quick installation device.

Description

Highway is handed over along line and is installed and execute quick installation device
Technical Field
The utility model belongs to the technical field of guardrail equipment, specifically indicate a highway is handed over along the line and is installed and execute quick installation device.
Background
The highway guardrail is a main form of a semi-rigid guardrail and is a continuous structure formed by splicing corrugated steel guardrail plates and supporting the corrugated steel guardrail plates by main columns. The vehicle can absorb energy when colliding, is not easy to be collided, and can well protect the vehicle and the driver and passengers. The highway guardrail can be divided into roadside guardrails and central division strip guardrails according to the installation position, and can be divided into A-level guardrail and S-level guardrail according to the anti-collision grade. The S-level guardrail belongs to a reinforced type and is suitable for particularly dangerous road sections on the road side, and the A-level guardrail is used for special roads. The common roadside corrugated beam guardrail can be divided into five grades of B, A, SB, SA and SS according to the anti-collision grade.
The existing highway guardrail needs to be installed on site when being installed. The connecting part of the transverse guardrail and the supporting column is generally fixed by riveting or bolts. The speed is low, and meanwhile, the labor is high, so that the defect of the existing engineering construction on the speed is not facilitated.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming prior art's defect, the utility model provides a practicality is high, and is simple to use, is convenient for assemble through the installation component, has buffer function, saves time for the construction progress is used manpower sparingly, all has fine anticollision effect simultaneously, absorbs the kinetic energy of accident vehicle striking, reduces the highway of accident loss and hands over along the line and installs and execute quick installation device.
The utility model adopts the following technical scheme: the utility model relates to a highway is crossed along line and is installed and execute quick installation device, including the support column, support column one side is equipped with the installation component, the installation component includes installation piece, connecting block, connecting plate, buffer board, first slider, second slider, gag lever post and connecting rod, one side connection is equipped with the fixed cavity on the support column, fixed cavity top is the setting of opening form, the installation piece is located the fixed cavity, the connecting block is connected and is located one side on the installation piece, the connecting plate is connected and is located one end on the connecting block, the buffer board is located the connecting plate and just to one side, be equipped with the spacing groove on the connecting plate relative to one side of the buffer board, first slider and second slider all slide and locate the spacing inslot, the connecting rod symmetry is located between buffer board and the connecting plate, and the connecting rod both ends are articulated respectively on the buffer board and on the first slider, and two ends of the limiting rod are respectively hinged to the connecting rod and the second sliding block.
Preferably, both sides all run through on the fixed chamber and are equipped with the dead lever, fixed intracavity top symmetry is equipped with the baffler, just the baffler is connected and is located dead lever one end, fixes spacingly to the installation piece, prevents that the installation piece from popping out fixed intracavity.
Preferably, the fixing rod is sleeved with an elastic part, two ends of the elastic part are respectively connected with the side wall of the fixing cavity and one end of the fixing rod, and the fixing rod can be conveniently pulled.
Preferably, the mounting block is arranged in a trapezoidal block shape, and the mounting block is engaged with the fixing cavity.
Preferably, the slider symmetry is equipped with two sets ofly, be equipped with first spring between the second slider, be equipped with the second spring between first slider and the spout lateral wall, through the buffer board to the connecting plate transmission, the slider extrudees tensile to the spring to cushion the impact force.
Preferably, one side is connected on the buffer board and is equipped with the connection chamber, it is equipped with the fixed block to connect the intracavity, just be equipped with the horizontal pole on the fixed block, it is equipped with two sets of screws to run through on the connection chamber, just fixed block one side is located to the screw rod, and is spacing to the fixed block.
Adopt above-mentioned structure the utility model discloses the beneficial effect who gains as follows: this scheme a highway is handed over along the line and is installed quick installation device, the practicality is high, and is simple to use, is convenient for assemble through the installation component, has buffer function, saves time for the construction progress is used manpower sparingly, all has fine anticollision effect simultaneously, absorbs the kinetic energy of accident vehicle striking, reduces the accident loss.
Drawings
FIG. 1 is a schematic view of the overall structure of a rapid installation device installed along a highway according to the present invention;
fig. 2 is the structure diagram of the fixing cavity of the rapid installation device installed along the highway.
Wherein, 1, support column, 2, installation component, 3, installation piece, 4, connecting block, 5, connecting plate, 6, buffer board, 7, first slider, 8, second slider, 9, gag lever post, 10, connecting rod, 11, fixed chamber, 12, spacing groove, 13, dead lever, 14, baffler, 15, elastic component, 16, first spring, 17, second spring, 18, connection chamber, 19, fixed block, 20, horizontal pole, 21, screw rod.
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in figure 1, the utility model relates to a highway line intersection installation and rapid installation device, which comprises a support column 1, wherein one side of the support column 1 is provided with an installation component 2, the installation component 2 comprises an installation block 3, a connecting block 4, a connecting plate 5, a buffer plate 6, a first slide block 7, a second slide block 8, a limiting rod 9 and a connecting rod 10, one side of the support column 1 is connected with a fixed cavity 11, the upper part of the fixed cavity 11 is arranged in an opening shape, the installation block 3 is arranged in the fixed cavity 11, the connecting block 4 is connected with one side of the installation block 3, the connecting plate 5 is connected with one end of the connecting block 4, the buffer plate 6 is arranged at one side opposite to the connecting plate 5, the connecting plate 5 is provided with a limiting groove 12 opposite to one side of the buffer plate 6, the first slide block 7 and the second slide block 8 are both arranged in the limiting groove 12, the connecting rod 10 is symmetrically arranged between the buffer plate 6 and the connecting plate 5, and the two ends of the connecting rod 10 are respectively hinged on the buffer plate 6 and the first sliding block 7, and the two ends of the limiting rod 9 are respectively hinged on the connecting rod 10 and the second sliding block 8.
As shown in fig. 2, both sides all run through on the fixed chamber 11 and are equipped with dead lever 13, the top symmetry is equipped with baffler 14 in the fixed chamber 11, just baffler 14 is connected and is located dead lever 13 and serve, fixes spacingly to installation piece 3, prevents that installation piece 3 from popping out in fixed chamber 11, the cover is equipped with elastic component 15 on the dead lever 13, just elastic component 15 both ends are connected respectively and are located fixed chamber 11 lateral wall and dead lever 13 and serve, are convenient for spur the fixed plate through dead lever 13.
The mounting block 3 is arranged in a trapezoidal block manner, and the mounting block 3 is meshed with the fixing cavity 11; two groups of sliding blocks are symmetrically arranged, a first spring 16 is arranged between the second sliding blocks 8, and a second spring 17 is arranged between the first sliding block 7 and the side wall of the sliding chute; a connecting cavity 18 is connected to one side of the buffer plate 6, a fixed block 19 is arranged in the connecting cavity 18, a cross rod 20 is arranged on the fixed block 19, two groups of screw rods 21 penetrate through the connecting cavity 18, and the screw rods 21 are arranged on one side of the fixed block 19;
when the device is used specifically, the supporting column 1 is fixed on a foundation, the mounting component 2 is pressed downwards from an opening above the fixed cavity 11 through the mounting block 3, the mounting block 3 is in a trapezoidal arrangement, the barrier plate 14 is pushed towards two sides in the pressing process, after the mounting is completed, the barrier plate 14 rebounds to an initial state due to the action of the elastic piece 15 to block the mounting block 3 and prevent the mounting block 3 from popping out of the fixed cavity 11, the mounting is convenient, manpower is saved, the fixing block 19 is arranged in the connecting cavity 18 through the opening on one side of the connecting cavity 18 and rotates through the screw 21 to block the fixing block 19, so that the mounting of the cross rod 20 is completed, the buffer plate 6 transmits to one side of the connecting plate 5 when collision occurs, the connecting rod 10 and the limiting rod 9 are extruded, so that the connecting rod 10 and the limiting rod 9 drive the first slider 7 and the second slider 8 to slide in the limiting groove 12, the first sliding block 7 extrudes the second spring 17, the second sliding block 8 extrudes the first spring 16, buffering can be effectively carried out, kinetic energy of accident vehicle impact is absorbed, and accident loss is reduced
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (6)

1. The utility model provides a highway is crossed along line and is installed quick installation device of executing which characterized in that: comprises a supporting column, wherein one side of the supporting column is provided with a mounting component, the mounting component comprises a mounting block, a connecting plate, a buffer plate, a first sliding block, a second sliding block, a limiting rod and a connecting rod, a fixed cavity is connected with one side of the supporting column, the upper part of the fixed cavity is arranged in an opening shape, the mounting block is arranged in the fixed cavity, the connecting block is connected with one side of the mounting block, the connecting plate is connected with one end of the connecting block, the buffer plate is arranged at one side opposite to the connecting plate, a limit groove is arranged at one side of the connecting plate opposite to the buffer plate, the first sliding block and the second sliding block are both arranged in the limiting groove in a sliding manner, the connecting rods are symmetrically arranged between the buffer plate and the connecting plate, and the two ends of the connecting rod are respectively hinged on the buffer plate and the first sliding block, and the two ends of the limiting rod are respectively hinged on the connecting rod and the second sliding block.
2. The device of claim 1, wherein the device comprises: the fixed chamber is provided with a fixed rod on both sides in a penetrating manner, the top of the fixed chamber is symmetrically provided with a baffle plate, and the baffle plate is connected to one end of the fixed rod.
3. The device of claim 2, wherein the device comprises: the fixing rod is sleeved with an elastic piece, and two ends of the elastic piece are respectively connected with the side wall of the fixing cavity and one end of the fixing rod.
4. The device of claim 1, wherein the device comprises: the mounting block is arranged in a trapezoidal block mode, and the mounting block is meshed with the fixing cavity.
5. The device of claim 1, wherein the device comprises: the slider symmetry is equipped with two sets ofly, be equipped with first spring between the second slider, be equipped with the second spring between first slider and the spout lateral wall.
6. The device of claim 1, wherein the device comprises: one side is connected on the buffer board and is equipped with the connection chamber, it is equipped with the fixed block to connect the intracavity, just be equipped with the horizontal pole on the fixed block, it is equipped with two sets of screw rods to run through on the connection chamber, just fixed block one side is located to the screw rod.
CN202220762594.XU 2022-04-02 2022-04-02 Highway is handed over along line and is installed and execute quick installation device Expired - Fee Related CN217104857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220762594.XU CN217104857U (en) 2022-04-02 2022-04-02 Highway is handed over along line and is installed and execute quick installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220762594.XU CN217104857U (en) 2022-04-02 2022-04-02 Highway is handed over along line and is installed and execute quick installation device

Publications (1)

Publication Number Publication Date
CN217104857U true CN217104857U (en) 2022-08-02

Family

ID=82577674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220762594.XU Expired - Fee Related CN217104857U (en) 2022-04-02 2022-04-02 Highway is handed over along line and is installed and execute quick installation device

Country Status (1)

Country Link
CN (1) CN217104857U (en)

Similar Documents

Publication Publication Date Title
CN208136786U (en) A kind of highway protective fence
CN103850205A (en) Rotary rod pressure spring type guide crash pad
CN209836869U (en) Road protection device for expressway
CN217104857U (en) Highway is handed over along line and is installed and execute quick installation device
CN111945629A (en) Double-resistance type highway protection buffer device
CN203782612U (en) Novel half-shell collision energy attenuation device used on highway guardrail ends
CN211113175U (en) Telescopic anticollision buffer of bridge railing tip
CN207210991U (en) A kind of anticollision buffering warning Guide vehicle
CN108004983B (en) A kind of flexible guardrail
CN211973281U (en) Concrete road anticollision partition fence
Yao et al. Analysis of anti-collision performance of a new assembled rolling guardrail
CN103437309B (en) A kind of fence unit and guardrail
CN209652820U (en) A kind of anticollision highway barrier
CN219972988U (en) Road bridge vehicle upper portion striking protector
CN203440773U (en) Fence unit and fence
CN205399305U (en) Expressway protective fence
CN220079736U (en) Wing-free wall transition section guardrail
CN221589258U (en) Crash barrier based on bridge design
CN219032926U (en) Road and bridge rail guard with buffering effect
CN219886543U (en) Highway bridge buffer stop
CN216712860U (en) Rubber anti-collision pad for highway
CN212052279U (en) Highway bridge engineering safety control buffer stop
CN220746684U (en) Highway rail guard buffer
CN217783132U (en) Anti-collision device for road safety construction
CN213805071U (en) Guardrail structure for highway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220802

CF01 Termination of patent right due to non-payment of annual fee