CN219261677U - High-stability building construction scaffold - Google Patents

High-stability building construction scaffold Download PDF

Info

Publication number
CN219261677U
CN219261677U CN202320382788.1U CN202320382788U CN219261677U CN 219261677 U CN219261677 U CN 219261677U CN 202320382788 U CN202320382788 U CN 202320382788U CN 219261677 U CN219261677 U CN 219261677U
Authority
CN
China
Prior art keywords
support plate
backup pad
support
fixed
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320382788.1U
Other languages
Chinese (zh)
Inventor
张悦
郁林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haoliang Ecological Construction Co ltd
Original Assignee
Anhui Haoliang Ecological Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haoliang Ecological Construction Co ltd filed Critical Anhui Haoliang Ecological Construction Co ltd
Priority to CN202320382788.1U priority Critical patent/CN219261677U/en
Application granted granted Critical
Publication of CN219261677U publication Critical patent/CN219261677U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a high-stability building construction scaffold which comprises a support plate, wherein support rods are symmetrically arranged on two sides of the support plate, guardrails are sleeved and arranged on the top ends of the support rods, fixing frames are symmetrically fixed on two sides of the bottom end of the support plate, elastic bolts are penetrated through the fixing frames in a sliding manner, and insertion holes matched with the elastic bolts are formed in one side, close to the elastic bolts, of the support rods; according to the utility model, the guardrail is sleeved at the top end of the support rod, and the elastic bolt at the bottom end of the support plate is inserted into the insertion hole on the support rod, so that the support plate and the support rod are assembled, the scaffold is convenient to detach and install, the scaffold is convenient to use, the threaded rod is unfolded around the hinged seat until the threaded rod abuts against the L-shaped limiting plate in the use process, the threaded pipe on the threaded rod is rotated out until the positioning cone abuts against the ground, and the reinforcement and positioning of the support rod are realized, so that the scaffold is stably supported, the stability is improved, and the toppling risk is not easy to occur.

Description

High-stability building construction scaffold
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a high-stability building construction scaffold.
Background
The house construction refers to production activities in the construction implementation stage of house engineering, and is a construction process of various house buildings, scaffolds are needed during the house construction, the scaffolds are working platforms which are erected for ensuring the smooth progress of the construction processes, scaffolds with different purposes are selected for different types of engineering construction, the bridge support frames are the most of the scaffold with bowl buckles, the door type scaffold is also the most of the scaffold with the main body structure construction floor scaffold with fasteners.
Most of the existing scaffolds have a single structure, for example, the utility model patent with the application number of 202022193668.6 discloses a building construction scaffold which is vertically supported only through supporting rods, is not stable enough and is easy to fall down, and the structures of the scaffold are fixed through nuts, so that the disassembly and the installation are complicated, and the use is not convenient enough, therefore, the utility model provides a high-stability building construction scaffold which is used for solving the problems in the prior art.
Disclosure of Invention
Aiming at the problems, the utility model aims to provide a high-stability building construction scaffold, which solves the problems that the existing scaffold is insufficient in stability, easy to fall down and complex in disassembly and assembly due to fixed structure.
In order to achieve the purpose of the utility model, the utility model is realized by the following technical scheme: the utility model provides a construction scaffold frame is built in high stability room, includes the backup pad, backup pad both sides equal symmetry is equipped with the bracing piece, the guardrail is installed in the sleeve joint of bracing piece top, equal symmetry in backup pad bottom both sides is fixed with the mount, it runs through to slide on the mount has the elasticity bolt, the jack with the elasticity bolt adaptation has been seted up to one side that the bracing piece is close to the elasticity bolt, the lower part that backup pad one side was kept away from to the bracing piece is fixed with L type limiting plate, L type limiting plate inboard is equipped with the articulated seat of connecting on the bracing piece, articulated on the articulated seat have the threaded rod, threaded pipe has been cup jointed to one side screw thread that the articulated seat was kept away from to the threaded rod, the one end that the threaded rod was kept away from to the threaded pipe is fixed with the locating cone.
The further improvement is that: the support plate is characterized in that a spring expansion piece hinged to the support rod is arranged below the support plate, a positioning column is fixed at one end, close to the support plate, of the spring expansion piece, and a positioning hole matched with the positioning column is formed in the bottom end of the support plate.
The further improvement is that: the spring telescoping piece is including articulating the sleeve pipe on the bracing piece and sliding connection in intraductal telescopic link of sleeve pipe, the inside bottom of sleeve pipe is connected with the telescopic link through first spacing spring, reference column and telescopic link fixed connection.
The further improvement is that: one side of the elastic bolt, which is positioned in the fixing frame, is sleeved with a stop block, one side of the stop block, which is far away from the jack, is connected with the inner side wall of the fixing frame through a second limiting spring, and the second limiting spring is movably sleeved outside the elastic bolt.
The further improvement is that: the utility model discloses a cat ladder, including backup pad, support plate left and right sides all articulates has the cat ladder, the cat ladder is close to one side of backup pad and is fixed with the couple, the hanging groove with the couple adaptation has all been seted up to backup pad top both sides.
The further improvement is that: the guardrail is characterized in that cover covers matched with the support rods are fixed at the left end and the right end of the guardrail, the cover covers are connected to the top ends of the support rods in a sleeved mode, a railing is arranged on the upper portion between the support rods on the front side and the rear side, inserting posts are fixed at the front end and the rear end of the railing, and a slot matched with the inserting posts is formed in one side, close to the inserting posts, of the support rods.
The beneficial effects of the utility model are as follows: the scaffold comprises the support plate, the guardrail is sleeved at the top end of the support plate, and the elastic bolt at the bottom end of the support plate is inserted into the insertion hole on the support plate, so that the support plate and the support plate are assembled, the scaffold is convenient to detach and install, the scaffold is convenient to use, the threaded rod is unfolded around the hinge seat in the use process until the threaded rod abuts against the L-shaped limiting plate, the threaded pipe on the threaded rod is rotated out until the positioning cone abuts against the ground, the reinforcement and positioning of the support plate are realized, the scaffold is stably supported, the stability is improved, and the toppling risk is not easy to occur.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a front cross-sectional view of the present utility model;
FIG. 3 is an enlarged view of the utility model at A;
FIG. 4 is an enlarged view of the utility model at B;
FIG. 5 is a side view of the present utility model;
FIG. 6 is a front cross-sectional view of the support plate and ladder of the present utility model;
fig. 7 is a cross-sectional view of a spring telescoping member of the present utility model.
Wherein: 1. a support plate; 2. a support rod; 3. guard bars; 4. a fixing frame; 5. an elastic bolt; 6. a jack; 7. an L-shaped limiting plate; 8. a hinge base; 9. a threaded rod; 10. a threaded tube; 11. positioning cone; 12. a spring telescoping member; 13. positioning columns; 14. positioning holes; 15. a stop block; 16. a second limit spring; 17. a ladder stand; 18. a hook; 19. a hanging groove; 20. a cover; 21. railing; 22. inserting a column; 23. a slot; 1201. a sleeve; 1202. a telescopic rod; 1203. and a first limit spring.
Detailed Description
The present utility model will be further described in detail with reference to the following examples, which are only for the purpose of illustrating the utility model and are not to be construed as limiting the scope of the utility model.
According to the figures 1, 2, 3, 4, 5, 6 and 7, the embodiment provides a high-stability building construction scaffold, which comprises two groups of support plates 1 and four groups of support rods 2, wherein the two groups of support plates 1 are vertically symmetrically distributed among the four groups of support rods 2, the top ends of the two groups of support rods 2 positioned at the front side and the two groups of support rods 2 positioned at the rear side are respectively sleeved and installed with a guardrail 3 playing a protective role, the left side and the right side of the bottom end of the support plate 1 are respectively fixed with a fixing frame 4 which is symmetrically distributed forwards and backwards, elastic bolts 5 which can rebound are penetrated through the fixing frames 4 in a sliding manner, one side, close to the elastic bolts 5, of the support rods 2 is provided with jacks 6 which are matched with the elastic bolts 5, the assembly of the support plates 1 and the support rods 2 is realized by inserting the elastic bolts 5 into the jacks 6, the top ends of the support rods 2 are sleeved and installed with the guardrail 3, the elastic bolt 5 at the bottom end of the supporting plate 1 is inserted into the insertion hole on the supporting rod 2, so that the supporting plate 1 and the supporting rod 2 are assembled, the scaffold is convenient to flexibly disassemble and assemble, the lower part of one side of the supporting rod 2 away from the supporting plate 1 is fixedly provided with an L-shaped limiting plate 7, the inner side of the L-shaped limiting plate 7 is provided with a hinge seat 8, the hinge seat 8 is connected to the supporting rod 2, one side of the hinge seat 8 away from the supporting rod 2 is hinged with a threaded rod 9, one side of the threaded rod 9 away from the hinge seat 8 is in threaded sleeve joint with a threaded pipe 10, one end of the threaded pipe 10 away from the threaded rod 9 is fixedly provided with a positioning cone 11, the threaded rod 9 is unfolded around the hinge seat 8 until the threaded pipe 10 on the threaded rod 9 is turned out until the positioning cone 11 is propped against the ground, the reinforcement and positioning of the supporting rod 9 are realized, thereby enabling the scaffold to be stably supported.
The support plate 1 below is equipped with spring telescoping member 12, and spring telescoping member 12 bottom articulates on bracing piece 2, and the one end that spring telescoping member 12 is close to backup pad 1 is fixed with reference column 13, and backup pad 1 bottom is offered and is located the locating hole 14 of reference column 13 adaptation, through the position with spring telescoping member 12 shrink and rotation reference column 13 to locating hole 14, loosens spring telescoping member 12 again and makes reference column 13 kick-back to locating hole 14 in, realizes further support fixed to backup pad 1.
The spring telescoping member 12 comprises a sleeve 1201 and a telescoping rod 1202, the sleeve 1201 is hinged on the support rod 2, the telescoping rod 1202 is slidably connected in the sleeve 1201, the bottom end inside the sleeve 1201 is connected with a first limiting spring 1203, the top end of the first limiting spring 1203 is connected to the bottom end of the telescoping rod 1202, the positioning column 13 is fixedly connected with the telescoping rod 1202, and the elastic force is provided for the telescoping rod 1202 through the first limiting spring 1203, so that the spring telescoping member 12 has a rebound reset function.
One side of the elastic bolt 5, which is positioned in the fixed frame 4, is sleeved with a stop block 15, one side of the stop block 15, which is far away from the jack 6, is connected with a second limit spring 16 movably sleeved outside the elastic bolt 5, one end of the second limit spring 16, which is far away from the stop block 15, is connected with the inner side wall of the fixed frame 4, and the elastic force is provided for the stop block 15 through the second limit spring 16, so that the elastic bolt 5 has a rebound reset function.
The left and right sides of backup pad 1 all articulates the cat ladder 17 that is used for workman climbing scaffold, and one side that cat ladder 17 is close to backup pad 1 is fixed with couple 18, and the hanging groove 19 with couple 18 adaptation has all been seted up on backup pad 1 top both sides, and cat ladder 17 articulates in backup pad 1 left and right sides through couple 18, the dismouting of being convenient for.
Both ends all are fixed with the cover 20 of the adaptation of bracing piece 2 about guardrail 3 and cup joint in bracing piece 2 top through cover 20, and the upper portion that is located between bracing piece 2 of front side and the bracing piece 2 that is located the rear side is equipped with railing 21, and both ends all are fixed with the spliced pole 22 around railing 21, and slot 23 with the spliced pole 22 adaptation has been seted up to one side that bracing piece 2 is close to spliced pole 22, plays the safety protection effect through setting up railing 21.
During the use, at the front and back both sides respectively gomphosis erection bracing piece 2 of railing 21, cup joint guardrail 3 through cover 20 at bracing piece 2 top simultaneously, then place backup pad 1 between left and right sides bracing piece 2, and insert in jack 6 with elastic bolt 5, realize the equipment of backup pad 1 and bracing piece 2, then expand threaded rod 9 around articulated seat 8, until support L type limiting plate 7, then rotate out screwed tube 10 on the threaded rod 9, until locating cone 11 supports ground, realize the reinforcement location to bracing piece 9, afterwards with the shrink of spring expansion piece 12 and rotate reference column 13 to the position of locating hole 14, finally loosen spring expansion piece 12 and make reference column 13 kick-back to the locating hole 14 in, realize further support fixed to backup pad 1.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a high stability room is built construction scaffold frame which characterized in that: including backup pad (1), backup pad (1) both sides equal symmetry is equipped with bracing piece (2), guardrail (3) are installed in cup joint on bracing piece (2) top, equal symmetry in backup pad (1) bottom both sides is fixed with mount (4), it runs through elastic bolt (5) to slide on mount (4), jack (6) with elastic bolt (5) adaptation have been seted up to one side that bracing piece (2) are close to elastic bolt (5), the lower part that backup pad (1) one side was kept away from to bracing piece (2) is fixed with L type limiting plate (7), L type limiting plate (7) inboard is equipped with articulated seat (8) of being connected on bracing piece (2), articulated threaded rod (9) have on articulated seat (8), threaded pipe (10) have been cup jointed to one side screw thread of articulated seat (8) are kept away from to threaded rod (9), the one end that threaded pipe (10) were kept away from threaded rod (9) is fixed with location awl (11).
2. The high stability building construction scaffolding of claim 1, wherein: the utility model discloses a support plate, including backup pad (1), backup pad (1) below is equipped with articulates spring expansion piece (12) on bracing piece (2), one end that spring expansion piece (12) are close to backup pad (1) is fixed with reference column (13), locating hole (14) with reference column (13) adaptation are seted up to backup pad (1) bottom.
3. The high stability building construction scaffolding of claim 2, wherein: the spring telescoping piece (12) comprises a sleeve (1201) hinged to the supporting rod (2) and a telescoping rod (1202) connected in the sleeve (1201) in a sliding mode, the bottom end inside the sleeve (1201) is connected with the telescoping rod (1202) through a first limiting spring (1203), and the positioning column (13) is fixedly connected with the telescoping rod (1202).
4. The high stability building construction scaffolding of claim 1, wherein: one side of the elastic bolt (5) positioned in the fixing frame (4) is sleeved with a stop block (15), one side of the stop block (15) away from the jack (6) is connected with the inner side wall of the fixing frame (4) through a second limiting spring (16), and the second limiting spring (16) is movably sleeved outside the elastic bolt (5).
5. The high stability building construction scaffolding of claim 1, wherein: the support plate (1) is hung on the left side and the right side of the support plate (1), a hook (18) is fixed on one side, close to the support plate (1), of the support plate (1), and hanging grooves (19) matched with the hook (18) are formed in the two sides of the top end of the support plate (1).
6. The high stability building construction scaffolding of claim 1, wherein: the guardrail is characterized in that cover covers (20) matched with the support rods (2) are fixed at the left end and the right end of the guardrail (3), the cover covers (20) are sleeved on the top ends of the support rods (2), a railing (21) is arranged on the upper portion between the support rods (2) on the front side and the rear side, inserting posts (22) are fixed at the front end and the rear end of the railing (21), and a slot (23) matched with the inserting posts (22) is formed in one side, close to the inserting posts (22), of the support rods (2).
CN202320382788.1U 2023-03-03 2023-03-03 High-stability building construction scaffold Active CN219261677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320382788.1U CN219261677U (en) 2023-03-03 2023-03-03 High-stability building construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320382788.1U CN219261677U (en) 2023-03-03 2023-03-03 High-stability building construction scaffold

Publications (1)

Publication Number Publication Date
CN219261677U true CN219261677U (en) 2023-06-27

Family

ID=86853405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320382788.1U Active CN219261677U (en) 2023-03-03 2023-03-03 High-stability building construction scaffold

Country Status (1)

Country Link
CN (1) CN219261677U (en)

Similar Documents

Publication Publication Date Title
US6422345B1 (en) Dismountable facade scaffold
US20210123249A1 (en) Individual scaffolding post
CN104533102B (en) Temporary guard railing for stair
CN219261677U (en) High-stability building construction scaffold
CN214785757U (en) Scaffold frame that building engineering used
CN210888010U (en) Construction handling frame
CN209760742U (en) Simple scaffold for house construction
CN113775213A (en) Detachable design protection operation canopy of construction is built in room
CN219773544U (en) Scaffold for building engineering
CN214658735U (en) Multifunctional building scaffold connecting mechanism
CN216042475U (en) Climbing frame combined structure for building scaffold
CN216196424U (en) Assembled engineering construction support of convenient climbing
CN113585700B (en) A assembled connection structure for shear force wall work platform
CN218234259U (en) Combined folding scaffold
KR200398851Y1 (en) A Fold Dropping Prevention Frame
CN220319104U (en) Scaffold connecting assembly and scaffold
CN221664200U (en) Indoor construction assembled climbing frame
CN217205743U (en) Building engineering rail guard
CN216042504U (en) Scaffold for building engineering
CN221219585U (en) Portal scaffold with supporting structure
CN221682400U (en) Scaffold for construction
CN219343933U (en) Operation platform device for building construction of anti-video wall of residence
CN221194376U (en) Combined type adjustable balcony safety protection plate
CN220167444U (en) Building engineering is with climbing frame
CN221143522U (en) Building construction anti-falling scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant