CN217053673U - Connecting structure for plastic pipeline and concrete prefabricated inspection well - Google Patents

Connecting structure for plastic pipeline and concrete prefabricated inspection well Download PDF

Info

Publication number
CN217053673U
CN217053673U CN202220492781.0U CN202220492781U CN217053673U CN 217053673 U CN217053673 U CN 217053673U CN 202220492781 U CN202220492781 U CN 202220492781U CN 217053673 U CN217053673 U CN 217053673U
Authority
CN
China
Prior art keywords
template
plastic pipe
wall
prefabricated inspection
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220492781.0U
Other languages
Chinese (zh)
Inventor
朱双卫
杨晓波
吴伟
郝学凯
白振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Engineering Design and Research Institute Co Ltd filed Critical Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority to CN202220492781.0U priority Critical patent/CN217053673U/en
Application granted granted Critical
Publication of CN217053673U publication Critical patent/CN217053673U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a connection structure for prefabricated inspection shaft of plastic conduit and concrete, including sealing washer and template, the sealing washer cover is established on the outer wall that is close to prefabricated inspection shaft one end on the plastic tubing, and the reservation hole department of setting on the inside and outside wall of prefabricated inspection shaft can be dismantled respectively to the template, and the position department that is located on the template on the prefabricated inspection shaft inner wall and is corresponding to the outer wall of plastic tubing and reserves between the hole inner wall is provided with the grout hole that is used for the grout. Set up the template through reservation hole department on the inside and outside wall at prefabricated inspection shaft, and set up the grout hole in the template, like this can be more convenient with the outer wall of plastic tubing with reserve the clearance between the hole inner wall fill concrete and concrete shaping, realize the intercommunication of plastic tubing and prefabricated inspection shaft, and the sealing washer on the cooperation plastic tubing outer wall can play better sealed effect, be difficult for the seepage, and template formwork is convenient, grouting equipment directly pours into the concrete into, high efficiency, time saving and labor saving, moreover, the steam generator is simple in structure, and convenient for construction.

Description

一种用于塑料管道与混凝土预制检查井的连接结构A connection structure for plastic pipes and concrete prefabricated inspection wells

技术领域technical field

本实用新型涉及市政设施技术领域,尤其涉及一种用于塑料管道与混凝土预制检查井的连接结构。The utility model relates to the technical field of municipal facilities, in particular to a connection structure for a plastic pipe and a concrete prefabricated inspection well.

背景技术Background technique

检查井是为城市地下基础设施的供电、给水、排水、排污、通讯、有线电视、煤气管、路灯线路等维修,安装方便而设置的。一般设在管道交汇处、转弯处、管径或坡度改变处、以及直线管段上每隔一定距离处,是便于定期检查附属构筑物。为了方便施工,检查井通常是在工厂由混凝土预制完成,然后运输至施工现场进行施工。为了实现管道之间的互联互通,通过需要在预制检查井时预留管道孔洞,且预留的管道孔洞通常相对较大,以便与不同规格的其他管道连通,这样导致在施工现场连接管道时出现如下问题:1、管道与检查井预留孔洞间的间隙过大,封堵困难,费时费力;2、常规连接方法为使用水泥砂浆封堵,成型后,易开裂渗漏。The inspection well is set up for the maintenance of power supply, water supply, drainage, sewage, communication, cable television, gas pipe, street light circuit, etc. of urban underground infrastructure, and is easy to install. It is generally located at the intersection of pipelines, turns, changes in pipe diameter or slope, and at certain distances on straight pipe sections, which is convenient for regular inspection of auxiliary structures. In order to facilitate construction, inspection wells are usually prefabricated from concrete at the factory, and then transported to the construction site for construction. In order to realize the interconnection between pipelines, it is necessary to reserve pipeline holes when prefabricating inspection wells, and the reserved pipeline holes are usually relatively large, so as to connect with other pipelines of different specifications, which leads to problems when connecting pipelines at the construction site. The following problems: 1. The gap between the pipeline and the reserved holes in the inspection well is too large, which is difficult to plug, time-consuming and labor-intensive; 2. The conventional connection method is to use cement mortar for plugging, and after forming, it is easy to crack and leak.

发明内容SUMMARY OF THE INVENTION

本实用新型所要解决的技术问题是针对上述现有技术的不足,提供一种用于塑料管道与混凝土预制检查井的连接结构。The technical problem to be solved by the utility model is to provide a connection structure for a plastic pipe and a concrete prefabricated inspection well, aiming at the above-mentioned deficiencies of the prior art.

本实用新型解决上述技术问题的技术方案如下:一种用于塑料管道与混凝土预制检查井的连接结构,包括与塑料管相匹配的密封圈和与所述塑料管相匹配的模板,所述密封圈套设在所述塑料管上靠近预制检查井一端的外壁上,所述模板分别可拆卸设置在所述预制检查井的内外壁上的预留孔洞处,且位于所述预制检查井内壁上的所述模板上对应于所述塑料管的外壁与所述预留孔洞内壁之间的位置处设置有用于灌浆的灌浆孔。The technical solution of the present invention to solve the above technical problems is as follows: a connection structure for plastic pipes and concrete prefabricated inspection wells, comprising a sealing ring matched with the plastic pipe and a template matched with the plastic pipe, the sealing The snare is arranged on the outer wall of the plastic pipe close to one end of the prefabricated inspection well, the template is detachably arranged at the reserved holes on the inner and outer walls of the prefabricated inspection well, and is located on the inner wall of the prefabricated inspection well. A grouting hole for grouting is provided on the template at a position corresponding to the position between the outer wall of the plastic pipe and the inner wall of the reserved hole.

本实用新型的有益效果是:本实用新型的用于塑料管道与混凝土预制检查井的连接结构,通过在预制检查井的内外壁上的预留孔洞处设置所述模板,并在所述模板上设置灌浆孔,这样可以比较方便的将所述塑料管的外壁与所述预留孔洞内壁之间间隙填充满混凝土并凝土成型,实现塑料管与预制检查井的连通,并配合所述塑料管外壁上的密封圈可以起到较好的密封效果,不易渗漏,且所述模板支模方便,灌浆设备直接注入混凝土,效率高,省时省力,结构简单,施工方便。The beneficial effects of the present utility model are as follows: the connecting structure of the present utility model used for plastic pipes and concrete prefabricated inspection wells, by arranging the template at the reserved holes on the inner and outer walls of the prefabricated inspection well, and placing the template on the template A grouting hole is provided, so that the gap between the outer wall of the plastic pipe and the inner wall of the reserved hole can be easily filled with concrete and formed by concrete, so as to realize the communication between the plastic pipe and the prefabricated inspection well, and cooperate with the plastic pipe The sealing ring on the outer wall can have a good sealing effect and is not easy to leak, and the formwork is convenient to support, and the grouting equipment can directly inject concrete, which has high efficiency, saves time and effort, has a simple structure and is convenient for construction.

在上述技术方案的基础上,本实用新型还可以做如下改进:On the basis of the above-mentioned technical scheme, the utility model can also be improved as follows:

进一步:所述密封圈为弹性材质制成的止水橡胶圈。Further: the sealing ring is a water-stop rubber ring made of elastic material.

上述进一步方案的有益效果是:通过设置止水橡胶圈,这样可以使得灌浆之后形成的混凝土与所述塑料管的外壁之间形成更好的密封效果,防止渗水导致加快腐蚀。The beneficial effect of the above-mentioned further solution is: by setting the water-stop rubber ring, a better sealing effect can be formed between the concrete formed after grouting and the outer wall of the plastic pipe, preventing water seepage and causing accelerated corrosion.

进一步:所述塑料管上靠近预制检查井一端的外壁设置与所述密封圈相匹配的环形凹槽,所述密封圈环绕设置与所述环形凹槽内。Further: an annular groove matching the sealing ring is arranged on the outer wall of the plastic pipe near one end of the prefabricated inspection well, and the sealing ring is arranged around the annular groove.

上述进一步方案的有益效果是:通过在所述塑料管的外壁上设置与所述密封圈相匹配的环形凹槽,这样可以更加方便所述密封圈的安装,并且通过所述密封圈可以使得所述灌浆之后形成的混凝土与所述塑料管的外壁之间密封效果更好。The beneficial effect of the above-mentioned further solution is: by arranging an annular groove matching with the sealing ring on the outer wall of the plastic pipe, the installation of the sealing ring can be more convenient, and the sealing ring can make the sealing ring more convenient. The sealing effect between the concrete formed after the grouting and the outer wall of the plastic pipe is better.

进一步:所述模板包括内模板和外模板,所述内模板和外模板上分别设置有与所述塑料管连通的通孔。Further: the template includes an inner template and an outer template, and the inner template and the outer template are respectively provided with through holes communicating with the plastic pipe.

上述进一步方案的有益效果是:通过设置所述内模板和外模板,可以配合所述塑料管的外壁和所述预制检查井上的预留孔洞内壁形成用于灌注混凝土的相对密闭空间,方便混凝土的灌注,并且通过在所述内模板和外模板上分别设置有与所述塑料管连通的通孔,这样可以方便所述内模板和外模板的临时固定,也不会对所述塑料管的端部造成遮挡。The beneficial effect of the above-mentioned further scheme is: by setting the inner formwork and the outer formwork, the outer wall of the plastic pipe and the inner wall of the reserved hole on the prefabricated inspection well can be combined to form a relatively closed space for pouring concrete, which is convenient for concrete. The inner and outer templates are respectively provided with through holes communicating with the plastic pipes, so that the temporary fixing of the inner and outer templates can be facilitated, and the ends of the plastic pipes will not be disturbed. occluded.

进一步:所述内模板上的所述通孔的直径与所述塑料管的内径相等,所述外模板上的通孔的直径与所述塑料管的外径相等。Further: the diameter of the through hole on the inner template is equal to the inner diameter of the plastic pipe, and the diameter of the through hole on the outer template is equal to the outer diameter of the plastic pipe.

上述进一步方案的有益效果是:通过将所述内模板上的所述通孔的直径设置为与所述塑料管的内径相等,所述外模板上的通孔的直径设置为与所述塑料管的外径相等,这样可以便于所述内模板和外模板分别与所述塑料管沿着其中心轴线方向对齐,保证灌注混凝土后将所述塑料管精准的固定于所述预留空洞的中心位置处。The beneficial effect of the above-mentioned further solution is: by setting the diameter of the through hole on the inner template to be equal to the inner diameter of the plastic pipe, the diameter of the through hole on the outer template is set to be equal to the diameter of the plastic pipe The outer diameters are equal to each other, which can facilitate the alignment of the inner formwork and the outer formwork with the plastic pipe along its central axis, so as to ensure that the plastic pipe is accurately fixed in the center of the reserved cavity after pouring concrete. place.

进一步:所述内模板朝向对应的所述通孔一侧设置有环状的基准支撑部,且当所述塑料管伸入对应的所述通孔内时,所述塑料管恰好与所述基准支撑部套接。Further: an annular reference support portion is provided on the side of the inner template facing the corresponding through hole, and when the plastic tube extends into the corresponding through hole, the plastic tube is just in line with the reference Support socket.

上述进一步方案的有益效果是:通过设置所述基准支撑部,这样可以方便所述塑料管伸入对应的所述通孔内时,所述塑料管恰好与所述基准支撑部套接,方便在所述混凝土成型时所述内模板和外模板分别相对于所述塑料管保持固定,进而使得所述塑料管精准的固定于所述预制检查井上的预留空洞的中心位置处。The beneficial effect of the above-mentioned further solution is that: by setting the reference support portion, it is convenient for the plastic tube to be just sleeved with the reference support portion when the plastic tube extends into the corresponding through hole, which is convenient for When the concrete is formed, the inner formwork and the outer formwork are respectively kept fixed relative to the plastic pipe, so that the plastic pipe is precisely fixed at the center position of the reserved cavity on the prefabricated inspection well.

进一步:所述基准支撑部与所述内模板一体成型设置。Further: the reference support portion is integrally formed with the inner template.

上述进一步方案的有益效果是:通过将所述基准支撑部与所述内模板一体成型设置,一方面可以提高二者连接的稳定性,另一方面可以对所述内模板精确地临时固定。The beneficial effect of the above-mentioned further solution is that by integrally forming the reference support portion and the inner template, on the one hand, the stability of the connection between the two can be improved, and on the other hand, the inner template can be accurately and temporarily fixed.

进一步:所述预制检查井的内外壁上位于所述预留孔洞的上下两侧分别设置有用于所述模板对准的刻度线。Further: the inner and outer walls of the prefabricated inspection well are respectively provided with tick marks for the template alignment on the upper and lower sides of the reserved hole.

上述进一步方案的有益效果是:通过设置所述刻度线,这样可以方便所述模板内外以及上下对齐,并且保证所述通孔与所述塑料管共中心轴线设置。The beneficial effect of the above-mentioned further solution is: by setting the scale line, it is convenient to align the inside and outside of the template as well as up and down, and it is ensured that the through hole and the plastic pipe are arranged on the same center axis.

附图说明Description of drawings

图1为本实用新型一实施例的用于塑料管道与混凝土预制检查井的连接结构的结构示意图。FIG. 1 is a schematic structural diagram of a connection structure for a plastic pipe and a concrete prefabricated inspection well according to an embodiment of the present invention.

附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of components represented by each number is as follows:

1、塑料管,2、密封圈,3、模板,4、预制检查井,5、灌浆孔,6、基准支撑部;1. Plastic pipe, 2. Sealing ring, 3. Formwork, 4. Prefabricated inspection well, 5. Grouting hole, 6. Reference support;

31、内模板,32、外模板。31, inner template, 32, outer template.

具体实施方式Detailed ways

以下结合附图对本实用新型的原理和特征进行描述,所举实例只用于解释本实用新型,并非用于限定本实用新型的范围。The principles and features of the present invention will be described below with reference to the accompanying drawings, and the examples are only used to explain the present invention, and are not intended to limit the scope of the present invention.

如图1所示,一种用于塑料管道与混凝土预制检查井的连接结构,包括与塑料管1相匹配的密封圈2和与所述塑料管1相匹配的模板3,所述密封圈2套设在所述塑料管1上靠近预制检查井4一端的外壁上,所述模板3分别可拆卸设置在所述预制检查井4的内外壁上的预留孔洞处,且位于所述预制检查井4内壁上的所述模板3上对应于所述塑料管1的外壁与所述预留孔洞内壁之间的位置处设置有用于灌浆的灌浆孔5。As shown in FIG. 1, a connection structure for plastic pipes and prefabricated concrete inspection wells includes a sealing ring 2 matched with the plastic pipe 1 and a template 3 matched with the plastic pipe 1. The sealing ring 2 Set on the outer wall of the plastic pipe 1 close to one end of the prefabricated inspection well 4, the template 3 is detachably arranged at the reserved holes on the inner and outer walls of the prefabricated inspection well 4, and is located in the prefabricated inspection well 4. A grouting hole 5 for grouting is provided on the template 3 on the inner wall of the well 4 at a position corresponding to the position between the outer wall of the plastic pipe 1 and the inner wall of the reserved hole.

本实用新型的用于塑料管道与混凝土预制检查井的连接结构,通过在预制检查井4的内外壁上的预留孔洞处设置所述模板3,并在所述模板3上设置灌浆孔5,这样可以比较方便的将所述塑料管1的外壁与所述预留孔洞内壁之间间隙填充满混凝土并凝土成型,实现塑料管1与预制检查井4的连通,并配合所述塑料管1外壁上的密封圈3可以起到较好的密封效果,不易渗漏,且所述模板3支模方便,灌浆设备直接注入混凝土,效率高,省时省力,结构简单,施工方便。In the connection structure of the present utility model for plastic pipes and concrete prefabricated inspection wells, the template 3 is arranged at the reserved holes on the inner and outer walls of the prefabricated inspection well 4, and the grouting holes 5 are arranged on the template 3, In this way, it is convenient to fill the gap between the outer wall of the plastic pipe 1 and the inner wall of the reserved hole with concrete and form the concrete, so as to realize the communication between the plastic pipe 1 and the prefabricated inspection well 4, and cooperate with the plastic pipe 1 The sealing ring 3 on the outer wall can have a good sealing effect and is not easy to leak, and the template 3 is convenient to form, and the grouting equipment can directly inject concrete, which has high efficiency, saves time and effort, has a simple structure and is convenient for construction.

在本实用新型的一个或多个实施例中,所述密封圈2为弹性材质制成的止水橡胶圈。通过设置止水橡胶圈,这样可以使得灌浆之后形成的混凝土与所述塑料管1的外壁之间形成更好的密封效果,防止渗水导致加快腐蚀。In one or more embodiments of the present invention, the sealing ring 2 is a water-stop rubber ring made of elastic material. By providing a water-stop rubber ring, a better sealing effect can be formed between the concrete formed after grouting and the outer wall of the plastic pipe 1, so as to prevent water seepage and lead to accelerated corrosion.

可选地,在本实用新型的一个或多个实施例中,所述塑料管1上靠近预制检查井4一端的外壁设置与所述密封圈2相匹配的环形凹槽,所述密封圈2环绕设置与所述环形凹槽内。通过在所述塑料管1的外壁上设置与所述密封圈2相匹配的环形凹槽,这样可以更加方便所述密封圈2的安装,并且通过所述密封圈2可以使得所述灌浆之后形成的混凝土与所述塑料管1的外壁之间密封效果更好。Optionally, in one or more embodiments of the present invention, an annular groove matching the sealing ring 2 is provided on the outer wall of the plastic pipe 1 near one end of the prefabricated inspection well 4 , and the sealing ring 2 Surrounded and arranged in the annular groove. By arranging an annular groove matching the sealing ring 2 on the outer wall of the plastic pipe 1, the installation of the sealing ring 2 can be more convenient, and the sealing ring 2 can make the grouting formed after grouting. The sealing effect between the concrete and the outer wall of the plastic pipe 1 is better.

在本实用新型的一个或多个实施例中,所述模板3包括内模板31和外模板32,所述内模板31和外模板32上分别设置有与所述塑料管1连通的通孔。通过设置所述内模板31和外模板32,可以配合所述塑料管1的外壁和所述预制检查井4上的预留孔洞内壁形成用于灌注混凝土的相对密闭空间,方便混凝土的灌注,并且通过在所述内模板31和外模板32上分别设置有与所述塑料管1连通的通孔,这样可以方便所述内模板31和外模板32的临时固定,也不会对所述塑料管1的端部造成遮挡。In one or more embodiments of the present invention, the template 3 includes an inner template 31 and an outer template 32 , and the inner template 31 and the outer template 32 are respectively provided with through holes communicating with the plastic pipe 1 . By setting the inner formwork 31 and the outer formwork 32, a relatively closed space for pouring concrete can be formed in cooperation with the outer wall of the plastic pipe 1 and the inner wall of the reserved hole on the prefabricated inspection well 4, which facilitates the pouring of concrete, and The inner template 31 and the outer template 32 are respectively provided with through holes communicating with the plastic pipe 1, so that the temporary fixing of the inner template 31 and the outer template 32 can be facilitated, and the plastic pipe is not affected. The ends of 1 cause occlusion.

可选地,在本实用新型的一个或多个实施例中,所述内模板31上的所述通孔的直径与所述塑料管1的内径相等,所述外模板32上的通孔的直径与所述塑料管1的外径相等。通过将所述内模板31上的所述通孔的直径设置为与所述塑料管1的内径相等,所述外模板32上的通孔的直径设置为与所述塑料管1的外径相等,这样可以便于所述内模板31和外模板32分别与所述塑料管1沿着其中心轴线方向对齐,保证灌注混凝土后将所述塑料管1精准的固定于所述预留空洞的中心位置处。Optionally, in one or more embodiments of the present invention, the diameter of the through hole on the inner template 31 is equal to the inner diameter of the plastic pipe 1 , and the diameter of the through hole on the outer template 32 is equal to that of the plastic pipe 1 . The diameter is equal to the outer diameter of the plastic tube 1 . By setting the diameter of the through hole on the inner template 31 to be equal to the inner diameter of the plastic pipe 1 , the diameter of the through hole on the outer template 32 is set to be equal to the outer diameter of the plastic pipe 1 , which can facilitate the alignment of the inner formwork 31 and the outer formwork 32 with the plastic pipe 1 along its central axis, so as to ensure that the plastic pipe 1 is accurately fixed in the center of the reserved cavity after pouring concrete place.

在本实用新型的一个或多个实施例中,所述内模板31朝向对应的所述通孔一侧设置有环状的基准支撑部6,且当所述塑料管1伸入对应的所述通孔内时,所述塑料管1恰好与所述基准支撑部6套接。通过设置所述基准支撑部6,这样可以方便所述塑料管1伸入对应的所述通孔内时,所述塑料管1恰好与所述基准支撑部6套接,方便在所述混凝土成型时所述内模板31和外模板32分别相对于所述塑料管1保持固定,进而使得所述塑料管1精准的固定于所述预制检查井4上的预留空洞的中心位置处。In one or more embodiments of the present invention, the inner template 31 is provided with an annular reference support portion 6 on the side facing the corresponding through hole, and when the plastic tube 1 extends into the corresponding through hole When inside the through hole, the plastic pipe 1 is just sleeved with the reference support part 6 . By setting the reference support portion 6, it is convenient for the plastic pipe 1 to be just sleeved with the reference support portion 6 when the plastic pipe 1 extends into the corresponding through hole, which is convenient for molding the concrete. At this time, the inner template 31 and the outer template 32 are respectively kept fixed relative to the plastic pipe 1 , so that the plastic pipe 1 is accurately fixed at the center of the reserved cavity on the prefabricated inspection well 4 .

可选地,在本实用新型的一个或多个实施例中,所述基准支撑部6与所述内模板31一体成型设置。通过将所述基准支撑部6与所述内模板31一体成型设置,一方面可以提高二者连接的稳定性,另一方面可以对所述内模板31精确地临时固定。Optionally, in one or more embodiments of the present invention, the reference support portion 6 and the inner template 31 are integrally formed. By integrally forming the reference support portion 6 and the inner template 31 , on the one hand, the stability of the connection between the two can be improved, and on the other hand, the inner template 31 can be accurately and temporarily fixed.

可选地,在本实用新型的一个或多个实施例中,所述预制检查井4的内外壁上位于所述预留孔洞的上下两侧分别设置有用于所述模板3对准的刻度线。通过设置所述刻度线,这样可以方便所述模板3内外以及上下对齐,并且保证所述通孔与所述塑料管1共中心轴线设置。Optionally, in one or more embodiments of the present invention, the inner and outer walls of the prefabricated inspection well 4 are respectively provided with tick marks for the alignment of the template 3 on the upper and lower sides of the reserved hole. . By setting the scale line, it is convenient to align the inside and outside of the template 3 as well as up and down, and it is ensured that the through hole and the plastic pipe 1 are arranged on the same center axis.

本实用新型的用于塑料管道与混凝土预制检查井的连接结构,实施过程为:The connection structure of the utility model for the plastic pipe and the concrete prefabricated inspection well, the implementation process is as follows:

1、将塑料管1的一端套上止密封圈2,密封圈2对准预制检查井4的井壁中心;1. Put a sealing ring 2 on one end of the plastic pipe 1, and the sealing ring 2 is aligned with the center of the well wall of the prefabricated inspection well 4;

2、在预制检查井4的井壁两侧支板,模板3的上下各开一直径5cm灌浆孔5;2. On both sides of the well wall of the prefabricated inspection well 4, a grouting hole 5 with a diameter of 5 cm is opened on the upper and lower sides of the template 3;

3、通过灌浆孔5向模板3、预制检查井4上的预留孔洞内壁以及塑料管1的外壁形成的密闭空间内注入混凝土,直至封堵密实;3. Inject concrete into the closed space formed by the formwork 3, the inner wall of the reserved hole on the prefabricated inspection well 4 and the outer wall of the plastic pipe 1 through the grouting hole 5 until it is sealed tightly;

4、混凝土凝固后,拆去模板3,施工完成。4. After the concrete is solidified, the formwork 3 is removed, and the construction is completed.

本实用新型的用于塑料管道与混凝土预制检查井的连接结构,管壁嵌有密封圈2,为柔性密封,密封效果好,不易渗漏;另外支模方便,通过灌浆设备注入混凝土,效率高,省时省力。The utility model is used for the connection structure of the plastic pipe and the concrete prefabricated inspection well. The pipe wall is embedded with a sealing ring 2, which is a flexible seal, and has good sealing effect and is not easy to leak; in addition, the formwork is convenient, and the concrete is injected through the grouting equipment, and the efficiency is high. ,save time and energy.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the present invention. within the scope of protection of the utility model.

Claims (8)

1.一种用于塑料管道与混凝土预制检查井的连接结构,其特征在于:包括与塑料管(1)相匹配的密封圈(2)和与所述塑料管(1)相匹配的模板(3),所述密封圈(2)套设在所述塑料管(1)上靠近预制检查井(4)一端的外壁上,所述模板(3)分别可拆卸设置在所述预制检查井(4)的内外壁上的预留孔洞处,且位于所述预制检查井(4)内壁上的所述模板(3)上对应于所述塑料管(1)的外壁与所述预留孔洞内壁之间的位置处设置有用于灌浆的灌浆孔(5)。1. A connection structure for a plastic pipe and a concrete prefabricated inspection well, characterized in that: it comprises a sealing ring (2) matched with the plastic pipe (1) and a template (2) matched with the plastic pipe (1). 3), the sealing ring (2) is sleeved on the outer wall of the plastic pipe (1) near one end of the prefabricated inspection well (4), and the template (3) is detachably arranged on the prefabricated inspection well (4). 4) at the reserved holes on the inner and outer walls, and on the template (3) on the inner wall of the prefabricated inspection well (4) corresponding to the outer wall of the plastic pipe (1) and the inner wall of the reserved hole A grouting hole (5) for grouting is provided at the position between them. 2.根据权利要求1所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述密封圈(2)为弹性材质制成的止水橡胶圈。2 . The connection structure for plastic pipes and concrete prefabricated inspection wells according to claim 1 , wherein the sealing ring ( 2 ) is a water-stop rubber ring made of elastic material. 3 . 3.根据权利要求2所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述塑料管(1)上靠近预制检查井(4)一端的外壁设置与所述密封圈(2)相匹配的环形凹槽,所述密封圈(2)环绕设置与所述环形凹槽内。3. The connection structure for plastic pipes and concrete prefabricated inspection wells according to claim 2, characterized in that: the outer wall of the plastic pipe (1) close to one end of the prefabricated inspection well (4) is provided with the sealing ring (2) A matching annular groove, the sealing ring (2) is arranged around the annular groove. 4.根据权利要求1所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述模板(3)包括内模板(31)和外模板(32),所述内模板(31)和外模板(32)上分别设置有与所述塑料管(1)连通的通孔。4. The connection structure for plastic pipes and concrete prefabricated inspection wells according to claim 1, wherein the formwork (3) comprises an inner formwork (31) and an outer formwork (32), and the inner formwork ( 31) and the outer template (32) are respectively provided with through holes communicating with the plastic pipe (1). 5.根据权利要求4所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述内模板(31)上的所述通孔的直径与所述塑料管(1)的内径相等,所述外模板(32)上的通孔的直径与所述塑料管(1)的外径相等。5. The connection structure for a plastic pipe and a concrete prefabricated inspection well according to claim 4, wherein the diameter of the through hole on the inner formwork (31) is the same as the diameter of the plastic pipe (1). The inner diameter is equal, and the diameter of the through hole on the outer template (32) is equal to the outer diameter of the plastic pipe (1). 6.根据权利要求5所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述内模板(31)朝向对应的所述通孔一侧设置有环状的基准支撑部(6),且当所述塑料管(1)伸入对应的所述通孔内时,所述塑料管(1)恰好与所述基准支撑部(6)套接。6 . The connection structure for plastic pipes and prefabricated concrete inspection wells according to claim 5 , wherein an annular reference support portion is provided on the side of the inner formwork ( 31 ) facing the corresponding through hole. 7 . (6), and when the plastic pipe (1) extends into the corresponding through hole, the plastic pipe (1) is just sleeved with the reference support portion (6). 7.根据权利要求6所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述基准支撑部(6)与所述内模板(31)一体成型设置。7. The connection structure for a plastic pipe and a prefabricated concrete inspection well according to claim 6, wherein the reference support portion (6) and the inner formwork (31) are integrally formed. 8.根据权利要求1-7任一项所述的用于塑料管道与混凝土预制检查井的连接结构,其特征在于:所述预制检查井(4)的内外壁上位于所述预留孔洞的上下两侧分别设置有用于所述模板(3)对准的刻度线。8. The connection structure for plastic pipes and concrete prefabricated inspection wells according to any one of claims 1-7, characterized in that: the inner and outer walls of the prefabricated inspection wells (4) are located at the edges of the reserved holes. The upper and lower sides are respectively provided with tick marks for the alignment of the template (3).
CN202220492781.0U 2022-03-07 2022-03-07 Connecting structure for plastic pipeline and concrete prefabricated inspection well Active CN217053673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220492781.0U CN217053673U (en) 2022-03-07 2022-03-07 Connecting structure for plastic pipeline and concrete prefabricated inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220492781.0U CN217053673U (en) 2022-03-07 2022-03-07 Connecting structure for plastic pipeline and concrete prefabricated inspection well

Publications (1)

Publication Number Publication Date
CN217053673U true CN217053673U (en) 2022-07-26

Family

ID=82488624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220492781.0U Active CN217053673U (en) 2022-03-07 2022-03-07 Connecting structure for plastic pipeline and concrete prefabricated inspection well

Country Status (1)

Country Link
CN (1) CN217053673U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117306665A (en) * 2023-08-17 2023-12-29 陕西晟泰源水泥制品有限公司 A kind of flexible connection structure between prefabricated concrete inspection well and pipeline
CN119754397A (en) * 2025-02-24 2025-04-04 福州市规划设计研究院集团有限公司 I-shaped sealing rubber ring for drainage inspection well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117306665A (en) * 2023-08-17 2023-12-29 陕西晟泰源水泥制品有限公司 A kind of flexible connection structure between prefabricated concrete inspection well and pipeline
CN119754397A (en) * 2025-02-24 2025-04-04 福州市规划设计研究院集团有限公司 I-shaped sealing rubber ring for drainage inspection well

Similar Documents

Publication Publication Date Title
CN217053673U (en) Connecting structure for plastic pipeline and concrete prefabricated inspection well
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN203514481U (en) Inspection well
CN109487813A (en) A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN202164698U (en) Steel die for sewage inspection well
CN107119725A (en) A kind of prefabricated box culvert structure containing glass fiber-reinforced polymer
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN206752632U (en) Plastic-reinforced composite structure municipal drainage inspection well
CN213358683U (en) Prefabricated integral type reinforced concrete inspection shaft
CN210484825U (en) Flexible stagnant water structure of sewage treatment wall pipe
CN105971016A (en) Utility tunnel internode connection structure
CN114183175B (en) A tunnel lining construction method
CN110195599B (en) A rigid anti-offset rectangular pipe jacking system and method thereof
CN218719380U (en) Roof penetrating waterproof sleeve based on main structure embedding
CN218027836U (en) Prefabricated grout of concrete seals assembled inspection shaft
CN207392235U (en) Construction template of circular pipe culvert in urban underground comprehensive pipe gallery
CN205046581U (en) Be applied to inside and outside bayonet joint of variable angle of inspection shaft
CN222363502U (en) Waterproof leaking stoppage sealing structure for pipeline penetrating through building floor
CN108331018B (en) Method for connecting precast concrete comprehensive pipe gallery by using square steel skeleton
CN216275824U (en) Prefabricated trench connection structure
CN222996208U (en) Waterproof structure for connection of electric power well and electric power pipeline
CN206888029U (en) A kind of prefabricated box culvert structure containing glass fiber-reinforced polymer
CN205745699U (en) Glass fiber double-layer anti-seepage concrete centrifuge tube
CN206986933U (en) A kind of precast inspection well