CN217079084U - Dredging device - Google Patents

Dredging device Download PDF

Info

Publication number
CN217079084U
CN217079084U CN202220634691.0U CN202220634691U CN217079084U CN 217079084 U CN217079084 U CN 217079084U CN 202220634691 U CN202220634691 U CN 202220634691U CN 217079084 U CN217079084 U CN 217079084U
Authority
CN
China
Prior art keywords
pipeline
dredging
mobile jib
sealed lid
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220634691.0U
Other languages
Chinese (zh)
Inventor
黄承军
李正利
刘彦
张秀全
张明勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Shengyuan Energy Technology Co ltd
Original Assignee
Puyang Shengyuan Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Shengyuan Energy Technology Co ltd filed Critical Puyang Shengyuan Energy Technology Co ltd
Priority to CN202220634691.0U priority Critical patent/CN217079084U/en
Application granted granted Critical
Publication of CN217079084U publication Critical patent/CN217079084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the technique of pipeline mediation and specifically relates to a pull throughs is related to. The water washing device comprises a discharging device, a water washing tank and a connecting pipeline, one end of the connecting pipeline is connected to a discharging port of the discharging device, the other end of the connecting pipeline is communicated with a water washing tank, a control valve is arranged at one end, close to the discharging device, of the connecting pipeline, three-interface pipelines are arranged at corners of the connecting pipeline, two of the three-interface pipelines are communicated with the discharging device and the water washing tank respectively, a dredging valve is arranged on the other interface of each three-interface pipeline, one end, far away from the three-interface pipeline, of the dredging valve is provided with a dredging pipeline, and a dredging assembly is arranged on the dredging pipeline. The utility model discloses a set up mediation subassembly and heat tracing pipe, just can dredge pipeline and valve under the condition that does not need the outage, the heat tracing pipe has kept the temperature of material simultaneously, reduces the material and solidifies because of the cooling and cause the jam.

Description

Dredging device
Technical Field
The utility model belongs to the technical field of the technique of pipeline mediation and specifically relates to a pull throughs is related to.
Background
Nowadays, in order to guarantee the quality of oil, need process the crude oil of exploitation in the production course of working of oil, all adopt the mode that pipeline and valve combined together to transmit between this in-process equipment, because the raw materials can solidify when the temperature is lower to and contain a large amount of impurity in the material, consequently the raw materials can take place to block up in the in-process of transmission often, just need dredge pipeline and valve in order to guarantee the normal operating of equipment.
Traditionally, people need to stop equipment and remove valves to dredge when carrying out the pipeline mediation, and adopt this kind of mode not only to waste time and energy, but also can cause high temperature injury to and dismantle and will cause the change of gasket, cause unsafe factor to production, the while is stopped to transport and also can cause certain economic loss, brings inconvenience for production.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a dredging device, it just can dredge pipeline and valve under the condition that does not need the outage through setting up mediation subassembly and heat tracing pipe, and the heat tracing pipe has kept the temperature of material simultaneously, reduces the material and causes the jam because of the cooling solidification.
The above object of the present invention is achieved by the following technical solutions:
the utility model provides a dredging device, includes discharging equipment, washes jar and connecting tube, connecting tube one end is connected in discharging equipment's discharge gate department, and the other end and the washing case intercommunication of connecting tube, the one end that connecting tube is close to discharging equipment are provided with the control valve, and the corner of connecting tube is provided with three interface pipelines, wherein two interfaces of three interface pipelines respectively with discharging equipment and washing case intercommunication, be provided with dredge valve on another interface of three interface pipelines, the one end that three interface pipelines were kept away from to the dredge valve is provided with dredge pipeline, the last dredging assembly that is provided with of dredge pipeline.
Preferably, the mediation subassembly includes the mobile jib, sealed lid and drive assembly, the internal thread has been seted up on the inside wall of sealed lid, dredge the pipeline and keep away from also seted up screw thread on the one end lateral wall of dredging the valve, sealed lid threaded connection is on dredging the pipeline, the perforation has been seted up on the lateral wall of sealed lid, the mobile jib is worn to establish in the perforation, the inside of dredging the pipeline is fixed and is provided with the supporting shoe, set up threaded hole on the lateral wall of supporting shoe, the mobile jib adopts the threaded rod, the mobile jib is worn to establish in the threaded hole and with supporting shoe threaded connection, drive assembly sets up in the one end that the mobile jib is close to sealed lid.
Preferably, drive assembly includes driving motor, reduction gear and mounting bracket, and the mounting bracket is fixed to be set up in the below of dredging the pipeline and is close to the position department of sealed lid, and the upper surface of mounting bracket is provided with the fixed plate, and the equal fixed mounting of driving motor and reduction gear is at the upper surface of fixed plate, and driving motor cooperatees with the reduction gear, and the coaxial fixed connection of mobile jib has seted up the slide rail on the upper surface of mounting bracket on the output of reduction gear, and the bottom of fixed plate is provided with the slider, and slider sliding fit is in the slide rail.
Preferably, the one end that sealed lid was kept away from to the mobile jib sets up to the toper, and the most advanced orientation of mobile jib is kept away from the direction of sealed lid, still fixedly on the lateral wall of mobile jib is provided with the spiral blade, and the spiral blade is closer to sealed lid than the most advanced of mobile jib.
Preferably, be provided with the control box on the mounting bracket, the inside of control box is provided with the controller, is provided with control button on the lateral wall of control box, driving motor and control button all with controller electric connection.
Preferably, be provided with the flowmeter on the connecting tube in control valve rear, be provided with the alarm on the lateral wall of dredging pipe way, flowmeter and alarm all with controller electric connection.
Preferably, the connecting pipeline is fixedly connected with a heat tracing pipe, the heat tracing pipe is a jacket heat tracing pipe, the control valve is fixedly covered with a heat insulation layer, and the heat insulation layer is filled with heat conduction cement.
To sum up, the utility model discloses a beneficial technological effect does:
through setting up mediation subassembly, flowmeter and alarm, the mediation subassembly includes mobile jib, sealed lid and drive assembly to with drive assembly, flowmeter and alarm all with controller electric connection, realize the automatic mediation of pipeline, need not to shut down convenient operation. In addition, through setting up heat tracing pipe and heat preservation, kept the temperature of material, reduced the material and solidified because of the cooling and cause the jam to can reduce the frequency of mediation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
FIG. 3 is a schematic view showing the structure of the support block and the spiral blade;
fig. 4 is a schematic view showing the structure of the slide rail.
In the figure, 11, a discharge device; 12. a water washing tank; 13. connecting a pipeline; 2. a control valve; 21. three-interface pipeline; 3. a dredging valve; 4. dredging the pipeline; 41. a support block; 51. a main rod; 511. a helical blade; 52. a sealing cover; 53. a drive motor; 54. a speed reducer; 55. a mounting frame; 551. a fixing plate; 56. a slide rail; 57. a slider; 6. a control box; 61. a control button; 71. a flow meter; 72. an alarm.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1-4, for the utility model discloses a dredging device, including discharging equipment 11, washing jar 12 and connecting tube 13, the discharge gate department at discharging equipment 11 is connected to the one end of connecting tube 13, and the other end and the washing case of connecting tube 13 communicate. The material flows out from the discharge hole of the discharging device 11 and enters the washing tank 12 through the connecting pipeline 13. The side wall of one end, close to the discharging device 11, of the connecting pipeline 13 is provided with a control valve 2, the corner of the connecting pipeline 13 is provided with a three-port pipeline 21, two ports of the three-port pipeline 21 are respectively communicated with the discharging device 11 and the water washing tank, and the other port of the three-port pipeline 21 is provided with a dredging valve 3. The dredging pipe 4 is arranged at one end of the dredging valve 3 far away from the three-port pipeline 21, and a dredging component is arranged on the dredging pipe 4. The heat tracing pipe is fixedly connected to the connecting pipeline 13, the heat tracing pipe is a jacket heat tracing pipe, the control valve 2 is fixedly covered with a heat preservation layer, and the heat preservation layer is filled with heat conduction cement. Through setting up heat tracing pipe and heat preservation, guarantee that the material can both keep certain temperature in the pipeline with when passing through control valve 2, can not solidify because of taking place, and cause the phenomenon of jam to the probability of mediation has been reduced.
The dredging component comprises a main rod 51, a sealing cover 52 and a driving component, wherein an inner thread is formed on the inner side wall of the sealing cover 52, a thread is also formed on the outer side wall of one end, away from the dredging valve 3, of the dredging pipeline 4, and the sealing cover 52 is in threaded connection with the dredging pipeline 4. The side wall of the sealing cover 52 is provided with a through hole, and the main rod 51 is arranged in the through hole in a penetrating way. The fixed supporting shoe 41 that is provided with in inside of dredging pipe 4, set up threaded hole on the lateral wall of supporting shoe 41, mobile jib 51 adopts the threaded rod, and mobile jib 51 wears to establish in the threaded hole and with supporting shoe 41 threaded connection. The end of the main rod 51 far away from the sealing cover 52 is provided with a taper shape, and the tip of the main rod 51 faces to the direction far away from the sealing cover 52. The side wall of the main rod 51 is also fixedly provided with a spiral blade 511, and the spiral blade 511 is closer to the sealing cover 52 than the tip end of the main rod 51. One end of the main rod 51 is set to be conical and the spiral blade 511 is installed, so that the blocked part is convenient to dredge. The driving assembly is disposed at one end of the main rod 51 near the sealing cover 52. The driving assembly comprises a driving motor 53, a reducer 54 and a mounting bracket 55, wherein the mounting bracket 55 is fixedly arranged below the dredging pipe 4 and close to the sealing cover 52. The upper surface of the mounting bracket 55 is provided with a fixing plate 551, the driving motor 53 and the speed reducer 54 are both fixedly mounted on the upper surface of the fixing plate 551, the driving motor 53 is matched with the speed reducer 54, and the main rod 51 is coaxially and fixedly connected to the output end of the speed reducer 54. The upper surface of the mounting frame 55 is provided with a slide rail 56, the bottom of the fixing plate 551 is provided with a slide block 57, and the slide block 57 is in sliding fit in the slide rail 56.
Be provided with control box 6 on the mounting bracket 55, the inside of control box 6 is provided with the controller, is provided with control button 61 on the lateral wall of control box 6, and driving motor 53 and control button 61 all with controller electric connection. The connecting pipeline 13 behind the control valve 2 is provided with a flow meter 71, the side wall of the dredging pipeline 4 is provided with an alarm 72, and the flow meter 71 and the alarm 72 are both electrically connected with the controller.
The implementation principle of the above embodiment is as follows: when the material in the connecting pipeline 13 or at the position of the control valve 2 is blocked, the flowmeter 71 detects that the flow of the material in the pipeline is reduced, the flowmeter 71 feeds a signal back to the controller, and the controller controls the alarm 72 to give an alarm to remind a worker. Meanwhile, the controller controls the driving motor 53 to work, the driving motor 53 drives the speed reducer 54 and the main rod 51 to coaxially rotate, and the main rod 51 moves towards the control valve 2 along the length direction of the dredging pipeline 4 due to the threads on the main rod 51, so that the main rod 51 can dredge the pipeline and the control valve 2. In addition, the main rod 51 moves to drive the driving motor 53 and the speed reducer 54 to slide along the length direction of the slide rail 56.
It should be understood that the above examples are only for clearly illustrating the present invention and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And such obvious variations or modifications which fall within the spirit of the invention are intended to be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a pull throughs, includes discharging equipment, washing jar and connecting tube, its characterized in that: connecting tube one end is connected in discharging device's discharge gate department, and connecting tube's the other end and washing case intercommunication, and the one end that connecting tube is close to discharging device is provided with the control valve, and connecting tube's corner is provided with three interface pipelines, and wherein two interfaces of three interface pipelines communicate with discharging device and washing case respectively, are provided with dredge valve on another interface of three interface pipelines, and the one end that three interface pipelines were kept away from to dredge valve is provided with dredge pipeline, is provided with the mediation subassembly on the dredge pipeline.
2. A pull through of claim 1 wherein: the mediation subassembly includes the mobile jib, sealed lid and drive assembly, the internal thread has been seted up on the inside wall of sealed lid, dredge also set up the screw thread on the one end lateral wall that the pipeline kept away from the mediation valve, sealed lid threaded connection is on dredging the pipeline, the perforation has been seted up on the lateral wall of sealed lid, the mobile jib wears to establish in the perforation, the fixed supporting shoe that is provided with in inside of dredging the pipeline, set up threaded hole on the lateral wall of supporting shoe, the mobile jib adopts the threaded rod, the mobile jib wears to establish in the threaded hole and with supporting shoe threaded connection, drive assembly sets up in the one end that the mobile jib is close to sealed lid.
3. A pull through of claim 2 wherein: the drive assembly comprises a drive motor, a speed reducer and a mounting rack, the mounting rack is fixedly arranged below the dredging pipeline and close to the position of the sealing cover, a fixing plate is arranged on the upper surface of the mounting rack, the drive motor and the speed reducer are fixedly arranged on the upper surface of the fixing plate, the drive motor is matched with the speed reducer, the main rod is fixedly connected to the output end of the speed reducer in a coaxial mode, a sliding rail is arranged on the upper surface of the mounting rack, a sliding block is arranged at the bottom of the fixing plate, and the sliding block is in sliding fit with the sliding rail.
4. A pull through of any one of claims 2 or 3 wherein: the one end that sealed lid was kept away from to the mobile jib sets up to the toper, and the most advanced orientation of mobile jib is kept away from the direction of sealed lid, still fixedly on the lateral wall of mobile jib is provided with the helical blade, and the helical blade is closer to sealed lid than the most advanced of mobile jib.
5. A pull through of claim 3 wherein: the mounting bracket is provided with a control box, a controller is arranged in the control box, a control button is arranged on the side wall of the control box, and the driving motor and the control button are electrically connected with the controller.
6. A pull through of claim 5 wherein: the connecting pipeline behind the control valve is provided with a flowmeter, the side wall of the dredging pipeline is provided with an alarm, and the flowmeter and the alarm are both electrically connected with the controller.
7. A pull through of claim 6 wherein: the heat tracing pipe is fixedly connected to the connecting pipeline, the heat tracing pipe is a jacket heat tracing pipe, the control valve is fixedly covered with a heat preservation layer, and the heat preservation layer is filled with heat conduction cement.
CN202220634691.0U 2022-03-22 2022-03-22 Dredging device Active CN217079084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220634691.0U CN217079084U (en) 2022-03-22 2022-03-22 Dredging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220634691.0U CN217079084U (en) 2022-03-22 2022-03-22 Dredging device

Publications (1)

Publication Number Publication Date
CN217079084U true CN217079084U (en) 2022-07-29

Family

ID=82550981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220634691.0U Active CN217079084U (en) 2022-03-22 2022-03-22 Dredging device

Country Status (1)

Country Link
CN (1) CN217079084U (en)

Similar Documents

Publication Publication Date Title
CN217079084U (en) Dredging device
CN216474867U (en) Gate for hydraulic engineering
CN210283197U (en) Rubber filter for producing CPE rubber compound
CN212121624U (en) Die casting machine gives hot water mechanism
CN213233332U (en) Water flow adjusting device for water conservancy gate
CN212177916U (en) Electric discharging valve
CN209580134U (en) Multi-line slicer is for fluid cylinder automatic liquid supply device
CN203663523U (en) Crushing filtering device
CN203256369U (en) Ingot pulling mechanism of directional solidification device
CN214113015U (en) Adjustable powder automatic filling machine
CN111690835A (en) Aluminum alloy refining system
CN211005651U (en) Automatic discharging device for electrolytic aluminum liquid
CN209917346U (en) Underflow dredging device of thickener
CN217004062U (en) Automatic nylon liquid raw material feeding device
CN203170934U (en) Metal liquid control flow rotating valve capable of preventing metal liquid from producing eddy flow when discharging
CN110227733B (en) Lubricating equipment for producing oxygen-free copper tube for mobile phone heat pipe and lubricating process thereof
CN213006137U (en) PVC leftover bits cooling device with quick cooling function
CN204985774U (en) Right -angle type motorised valve based on guide's structure
CN219008755U (en) Vertical heat preservation storage tank of hangers
CN218150827U (en) Intelligent back flushing device for oilfield pipeline
CN219490233U (en) Doping device for single crystal furnace
CN215830824U (en) Machine-mounted ultrahigh-pressure hydraulic system for hydraulic shears
CN212178023U (en) Broken electronic blowing valve
CN216279487U (en) Gate valve with anti-blocking and bidirectional flow guiding functions
CN211624368U (en) Valve component for ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant