CN216999837U - Tower mill basis is pre-buried device - Google Patents
Tower mill basis is pre-buried device Download PDFInfo
- Publication number
- CN216999837U CN216999837U CN202220612081.0U CN202220612081U CN216999837U CN 216999837 U CN216999837 U CN 216999837U CN 202220612081 U CN202220612081 U CN 202220612081U CN 216999837 U CN216999837 U CN 216999837U
- Authority
- CN
- China
- Prior art keywords
- tower mill
- connecting plate
- side plates
- foundation
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model belongs to the technical field of tower mills, and particularly relates to a foundation pre-embedding device of a tower mill. The manufacturing is simple and convenient, the cost is low, the installation time of the on-site tower mill is greatly shortened, and the labor intensity of workers is reduced. Comprises two side plates, a connecting plate, a central plate and four lacing wires; the connecting plate is clamped between the two side plates, two ends of the connecting plate are respectively connected and fixed with the corresponding side plates through bolts, and the two side plates are parallel to each other and are vertical to the connecting plate; forming a rectangular frame structure with one open side; the central plate is positioned between the four lacing wires, and the first ends of the four lacing wires are respectively connected with the central plate to form an X-shaped structure; the X-shaped structure is positioned in the rectangular frame structure, and four free ends of the X-shaped structure are respectively connected with the rectangular frame structure and used as positioning templates; the two positioning templates are arranged in parallel from top to bottom, a certain distance is reserved between the two positioning templates, and the two positioning templates are connected through a plurality of vertically arranged foundation bolts.
Description
Technical Field
The utility model belongs to the technical field of tower mills, and particularly relates to a foundation pre-embedding device of a tower mill.
Background
At present, the tower mill is mainly applied to fine grinding operation in the industries of mines, cement, metallurgy and the like, and can replace a ball mill to be used as two-stage or three-stage ore grinding equipment. Compared with a ball mill, the tower mill has the characteristics of simple structure, small occupied area, high energy utilization rate, low consumption of medium balls, uniform product distribution granularity and the like, is widely accepted in the industry, and has wide market application prospect.
All need make the cement foundation before the installation of tower mill base member, pre-buried rag bolt, because the general error of civil engineering is bigger, if adopt the pre-buried form of ordinary rag bolt, hardly guarantee rag bolt's positioning dimension after the construction is accomplished, when the installation of tower mill base member, tower mill bottom plate foot hole appears very easily with the condition that ground rag bolt is not to last, lead to the tower mill to be unable to install, and maintain the foundation again consuming time and wasting power, seriously influence the on-the-spot installation progress of tower mill, cause economic loss.
If the form of T type head rag bolt is adopted, through the position of adjusting rag bolt in the anchor pipe, though can guarantee when the tower mill base member installation well tower mill bottom plate rag bolt hole, the hole site can not appear the condition to the top. However, the foundation bolts need to be matched with the anchor plates for use, the anchor plates are time-consuming and labor-consuming to manufacture, each foundation bolt needs to be provided with one anchor plate, the manufacturing quantity is large, and the cost is high. Moreover, when the assembly is carried out, workers are difficult to adjust the positions of the foundation bolts, the foundation bolts are prone to incline, and the nuts cannot be locked completely.
Disclosure of Invention
The utility model aims at overcoming the defects in the prior art, and provides a tower mill foundation embedding device which is designed for solving the problem that a tower mill base body can be installed quickly and accurately.
In order to achieve the purpose, the utility model adopts the following technical scheme that the device comprises two side plates, a connecting plate, a central plate and four lacing wires; the connecting plate is clamped between the two side plates, two ends of the connecting plate are respectively connected and fixed with the corresponding side plates through bolts, and the two side plates are parallel to each other and are vertical to the connecting plate; forming a rectangular frame structure with one side open; the central plate is positioned between the four lacing wires, and the first ends of the four lacing wires are respectively connected with the central plate to form an X-shaped structure; the X-shaped structure is positioned in the rectangular frame structure, and four free ends of the X-shaped structure are respectively connected with the rectangular frame structure and used as positioning templates; the positioning templates are arranged in parallel from top to bottom, a certain distance is reserved between the two positioning templates, and the two positioning templates are connected through a plurality of vertically arranged foundation bolts.
Furthermore, the upper layer positioning template and the lower layer positioning template are both horizontally arranged.
Further, the curb plate is provided with rag bolt hole, and rag bolt passes two locating template's about rag bolt hole, and rag bolt wears out locating template's one end and locks through first nut, and rag bolt wears out locating template's one end down and locks through the second nut.
Furthermore, the foundation bolts on the side plate of the upper positioning template and the foundation bolts on the side plate of the lower positioning template are arranged in a vertically one-to-one correspondence and concentric manner.
Further, the distance between the upper layer positioning template and the lower layer positioning template is larger than the height of concrete pouring.
Compared with the prior art, the utility model has the beneficial effects.
The utility model can effectively solve the problem, has simple and convenient manufacture and low cost, greatly shortens the installation time of the on-site tower mill, reduces the labor intensity of workers, and can be widely applied to the technical field of the tower mill.
Drawings
The utility model is further described with reference to the following figures and detailed description. The scope of the utility model is not limited to the following expressions.
FIG. 1 is a schematic three-dimensional structure of an embodiment.
FIG. 2 is a schematic side sectional view of an embodiment.
FIG. 3 is a schematic cross-sectional front view of an embodiment.
In the figure, 1 is a lacing wire, 2 is a central plate, 3 is a connecting plate, 4 is a side plate, 5 is an anchor bolt, 6 is a nut, 7 is a cement foundation, 8 is a lower layer positioning template, 9 is an upper layer positioning template, and 10 is a tower mill base body.
Detailed Description
As shown in fig. 1-3, the specific embodiment: comprises two side plates 4, a connecting plate 3, a central plate 2 and four lacing wires 1; the connecting plate is characterized in that the connecting plate 3 is clamped between the two side plates 4, two ends of the connecting plate 3 are respectively connected and fixed with the corresponding side plates 4 through bolts, and the two side plates 4 are parallel to each other and are vertical to the connecting plate 3; forming a rectangular frame structure with one open side.
The central plate 2 is positioned among the four lacing wires 1, and the first ends of the four lacing wires 1 are respectively connected with the central plate 2 to form an X-shaped structure; the X-shaped structure is positioned in the rectangular frame structure, and four free ends of the X-shaped structure are respectively connected with the rectangular frame structure and used as positioning templates.
The positioning template has two, and two positioning template upper and lower parallel arrangement leave certain interval in the middle of, link to each other through a plurality of vertically arranged rag bolt 5 between two positioning template.
Preferably, the upper positioning template 9 and the lower positioning template 8 are both horizontally arranged.
Preferably, curb plate 4 is provided with rag bolt 5 holes, and rag bolt 5 passes two locating templates's rag bolt 5 holes from top to bottom, and rag bolt 5 wears out locating template's one end and locks through first nut 6, and rag bolt 5 wears out locating template's one end down and locks through second nut 6.
Preferably, the anchor bolts 5 on the side plate 4 of the upper positioning template 9 and the anchor bolts 5 on the side plate 4 of the lower positioning template 8 are arranged in a one-to-one correspondence and in a concentric manner.
Preferably, the distance between the upper and lower positioning formworks 8 is greater than the height of the concrete casting.
During on-site construction, as shown in the attached drawings 1-3, a lower layer positioning template 8 and an upper layer positioning template 9 are respectively assembled, two ends of a connecting plate 3 are respectively connected and fixed with two side plates 4 through bolts, the two side plates 4 are parallel to each other and are perpendicular to the connecting plate 3, one ends of four tie bars 1 are respectively installed on a central plate 2, the other ends of the four tie bars are installed on the two side plates 4 and are connected and fixed through bolts, the lower layer positioning template 8 is assembled, and the upper layer positioning template 9 is assembled by the same method.
Parallel placement about lower floor's locating template 8 and upper locating template 9 keeps the certain distance, makes the rag bolt hole of curb plate 4 one-to-one from top to bottom, uses rag bolt 5 to pass the rag bolt hole of lower floor's locating template 8 and upper locating template 9 respectively, screws up nut 6 below the curb plate 4 is upper and lower.
After the assembly is finished, the whole body is placed on a cement foundation 7 of a tower mill, concrete is poured, and the lower positioning template 8 is completely embedded until reaching the lower surface of the upper positioning template 9 at a certain distance; and after the concrete is cured, removing the upper positioning template 9 and the nut 6, installing the base body 10 of the tower mill, enabling the foundation bolts 5 to respectively penetrate through the foundation holes of the base plate of the tower mill, and screwing the nut 6 to finish the installation of the base body 10 of the tower mill.
The utility model aims to solve the problem that the positioning size of the embedded foundation bolt is not accurate during the civil construction of the tower mill through the foundation embedding device of the tower mill. When the foundation bolt can be quickly and accurately aligned in the foundation hole of the base plate of the tower mill base body during installation, the installation is completed, the field installation time and the labor intensity of workers are reduced, and considerable economic benefits are brought.
It should be understood that the detailed description and specific examples, while indicating preferred embodiments of the utility model, are given by way of illustration only, not limitation, and it will be understood by those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the utility model; as long as the use requirements are met, the method is within the protection scope of the utility model.
Claims (5)
1. A tower mill foundation pre-embedding device comprises two side plates, a connecting plate, a central plate and four tie bars; the method is characterized in that: the connecting plate is clamped between the two side plates, two ends of the connecting plate are respectively fixedly connected with the corresponding side plates through bolts, and the two side plates are parallel to each other and are vertical to the connecting plate; forming a rectangular frame structure with one open side;
the central plate is positioned between the four lacing wires, and the first ends of the four lacing wires are respectively connected with the central plate to form an X-shaped structure; the X-shaped structure is positioned in the rectangular frame structure, and four free ends of the X-shaped structure are respectively connected with the rectangular frame structure and used as positioning templates;
the two positioning templates are arranged in parallel from top to bottom, a certain distance is reserved between the two positioning templates, and the two positioning templates are connected through a plurality of vertically arranged foundation bolts.
2. The tower mill foundation embedding device according to claim 1, characterized in that: the upper positioning template and the lower positioning template are both horizontally arranged.
3. The tower mill foundation embedding device according to claim 1, characterized in that: the side plate is provided with an anchor bolt hole, an anchor bolt penetrates through the anchor bolt holes of the upper positioning template and the lower positioning template, one end, penetrating out of the upper positioning template, of the anchor bolt is locked through a first nut, and one end, penetrating out of the lower positioning template, of the anchor bolt is locked through a second nut.
4. The tower mill foundation embedding device according to claim 1, characterized in that: the foundation bolts on the upper positioning template side plate and the foundation bolts on the lower positioning template side plate are arranged in a vertically one-to-one correspondence and in a concentric mode.
5. The tower mill foundation embedding device according to claim 1, characterized in that: the distance between the upper and lower positioning templates is greater than the height of concrete pouring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220612081.0U CN216999837U (en) | 2022-03-21 | 2022-03-21 | Tower mill basis is pre-buried device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220612081.0U CN216999837U (en) | 2022-03-21 | 2022-03-21 | Tower mill basis is pre-buried device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216999837U true CN216999837U (en) | 2022-07-19 |
Family
ID=82369990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220612081.0U Active CN216999837U (en) | 2022-03-21 | 2022-03-21 | Tower mill basis is pre-buried device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216999837U (en) |
-
2022
- 2022-03-21 CN CN202220612081.0U patent/CN216999837U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211517947U (en) | Bridge case roof beam is prefabricated with shaped steel pedestal | |
CN216999837U (en) | Tower mill basis is pre-buried device | |
CN117431788A (en) | Combined track vibration reduction system applied to vehicle Duan Ku inner line and adjusting method thereof | |
CN206220117U (en) | For the positioner of column foot | |
CN209975509U (en) | Pile foundation steel reinforcement cage adjusting and positioning device | |
CN112411607A (en) | Anchor rod foundation for reinforcing power transmission line foundation | |
CN109797773B (en) | Assembled steel structure tower crane foundation bearing platform capable of freely adjusting angle and position | |
CN214992735U (en) | Systematization template for high-speed rail base adopting glass fiber panel | |
CN110863652A (en) | Precise positioning and mounting method for prefabricated and assembled double-section stand column | |
CN103510521A (en) | Connecting component | |
CN213539038U (en) | Non-embedded type rear tower crane foundation device suitable for building construction | |
CN202970006U (en) | L-shaped prefabricated clear water bleacher plate installation construction structure | |
CN215629452U (en) | Pull rod-free mobile trolley construction device for frame bridge | |
CN201648890U (en) | Anti-displacement control frame for construction of curve section of track slab | |
CN207079484U (en) | Cast-in-situ Beam prestressed anchor backing plate is accurately positioned frock | |
CN203594264U (en) | Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification | |
CN210530459U (en) | Consolidation cable system of mixed structure wind tower | |
CN109291208B (en) | Large-span prestressed concrete double-T-plate construction method | |
CN102943484B (en) | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation | |
CN112212135A (en) | Horizontal adjustable supporting structure of counter-force pedestal loading hole module and construction method thereof | |
CN214784135U (en) | Anchor rod-prefabricated cushion block type foundation | |
CN201288329Y (en) | Precision built-in steel mold of ultralong cluster anchor bolt | |
CN110439273A (en) | A kind of mold and installation method of telescopic production slope monitoring clump pedestal | |
CN212271231U (en) | Column base connecting piece | |
CN210395124U (en) | Pylon installation positioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |