- Prior art keywords
- bolt
- fixedly connected
- screw
- bevel gear
- inboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a tall and big template supporting construction for building, including the installation base, the screw has been seted up to installation base inboard, and the screw has four groups about the equidistant distribution such as perpendicular center line annular of installation base, the inboard threaded connection of screw has the hexagonal screw, and hexagonal screw and screw looks adaptation, mounting plate upper end fixedly connected with fixed column. The high and large formwork supporting structure for the building is provided with a movable bolt fixing block, and the height of the bolt fixing block during movement can be roughly adjusted by means of matching of bolt holes formed in the inner sides of vertical rods, so that the mounting height of a cross rod is roughly fixed; this tall and big template supporting construction for building is provided with the telescopic link in the bottom, and the accessible waves the height of the accurate adjustment montant of rotation handle in the short distance in the outside, through the cooperation with movable bolt fixed block to the mounting height of accurate regulation horizontal pole.
Description
Technical Field
The utility model relates to a template supporting construction technical field specifically is a tall and big template supporting construction for building.
Background
The formwork support structure is generally assembled by steel or wood beams to form a formwork bracket, a scaffold is built by using steel or wood rods to form a bracket support, and concrete construction is carried out by matching with a steel formwork.
However, the high and large formwork supporting structure for buildings in the existing market is mostly made of wood bars or iron pipes, the height cannot be adjusted, assembling and building workload of the high and large formwork supporting structure for buildings in the existing market is large, a large amount of manpower is often consumed for building, construction efficiency is low, the high and large formwork supporting structure for buildings in the existing market is difficult to adjust, and the construction requirements of various landforms cannot be met.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high big template supporting construction for building to it is made by stick or iron pipe greatly to propose the high big template supporting construction for building on the existing market among the above-mentioned background art to solve, but height-adjusting, and the high big template supporting construction for building on the existing market is assembled and is built the work load big, often need consume a large amount of manpowers and build, the efficiency of construction is low, and the high big template supporting construction for building on the existing market is difficult to adjust, the problem of the construction requirement of the various landforms of unable adaptation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a tall and big template supporting construction for building, includes the installation base, the screw has been seted up to installation base inboard, and the screw has four groups with equal interval distribution about the perpendicular central line ring shape of installation base, the inboard threaded connection of screw has the hexagonal screw, and hexagonal screw and screw looks adaptation, installation base upper end fixedly connected with fixed column.
Preferably, the first bearing of installation base upper end fixedly connected with, the inboard rotation of first bearing is connected with the threaded rod, the first bevel gear of threaded rod outside fixedly connected with, threaded rod outside fixedly connected with limit baffle, threaded rod top fixedly connected with stopper.
Preferably, the inner side of the fixing column is fixedly connected with a second bearing, the inner side of the second bearing is fixedly connected with an anti-skidding rocker, the inner side of the anti-skidding rocker is fixedly connected with a second bevel gear, the second bevel gear is meshed with the first bevel gear, and the second bevel gear is matched with the first bevel gear.
Preferably, the inner side of the fixed column is movably connected with a telescopic column, the inner side of the telescopic column is provided with a limit groove, and the limit groove is matched with the limit block.
Preferably, the bolt groove has been seted up to flexible post inboard, and the bolt groove is distributed with equal interval about the perpendicular central line of flexible post, flexible post outside swing joint has the bolt fixed block, and bolt fixed block and flexible post looks adaptation, the bolt hole has been seted up to bolt fixed block inboard, and the bolt hole has four groups with equal interval distribution about the perpendicular central line annular of bolt fixed block, bolt downthehole side can be dismantled and be connected with fixed bolt, and fixed bolt and bolt hole looks adaptation, the spread groove has been seted up to bolt fixed block inboard, and the spread groove has four groups with equal interval distribution about the perpendicular central line annular of bolt fixed block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the high and large formwork supporting structure for the building is provided with a movable bolt fixing block, and the height of the bolt fixing block during movement can be roughly adjusted by means of matching of bolt holes formed in the inner sides of vertical rods, so that the mounting height of a cross rod is roughly fixed;
2. this tall and big template supporting construction for building is provided with the telescopic link in the bottom, and the accessible waves the height of the accurate adjustment montant of rotation handle in the short distance in the outside, through the cooperation with movable bolt fixed block to the mounting height of accurate regulation horizontal pole.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention in an extended state;
FIG. 3 is a schematic cross-sectional view of the utility model in a contracted state;
fig. 4 is the schematic structural diagram of the bolt fixing block of the present invention.
In the figure: 1. installing a base; 2. a screw hole; 3. a hexagonal screw; 4. fixing a column; 5. a first bearing; 6. a threaded rod; 7. a first bevel gear; 8. a limit baffle; 9. a limiting block; 10. a second bearing; 11. an anti-slip rocker; 12. a second bevel gear; 13. a telescopic column; 14. a limiting groove; 15. a latch slot; 16. a bolt fixing block; 17. a pin hole; 18. fixing the bolt; 19. and connecting the grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a tall and big template supporting construction for building, includes installation base 1, and screw 2 has been seted up to installation base 1 inboard, and screw 2 has four groups about the equal interval distribution of perpendicular central line annular of installation base 1, and the inboard threaded connection of screw 2 has hexagonal screw 3, and hexagonal screw 3 and the adaptation of screw 2, and the fixed column 4 of fixedly connected with in installation base 1 upper end.
Further, the first bearing 5 of fixedly connected with in installation base 1 upper end, the inboard rotation of first bearing 5 is connected with threaded rod 6, the first bevel gear 7 of fixedly connected with in the 6 outsides of threaded rod, the 6 outsides of threaded rod fixedly connected with limit baffle 8, the 6 top fixedly connected with stopper 9 of threaded rod carry on effectual spacing, avoid the activity excessive.
Further, a second bearing 10 is fixedly connected to the inner side of the fixed column 4, an anti-skid rocker 11 is fixedly connected to the inner side of the second bearing 10, a second bevel gear 12 is fixedly connected to the inner side of the anti-skid rocker 11, the second bevel gear 12 is meshed with the first bevel gear 7, and the second bevel gear 12 is matched with the first bevel gear 7, so that the lifting of the rod is controlled.
Further, the inboard swing joint of fixed column 4 has flexible post 13, and spacing groove 14 has been seted up to flexible post 13 inboard, and spacing groove 14 and stopper 9 looks adaptation carry on spacingly when not influencing the activity.
Further, bolt groove 15 has been seted up to flexible post 13 inboard, and bolt groove 15 is in the equal interval distribution of the perpendicular central line of flexible post 13, flexible post 13 outside swing joint has bolt fixed block 16, and bolt fixed block 16 and flexible post 13 looks adaptation, bolt hole 17 has been seted up to bolt fixed block 16 inboard, and bolt hole 17 has four groups about the equal interval distribution of the perpendicular central line annular of bolt fixed block 16, bolt hole 17 inboard can be dismantled and be connected with fixing bolt 18, and fixing bolt 18 and bolt hole 17 looks adaptation, connecting groove 19 has been seted up to bolt fixed block 16 inboard, and connecting groove 19 has four groups about the equal interval distribution of the perpendicular central line annular of bolt fixed block 16, thereby firm connecting cross rod.
The working principle is as follows: the device can be fixed by screwing a hexagonal screw 3 into a screw hole 2 on the inner side of a mounting base 1, fixing a bolt fixing block 16 on the outer side of a telescopic column 13, after the fixing height of a cross bar is determined, fixing the bolt fixing block 16 at a bolt groove 15 with approximate height, inserting a fixing bolt 18 into a bolt hole 17 to penetrate through the bolt groove 15 to the other end, thereby roughly adjusting the height of the bolt fixing block 16, rotating by means of a second bearing 10 by shaking an anti-skid rocker 11 on the outer side of a fixing column 4, driving a second bevel gear 12 on the inner side to rotate, driving a threaded rod 6 on the inner side of a first bevel gear 7 to rotate by means of the meshing of the second bevel gear 12 and the first bevel gear 7, rotating the threaded rod 6 by means of a first bearing 5 at the bottom end, adjusting the height of the telescopic column 13 by means of threaded connection, and when the height of the telescopic column 13 is adjusted, the limit baffle, under the limiting action of limiting groove 14 through stopper 9, can prevent flexible post 13 excessive upward movement, through the height of adjusting flexible post 13, thereby can finely adjust the fixed height of the accurate fixed horizontal pole of height of bolt fixed block 16, connect the horizontal pole through spread groove 19 can, because of its height-adjustable, the requirement of adaptable various landforms, when the ground is soft sinks, only need to rotate anti-skidding rocker 11 can readjust the height, can extensively be applicable to different landforms, geological conditions.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a big template supporting construction for building height, includes the installation base, its characterized in that: the inner side of the mounting base is provided with screw holes, four groups of screw holes are annularly distributed at equal intervals around the vertical center line of the mounting base, the inner side of each screw hole is in threaded connection with a hexagonal screw, the hexagonal screws are matched with the screw holes, and the upper end of the mounting base is fixedly connected with a fixing column.
2. The tall formwork support structure for construction according to claim 1, wherein: the mounting base is characterized in that a first bearing is fixedly connected to the upper end of the mounting base, a threaded rod is rotatably connected to the inner side of the first bearing, a first bevel gear is fixedly connected to the outer side of the threaded rod, a limiting baffle is fixedly connected to the outer side of the threaded rod, and a limiting block is fixedly connected to the top end of the threaded rod.
3. The tall formwork support structure for construction according to claim 1, wherein: the inner side of the fixing column is fixedly connected with a second bearing, the inner side of the second bearing is fixedly connected with an anti-skidding rocker, the inner side of the anti-skidding rocker is fixedly connected with a second bevel gear, the second bevel gear is meshed with the first bevel gear, and the second bevel gear is matched with the first bevel gear.
4. The tall formwork support structure for construction according to claim 1, wherein: the inboard swing joint of fixed column has flexible post, the spacing groove has been seted up to flexible post inboard, and spacing groove and stopper looks adaptation.
5. The tall formwork support structure for construction according to claim 4, wherein: the utility model discloses a telescopic column, including telescopic column, bolt hole, fixed bolt hole, bolt fixed block, bolt hole and four groups, the bolt groove has been seted up to telescopic column inboard, and the bolt groove distributes about the equidistant such as vertical center line of telescopic column, telescopic column outside swing joint has the bolt fixed block, and bolt fixed block and telescopic column looks adaptation, the bolt hole has been seted up to bolt fixed block inboard, and the equidistant such as vertical center line annular of bolt hole about the bolt fixed block distributes and have four groups, bolt downthehole side can be dismantled and be connected with fixed bolt, and fixed bolt and bolt hole looks adaptation, the spread groove has been seted up to bolt fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020959097.XU CN212743384U (en) | 2020-05-29 | 2020-05-29 | High and large formwork supporting structure for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020959097.XU CN212743384U (en) | 2020-05-29 | 2020-05-29 | High and large formwork supporting structure for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212743384U true CN212743384U (en) | 2021-03-19 |
Family
ID=75006312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020959097.XU Expired - Fee Related CN212743384U (en) | 2020-05-29 | 2020-05-29 | High and large formwork supporting structure for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212743384U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115434541A (en) * | 2022-10-13 | 2022-12-06 | 福建徐钢重工有限公司 | Adjustable assembled building carrier plate strutting arrangement |
-
2020
- 2020-05-29 CN CN202020959097.XU patent/CN212743384U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115434541A (en) * | 2022-10-13 | 2022-12-06 | 福建徐钢重工有限公司 | Adjustable assembled building carrier plate strutting arrangement |
CN115434541B (en) * | 2022-10-13 | 2024-03-15 | 福建徐钢重工有限公司 | Adjustable assembled floor carrier plate strutting arrangement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108756241B (en) | Device is established to shear force wall outside floor template of encorbelmenting | |
CN210395652U (en) | Steel structure for assembly type building | |
CN207513156U (en) | Telescopic frame body for building | |
CN212613769U (en) | Outer wall formwork reinforcing bracket at connecting position of shear wall floors | |
CN204492134U (en) | Be convenient to the height scaffolding installed | |
CN212743384U (en) | High and large formwork supporting structure for building | |
CN204728676U (en) | Bearing hanging rack for supporting variable cross-section wall | |
CN206251023U (en) | A kind of large span photovoltaic bracket of adjustable angle | |
CN211114801U (en) | Roof template supporting component for constructional engineering | |
CN217076793U (en) | Tower crane installation adjusting base | |
CN211201134U (en) | Horizontal support truss structure of attached lifting scaffold | |
CN213449446U (en) | Assembled multi-functional type outrigger combination basis | |
CN210507431U (en) | Detachable prevents that pile foundation steel from protecting a section of thick bamboo and sinks device | |
CN212986625U (en) | Lower margin frame with level (l) ing device | |
CN221143673U (en) | Reinforced concrete frame shear wall reinforcing structure | |
CN210685313U (en) | Safe convenient house steel connection structure | |
CN214834668U (en) | Ultra-long support device of all-steel climbing frame | |
CN219974055U (en) | Tower leg installation connection structure for transmission line iron tower | |
CN204238547U (en) | A kind of tower formwork erecting structure | |
CN215926624U (en) | Construction frame reinforcing apparatus | |
CN217760272U (en) | Novel design protection operation canopy of project is built in room | |
CN210164236U (en) | Super thick garage roof concrete strutting arrangement | |
CN211899757U (en) | Wallboard support for assembly type building construction | |
CN221837959U (en) | Building templates support frame | |
CN216196516U (en) | Safety and stability base that pin-connected panel building scaffold used combination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||