CN221461252U - Water conservancy hydropower construction cofferdam strutting arrangement - Google Patents

Water conservancy hydropower construction cofferdam strutting arrangement Download PDF

Info

Publication number
CN221461252U
CN221461252U CN202420091451.XU CN202420091451U CN221461252U CN 221461252 U CN221461252 U CN 221461252U CN 202420091451 U CN202420091451 U CN 202420091451U CN 221461252 U CN221461252 U CN 221461252U
Authority
CN
China
Prior art keywords
support frame
fixedly connected
adjusting plate
frame
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420091451.XU
Other languages
Chinese (zh)
Inventor
金鹏武
张友宜
赵俊伟
周忠宇
杨兴红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xizang Mingyu Engineering Consulting Co ltd
Original Assignee
Xizang Mingyu Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xizang Mingyu Engineering Consulting Co ltd filed Critical Xizang Mingyu Engineering Consulting Co ltd
Priority to CN202420091451.XU priority Critical patent/CN221461252U/en
Application granted granted Critical
Publication of CN221461252U publication Critical patent/CN221461252U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a water conservancy and hydropower construction cofferdam supporting device, which relates to the technical field of hydraulic engineering and comprises a supporting frame, wherein a reinforcing rod is arranged on one side of the supporting frame, an adjusting device is arranged on one side of the supporting frame, the adjusting device comprises an adjusting plate, the adjusting plate is in sliding connection with the supporting frame, a plurality of clamping grooves are formed in the surface of the adjusting plate, clamping blocks are inserted into the surface of the supporting frame, the clamping blocks are clamped with the clamping grooves on the surface of the adjusting plate, one end of the adjusting plate is fixedly connected with a control frame, two sides of the adjusting plate are fixedly connected with circular arc strips, the surface of the circular arc strips is smooth, one end of the control frame is fixedly connected with a rubber sleeve, and the size of the rubber sleeve is matched with the size of the control frame.

Description

Water conservancy hydropower construction cofferdam strutting arrangement
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to a cofferdam supporting device for hydraulic and hydroelectric construction.
Background
The cofferdam supporting device is a device for supporting the inner side of the cofferdam after the cofferdam is installed, and can be used in water conservancy construction.
When carrying out water conservancy and hydropower construction, can build the cofferdam, prevent that water and soil from getting into the construction position of building, then use the support frame again, support the reinforcement to the cofferdam, promote the result of use of cofferdam. However, when the supporting rods are used, the supporting frames are fixed in size, and when cofferdams with different heights are encountered, the supporting frames cannot be supported at proper positions of the cofferdams, so that the problem that the use suitability of the supporting device is affected is caused.
Disclosure of utility model
The utility model provides a water conservancy and hydropower construction cofferdam supporting device, which aims to solve the problem that the suitability of the supporting device is affected due to the fact that the supporting frame cannot be supported at a proper position of a cofferdam when the supporting frame is fixed in size and the cofferdams with different heights are encountered when the supporting frame is used.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a water conservancy and hydropower construction cofferdam strutting arrangement, includes the support frame, one side of support frame is equipped with the stiffener, one side of support frame is equipped with adjusting device, adjusting device includes the regulating plate, regulating plate and support frame sliding connection, a plurality of draw-in groove has been seted up on the surface of regulating plate, the fixture block has been inserted on the surface of support frame, fixture block and regulating plate surface draw-in groove joint, the one end fixedly connected with control frame of regulating plate.
The effects achieved by the components are as follows: when carrying out water conservancy and hydropower construction, can build the cofferdam, prevent that water and soil from getting into the construction position of building, then use the support frame again, support the reinforcement to the cofferdam, promote the result of use of cofferdam. When the size of the support frame needs to be changed, the adjusting plate can be moved through the control frame, so that the adjusting plate slides inside the support frame, then the clamping block is moved, the clamping block penetrates through the support frame to be clamped with the clamping groove on the surface of the adjusting plate, then the position of the adjusting plate is fixed, the size of the support frame can be adjusted and changed by using the adjusting device, and then the support frame is matched with cofferdams of different sizes, so that the suitability of the support device in use can be improved.
Preferably, the two sides of the adjusting plate are fixedly connected with arc strips, and the surfaces of the arc strips are smooth.
The effects achieved by the components are as follows: the friction force between the adjusting plate and the supporting frame can be achieved through the arc strips, and then the adjusting plate can move inside the supporting frame more easily.
Preferably, one end of the control frame is fixedly connected with a rubber sleeve, and the size of the rubber sleeve is matched with the size of the control frame.
The effects achieved by the components are as follows: the friction force between the hands of the operator and the control frame can be improved through the rubber sleeve, and then the operator can better hold the control frame for use.
Preferably, one end of the supporting frame is fixedly connected with an elastic rope, and one end of the elastic rope, which is far away from the supporting frame, is fixedly connected with the clamping block.
The effects achieved by the components are as follows: the clamping block can be connected and fixed with the supporting frame through the elastic rope, so that the condition that the clamping block is lost is avoided.
Preferably, one end of the support frame, which is close to the clamping block, is fixedly connected with a sliding rail, and the inside of the sliding rail is fixedly connected with a baffle plate.
The effects achieved by the components are as follows: the baffle inside the slide rail can be moved to limit the position of the clamping block for fixing the adjusting plate, and then the condition that the clamping block is separated from the clamping groove on the surface of the adjusting plate is avoided, so that the using effect of the clamping block is improved.
Preferably, the surface of support frame is equipped with reinforcing apparatus, reinforcing apparatus includes the rack, rack and support frame fixed connection, the inside of rack is inserted and is equipped with the staple, the through-hole has been seted up on the surface of support frame, the size looks adaptation of support frame surface through-hole size and staple, the inside sliding connection of rack has the movable plate.
The effects achieved by the components are as follows: when using the support frame, can remove the movable plate, make the movable plate keep away from the staple, then make the staple pass the through-hole on support frame surface, then give the staple underground, then accomplish the fixed of support frame position, through using reinforcing apparatus, can promote the joint strength of support frame and ground, avoid the condition that the support frame took place to remove to promote strutting arrangement's result of use.
Preferably, the size of one end of the fixing nail far away from the placing frame is smaller than the size of the other end, and one end of the fixing nail far away from the placing frame is conical.
The effects achieved by the components are as follows: the staples may be better inserted into the ground by tapering one end of the staples.
Preferably, one end of the movable plate far away from the fixed nail is fixedly connected with a control frame, and the section of the control frame is circular.
The effects achieved by the components are as follows: the contact area of the movable plate and the hand of the operator can be lifted through the control frame, and then the operator can move the movable plate more easily.
In summary, the beneficial effects of the utility model are as follows:
Through using adjusting device, can adjust the change to the size of support frame, then make the cofferdam of support frame adaptation not unidimensional to can promote the suitability that strutting arrangement used.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of a partial perspective structure of an adjusting device according to the present utility model;
FIG. 3 is an enlarged view of the utility model at A of FIG. 2;
fig. 4 is a schematic perspective view of a reinforcement device according to the present utility model.
Legend description: 1. a support frame; 2. an adjusting device; 21. an adjustment plate; 22. a clamping groove; 23. a clamping block; 24. a control rack; 25. arc strips; 26. a rubber sleeve; 27. an elastic rope; 28. a slide rail; 29. a baffle; 3. a reinforcing device; 31. a placing rack; 32. fixing nails; 33. a through hole; 34. a moving plate; 35. a control block; 4. and a reinforcing rod.
Detailed Description
Referring to fig. 1-4, this embodiment discloses a water conservancy and hydropower construction cofferdam strutting arrangement, including support frame 1, one side of support frame 1 is equipped with stiffener 4, and one side of support frame 1 is equipped with adjusting device 2.
Referring to fig. 1-4, the embodiment discloses an adjusting device 2 comprising an adjusting plate 21, wherein the adjusting plate 21 is slidably connected with a supporting frame 1, a plurality of clamping grooves 22 are formed in the surface of the adjusting plate 21, a clamping block 23 is inserted into the surface of the supporting frame 1, the clamping block 23 is clamped with the clamping groove 22 on the surface of the adjusting plate 21, and one end of the adjusting plate 21 is fixedly connected with a control frame 24. When carrying out water conservancy and hydropower construction, can build the cofferdam, prevent that water and soil from getting into the construction position of building, then use support frame 1 again, support the reinforcement to the cofferdam, promote the result of use of cofferdam. When the size of the support frame 1 needs to be changed, the adjusting plate 21 can be moved through the control frame 24, so that the adjusting plate 21 slides in the support frame 1, then the clamping block 23 is moved, the clamping block 23 penetrates through the support frame 1 to be clamped with the clamping groove 22 on the surface of the adjusting plate 21, then the position of the adjusting plate 21 is fixed, the size of the support frame 1 can be adjusted and changed by using the adjusting device 2, then the support frame 1 is matched with cofferdams of different sizes, and accordingly the use suitability of the supporting device can be improved.
Referring to fig. 1-4, this embodiment discloses that the two sides of the adjusting plate 21 are fixedly connected with arc strips 25, and the surfaces of the arc strips 25 are smooth. The friction of the adjusting plate 21 with the support frame 1 can be made by the circular arc 25, and then the adjusting plate 21 is moved inside the support frame 1 more easily. One end of the control frame 24 is fixedly connected with a rubber sleeve 26, and the size of the rubber sleeve 26 is matched with the size of the control frame 24. The friction between the operator's hand and the control frame 24 can be raised by the rubber sleeve 26, and then the operator can better hold the control frame 24 for use. One end of the support frame 1 is fixedly connected with an elastic rope 27, and one end of the elastic rope 27 far away from the support frame 1 is fixedly connected with the clamping block 23. The clamping block 23 and the support frame 1 can be connected and fixed through the elastic rope 27, so that the condition that the clamping block 23 is lost is avoided. One end of the support frame 1, which is close to the clamping block 23, is fixedly connected with a slide rail 28, and the inside of the slide rail 28 is fixedly connected with a baffle 29. The baffle 29 inside the slide rail 28 can be moved to limit the position of the clamping block 23 for fixing the adjusting plate 21, and then the condition that the clamping block 23 is separated from the clamping groove 22 on the surface of the adjusting plate 21 is avoided, so that the using effect of the clamping block 23 is improved.
Referring to fig. 1-4, this embodiment discloses that the surface of support frame 1 is equipped with reinforcing apparatus 3, and reinforcing apparatus 3 includes rack 31, rack 31 with support frame 1 fixed connection, the inside of rack 31 is inserted and is equipped with staple 32, and through-hole 33 has been seted up on the surface of support frame 1, and the size of support frame 1 surface through-hole 33 and staple 32's size looks adaptation, and the inside sliding connection of rack 31 has movable plate 34. When using support frame 1, can remove movable plate 34, make movable plate 34 keep away from staple 32, then make staple 32 pass support frame 1 surface's through-hole 33, then give staple 32 underground, then accomplish the fixed of support frame 1 position, through using reinforcing apparatus 3, can promote support frame 1 and the joint strength on ground, avoid support frame 1 to take place the condition of removal to promote strutting arrangement's result of use.
Referring to fig. 1-4, the present embodiment discloses that the dimension of the end of the staple 32 remote from the shelf 31 is smaller than the dimension of the other end, and the end of the staple 32 remote from the shelf 31 is tapered. The staples 32 may be better inserted into the ground by tapering one end of the staples 32. The end of the moving plate 34 far away from the fixed nail 32 is fixedly connected with a control frame 24, and the section of the control frame 24 is circular. The contact area of the moving plate 34 with the hands of the operator can be raised by the control frame 24, and then the operator can move the moving plate 34 more easily.
Working principle: when carrying out water conservancy and hydropower construction, can build the cofferdam, prevent that water and soil from getting into the construction position of building, then use support frame 1 again, support the reinforcement to the cofferdam, promote the result of use of cofferdam. When the size of the support frame 1 needs to be changed, the adjusting plate 21 with the circular arc strips 25 can be moved through the control frame 24 with the rubber sleeve 26, so that the adjusting plate 21 slides in the support frame 1, then the clamping block 23 with the elastic rope 27 is moved, the clamping block 23 penetrates through the support frame 1 to be clamped with the clamping groove 22 on the surface of the adjusting plate 21, then the baffle 29 in the sliding rail 28 is moved, so that the clamping block 23 for fixing the adjusting plate 21 is limited in position, the condition that the clamping block 23 is separated from the clamping groove 22 on the surface of the adjusting plate 21 is avoided, then the position of the adjusting plate 21 is fixed, the size of the support frame 1 can be adjusted and changed through the adjusting device 2, then the support frame 1 is matched with cofferdams with different sizes, and the use adaptability of the supporting device can be improved.
When using support frame 1, can remove movable plate 34 through control frame 35, make movable plate 34 keep away from staple 32, then make staple 32 pass support frame 1 surface's through-hole 33, then give staple 32 underground, then accomplish the fixed of support frame 1 position, through using reinforcing apparatus 3, can promote support frame 1 and the joint strength on ground, avoid support frame 1 to take place the condition of removal to promote strutting arrangement's result of use.

Claims (8)

1. The utility model provides a water conservancy and hydropower construction cofferdam strutting arrangement, includes support frame (1), its characterized in that: one side of support frame (1) is equipped with stiffener (4), one side of support frame (1) is equipped with adjusting device (2), adjusting device (2) are including adjusting plate (21), adjusting plate (21) and support frame (1) sliding connection, a plurality of draw-in groove (22) have been seted up on the surface of adjusting plate (21), fixture block (23) have been inserted on the surface of support frame (1), fixture block (23) and adjusting plate (21) surface draw-in groove (22) joint, one end fixedly connected with control frame (24) of adjusting plate (21).
2. The water conservancy and hydropower construction cofferdam supporting device according to claim 1, wherein: the two sides of the adjusting plate (21) are fixedly connected with arc strips (25), and the surfaces of the arc strips (25) are smooth.
3. The water conservancy and hydropower construction cofferdam supporting device according to claim 2, wherein: one end of the control frame (24) is fixedly connected with a rubber sleeve (26), and the size of the rubber sleeve (26) is matched with the size of the control frame (24).
4. A hydropower construction cofferdam supporting device as in claim 3, wherein: one end of the support frame (1) is fixedly connected with an elastic rope (27), and one end of the elastic rope (27) away from the support frame (1) is fixedly connected with a clamping block (23).
5. The water conservancy and hydropower construction cofferdam supporting device according to claim 4, wherein: one end of the support frame (1) close to the clamping block (23) is fixedly connected with a sliding rail (28), and a baffle (29) is fixedly connected inside the sliding rail (28).
6. The water conservancy and hydropower construction cofferdam supporting device according to claim 5, wherein: the surface of support frame (1) is equipped with reinforcing apparatus (3), reinforcing apparatus (3) are including rack (31), rack (31) and support frame (1) fixed connection, peg (32) have been inserted to the inside of rack (31), through-hole (33) have been seted up on the surface of support frame (1), the size of support frame (1) surface through-hole (33) and the size looks adaptation of peg (32), the inside sliding connection of rack (31) has movable plate (34).
7. The water conservancy and hydropower construction cofferdam supporting device as set forth in claim 6, wherein: the size of one end of the fixing nail (32) far away from the placing frame (31) is smaller than that of the other end, and one end of the fixing nail (32) far away from the placing frame (31) is conical.
8. The water conservancy and hydropower construction cofferdam supporting device as set forth in claim 7, wherein: one end of the moving plate (34) far away from the fixed nail (32) is fixedly connected with a control frame (24), and the section of the control frame (24) is circular.
CN202420091451.XU 2024-01-15 2024-01-15 Water conservancy hydropower construction cofferdam strutting arrangement Active CN221461252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420091451.XU CN221461252U (en) 2024-01-15 2024-01-15 Water conservancy hydropower construction cofferdam strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420091451.XU CN221461252U (en) 2024-01-15 2024-01-15 Water conservancy hydropower construction cofferdam strutting arrangement

Publications (1)

Publication Number Publication Date
CN221461252U true CN221461252U (en) 2024-08-02

Family

ID=92359772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420091451.XU Active CN221461252U (en) 2024-01-15 2024-01-15 Water conservancy hydropower construction cofferdam strutting arrangement

Country Status (1)

Country Link
CN (1) CN221461252U (en)

Similar Documents

Publication Publication Date Title
CN221461252U (en) Water conservancy hydropower construction cofferdam strutting arrangement
CN209654755U (en) The support device of pipe laying
CN207498951U (en) A kind of clamping head of static-pressure pile planting machine
CN109538230B (en) But municipal administration piping lane construction is with push bench of height-adjusting
CN211547675U (en) Dykes and dams slope tamping device for water conservancy construction
CN209820815U (en) Soil sampling ware that can fast assembly
CN216475046U (en) Geotechnical engineering slip casting device
CN210341921U (en) Static pressure pile machine clamp
CN205276272U (en) A tub machine is beaten in static pressure pneumatics
CN203878457U (en) Regulating structure for bridge abutment butt strap
CN210530404U (en) Detachable temporary support for constructional engineering construction
CN209682841U (en) A kind of core-removing device
CN209585043U (en) A kind of clip pile device of static pile press
CN216515640U (en) Channel lateral wall support equipment for hydraulic engineering construction
CN218905420U (en) Flexible simulation clamp of robot
CN220094921U (en) Gypsum mould of automatic grouting machine
CN217272365U (en) Novel hydraulic engineering water supply pipe is fixed device
CN219175959U (en) Quick-mounting support upright post for interior decoration
CN220847715U (en) Water-stopping steel plate fixed mounting structure convenient to install and adjust
CN221502007U (en) Quick supporting construction of underground connection wall
CN221258290U (en) Hydraulic support rod convenient to install
CN216939578U (en) A pipeline cutting device for hydraulic engineering construction
CN214460078U (en) Novel construction chute support
CN219219904U (en) Support steady support frame
CN212957821U (en) Display platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant