CN217087472U - Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation - Google Patents

Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation Download PDF

Info

Publication number
CN217087472U
CN217087472U CN202123454857.5U CN202123454857U CN217087472U CN 217087472 U CN217087472 U CN 217087472U CN 202123454857 U CN202123454857 U CN 202123454857U CN 217087472 U CN217087472 U CN 217087472U
Authority
CN
China
Prior art keywords
low speed
medium
arrester
contact rail
ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123454857.5U
Other languages
Chinese (zh)
Inventor
林真兵
徐早华
许泽群
晁鹏程
周鹏
叶文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Electric Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202123454857.5U priority Critical patent/CN217087472U/en
Application granted granted Critical
Publication of CN217087472U publication Critical patent/CN217087472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a supplementary ladder of medium-low speed magnetism suspension contact rail arrester installation, including supplementary ladder main part, the top of supplementary ladder main part even has the connecting rod that a pair of level set up, downward vertical installation has the peg on the connecting rod, the bottom of supplementary ladder main part is provided with the bottom plate. The utility model discloses a set up the peg, make supplementary ladder inject the gap between the pier top horizontal tie beam through the peg to make supplementary ladder main part can hang in the side of horizontal tie beam, the staff can stand and carry out contact rail arrester installation operation on the bottom plate.

Description

Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation
Technical Field
The utility model belongs to railway construction field, concretely relates to supplementary ladder of well low-speed magnetism suspension contact rail arrester installation.
Background
In the installation process of the lightning arrester of the contact rail, the quality requirement of the installation of the lightning arrester can be ensured only if the installation parameters of the embedded part of the lightning arrester meet the design requirements. Because maglev circuit bridge section adopts the simple beam, adopts the horizontal tie beam to connect between the line roof beam body about, and maglev contact rail arrester is installed on the lateral wall of the horizontal tie beam at pier top, and pier top space is shared by the horizontal tie beam almost completely, punches when carrying out the arrester installation on the horizontal tie beam lateral wall, has high installation risk. Only when the lightning arrester is effectively avoided, the risk of the lightning arrester during installation can be effectively avoided, and the construction progress and the operation safety can be guaranteed.
The installation positions of the magnetic suspension arresters at other places at home and abroad are different from those of the medium-low speed magnetic suspension tourism special line, the contact rail arrester adopts a mode of being installed on the side wall of a transverse beam at the top of a pier, and no professional operation auxiliary tool exists at home and abroad.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model provides a supplementary ladder of medium-low speed magnetism suspension contact rail arrester installation to make things convenient for the staff at pier top beam side wall mounting contact rail arrester.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a middle-low speed magnetism floats supplementary ladder of installation of contact rail lightning-arrest, includes supplementary ladder main part, the top of supplementary ladder main part even has the connecting rod that a pair of level set up, the downwardly vertical peg of installing on the connecting rod, the bottom of supplementary ladder main part is provided with the bottom plate.
Further, a fixing plate is installed between the connecting rods, and bolt through holes are formed in the fixing plate.
Further, a guard rail is arranged on the outer side of the auxiliary ladder main body.
Furthermore, the guard rails are provided with three groups from top to bottom, and reinforcing steel bars are connected between the three groups of guard rails.
Further, the guard rail is arc-shaped.
Further, a steel pipe is arranged on one side, close to the hanging rod, of the bottom of the auxiliary ladder main body and used for supporting the side face of the transverse tie beam.
Further, the length of the steel pipe is 200 mm.
Furthermore, one side of the auxiliary ladder main body close to the hanging rod is provided with a cross arm.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a top erection joint pole and peg at supplementary ladder can let the peg card go into the gap between the horizontal tie beam to make supplementary ladder hang in the side of horizontal tie beam, make things convenient for the staff to stand and carry out arrester installation operation on the bottom plate of supplementary ladder.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the installation of the present invention;
in the drawings, the components represented by the respective reference numerals are listed below:
1. the auxiliary ladder comprises an auxiliary ladder main body, 2 connecting rods, 3 hanging rods, 4 bottom plates, 5 fixing plates, 6 cross arms, 7 protective railings, 8 cross tie beams, 9 support rail beams, 10 bridge piers.
Detailed Description
The present invention is further described in detail below with reference to specific embodiments so that those skilled in the art can more clearly understand the present invention.
As shown in fig. 1-2, an auxiliary ladder for installing a medium-low speed magnetic levitation contact rail arrester comprises an auxiliary ladder main body 1, wherein the top of the auxiliary ladder main body 1 is connected with a pair of connecting rods 2 horizontally arranged, hanging rods 3 are vertically installed downwards on the connecting rods 2, and a bottom plate 4 is arranged at the bottom of the auxiliary ladder main body 1.
In the above embodiment, the hanging rod 3 is inserted into the gap between the cross girders 8 at the top of the pier, so that the auxiliary ladder body 1 can be hung on the side of the cross girders 8, and the worker can stand on the bottom plate to perform the installation work of the contact rail arrester.
In order to improve the suspension stability of the auxiliary ladder main body 1, a fixing plate 5 is installed between the connecting rods, bolt through holes are formed in the fixing plate 5, and the fixing plate and the top of the transverse tie beam 8 are fixedly connected through the bolt through holes by bolts during suspension.
Preferably, the number of the bolt through holes is four, and the bolt through holes are arranged in a square shape, so that the auxiliary ladder can be prevented from overturning when the fixing plate 5 is fixed.
In order to improve the safety, the guard rail 7 is arranged on the outer side of the auxiliary ladder main body 1, so that the auxiliary ladder can be effectively prevented from falling to the outer side of the auxiliary ladder during operation.
In order to further improve the protection effect, the guard rails 7 are provided with three groups from top to bottom, and the three groups of guard rails 7 are connected with reinforcing steel bars, so that the protection area is increased, and the overall strength of the guard rails 7 is improved.
The guard rail 7 is arc-shaped, so that the human engineering is met, the protection performance is ensured, and the limitation of the guard rail 7 on the moving range of an operator is reduced.
One side of the bottom of the auxiliary ladder main body 1, which is close to the hanging rod 3, is provided with a steel pipe so as to be used for propping against the side surface of the transverse tie beam 8 and forming a reserved operation space so as to ensure the safety of construction.
Specifically, the length of the steel pipe is 200 mm.
One side that supplementary ladder main part 1 is close to peg 3 is provided with the cross arm, makes things convenient for personnel to go up and down supplementary ladder, guarantees personnel's upper and lower safety.
The working principle is as follows: a pair of transverse tie beams 8 are arranged on the bridge pier 10, and the two ends of the transverse tie beams 8 are supported by rail bearing beams 9.
When using, earlier block the gap between the horizontal tie beam 8 with peg 3, make supplementary ladder hang in the side of horizontal tie beam 8, through the bolt through-hole on fixed plate 5, with the top of fixed plate 5 bolt fastening at horizontal tie beam 8, the operating personnel can climb down supplementary ladder and carry out the arrester installation operation at the side of horizontal tie beam 8.
The mechanisms, assemblies and components of the present invention that are not described with respect to specific structures are conventional structures that exist in the prior art. Can be purchased directly from the market.
The above is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation, includes supplementary ladder main part (1), its characterized in that, the top of supplementary ladder main part (1) even has connecting rod (2) that a pair of level set up, downward vertical installation has peg (3) on connecting rod (2), the bottom of supplementary ladder main part (1) is provided with bottom plate (4).
2. The auxiliary ladder for mounting the arrester of the medium-low speed magnetic levitation contact rail according to claim 1, wherein a fixing plate (5) is mounted between the connecting rods, and a bolt through hole is formed in the fixing plate (5).
3. The auxiliary ladder for mounting the arrester of the medium-low speed magnetic levitation contact rail according to claim 1, characterized in that a guard rail (7) is arranged on the outer side of the main body (1) of the auxiliary ladder.
4. The auxiliary ladder for mounting the arrester of the medium-low speed magnetic levitation contact rail according to claim 3, wherein the protective guards (7) are provided with three groups from top to bottom, and reinforcing steel bars are connected between the three groups of protective guards (7).
5. The auxiliary ladder for installing the arrester of the medium-low speed magnetic suspension contact rail as claimed in claim 3, wherein the guard rail (7) is arc-shaped.
6. The auxiliary ladder for mounting the arrester of the medium-low speed magnetic levitation contact rail according to claim 1, wherein a steel pipe is arranged on one side of the bottom of the auxiliary ladder body (1) close to the hanging rod (3) for supporting the side surface of the transverse tie beam (8).
7. The auxiliary ladder for installing the arrester of the medium-low speed magnetic levitation contact rail as claimed in claim 6, wherein the length of the steel tube is 200 mm.
8. The auxiliary ladder for mounting the arrester of the medium-low speed magnetic levitation contact rail according to claim 1, wherein a cross arm (6) is arranged on one side of the main body (1) of the auxiliary ladder close to the hanging rod (3).
CN202123454857.5U 2021-12-31 2021-12-31 Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation Active CN217087472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123454857.5U CN217087472U (en) 2021-12-31 2021-12-31 Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123454857.5U CN217087472U (en) 2021-12-31 2021-12-31 Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation

Publications (1)

Publication Number Publication Date
CN217087472U true CN217087472U (en) 2022-07-29

Family

ID=82541566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123454857.5U Active CN217087472U (en) 2021-12-31 2021-12-31 Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation

Country Status (1)

Country Link
CN (1) CN217087472U (en)

Similar Documents

Publication Publication Date Title
CN110512517B (en) Bridge engineering construction platform
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN217087472U (en) Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation
CN201793330U (en) Gantry hanger frame device
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN209975993U (en) Suspension cage
CN108625292B (en) Template assembling platform of prefabricated stand column
CN210395123U (en) Front supporting leg telescopic structure convenient to operate for bridge girder erection machine
CN211899567U (en) Novel assembled building corridor external hanging rack
CN208310160U (en) A kind of suspended rail formula lighting roof installation steel mobile platform
CN208981152U (en) A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform
CN112627045A (en) Hang basket template scissors cat ladder
CN112049017A (en) Bailey frame integral frame falling device for cast-in-place box girder and construction process
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN220336411U (en) Protection platform lifting point truss for building construction
CN215164762U (en) Protective equipment for cradle operation platform
CN218912192U (en) Clamp type operation platform suitable for box girder
CN215564337U (en) Construction hanging basket used under beam and provided with hanger rods for replacement
CN212611979U (en) Detachable cover beam prestress construction platform
CN215164722U (en) A construction platform for steel landing stage superstructure installation
CN212050441U (en) Lifting device for overhaul in desulfurizing tower
CN220767740U (en) Multifunctional vehicle suitable for installation of overlength landing stage guardrail
CN220847086U (en) Movable aerial work trolley for steel box girder construction
CN211946018U (en) Tower crane balance arm structure with stable steel frame structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant