CN214144622U - Hanging and hoisting type steel platform - Google Patents

Hanging and hoisting type steel platform Download PDF

Info

Publication number
CN214144622U
CN214144622U CN202022518200.XU CN202022518200U CN214144622U CN 214144622 U CN214144622 U CN 214144622U CN 202022518200 U CN202022518200 U CN 202022518200U CN 214144622 U CN214144622 U CN 214144622U
Authority
CN
China
Prior art keywords
jib
steel
factory building
building roof
roof girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022518200.XU
Other languages
Chinese (zh)
Inventor
徐治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Musen Automation Equipment Co ltd
Original Assignee
Jiangxi Musen Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Musen Automation Equipment Co ltd filed Critical Jiangxi Musen Automation Equipment Co ltd
Priority to CN202022518200.XU priority Critical patent/CN214144622U/en
Application granted granted Critical
Publication of CN214144622U publication Critical patent/CN214144622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a hang hoist and mount formula steel platform relates to the structure field of steel platform, including factory building roof girder steel, the bottom of factory building roof girder steel is provided with the upper jib, and one side that the bottom of factory building roof girder steel is located the upper jib is provided with the diagonal member, the bottom of upper jib is provided with lower floor's jib, and one side of lower floor's jib is provided with the carriage release frame, the top of carriage release frame is provided with the conveyer, and the below that the top of carriage release frame is located the factory building roof girder steel is provided with clean board, the bottom of factory building roof girder steel is provided with the bracing piece that runs through to the carriage release frame below, and the bottom of bracing piece is provided with place the platform. The utility model discloses a set up factory building roof girder steel, upper jib, lower floor's jib etc. and make the device hang in the top on ground through the equipment to do not occupy a little space on ground, make personnel and logistics channel and equipment layout plan more freely, factory workshop availability factor is higher.

Description

Hanging and hoisting type steel platform
Technical Field
The utility model relates to a steel platform's structure field specifically is a hang hoist and mount formula steel platform.
Background
The steel structure platform is also called a working platform. Modern steel structure platform structural style is various, and the function should also be complete. The structure of the storage device is characterized by a full-assembly structure, flexible design and wide application in modern storage.
At present, most of steel platforms on the market are in a column form, the column form is limited by space, and particularly, a scene that large-scale inherent equipment is arranged on the ground of a first floor is provided. And the upright column form occupies partial ground space, so that personnel and logistics channels are difficult to plan and efficient and convenient to use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem of occupying too much ground space, a suspended and hoisted steel platform is provided.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hang hoist and mount formula steel platform, includes factory building roof girder steel, the bottom of factory building roof girder steel is provided with the upper jib, and one side that the bottom of factory building roof girder steel is located the upper jib is provided with the diagonal member, the bottom of upper jib is provided with lower floor's jib, and one side of lower floor's jib is provided with the carriage release rack, the top of carriage release rack is provided with the conveyer, and the below that the top of carriage release rack is located the factory building roof girder steel is provided with clean board, the bottom of factory building roof girder steel is provided with the bracing piece that runs through to the carriage release rack below, and the bottom of bracing piece is provided with place the platform, the one end of upper jib is provided with the platform crossbeam.
Preferably, a circular flange is arranged at the position above the middle part of the lower-layer hanger rod.
Preferably, the bottom of the clean board is provided with a through hole penetrating to the top of the clean board, and the size of the through hole is matched with the top end of the lower layer suspender.
Preferably, the steel platform beam is a 125 x 125mm H-section steel.
Preferably, the diagonal draw bar consists of an M12 screw and a single hook turn-buckle bolt.
Preferably, one end of the diagonal draw bar is buckled at the bottom end of the upper layer hanging rod and the outer side of the flange plate at the top.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model is provided with the factory roof steel beam, the upper layer suspender, the lower layer suspender and the like, and the device is hung above the ground through assembly, thereby not occupying a little space on the ground, enabling personnel, logistics channels and equipment arrangement to be more freely planned, and having higher use efficiency of factory workshops;
drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is an enlarged view of a point a in fig. 1 according to the present invention;
fig. 4 is an enlarged view of the position B in fig. 3 according to the present invention.
In the figure: 1. a factory roof steel beam; 2. cleaning the plate; 3. an upper layer hanger rod; 4. a lower layer hanger rod; 5. a conveyor; 6. a diagonal member; 7. a steel platform beam; 8. a steel platform checkered plate; 9. placing a platform; 10. a movable frame; 11. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "disposed" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention according to its overall structure.
Please refer to fig. 1-4, a suspended and hoisted steel platform, which comprises a factory roof steel beam 1, wherein an upper layer hanger rod 3 is arranged at the bottom end of the factory roof steel beam 1, a diagonal draw bar 6 is arranged at one side of the upper layer hanger rod 3 at the bottom end of the factory roof steel beam 1, a lower layer hanger rod 4 is arranged at the bottom end of the upper layer hanger rod 3, a movable frame 10 is arranged at one side of the lower layer hanger rod 4, a conveyor 5 is arranged at the top end of the movable frame 10, a cleaning plate 2 is arranged below the factory roof steel beam 1 above the movable frame 10, a support rod 11 penetrating through the bottom end of the movable frame 10 is arranged at the bottom end of the support rod 11, a placing platform 9 is arranged at the bottom end of the support rod 11, and a platform beam 7 is arranged at one end of the upper layer hanger rod 3.
Please refer to fig. 2 and 3, a circular flange is disposed at a position above the middle of the lower suspension rod 4 for fixing the cleaning plate 2.
Please refer to fig. 1, 2 and 3, the bottom of the cleaning plate 2 is provided with a through hole penetrating to the top of the cleaning plate 2, and the size of the through hole is matched with the top of the lower suspension rod 4, so that the top of the lower suspension rod 4 is connected with the bottom of the upper suspension rod 3.
Please refer to fig. 4, the steel platform beam 7 is a 125 × 125mm H-shaped steel for supporting the placing platform 9.
Please refer to fig. 3 and 4, the diagonal draw bar 6 is composed of an M12 screw and a single hook turn buckle, and is conveniently connected with the upper layer suspension rod 3.
Please refer to fig. 4, one end of the diagonal member 6 is fastened to the outside of the flange at the bottom and top of the upper suspension rod 3, so as to connect the diagonal member 6 with the upper suspension rod 3.
The working principle is as follows: firstly, manufacturing steel according to a drawing, spraying plastics, then carrying out local assembly, transporting to the site, assembling through equipment such as a climbing vehicle and a scaffold when the device is installed on the site, then installing according to the sequence of a factory roof steel beam 1, an upper layer suspender 3, a clean plate 2, a lower layer suspender 4, a moving frame 10, a conveyor 5, a diagonal draw bar 6, a steel platform cross beam 7 and a steel platform checkered plate 8, finally measuring the levelness and the verticality, then adjusting and fastening the unlocked positions of the diagonal draw bar 6 and the like, even reinforcing the local position by welding, and thus assembling and fixing the device.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a hang hoist and mount formula steel platform, includes factory building roof girder steel (1), its characterized in that: the bottom of factory building roof girder steel (1) is provided with upper jib (3), and one side that the bottom of factory building roof girder steel (1) is located upper jib (3) is provided with diagonal draw bar (6), the bottom of upper jib (3) is provided with lower floor jib (4), and one side of lower floor jib (4) is provided with carriage (10), the top of carriage (10) is provided with conveyer (5), and the below that the top of carriage (10) is located factory building roof girder steel (1) is provided with clean board (2), the bottom of factory building roof girder steel (1) is provided with bracing piece (11) that run through to carriage (10) below, and the bottom of bracing piece (11) is provided with place the platform (9), the one end of upper jib (3) is provided with platform crossbeam (7).
2. A suspended and hoisted steel platform according to claim 1, characterised in that: and a circular flange is arranged at the position close to the upper part of the middle part of the lower-layer suspender (4).
3. A suspended and hoisted steel platform according to claim 1, characterised in that: the bottom of clean board (2) is provided with the through-hole that runs through to clean board (2) top, and the size of through-hole agrees with mutually with the top of lower floor's jib (4).
4. A suspended and hoisted steel platform according to claim 1, characterised in that: the platform beam (7) is H-shaped steel with the thickness of 125 x 125 mm.
5. A suspended and hoisted steel platform according to claim 1, characterised in that: the diagonal draw bar (6) is composed of an M12 screw and a single-hook turn buckle.
6. A suspended and hoisted steel platform according to claim 1, characterised in that: one end of the diagonal draw bar (6) is buckled at the bottom end of the upper layer suspender (3) and the outer side of the flange plate at the top.
CN202022518200.XU 2020-11-04 2020-11-04 Hanging and hoisting type steel platform Active CN214144622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022518200.XU CN214144622U (en) 2020-11-04 2020-11-04 Hanging and hoisting type steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022518200.XU CN214144622U (en) 2020-11-04 2020-11-04 Hanging and hoisting type steel platform

Publications (1)

Publication Number Publication Date
CN214144622U true CN214144622U (en) 2021-09-07

Family

ID=77562083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022518200.XU Active CN214144622U (en) 2020-11-04 2020-11-04 Hanging and hoisting type steel platform

Country Status (1)

Country Link
CN (1) CN214144622U (en)

Similar Documents

Publication Publication Date Title
CN106088565B (en) Attachment type raise scaffold tiltedly climbs method and attachment type raise scaffold
CN214144622U (en) Hanging and hoisting type steel platform
CN111206763A (en) Adjustable section steel suspension hanging basket
CN212076208U (en) Assembled building component lifting device
CN214531835U (en) External hanging type operation device for large storage tank
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN212559249U (en) Motor lifting ring for crown block
CN209799326U (en) liftable oblique-pulling operation platform
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN219387105U (en) Supporting platform for high-altitude steel structure operation
CN218810043U (en) Light partition plate assists installation device
CN218933806U (en) Detachable auxiliary stand
CN214692890U (en) Be applied to safe type lifting device of water and electricity construction
CN220312209U (en) Frame type high pile construction operation platform
CN217232654U (en) Guide rail for building construction climbing frame
CN213112274U (en) Frock car for flexible PC production line
KR100777370B1 (en) Glass panel construction apparatus of building
CN213806506U (en) Handling frame and high-altitude safe operation platform
CN213015330U (en) Lower hanging seat for climbing frame lifting
CN213174745U (en) Support bracket device for climbing frame
CN211173028U (en) Peripheral wall mounted air frame of building engineering
CN219387106U (en) Outer wall plastering scaffold
CN220766259U (en) Lifting appliance
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN218324717U (en) Ladder for ascending height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant