CN216949434U - Attached climbing scaffold guide rail - Google Patents
Attached climbing scaffold guide rail Download PDFInfo
- Publication number
- CN216949434U CN216949434U CN202123146165.4U CN202123146165U CN216949434U CN 216949434 U CN216949434 U CN 216949434U CN 202123146165 U CN202123146165 U CN 202123146165U CN 216949434 U CN216949434 U CN 216949434U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- truss
- climbing scaffold
- attached
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses an attached climbing scaffold guide rail, which relates to the field of scaffolds and comprises a lifting seat, a truss and a base, wherein the lifting seat comprises a seat body, the truss comprises a frame body, the base comprises an anti-falling baffle, wall-attached guide seats and guide rails, one side surfaces of the two frame bodies are respectively connected with one side surface of the seat body, the other side surfaces of the two frame bodies are respectively connected with one side surface of the anti-falling baffle, the two wall-attached guide seats are respectively arranged in the anti-falling baffle, and one side surfaces of the two guide rails are respectively connected with the other two side surfaces of the anti-falling baffle. The attached climbing scaffold guide rail provided by the utility model has the advantages that the overall weight is reduced by arranging the space holes and the process holes, a space truss structure is formed, and the stress structure is more reasonable.
Description
Technical Field
The utility model relates to the field of scaffolds, in particular to an attached climbing scaffold guide rail.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. Along with the appearance of a large number of modern large-scale building systems in China, the fastener type steel pipe scaffold can not adapt to the requirement of building construction development, and the development, popularization and application of the novel scaffold are urgent, so that the novel guide rail type scaffold is a better choice.
The lower scaffold guide rail in the prior art has the defects of unreasonable stress structure, poor safety, manpower waste and the like, and therefore an attached climbing scaffold guide rail is provided.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide an attached climbing scaffold guide rail which can effectively solve the problems of unreasonable stress structure, poor safety, labor waste and the like in the background technology.
In order to solve the technical problems, the utility model is realized by the following technical scheme: the utility model provides an inserted climbing scaffold guide rail, includes promotion seat, truss and base, the promotion seat includes the pedestal, the truss includes the support body, the base is including preventing weighing down the fender, attaching wall guide holder and guide rail, two support body side surface all is connected with pedestal side surface, two support body opposite side surface all with prevent weighing down keep off a side surface and be connected, two it all installs in preventing weighing down and keeps off inside to attach the wall guide holder, two guide rail side surface respectively with prevent weighing down keep off other both sides surface connection.
Preferably, the lifting seat further comprises mounting holes, the mounting holes are formed in the surfaces of the two sides of the seat body respectively and are circular hole structures, and the mounting holes are used for mounting a scaffold.
Preferably, the truss still includes the space hole, and is a plurality of two support body side surfaces are located respectively to the space hole, and is a plurality of the space hole is triangle hole structure, and the effect in space hole can lighten weight, forms space truss structure again, and the atress structure is more reasonable.
Preferably, the base is still including preventing weighing down hole and fabrication hole, and is a plurality of prevent weighing down the hole and locate respectively and prevent weighing down and keep off a side surface, and is a plurality of the fabrication hole is located respectively and prevents weighing down and keep off the opposite side surface, and is a circular hole structure, and is a plurality of prevent weighing down the hole and be the quad slit structure, prevent weighing down the effect in hole and prevent that the scaffold frame from falling, strengthen safety, the effect in fabrication hole is to alleviate whole weight, attaches the effect of wall guide holder and guide rail and leads to and pass power with the gyro wheel cooperation to the scaffold frame, has practiced thrift the manpower.
The utility model has the following beneficial effects:
1. the utility model reduces the whole weight by arranging the space holes and the fabrication holes, and forms a space truss structure, so that the stress structure is more reasonable;
2. the anti-falling holes are arranged to match with the anti-falling blocks to prevent the scaffold from falling, so that safety is enhanced;
3. the wall-attached guide seat, the guide rail and the roller are matched to guide and transmit force to the scaffold, so that manpower is saved.
Of course, it is not necessary for any product in which the utility model is practiced to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view illustrating the overall structure of an attached climbing scaffold rail according to the present invention;
FIG. 2 is a schematic structural view of another embodiment of an attached climbing scaffold rail according to the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1.
In the drawings, the reference numbers indicate the following list of parts:
100. a lifting seat; 110. a base body; 120. mounting holes; 200. a truss; 210. a frame body; 220. a spatial hole; 300. a base; 310. the anti-falling gear; 320. an anti-falling hole; 330. a wall-attached guide seat; 340. a guide rail; 350. and (5) processing holes.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further explained by combining the specific embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art.
Referring to fig. 1-3, the present invention is an attached climbing scaffold guide rail, comprising a lifting seat 100, a truss 200 and a base 300, wherein the lifting seat 100 comprises a seat body 110, the truss 200 comprises frame bodies 210, the base 300 comprises an anti-falling stopper 310, wall-attached guide seats 330 and guide rails 340, one side surface of each of the two frame bodies 210 is connected with one side surface of the seat body 110, the other side surface of each of the two frame bodies 210 is connected with one side surface of the anti-falling stopper 310, the two wall-attached guide seats 330 are installed inside the anti-falling stopper 310, and one side surface of each of the two guide rails 340 is connected with the other two side surfaces of the anti-falling stopper 310.
Further, the lifting seat 100 further includes mounting holes 120, the mounting holes 120 are respectively disposed on two side surfaces of the seat body 110, the mounting holes 120 are all circular hole structures, and the mounting holes 120 are used for mounting a scaffold.
Further, the truss 200 further comprises space holes 220, the space holes 220 are respectively formed in one side surface of the two frame bodies 210, the space holes 220 are all triangular hole structures, the space holes 220 are used for reducing weight, a space truss structure is formed, and the stress structure is more reasonable.
Further, base 300 still includes and prevents weighing down hole 320 and fabrication hole 350, a plurality of holes 320 of preventing weighing down are located respectively and are prevented weighing down and keep off 310 side surface, a plurality of fabrication holes 350 are located respectively and are prevented weighing down and keep off 310 opposite side surface, a plurality of fabrication holes 350 are the circular port structure, a plurality of holes 320 of preventing weighing down are the quad slit structure, the effect of preventing weighing down hole 320 is that the cooperation is prevented weighing down and is kept off 310 and prevent that the scaffold from falling, strengthen safety, the effect of fabrication hole 350 is that whole weight is alleviateed, the effect that attaches wall guide holder 330 and guide rail 340 leads and passes power with the gyro wheel cooperation to the scaffold, the manpower has been practiced thrift.
The working principle of the utility model is as follows:
when the personnel use, install the scaffold frame through mounting hole 120, space hole 220 and fabrication hole 350 lighten whole weight, form space truss structure again, and the atress structure is more reasonable. The anti-falling hole 320 is matched with the anti-falling baffle 310 to prevent the scaffold from falling and enhance safety. The wall-attached guide seat 330 and the guide rail 340 are matched with the rollers to guide and transfer force to the scaffold, so that manpower is saved.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (4)
1. An attached climbing scaffold guide rail is characterized in that: including lifting seat (100), truss (200) and base (300), lifting seat (100) is including pedestal (110), truss (200) are including support body (210), base (300) are including preventing weighing down keeping off (310), attaching wall guide holder (330) and guide rail (340), two support body (210) a side surface all is connected with pedestal (110) a side surface, two support body (210) opposite side surface all with prevent weighing down keep off (310) a side surface and be connected, two it all installs in preventing weighing down to keep off (310) inside attaching wall guide holder (330), two guide rail (340) a side surface respectively with prevent weighing down keep off (310) both sides surface connection in addition.
2. An attached climbing scaffold rail according to claim 1, characterized in that: the lifting seat (100) further comprises mounting holes (120), and the mounting holes (120) are respectively formed in the surfaces of the two sides of the seat body (110).
3. An attached climbing scaffold rail according to claim 1, characterized in that: the truss (200) further comprises space holes (220), and the space holes (220) are respectively formed in one side surface of each of the two frame bodies (210).
4. An attached climbing scaffold rail according to claim 1, characterized in that: the base (300) further comprises an anti-falling hole (320) and a process hole (350), the anti-falling hole (320) is formed in one side surface of the anti-falling block (310), and the process hole (350) is formed in the other side surface of the anti-falling block (310).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123146165.4U CN216949434U (en) | 2021-12-14 | 2021-12-14 | Attached climbing scaffold guide rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123146165.4U CN216949434U (en) | 2021-12-14 | 2021-12-14 | Attached climbing scaffold guide rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216949434U true CN216949434U (en) | 2022-07-12 |
Family
ID=82311475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123146165.4U Active CN216949434U (en) | 2021-12-14 | 2021-12-14 | Attached climbing scaffold guide rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216949434U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115450416A (en) * | 2022-09-23 | 2022-12-09 | 甘肃第六建设集团股份有限公司 | Climb frame with light-duty anchor formula anti-tilt anticreep aluminum alloy guide rail |
-
2021
- 2021-12-14 CN CN202123146165.4U patent/CN216949434U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115450416A (en) * | 2022-09-23 | 2022-12-09 | 甘肃第六建设集团股份有限公司 | Climb frame with light-duty anchor formula anti-tilt anticreep aluminum alloy guide rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216949434U (en) | Attached climbing scaffold guide rail | |
CN107090968B (en) | Lifting method of integrated attached lifting scaffold | |
CN214144128U (en) | Steel structure sliding frame | |
CN211622534U (en) | Movable cantilever operation platform | |
CN111377364A (en) | Ground jacking type tower crane device and construction method | |
CN214402679U (en) | Modular electric climbing frame | |
CN201502170U (en) | Horizontal supporting device of building external frame | |
CN210763910U (en) | Auxiliary force application structure for hoisting steel structure | |
CN2494860Y (en) | Outrigger supporting up-down scaffold | |
CN210459705U (en) | Detachable steel bar truss floor support plate supporting structure | |
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN213174745U (en) | Support bracket device for climbing frame | |
CN221118502U (en) | Hanging tool and mounting structure for mounting steel support and steel enclosing purlin | |
CN220924107U (en) | Novel rail-mounted area double-line operation detachable rail-mounted vehicle | |
CN212773380U (en) | Lower hanger structure for scaffold | |
CN217871736U (en) | Guide holder with adjustable high stability | |
CN220908406U (en) | Top bracket for reinforcement cage construction and construction equipment thereof | |
CN216949371U (en) | Combined high-grade tool | |
CN214144622U (en) | Hanging and hoisting type steel platform | |
CN214905078U (en) | Building engineering management bid inviting device | |
CN214246512U (en) | Assembled scaffold structure for building engineering | |
CN214589208U (en) | Pole holding device for mobile communication base station | |
CN213738111U (en) | Vertical transportation equipment for building assembly plate | |
CN217439942U (en) | Portable ladder stand and platform thereof | |
CN213015330U (en) | Lower hanging seat for climbing frame lifting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |