CN216959269U - Cable moves device along with curtain circular rail in superelevation curtain installation - Google Patents

Cable moves device along with curtain circular rail in superelevation curtain installation Download PDF

Info

Publication number
CN216959269U
CN216959269U CN202122874021.4U CN202122874021U CN216959269U CN 216959269 U CN216959269 U CN 216959269U CN 202122874021 U CN202122874021 U CN 202122874021U CN 216959269 U CN216959269 U CN 216959269U
Authority
CN
China
Prior art keywords
steel
wall
fixedly connected
curtain wall
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122874021.4U
Other languages
Chinese (zh)
Inventor
王世栋
亓守刚
慎旭双
卜项涛
胡建中
满迪
吴振东
蓝杭焜
赵建
胡松伟
蔡睿欣
李云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202122874021.4U priority Critical patent/CN216959269U/en
Application granted granted Critical
Publication of CN216959269U publication Critical patent/CN216959269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model relates to the technical field of curtain wall installation, in particular to a device for moving a cable along with a curtain wall circular rail in the installation process of an ultrahigh curtain wall, which comprises a first I-shaped steel, wherein the outer wall of the top of the first I-shaped steel is fixedly connected with a stiffening inner plate which is distributed at equal intervals, the outer wall of one side of the stiffening inner plate is fixedly connected with a third I-shaped steel, the outer wall of the bottom of the first I-shaped steel is fixedly connected with a supporting rod, and one end of the supporting rod, which is far away from the first I-shaped steel, is fixedly connected with a square steel, in the utility model, a worker arranges two magnetic blocks on a cable body every other meter, and the cable body can be tidied by applying the principle that like poles repel each other and opposite poles attract each other of the magnetic blocks, when the cable body hangs down, the two magnetic blocks at the position of each meter of the cable body are adsorbed together, so that the cable body does not droop and cannot cause winding, the safety performance is improved, and the free hanging down height of the cable body can be well guaranteed no matter how long, without potential safety hazard.

Description

Cable moves device along with curtain ring rail in superelevation curtain installation
Technical Field
The utility model relates to the technical field of curtain wall installation, in particular to a cable moving device along with a curtain wall circular rail in the installation process of an ultrahigh curtain wall.
Background
With the development of science and technology, curtain walls are widely applied to the field of building engineering, especially public building engineering, due to the advantages of light weight, flexible design, strong shock resistance, systematic construction, modernization, convenient updating and maintenance and the like.
The curtain wall can be divided into component type, unit type, point support type, full glass type, double-layer (breathing type) curtain wall and the like according to the stress state of the panel, wherein the unit type curtain wall is known for high installation speed, short construction period, high surface flatness of the curtain wall and good decoration effect. And unit curtain adopts ring rail cooperation electric block to install the unit plate most conveniently in superelevation layer installation, but current electric block can not effectual assurance cable move along with it in the ring rail removal process to it hangs down the length overlength and has great potential safety hazard to take place the cable easily, consequently, needs a cable to solve above-mentioned problem along with curtain ring rail mobile device in the superelevation curtain installation urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a device for moving a cable along with a curtain wall circular rail in the installation process of an ultrahigh curtain wall, so as to solve the problems in the background technology.
The technical scheme of the utility model is as follows: the utility model provides a cable encircles rail mobile device along with curtain in superelevation curtain installation, includes first I-steel, the inner panel of putting more energy into that the top outer wall fixedly connected with equidistance of first I-steel distributes, the one side outer wall fixedly connected with third I-steel of the inner panel of putting more energy into, the bottom outer wall fixedly connected with bracing piece of first I-steel, the bracing piece is kept away from the one end fixedly connected with square beam of first I-steel, one side of first I-steel is provided with wire rope, the bottom outer wall fixedly connected with second I-steel of first I-steel, the both sides of second I-steel all are provided with first gyro wheel, the below of first gyro wheel is provided with electric block, one side of first I-steel is provided with the removal subassembly.
Preferably, the square steel and the outer wall of one side of the supporting rod are fixedly connected with angle steel, and one end of the angle steel is fixedly connected to the outer wall of the bottom of the first I-shaped steel.
Preferably, the moving assembly comprises second rollers arranged on two sides of the second I-shaped steel, the outer circumferential wall of each second roller is connected with a cable body in a transmission mode, and an adjusting assembly is arranged on the agenda of each second roller.
Preferably, the adjusting assembly comprises a first fixing bolt in threaded connection with the outer wall of one side of the second roller, the first fixing bolt is in threaded connection with a connecting sheet, a first threaded hole is formed in one side of the connecting sheet, and a U-shaped screw rod is in threaded connection with the inner portion of the first threaded hole.
Preferably, a vertical rod is inserted into one end of the U-shaped screw, a wiring fixture is fixedly connected to one end of the vertical rod, and one end of the cable body penetrates through the wiring fixture.
Preferably, the wiring fixture comprises a clamp plate fixedly connected to the bottom of the vertical rod, the number of the clamp plate is two, one group of the clamp plate is provided with a round hole in the top, the other group of the clamp plate is provided with a second threaded hole in one side, and the second threaded hole is connected with a second fixing screw in a threaded manner.
Preferably, one side of the cable body is provided with magnetic blocks, and the magnetic blocks are distributed equidistantly below the first I-shaped steel.
The utility model provides a device for moving a cable along with a curtain wall circular rail in the installation process of an ultrahigh curtain wall through improvement, and compared with the prior art, the device has the following improvements and advantages:
one is as follows: according to the utility model, through the arranged adjusting assembly, workers can adjust the U-shaped screw and the first fixing bolt on one side of the connecting sheet, so that the connection tightness degree of the second roller and the annular rail is proper, and the requirements that the second roller rolls on the second I-shaped steel wing element without obstacles and does not fall off are met;
the second step is as follows: according to the cable body, the arranged magnetic blocks are arranged on the cable body every other meter by workers, and the principle that like poles of the magnetic blocks repel each other and opposite poles of the magnetic blocks attract each other is utilized, so that the cable body can be arranged, when the cable body hangs down, the two magnetic blocks at the position of each meter of the cable body are adsorbed together, the cable body is prevented from hanging down disorderly and winding, the safety performance is improved, and therefore, the free hanging-down height of the cable body can be well guaranteed no matter how long the cable body is, and potential safety hazards cannot occur.
Drawings
The utility model is further explained below with reference to the figures and examples:
FIG. 1 is a schematic side view of a ring rail mounting node of the present invention;
FIG. 2 is a schematic view of the front elevation of the ring rail mounting node of the present invention;
fig. 3 is a schematic sectional view of the wiring jig of the present invention.
Description of reference numerals:
1. a first I-steel; 2. a second I-steel; 3. a first roller; 4. an electric hoist; 5. square steel; 6. angle steel; 7. a wire rope; 8. a support bar; 9. a third I-steel; 10. a stiffening inner plate; 11. a second roller; 12. a wiring fixture; 13. a magnetic block; 14. a cable body; 15. a first fixing bolt; 16. connecting sheets; 17. a first threaded hole; 18. a U-shaped screw; 19. a splint; 20. a second fixing screw; 21. a vertical rod.
Detailed Description
The present invention is described in detail below, and technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model provides a device for moving a cable along with a curtain wall circular rail in the installation process of an ultrahigh curtain wall through improvement, and the technical scheme of the device is as follows:
as shown in fig. 1-3, the device for moving a cable along with a curtain wall circular track in the installation process of an ultrahigh curtain wall comprises a first i-shaped steel 1, a stiffening inner plate 10 which is distributed equidistantly and fixedly connected to the outer wall of the top of the first i-shaped steel 1, a third i-shaped steel 9 fixedly connected to the outer wall of one side of the stiffening inner plate 10, a support rod 8 fixedly connected to the outer wall of the bottom of the first i-shaped steel 1, a square steel 5 fixedly connected to one end of the support rod 8, which is far away from the first i-shaped steel 1, a steel wire rope 7 arranged on one side of the first i-shaped steel 1, a second i-shaped steel 2 fixedly connected to the outer wall of the bottom of the first i-shaped steel 1, first rollers 3 arranged on two sides of the second i-shaped steel 2, an electric hoist 4 arranged below the first rollers 3, and a moving assembly arranged on one side of the first i-shaped steel 1.
Further, the equal fixedly connected with angle steel 6 of one side outer wall of square steel 5 and bracing piece 8, the one end fixed connection of angle steel 6 is on the bottom outer wall of first I-steel 1, and the stability that can 5 and 1 first I-steel 1 be connected of square steel of effectual assurance through two sets of angle steel 6 that set up.
Further, the moving assembly comprises second rollers 11 arranged on two sides of the second I-shaped steel 2, the outer circumferential wall of each second roller 11 is connected with a cable body 14 in a transmission mode, and an adjusting assembly is arranged on the agenda of each second roller 11.
Further, the adjusting part comprises a first fixing bolt 15 in threaded connection with the outer wall of one side of the second roller 11, the first fixing bolt 15 is in threaded connection with a connecting piece 16, a first threaded hole 17 is formed in one side of the connecting piece 16, a U-shaped screw rod 18 is in threaded connection with the inside of the first threaded hole 17, and a worker can adjust the U-shaped screw rod 18 and the first fixing bolt 15 on one side of the connecting piece 16, so that the tightness degree of the connection between the second roller 11 and the annular rail is proper, and the requirement that the second roller 11 rolls on the 2 wing elements of the second I-steel without obstacles and is unlikely to drop is met.
Furthermore, a vertical rod 21 is inserted into one end of the U-shaped screw 18, one end of the vertical rod 21 is fixedly connected with the wiring fixture 12, and one end of the cable body 14 penetrates through the wiring fixture 12.
Further, the wiring fixture 12 comprises two groups of clamping plates 19 fixedly connected to the bottom of a vertical rod 21, the number of the clamping plates 19 is two, a circular hole is formed in the top of one group of the clamping plates 19, a second threaded hole is formed in one side of the other clamping plate 19, a second fixing screw 20 is in threaded connection with the inside of the second threaded hole, the device is provided with the wiring fixture 12 and second rollers 11 fixed on the circular track at the position not exceeding 2m of the length of the cable body 14, after the wiring fixture 12 clamps the cable body 14 in the middle through the two groups of the clamping plates 19, the second fixing screw 20 is used for connecting and fixing the upper clamping plate 19 and the lower clamping plate 19 of the wiring fixture 12, the vertical rod 21 on the wiring fixture 12 is fixedly connected with the connecting piece 16 through the U-shaped screw 18, one rod piece of the U-shaped screw 18 penetrates into a reserved hole formed in one side of the vertical rod 21 on the wiring fixture 12, and then the connecting piece 16 is fixed on the second roller 11 through the first fixing bolt 15, two second rollers 11 are placed on the lower wing elements on both sides of the second i-beam 2 of the circular track.
Further, one side of cable body 14 is provided with magnetic path 13, magnetic path 13 is the equidistance and distributes in the below of first I-steel 1, the staff sets up two magnetic paths 13 every 1m on cable body 14, the like poles of application magnetic path 13 repel each other, the principle that opposite poles attract, thereby can arrange cable body 14 in order, when cable body 14 hangs down, two magnetic paths 13 of every 1m cable body 14 department adsorb together, prevent that cable body 14 from drooping randomly arranged, cause the winding, improve the security performance, so, no matter how long cable body 14 can be fine guarantee its height of freely hanging down, and not take place the potential safety hazard.
The working principle is as follows: the device is characterized in that a wiring clamp 12 and second rollers 11 are arranged at positions not exceeding the length 2m of a cable body 14 and fixed on an annular rail, after the wiring clamp 12 clamps the cable body 14 in the middle through two groups of clamping plates 19, a second fixing screw 20 is used for connecting and fixing an upper clamping plate 19 and a lower clamping plate 19 of the wiring clamp 12, a vertical rod 21 on the wiring clamp 12 is connected and fixed with a connecting piece 16 through a U-shaped screw 18, wherein one rod piece of the U-shaped screw 18 penetrates into a reserved hole formed in one side of the vertical rod 21 on the wiring clamp 12, then the connecting piece 16 is fixed on the second rollers 11 through a first fixing bolt 15, the two second rollers 11 are placed on lower wing elements on two sides of a second I-shaped steel 2 of the annular rail, and a worker adjusts the U-shaped screw 18 and the first fixing bolt 15 on one side of the connecting piece 16 to enable the tightness degree of the connection between the second rollers 11 and the annular rail to be proper, satisfy second gyro wheel 11 accessible roll on the 2 wing elements of second I-steel and be unlikely to the demand that takes place to drop, the staff sets up two magnetic paths 13 every 1m on cable body 14, the like poles of application magnetic path 13 repel each other, the principle that opposite poles attract mutually, thereby can arrange cable body 14 in order, when cable body 14 hangs down, two magnetic paths 13 of every 1m cable body 14 department adsorb together, prevent that cable body 14 from flagging in a jumble and disorderly, cause the winding, improve the security performance, so, no matter how long cable body 14 can all be fine guarantee its free height of hanging down, and do not take place the potential safety hazard.
The previous description is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. The utility model provides a cable is along with curtain circular rail mobile device in superelevation curtain installation which characterized in that: including first I-steel (1), the inner panel (10) of putting more energy into that the top outer wall fixedly connected with equidistance of first I-steel (1) distributes, the one side outer wall fixedly connected with third I-steel (9) of the inner panel (10) of putting more energy into, the bottom outer wall fixedly connected with bracing piece (8) of first I-steel (1), keep away from bracing piece (8) the one end fixedly connected with square beam (5) of first I-steel (1), one side of first I-steel (1) is provided with wire rope (7), the bottom outer wall fixedly connected with second I-steel (2) of first I-steel (1), the both sides of second I-steel (2) all are provided with first gyro wheel (3), the below of first gyro wheel (3) is provided with electric block (4), one side of first I-steel (1) is provided with the removal subassembly.
2. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 1, wherein: the square steel (5) and the outer wall of one side of the supporting rod (8) are fixedly connected with angle steel (6), and one end of the angle steel (6) is fixedly connected to the outer wall of the bottom of the first I-shaped steel (1).
3. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 2, wherein: the moving assembly comprises second rollers (11) arranged on two sides of the second I-shaped steel (2), the outer circumferential wall of each second roller (11) is connected with a cable body (14) in a transmission mode, and an adjusting assembly is arranged on one side of each second roller (11).
4. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 3, wherein: the adjusting assembly comprises a first fixing bolt (15) which is in threaded connection with the outer wall of one side of the second roller (11), the first fixing bolt (15) is in threaded connection with a connecting piece (16), a first threaded hole (17) is formed in one side of the connecting piece (16), and the inner portion of the first threaded hole (17) is in threaded connection with a U-shaped screw (18).
5. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 4, wherein: one end of the U-shaped screw rod (18) is inserted with a vertical rod (21), one end of the vertical rod (21) is fixedly connected with a wiring clamp (12), and one end of the cable body (14) penetrates through the wiring clamp (12).
6. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 5, wherein: wiring fixture (12) including fixed connection in splint (19) of montant (21) bottom, the figure of splint (19) is two sets of, and is a set of the round hole has been seted up at the top of splint (19), another the second screw hole has been seted up to one side of splint (19), the internal thread of second screw hole is connected with second fixing screw (20).
7. The device for moving the cable along with the circular track of the curtain wall in the installation process of the ultrahigh curtain wall as claimed in claim 3, wherein: magnetic blocks (13) are arranged on one side of the cable body (14), and the magnetic blocks (13) are distributed below the first I-shaped steel (1) at equal intervals.
CN202122874021.4U 2021-11-22 2021-11-22 Cable moves device along with curtain circular rail in superelevation curtain installation Active CN216959269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122874021.4U CN216959269U (en) 2021-11-22 2021-11-22 Cable moves device along with curtain circular rail in superelevation curtain installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122874021.4U CN216959269U (en) 2021-11-22 2021-11-22 Cable moves device along with curtain circular rail in superelevation curtain installation

Publications (1)

Publication Number Publication Date
CN216959269U true CN216959269U (en) 2022-07-12

Family

ID=82304874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122874021.4U Active CN216959269U (en) 2021-11-22 2021-11-22 Cable moves device along with curtain circular rail in superelevation curtain installation

Country Status (1)

Country Link
CN (1) CN216959269U (en)

Similar Documents

Publication Publication Date Title
CN211775968U (en) A face limit protector for floor template construction
CN108758083A (en) A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing
CN216959269U (en) Cable moves device along with curtain circular rail in superelevation curtain installation
CN204703480U (en) A kind of integral supporting structure for building
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN111206763A (en) Adjustable section steel suspension hanging basket
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN215681693U (en) Novel closed bus system bridge
CN206091354U (en) High -speed railway station curtain service equipment
CN212927242U (en) Civil air defense engineering battle plugging wall
CN212304631U (en) Cable protection clamp
CN203820360U (en) Lifting appliance for installing existing railway sound barrier plate
CN210530363U (en) Gradual change formula triangle-shaped curtain skeleton construction operation platform
CN203023637U (en) Upside-down flag type supporting frame for mounting suspended ceiling of gridding bridge frame
CN204626263U (en) A kind of outrigger structure for installing steel box-girder
CN208352907U (en) A kind of cable testing bridge structure facilitating installation
CN201605142U (en) Anti-dropping device of lifting system
CN104878696B (en) A kind of outrigger device for installing steel box-girder
CN210342615U (en) Shear wall-free elevator shaft construction platform convenient to install
CN210239207U (en) Reinforcement shaped steel structure for building
CN210246140U (en) Grounding device for seven-wheel pay-off tackle
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN216512333U (en) Lifting appliance for lifting unit plate block at shear wall position
CN217869970U (en) Movable electromechanical mounting auxiliary tool
CN220168779U (en) Underground pipeline suspension protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant