CN217027954U - Scaffold for building engineering - Google Patents

Scaffold for building engineering Download PDF

Info

Publication number
CN217027954U
CN217027954U CN202220639228.5U CN202220639228U CN217027954U CN 217027954 U CN217027954 U CN 217027954U CN 202220639228 U CN202220639228 U CN 202220639228U CN 217027954 U CN217027954 U CN 217027954U
Authority
CN
China
Prior art keywords
scaffold
support column
fixedly connected
spacing dish
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220639228.5U
Other languages
Chinese (zh)
Inventor
刘荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220639228.5U priority Critical patent/CN217027954U/en
Application granted granted Critical
Publication of CN217027954U publication Critical patent/CN217027954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold for constructional engineering, which comprises a first supporting column and a second supporting column, the connecting cylinders are arranged between the first supporting column and the second supporting column, the scaffold for the building engineering is provided by the utility model, by arranging the matching among the inserted rod, the first limit disc, the jack and the second limit disc, when the device is used, the connecting block can be effectively arranged at different angles of the first supporting column according to the requirement, so that the connecting cylinder can be effectively arranged at different angles of the first supporting column, when the connection is carried out, the support with different angles can be achieved, so that the use is more convenient when the worker uses the device, the situation that partial angles can not reach is avoided, the scaffold can be directly used when being connected, so that when the scaffold is supported, workers on the scaffold need to walk around.

Description

Scaffold for building engineering
Technical Field
The utility model relates to a scaffold, in particular to a scaffold for constructional engineering.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
1. When the scaffold is used, the connection position between the two scaffolds is inconvenient to ensure according to the actual use condition, so that the inconvenience in use is caused when the subsequent workers use the scaffold;
2. when using scaffold frame, inconvenient size according to the movable plate plays the effect of adjusting, and then makes it when using, because length adaptation, and then the effect that influences the use, leads to the scaffold frame that needs to prepare a plurality of different grade types to use, has improved the cost of using.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a scaffold for construction engineering to solve the above problems.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a scaffold frame for building engineering, includes first support column and second support column, all be provided with the connecting cylinder between first support column and the second support column, the inner wall sliding connection of connecting cylinder has the regulation pole, the tip fixedly connected with connecting block of connecting cylinder, the bottom fixedly connected with inserted bar of connecting block, the surface of first support column is from last to the first spacing dish of fixedly connected with and the spacing dish of second respectively down, the jack has been run through at the top of first spacing dish and has been seted up, the inserted bar runs through the jack and can dismantle with the spacing dish of second and be connected to the bottom of first spacing dish.
According to a preferable technical scheme of the utility model, a plurality of adjusting holes are arranged at the top of the adjusting rod, a nut is fixedly connected to the top of the connecting cylinder, a bolt is connected to the inner wall of the nut in a threaded manner, and the bolt is in through connection with the adjusting holes.
As a preferred technical scheme of the utility model, the top of the second limiting disc is provided with a limiting hole, the bottom of the inserted bar is fixedly connected with a screw, the screw penetrates through the limiting hole to the bottom of the second limiting disc, the bottom of the second limiting disc is provided with a threaded ring, and the limiting hole is in threaded connection with the threaded ring.
As a preferred technical solution of the present invention, the surfaces of the first support column and the second support column are sleeved with a bearing plate, the surface of the first support column is fixedly connected with a support plate, and the bearing plate contacts with the bottom of the support plate.
As a preferable technical scheme of the utility model, the bottoms of the first support column and the second support column are fixedly connected with a chassis, and the connecting cylinders are symmetrically arranged at the positions of the adjusting rods.
As a preferable technical scheme of the utility model, the connecting block and the jacks are both square, and the jacks are arranged in a plurality.
According to a preferable technical scheme of the utility model, the limiting holes are arranged in a plurality of numbers, the limiting holes are arranged right below the insertion holes, and the diameter of the screw is smaller than the groove diameter of the insertion holes.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the arrangement of the matching among the inserted rod, the first limiting disc, the jack and the second limiting disc, when the device is used, the connecting block can be effectively arranged at different angles of the first supporting column according to requirements, so that the connecting cylinder can be effectively arranged at different angles of the first supporting column, and further, when the device is used, the support at different angles can be achieved when the connecting cylinders are connected with each other, so that when a worker uses the device, the use is more convenient, the phenomenon that part of angles cannot reach is avoided, the scaffold can go straight when being connected, and therefore, when the support occurs, the worker on the scaffold needs to go round the scaffold.
2. The adjusting holes, the nuts and the bolts are matched, so that the position of the adjusting rod in the connecting cylinder can be effectively adjusted when the device is used, the adjusting function can be realized according to different sizes of the bearing plate when the device is used, the supporting effect is effectively ensured, and the situation that the device cannot be normally used due to the fact that the size of the device is not matched is avoided.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic view of the connection of the connecting cylinder and the adjustment lever of the present invention;
fig. 3 is a schematic view of the connection of the connector barrel and the first support post of the present invention.
In the figure: 1. a first support column; 2. a second support column; 3. a connecting cylinder; 4. adjusting a rod; 5. connecting blocks; 6. a rod is inserted; 7. a first limiting disc; 8. a jack; 9. a second limiting disc; 10. an adjustment hole; 11. a nut; 12. a bolt; 13. a limiting hole; 14. a threaded ring; 15. a screw; 16. a bearing plate; 17. a support disc; 18. a chassis.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the scaffold for building engineering comprises a first supporting column 1 and a second supporting column 2, wherein a connecting cylinder 3 is arranged between the first supporting column 1 and the second supporting column 2, the inner wall sliding connection of the connecting cylinder 3 is provided with an adjusting rod 4, the end part of the connecting cylinder 3 is fixedly connected with a connecting block 5, the bottom of the connecting block 5 is fixedly connected with an inserting rod 6, the surface of the first supporting column 1 is provided with a first limiting disc 7 and a second limiting disc 9 which are fixedly connected from top to bottom respectively, the top of the first limiting disc 7 is penetrated and provided with a jack 8, the inserting rod 6 penetrates through the jack 8 to the bottom of the first limiting disc 7 to be detachably connected with the second limiting disc 9, the scaffold is used and plays a role in connection through the arranged connecting block 5, the effect of adjusting the distance between the second supporting column 2 and the first supporting column 1 is played through the arranged connecting cylinder 3 and the adjusting rod 4, the effect of adjusting the distance between the second supporting column 2 and the first supporting column 1 is played through the arranged first limiting disc 7, The jack 8 plays a role in limiting the inserted rod 6, so that the angle is adjusted, and the limiting and fixing effects are achieved through the second limiting disc 9.
Specifically, a plurality of adjusting holes 10 have been seted up to the top range of adjusting pole 4, and the top fixedly connected with nut 11 of connecting cylinder 3, the inner wall threaded connection of nut 11 has bolt 12, and bolt 12 and adjusting hole 10 through connection set up to a plurality ofly through the adjusting hole 10 that sets up to make when adjusting, adjust convenient more light.
Specifically, spacing hole 13 has been seted up at the top of the spacing dish of second 9, the bottom fixedly connected with screw rod 15 of inserted bar 6, screw rod 15 runs through spacing hole 13 to the bottom of the spacing dish of second 9, the bottom of the spacing dish of second 9 is provided with screw ring 14, spacing hole 13 and 14 threaded connection of screw ring, spacing hole 13 through setting up plays spacing effect, screw ring 14 and screw rod 15 through setting up play the fixed action, the stability of connecting after inserting the bottom of first spacing dish 7 of inserted bar 6 has been guaranteed.
Specifically, bearing plate 16 has been cup jointed on the surface of first support column 1 and second support column 2, and the fixed surface of first support column 1 is connected with supporting disk 17, and bearing plate 16 and the bottom contact of supporting disk 17 make things convenient for staff's use and walk through the bearing plate 16 that sets up, play the effect of support through the supporting disk 17 that sets up.
Specifically, the equal fixedly connected with chassis 18 in bottom of first support column 1 and second support column 2, connecting cylinder 3 are located the symmetry setting of adjusting pole 4, play the effect of support through the chassis 18 that sets up, and 3 symmetry settings through the connecting cylinder that sets up for when adjusting, make the atress more even when supporting bearing plate 16.
Specifically, connecting block 5 and jack 8 all set up to squarely, and jack 8 sets up to a plurality ofly, through such time for the inserted bar 6 can not be because of the rotation of inserted bar 6 when inserting in jack 8, thereby appear connecting not hard up the condition and take place.
Specifically, spacing hole 13 sets up to a plurality ofly, and spacing hole 13 sets up under jack 8, and the diameter of screw rod 15 is little and the groove footpath of jack 8, and when the device is using, through such setting for inserted bar 6 when inserting in jack 8, can make screw rod 15 insert spacing downthehole 13 and carry on spacingly.
The working principle of the utility model is as follows: when the device is used, the inserted rod 6 is inserted into the position of the jack 8 at the first limiting disc 7, then the screw rod 15 is inserted into the limiting hole 13, the screw rod 15 is connected in a threaded manner after being rotated through the arranged threaded ring 14, so that the connection between the connecting block 5 and the first limiting disc 7 is ensured, when the connection is carried out, the inserted rod 6 is inserted into the jacks 8 at different positions, so that the adjustment effect is achieved, when the second supporting column 2 and the first supporting column 1 are assembled, the plurality of second supporting columns 2 can be respectively connected to different positions of the first supporting column 1, and further, the situation that the detour needs to occur when the device walks at the top of the bearing plate 16 due to inconvenient angle adjustment is effectively ensured when a worker uses the device, through the length of adjusting pole 4 at the connecting cylinder 3, then run through behind the regulation hole 10 with nut 11 threaded connection through bolt 12 to reach spacing effect, and then make the device can effectually play the effect of adjusting according to the length difference of bearing plate 16, guaranteed the effect of connecting.
In the description of the present invention, it is to be understood that the indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings and are only for convenience in describing the present invention and simplifying the description, but are not intended to indicate or imply that the indicated devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly attached, detachably attached, or integrated; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a scaffold for building engineering, includes first support column (1) and second support column (2), its characterized in that: all be provided with connecting cylinder (3) between first support column (1) and second support column (2), the inner wall sliding connection of connecting cylinder (3) has regulation pole (4), tip fixedly connected with connecting block (5) of connecting cylinder (3), the bottom fixedly connected with inserted bar (6) of connecting block (5), the surface of first support column (1) is from last to the first spacing dish of fixedly connected with (7) and the spacing dish of second (9) down respectively, jack (8) have been seted up in running through at the top of first spacing dish (7), inserted bar (6) run through jack (8) to the bottom of first spacing dish (7) can be dismantled with the spacing dish of second (9) and be connected.
2. A scaffold for construction engineering according to claim 1, characterized in that: the top of adjusting pole (4) is arranged and is seted up a plurality of regulation holes (10), the top fixedly connected with nut (11) of connecting cylinder (3), the inner wall threaded connection of nut (11) has bolt (12), bolt (12) and regulation hole (10) through connection.
3. A scaffold for construction engineering according to claim 1, characterized in that: spacing hole (13) have been seted up at the top of spacing dish of second (9), the bottom fixedly connected with screw rod (15) of inserted bar (6), screw rod (15) run through the bottom of spacing hole (13) to the spacing dish of second (9), the bottom of the spacing dish of second (9) is provided with screw ring (14), spacing hole (13) and screw ring (14) threaded connection.
4. A scaffold for construction engineering according to claim 1, characterized in that: bearing plate (16) have been cup jointed on the surface of first support column (1) and second support column (2), the fixed surface of first support column (1) is connected with supporting disk (17), the bottom contact of bearing plate (16) and supporting disk (17).
5. A scaffold for construction engineering according to claim 1, wherein: the bottom of the first supporting column (1) and the bottom of the second supporting column (2) are fixedly connected with chassis (18), and the connecting cylinders (3) are symmetrically arranged at the positions of the adjusting rods (4).
6. A scaffold for construction engineering according to claim 1, characterized in that: connecting block (5) and jack (8) all set up to square, jack (8) set up to a plurality ofly.
7. A scaffold for construction engineering according to claim 3, wherein: the limiting holes (13) are arranged in a plurality of numbers, the limiting holes (13) are arranged under the insertion holes (8), and the diameter of the screw rod (15) is small and equal to the groove diameter of the insertion holes (8).
CN202220639228.5U 2022-03-23 2022-03-23 Scaffold for building engineering Active CN217027954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220639228.5U CN217027954U (en) 2022-03-23 2022-03-23 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220639228.5U CN217027954U (en) 2022-03-23 2022-03-23 Scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN217027954U true CN217027954U (en) 2022-07-22

Family

ID=82413346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220639228.5U Active CN217027954U (en) 2022-03-23 2022-03-23 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN217027954U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478680A (en) * 2022-08-18 2022-12-16 栋梁铝业有限公司 Adjustable connecting cross rod device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478680A (en) * 2022-08-18 2022-12-16 栋梁铝业有限公司 Adjustable connecting cross rod device
CN115478680B (en) * 2022-08-18 2024-02-06 栋梁铝业有限公司 Adjustable connecting cross rod device

Similar Documents

Publication Publication Date Title
CN217027954U (en) Scaffold for building engineering
CN211006339U (en) Guardrail adjusting support
CN213626572U (en) Tool type external cantilever operation platform
CN216974154U (en) Plate buckle frame support
CN216276889U (en) Building site is with high formwork mechanism of preventing collapsing
CN214785778U (en) Scaffold for building construction
CN214834659U (en) Attached supporting steel frame
CN212743384U (en) High and large formwork supporting structure for building
CN112538960A (en) Make things convenient for dismouting and firm scaffold frame
CN208563926U (en) A kind of architectural engineering steel pipe scaffold of Fast Installation
CN219196670U (en) Construction bench for steel structure factory building construction
CN216042504U (en) Scaffold for building engineering
CN218478415U (en) Elevator double-inclined pull rod fixing mechanism
CN219909884U (en) Scaffold for side slope
CN207920052U (en) Novel building engineering scaffold
CN220768762U (en) Scaffold for building construction
CN219261677U (en) High-stability building construction scaffold
CN219732729U (en) Lotus flower seat scaffold
CN218990840U (en) Scaffold erecting structure
CN219773544U (en) Scaffold for building engineering
CN219365377U (en) Safety protection scaffold board
CN216277931U (en) Multi-angle rotating supporting jacking for mounting steel arch frame
CN215407590U (en) Steel structure supporting and fixing frame
CN220247518U (en) Anti-tilting scaffold
CN211691362U (en) Scaffold for building installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant