CN216948214U - Auxiliary device for quickly connecting steel sheet piles - Google Patents

Auxiliary device for quickly connecting steel sheet piles Download PDF

Info

Publication number
CN216948214U
CN216948214U CN202122356735.6U CN202122356735U CN216948214U CN 216948214 U CN216948214 U CN 216948214U CN 202122356735 U CN202122356735 U CN 202122356735U CN 216948214 U CN216948214 U CN 216948214U
Authority
CN
China
Prior art keywords
steel sheet
clamping
auxiliary device
sheet pile
sheet piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122356735.6U
Other languages
Chinese (zh)
Inventor
李鹏
李波
杜清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongzhuo Construction Engineering Co ltd
Original Assignee
Shaanxi Zhongzhuo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhongzhuo Construction Engineering Co ltd filed Critical Shaanxi Zhongzhuo Construction Engineering Co ltd
Priority to CN202122356735.6U priority Critical patent/CN216948214U/en
Application granted granted Critical
Publication of CN216948214U publication Critical patent/CN216948214U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to an auxiliary device for steel sheet pile high-speed joint relates to the field of steel sheet pile grafting equipment, and it includes clamping part and guide part, the guide part includes two clamp flitchs, and the clamping part is used for pressing from both sides the flitch and is fixed in the steel sheet pile main part, and two clamp flitchs distribute side by side, form the guide district between two clamp flitchs, and two interval orientation that press from both sides between the flitch are kept away from the one end crescent of steel sheet pile main part. This application has the effect that the operating personnel splices two adjacent steel sheet piles of being convenient for.

Description

Auxiliary device for quickly connecting steel sheet piles
Technical Field
The utility model relates to a field of steel sheet pile grafting equipment especially relates to an auxiliary device that is used for steel sheet pile high-speed joint.
Background
The steel sheet pile is often used in the construction, and it is applicable to soft soil foundation and the higher deep basal pit of ground water level and struts, and during the use, after driving into the ground with a plurality of steel sheet piles, the steel sheet pile interconnects into steel sheet pile wall, and it can be used to keep off soil and manger plate, and after the use, can split a plurality of steel sheet piles for steel sheet pile can used repeatedly.
In the related art, referring to fig. 1, the steel sheet pile includes a steel sheet pile main body 61 and two buckling plates 62, the steel sheet pile main body 61 includes a horizontal plate 611 and two inclined plates 612, two ends of each horizontal plate 611 are respectively connected with one inclined plate 612 integrally, the horizontal plate 611 and the two inclined plates 612 enclose to form a concave structure, that is, the horizontal plate 611 and the two inclined plates 612 enclose to form a semi-closed region 613, one end of each inclined plate 612 away from the horizontal plate 611 is turned over towards the outside of the semi-closed region 613 to form a turned edge, each buckling plate 62 is fixedly connected with one turned edge integrally, the buckling plate 62 is located on one side of the inclined plate 612 away from the semi-closed region 613, and a buckling interface 63 is formed between each buckling plate 62 and the inclined plate 612; when two adjacent steel sheet piles are spliced, the fastening plate 62 of any one steel sheet pile is inserted into the fastening opening 63 of the other steel sheet pile, so that the two adjacent steel sheet piles can be spliced.
In the above related art, since the fastening opening 63 is small, it takes a lot of labor to insert the fastening plate 62 of another steel sheet pile into the fastening opening 63, and the inventor believes that there is a drawback that it is inconvenient for the worker to work.
SUMMERY OF THE UTILITY MODEL
In order to make things convenient for the operating personnel to splice two adjacent steel sheet piles, this application provides an auxiliary device for steel sheet pile high-speed joint.
The application provides an auxiliary device for steel sheet pile high-speed joint adopts following technical scheme:
the utility model provides an auxiliary device for steel sheet pile high-speed joint, includes clamping part and guide part, the guide part includes two clamp flitchs, and the clamping part is used for pressing from both sides the flitch and is fixed in the steel sheet pile main part, and two clamp flitchs distribute side by side, and two press from both sides and form the guide district between the flitch, and two intervals that press from both sides between the flitch are towards the one end crescent of keeping away from the steel sheet pile main part.
By adopting the technical scheme, when in use, the first steel sheet pile is vertically inserted into a foundation, then the rest steel sheet piles are sequentially installed, before the rest steel sheet piles are installed, the clamping plate is fixed on the steel sheet pile main body by using the clamping part, then the steel sheet piles are downwards inserted into the material guiding area, the device for inserting the steel sheet piles is usually a crane, and the opening of the material guiding area is gradually enlarged towards one end far away from the steel sheet pile main body, so that when a new steel sheet pile main body is pushed downwards, one end of the clamping plate far away from the steel sheet pile main body can play a role in guiding the next steel sheet pile, and even if the buckling plate and the buckling opening of the two steel sheet piles are not aligned, the two steel sheet piles can be spliced by the guiding function of the clamping plate, thereby facilitating construction operation; moreover, at present, when two steel sheet piles are butted, the steel sheet piles are often held by constructors, so that the effect of aligning the buckling plates and the buckling openings is achieved, and the constructors do not need to hold the steel sheet piles, can be far away from the steel sheet piles, and have high safety.
Optionally, the guide portion further includes a material abutting plate, the material abutting plate is arranged at an opening on one side of the material guiding area, and the material abutting plate is fixed to the material clamping plate.
Through adopting above-mentioned technical scheme, during the use, with the side and the flitch butt of withholding plate to the flitch can restrict the position of withholding plate, and the personnel of further being convenient for aim at withholding plate and lock joint mouth.
Optionally, the clamping part comprises a clamping seat, a clamping groove is formed in the clamping seat, and the material clamping plate is connected with the clamping seat.
Through adopting above-mentioned technical scheme, during fixed, utilize the joint groove to block joint the joint seat in the steel sheet pile main part to alright be fixed in the steel sheet pile main part with the joint seat on, and then will press from both sides the flitch rigid coupling in the steel sheet pile main part.
Optionally, the clamping groove is linear or bent.
By adopting the technical scheme, when the clamping groove is linear, the clamping seat is arranged on the transverse plate or the inclined plate of the steel sheet pile, and the position of the clamping seat is convenient to adjust; when the draw-in groove is the type of buckling, install the joint seat in the part of bending of steel sheet pile main part to can reduce the joint seat and slide along the steel sheet pile, improve the stability of clamping part and guide part.
Optionally, a magnet is fixedly connected in the clamping groove.
Through adopting above-mentioned technical scheme, when blocking the joint seat in the steel sheet pile main part, magnet can adsorb the steel sheet pile to the stability between joint seat and the steel sheet pile has been increased.
Optionally, the clamping portion further includes at least one adjusting tab detachably connected in the clamping groove.
Through adopting above-mentioned technical scheme, when there is the clearance between joint groove and the steel sheet pile main part, insert the adjustment sheet between the lateral wall of joint inslot wall and steel sheet pile main part to the commonality of joint seat has been improved.
Optionally, the telescopic rod is connected between the clamping part and the guide part.
Through adopting above-mentioned technical scheme, adopt the telescopic link to adjust the interval between clamping part and the guide part, can be adapted to the steel sheet pile of different models, improved the commonality of structure.
Optionally, the material pushing device further comprises a material pushing assembly, the material pushing assembly comprises a support and a caster, and the clamping seat is connected to the support in a sliding mode along the vertical direction.
Through adopting above-mentioned technical scheme, when needing to remove the position of guide part and clamping part, promote the support, alright remove the support to different positions to drive guide part and clamping part and remove to different positions, because the setting of truckle can make the promotion of support more convenient.
Optionally, still include drive assembly, drive assembly includes screw rod, screw nut and motor, the screw rod rotate connect in the support, the axis of screw rod is on a parallel with the slip direction of joint seat, screw nut threaded connection in the screw rod, joint seat rigid coupling in screw nut, the motor is used for the drive the screw rod rotates.
Through adopting above-mentioned technical scheme, drive the screw rod by the motor and rotate, screw rod pivoted in-process, screw nut moves along the axis direction of screw rod, drives joint seat synchronous motion during screw nut moves to realize joint seat's up-and-down motion, be convenient for block joint seat in the steel sheet pile main part.
In summary, the present application includes at least one of the following beneficial technical effects:
the guide part is arranged, so that the fastening plate can be aligned to the fastening port conveniently, two steel sheet piles can be inserted conveniently, meanwhile, a person does not need to hold the steel sheet piles by hands, and the safety is high;
the material resisting plate is arranged to further facilitate the alignment of the fastening plate to the fastening port;
through setting up pushing equipment and drive assembly be convenient for personnel and remove guide part and clamping part.
Drawings
Fig. 1 is a schematic structural view of a steel sheet pile body, a buckling plate, and a buckling port in the related art;
FIG. 2 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 3 is a schematic structural view of a driving assembly, a clamping portion and a guide portion in an embodiment of the present application;
FIG. 4 is a schematic structural view of a guide part in the embodiment of the present application;
fig. 5 is an enlarged view of a portion a in fig. 3.
Description of reference numerals: 1. a material pushing assembly; 11. a support; 111. a guide groove; 12. a caster wheel; 2. a drive assembly; 21. a screw; 22. a slider; 23. a lead screw nut; 24. a motor; 25. a mounting seat; 3. a clamping portion; 31. a clamping seat; 311. a clamping groove; 32. a regulating sheet; 33. a magnet; 4. a guide portion; 41. a material clamping plate; 411. connecting blocks; 42. a material supporting plate; 43. a material guiding area; 5. a telescopic rod; 51. fixing the rod; 52. a movable rod; 53. a fastener; 61. a steel sheet pile main body; 611. a transverse plate; 612. a sloping plate; 613. a semi-enclosed region; 62. a buckle plate; 63. and (4) buckling an interface.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses an auxiliary device for steel sheet pile high-speed joint. Referring to fig. 2 and 3, an auxiliary device for quickly connecting a steel sheet pile comprises a pushing assembly 1, a driving assembly 2, a clamping part 3 and a guiding part 4; drive assembly 2 is used for driving clamping part 3 and guide part 4 along vertical direction up-and-down motion, pushes away material assembly 1 and is used for driving drive assembly 2 motion, and clamping part 3 is used for fixing guide part 4 and steel sheet pile main part 61, and guide part 4 leads when being used for pegging graft to the steel sheet pile.
Referring to fig. 2, the pushing assembly 1 includes a bracket 11 and four casters 12, the casters 12 are mounted on the bottom wall of the bracket 11 through screws, in order to facilitate the control of the start and stop of the bracket 11, the casters 12 are brake casters in this embodiment.
Referring to fig. 3, the driving assembly 2 includes a screw 21, a slider 22, a lead screw nut 23, and a motor 24; a guide groove 111 is formed in the side wall of the support 11 along the vertical direction, and the slider 22 is connected in the guide groove 111 in a sliding manner along the vertical direction; the side wall of the bracket 11 is welded with a mounting seat 25 at each of two ends of the guide groove 111, the end of the screw 21 is rotatably connected with the mounting seat 25, the motor 24 is a servo motor, the shell of the motor 24 is fixed with any one of the mounting seats 25 through a screw, and the output shaft of the motor 24 is coaxially and fixedly connected with the screw 21 through a coupler; the screw nut 23 is welded to the slider 22, and the screw nut 23 is screwed to the screw rod 21.
Referring to fig. 3 and 4, the clamping portion 3 includes a clamping seat 31 and at least one adjusting piece 32, the clamping seat 31 is fixedly connected with the lead screw nut 23 through a screw, a clamping groove 311 is formed in the bottom wall of the clamping seat 31, in this embodiment, the clamping groove 311 is bent, a part of the clamping groove 311 is used for embedding the transverse plate 611, and the rest of the clamping groove 311 is used for embedding any inclined plate 612, in other embodiments, the clamping groove 311 may also be linear and used for embedding the transverse plate 611 or the inclined plate 612; the clamping seat 31 is clamped to the steel sheet pile main body 61 through the clamping groove 311; in order to be connected joint seat 31 and steel sheet pile main part 61 more firmly, the inboard roof of joint groove 311 has magnet 33 through the screw rigid coupling, and in order to further adapt to the steel sheet pile main part 61 of different thickness, adjustment sheet 32 detachable pegs graft in joint groove 311, and the material of adjustment sheet 32 is iron, and consequently, adjustment sheet 32 can adsorb fixedly with magnet 33.
Referring to fig. 3 and 4, the guide portion 4 includes two material clamping plates 41 and one material resisting plate 42, the two material clamping plates 41 are distributed side by side, a material guiding area 43 is formed between the two material clamping plates 41, and a distance between the two material guiding areas 43 gradually increases towards an end away from the steel sheet pile main body 61, in this embodiment, the material clamping plates 41 are arc-shaped, and the opening faces towards a side away from the material guiding area 43, in other embodiments, the material clamping plates 41 may also be straight plate-shaped; the material abutting plate 42 is arranged at an opening at one side of the material guiding area 43, the fastening plate 62 is inserted into the opening at the other side of the material guiding area 43, the connecting block 411 is welded on the side wall, close to the material clamping plate 41, of the material abutting plate 42, and the other end of the connecting block 411 is welded with the material clamping plate 41, so that the material abutting plate 42 and the material clamping plate 41 are fixed; when the clamping seat 31 is clamped in the previous steel sheet pile main body 61, the bottom opening of the material guiding region 43 is located right above the clamping port 63 of the previous steel sheet pile main body 61, and the opening of the material guiding region 43 on the side away from the material supporting plate 42 faces the side of the steel sheet pile main body 61 to be inserted next.
Referring to fig. 3 and 5, in order to facilitate the interval between adjusting guide portion 4 and the clamping portion 3, so as to be applicable to the steel sheet pile of more models, be connected with telescopic link 5 between guide portion 4 and the clamping portion 3, telescopic link 5 includes dead lever 51, movable rod 52 and fastener 53, dead lever 51 passes through screw fixed connection with joint seat 31, movable rod 52 passes through screw detachable connection with arbitrary clamp plate 41, dead lever 51 cavity sets up, movable rod 52 sliding connection is in the dead lever 51 inner wall, fastener 53 is the jackscrew, fastener 53 and dead lever 51 threaded connection, and fastener 53 passes the dead lever 51 lateral wall and supports tightly with movable rod 52 outer wall.
The implementation principle of the auxiliary device for quickly connecting the steel sheet piles is as follows: during operation, the bracket 11 is pushed to a desired position, and the driving assembly 2 drives the clamping portion 3 and the guiding portion 4 to move downward, so that the clamping seat is clamped on the steel sheet pile main body 61.
When the clamping device is driven, the motor 24 drives the screw rod 21 to rotate, and when the screw rod 21 rotates, the screw rod nut 23 is driven to slide along the axis direction of the screw rod 21, so that the clamping part 3 and the guide part 4 are driven to synchronously move downwards.
When the clamping seat 31 moves downwards, the clamping seat is clamped on the steel sheet pile main body 61 through the clamping groove 311, meanwhile, the guide portion 4 is not provided with one side opening of the material supporting plate 42 towards one side of the steel sheet pile to be inserted, so that when the steel sheet pile to be inserted moves downwards, the material supporting plate 42 and the material clamping plate 41 play a role in guiding the movement of the steel sheet pile to be inserted, and the steel sheet pile is convenient to insert.
If the steel sheet piles of different types need to be adapted, the distance between the guide part 4 and the clamping part 3 can be changed by adjusting the length of the telescopic rod 5, and when the adjustment is carried out, the fastener 53 is loosened, the movable rod 52 slides to a required position along the fixed rod 51, and the fastener 53 is used for tightly abutting the movable rod 52, so that the movable rod 52 and the fixed rod 51 can be fixed. When the steel sheet pile main body 61 needs to be adapted to different steel sheet pile bodies, the adjustment can be performed by inserting different numbers of adjusting pieces 32 into the clamping grooves 311.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides an auxiliary device for steel sheet pile high-speed joint which characterized in that: including clamping part (3) and guide part (4), guide part (4) include two clamp flitches (41), and clamping part (3) are used for pressing from both sides flitch (41) and are fixed in steel sheet pile main part (61), and two clamp flitches (41) distribute side by side, form guide district (43) between two clamp flitches (41), and two interval orientation that press from both sides between flitch (41) are kept away from the one end crescent of steel sheet pile main part (61).
2. An auxiliary device for the quick connection of steel sheet piles according to claim 1, wherein: the guide part (4) further comprises a material abutting plate (42), the material abutting plate (42) is arranged at an opening on one side of the material guiding area (43), and the material abutting plate (42) is fixed with the material clamping plate (41).
3. Auxiliary device for the quick connection of steel sheet piles according to any one of claims 1 to 2, characterised in that: the clamping part (3) comprises a clamping seat (31), a clamping groove (311) is formed in the clamping seat (31), and the material clamping plate (41) is connected with the clamping seat (31).
4. An auxiliary device for the quick connection of steel sheet piles according to claim 3, wherein: the clamping groove (311) is linear or bent.
5. An auxiliary device for the quick connection of steel sheet piles according to claim 3, wherein: and a magnet (33) is fixedly connected in the clamping groove (311).
6. An auxiliary device for the quick connection of steel sheet piles according to claim 3, wherein: the clamping part (3) further comprises at least one adjusting sheet (32), and the adjusting sheet (32) is detachably connected in the clamping groove (311).
7. Auxiliary device for the quick connection of steel sheet piles according to any one of claims 1 to 2, characterised in that: still include telescopic link (5), telescopic link (5) are connected between clamping part (3) and guide part (4).
8. An auxiliary device for the quick connection of steel sheet piles according to claim 3, wherein: still include and push away material subassembly (1), it includes support (11) and truckle (12) to push away material subassembly (1), vertical sliding connection in support (11) is followed in joint seat (31).
9. An auxiliary device for the quick connection of steel sheet piles according to claim 8, wherein: still include drive assembly (2), drive assembly (2) include screw rod (21), screw nut (23) and motor (24), screw rod (21) rotate connect in support (11), the axis of screw rod (21) is on a parallel with the slip direction of joint seat (31), screw nut (23) threaded connection in screw rod (21), joint seat (31) rigid coupling in screw nut (23), motor (24) are used for the drive screw rod (21) rotate.
CN202122356735.6U 2021-09-27 2021-09-27 Auxiliary device for quickly connecting steel sheet piles Active CN216948214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122356735.6U CN216948214U (en) 2021-09-27 2021-09-27 Auxiliary device for quickly connecting steel sheet piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122356735.6U CN216948214U (en) 2021-09-27 2021-09-27 Auxiliary device for quickly connecting steel sheet piles

Publications (1)

Publication Number Publication Date
CN216948214U true CN216948214U (en) 2022-07-12

Family

ID=82302370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122356735.6U Active CN216948214U (en) 2021-09-27 2021-09-27 Auxiliary device for quickly connecting steel sheet piles

Country Status (1)

Country Link
CN (1) CN216948214U (en)

Similar Documents

Publication Publication Date Title
CN109853950A (en) A kind of building trade form clamp
CN216948214U (en) Auxiliary device for quickly connecting steel sheet piles
CN220348245U (en) Butt joint appurtenance is used in plumbing installation
CN108005073A (en) The steel structure body machining robot of steel sheet pile can be pulled out automatically
CN108005074A (en) It is a kind of can mechanization remove steel sheet pile steel structure bridge cofferdam construction equipment
CN114086780B (en) Assembled building construction strutting arrangement
CN215787816U (en) Bottom plate positioning device for automatic welding of steel rail base plate
CN210685467U (en) Construction is with consolidating anchor clamps
CN114682985A (en) Butt positioning device suitable for welding large-diameter steel pipes
CN211681829U (en) Crane part installation auxiliary device convenient to accurate butt joint
CN217028174U (en) Steel member slope fixing device
CN219298481U (en) Prefabricated member butt joint structure
CN221546378U (en) Limiting condition template pull rod fastening device
CN215594996U (en) Installation device of multifunctional structural slab
CN215051939U (en) Airport field road surface slot-cutting machine
CN220539234U (en) Concrete form reinforcing apparatus
CN108118700A (en) A kind of steel structure bridge cofferdam construction special-purpose steel sheet pile intelligence pulling machine
CN217798260U (en) Bending equipment for building steel
CN216076485U (en) Energy-saving type house beam supporting device for house reinforcement
CN221278671U (en) Pipeline bracket for building construction
CN219808736U (en) Arc girder steel butt joint auxiliary positioning device
CN221461252U (en) Water conservancy hydropower construction cofferdam strutting arrangement
CN216297835U (en) Steel bar cutting machine for urban subway tunnel engineering construction
CN215055359U (en) Diagonal bracing structure for building template
CN219007086U (en) Automatic connection splicing device for pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant