CN216914260U - Positioning frame for prefabricated inner wallboard drawing die hole die - Google Patents

Positioning frame for prefabricated inner wallboard drawing die hole die Download PDF

Info

Publication number
CN216914260U
CN216914260U CN202123341621.0U CN202123341621U CN216914260U CN 216914260 U CN216914260 U CN 216914260U CN 202123341621 U CN202123341621 U CN 202123341621U CN 216914260 U CN216914260 U CN 216914260U
Authority
CN
China
Prior art keywords
die
wallboard
hole
rods
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123341621.0U
Other languages
Chinese (zh)
Inventor
艾峰全
田有利
王文彬
王洪卫
刘守中
梁方元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Construction Assembly Technology Co ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Construction Assembly Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Construction Assembly Technology Co ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Construction Assembly Technology Co ltd
Priority to CN202123341621.0U priority Critical patent/CN216914260U/en
Application granted granted Critical
Publication of CN216914260U publication Critical patent/CN216914260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prefabricated inner wallboard drawing die hole die positioning frame which comprises a tool frame and a prefabricated wallboard die, wherein the tool frame is positioned on the upper surface of the prefabricated wallboard die, the surface of the tool frame is connected with a plurality of drawing die hole die rods in a sliding mode, one side of the tool frame is in threaded connection with a plurality of positioning screw rods, the number of the positioning screw rods is the same as that of the drawing die hole die rods, the positions of the positioning screw rods correspond to the drawing die hole die rods, one ends of the positioning screw rods are fixedly connected with a knob, the left side and the right side of the upper surface of the tool frame are in threaded connection with two wallboard die connecting screw rods, and the lower end of each wallboard die connecting screw rod penetrates through the top of the prefabricated wallboard die. The utility model realizes accurate die drawing hole reservation by fixing the metal die drawing rod by the upper suspension tool rack, has simple, convenient and quick operation, and can ensure the accuracy of the hole size and improve the accuracy of the hole position.

Description

Positioning frame for prefabricated inner wallboard drawing die hole die
Technical Field
The utility model belongs to the technical field of prefabricated wallboards, and particularly relates to a positioning frame for a die drawing hole die of a prefabricated inner wallboard.
Background
In the factory production of the assembled concrete inner wall board, the way of reserving holes in the wall board is different, the quality of finished products is more good and uneven, the lower end of a mould rod for reserving the holes needs to be in direct contact with a mould platform, and the upper end of the mould rod is of a cantilever structure, so most wall board manufacturers choose to directly weld the mould rod on the bottom mould platform, the material is wasted, certain requirements are met on a welding process, on the other hand, the mould platform is damaged to a certain extent, and the mould platform surface is damaged in the long term and cannot be paid back. Therefore, a prefabricated inner wallboard drawing die hole die positioning frame is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a die positioning frame for a drawing die hole of a prefabricated inner wallboard, which can realize accurate reservation of the drawing die hole by fixing a metal drawing die rod by utilizing an upper suspension tooling frame, is simple, convenient and quick to operate, and can ensure the accuracy of the hole size and improve the accuracy of the hole position.
In order to achieve the purpose, the utility model provides the following technical scheme: wallboard drawing die hole mould locating rack in prefabricating, including frock frame and prefabricated wallboard mould, the frock frame is located prefabricated wallboard mould upper surface, frock frame sliding connection has a plurality of drawing die hole die rods.
Specifically, through reserving the hole in the surface of the tool frame, the subsequent die drawing hole die rod is simply inserted and placed and is convenient to disassemble, the hole is accurately positioned and can be prevented from deforming, and the damage of the process to the die is reduced.
Preferably, one side of the tool rack is in threaded connection with a plurality of positioning screw rods.
Specifically, fix drawing a die hole die rod through screwing up the locating screw, pouring and accomplishing, when the concrete reaches initial set, transfer the locating screw pine, slowly extract drawing a die hole die rod and can accomplish dismantlement work.
Preferably, the number of the positioning screw rods is the same as that of the die hole drawing die rods, and the positions of the positioning screw rods correspond to those of the die hole drawing die rods.
Specifically, each die hole die rod can be fixed through the positioning screw rod, and the die rods can be prevented from floating upwards when concrete is poured and vibrated.
Preferably, one end of the positioning screw rod is fixedly connected with a knob.
Particularly, the positioning screw rod can be conveniently controlled to rotate by rotating the knob, and convenience in operation of the positioning frame is improved.
Preferably, the left side and the right side of the upper surface of the tool rack are in threaded connection with two wallboard die connecting screw rods.
Particularly, the prefabricated wallboard moulds of the tool frame are convenient to connect.
Preferably, the lower end threads of the wallboard mould connecting screw rod penetrate through the top of the prefabricated wallboard mould.
Specifically, the tool frame and the prefabricated wallboard die can be connected conveniently through the wallboard die connecting screw rod, so that subsequent pouring work is facilitated.
Compared with the prior art, the utility model has the beneficial effects that:
1. through reserving the hole in the frock frame surface, follow-up will draw the die orifice die rod to insert put simply and dismantle the convenience, its hole location is accurate and can prevent that the hole from warping, reduces the harm of process to the mould.
2. Through screwing up fixed drawing die hole die rod with the positioning screw, the die rod come-up when preventing concrete placement from vibrating, when pouring the completion, when the concrete reaches the initial set, will position the screw location screw and transfer the pine, slowly extract draw die hole die rod can, its easy and simple to handle has improved device efficiency of construction.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural diagram of the tool rack of the present invention.
In the figure: 1. a tool rack; 2. drawing a die hole and a die rod; 3. positioning a screw rod; 4. a knob; 5. the wallboard mould is connected with the screw rod; 6. and (5) prefabricating a wallboard mould.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: wallboard drawing die hole mould locating rack in prefabricating, including frock frame 1 and prefabricated wallboard mould 6, frock frame 1 is located prefabricated wallboard mould 6 upper surface, 1 surperficial sliding connection of frock frame has a plurality of drawing die hole die-pins 2.
In this embodiment, through reserving the hole in frock frame 1 surface, follow-up will draw die hole die rod 2 to insert put simply and dismantle the convenience, its hole location is accurate and can prevent that the hole from warping, reduces the harm of process to the mould.
Wherein, in order to realize being convenient for dismouting positioning screw 3's purpose, this device adopts following technical scheme to realize: 1 one side threaded connection of frock frame has a plurality of positioning screw rods 3, positioning screw rods 3's quantity is the same with drawing die hole die rod 2, positioning screw rods 3's position corresponds with drawing die hole die rod 2, 3 one end fixedly connected with knobs 4 of positioning screw rods, fix drawing die hole die rod 2 through screwing up positioning screw rods 3, pouring the completion, when the concrete reaches initial set, transfer the positioning screw rods 3 pine, draw die hole die rod 2 and can accomplish dismantlement work slowly and extract, can fix each drawing die hole die rod 2 through positioning screw rods 3, can prevent that concrete placement from vibrating the time die rod come-up, through rotatory knob 4, can be convenient for control positioning screw rods 3 and rotate, improved the convenience of locating rack operation.
Wherein, in order to realize being convenient for the purpose with 1 installation of frock frame, this device adopts following technical scheme to realize: equal threaded connection in the 1 upper surface left and right sides of frock frame has two wallboard moulds to connect lead screw 5, wallboard mould connects 5 lower extreme screw threads of lead screw and runs through prefabricated wallboard mould 6 tops, is convenient for connect between 1 prefabricated wallboard mould of frock frame 6, connects lead screw 5 through wallboard mould and can be convenient for to couple together frock frame 1 and prefabricated wallboard mould 6 to be convenient for carry out follow-up pouring work.
The working principle and the using process of the utility model are as follows: during assembly, the tool frame 1 and the prefabricated wallboard mould 6 are combined and connected according to the size, the die drawing hole mould rod 2 is precoated with a release agent and is inserted into a preformed hole of the tool frame 1 and falls to a mould platform, and finally the positioning screw rod 3 is screwed up to fix the die drawing hole mould rod 2, so that the mould rod is prevented from floating upwards when concrete pouring is vibrated, when the pouring is finished and the concrete reaches initial setting, the positioning screw rod 3 is loosened, and the die drawing hole mould rod 2 is pulled out slowly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Wallboard drawing die hole mould locating rack in prefabricating, including frock frame (1) and prefabricated wallboard mould (6), its characterized in that: the tool frame (1) is located on the upper surface of the prefabricated wallboard mould (6), and a plurality of die drawing hole die rods (2) are connected to the surface of the tool frame (1) in a sliding mode.
2. The prefabricated interior wallboard die-drawing hole mold locating rack of claim 1, characterized in that: one side of the tool rack (1) is in threaded connection with a plurality of positioning screw rods (3).
3. The prefabricated interior wallboard die-drawing hole mold locating rack of claim 2, characterized in that: the number of the positioning screw rods (3) is the same as that of the die hole drawing die rods (2), and the positions of the positioning screw rods (3) correspond to those of the die hole drawing die rods (2).
4. The prefabricated interior wallboard die-drawing hole mold locating rack of claim 2, characterized in that: one end of the positioning screw rod (3) is fixedly connected with a knob (4).
5. The prefabricated interior wallboard die-drawing hole mold locating rack of claim 1, characterized in that: the left side and the right side of the upper surface of the tool rack (1) are in threaded connection with two wallboard die connecting screw rods (5).
6. The prefabricated interior wallboard die-drawing hole mold locating rack of claim 5, characterized in that: the lower end of the wallboard die connecting screw rod (5) is threaded through the top of the prefabricated wallboard die (6).
CN202123341621.0U 2021-12-28 2021-12-28 Positioning frame for prefabricated inner wallboard drawing die hole die Active CN216914260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123341621.0U CN216914260U (en) 2021-12-28 2021-12-28 Positioning frame for prefabricated inner wallboard drawing die hole die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123341621.0U CN216914260U (en) 2021-12-28 2021-12-28 Positioning frame for prefabricated inner wallboard drawing die hole die

Publications (1)

Publication Number Publication Date
CN216914260U true CN216914260U (en) 2022-07-08

Family

ID=82254189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123341621.0U Active CN216914260U (en) 2021-12-28 2021-12-28 Positioning frame for prefabricated inner wallboard drawing die hole die

Country Status (1)

Country Link
CN (1) CN216914260U (en)

Similar Documents

Publication Publication Date Title
CN205600936U (en) Self preservation temperature concrete hollow block mould
CN216914260U (en) Positioning frame for prefabricated inner wallboard drawing die hole die
CN205704593U (en) A kind of mould suppressing gypsum hollow brick
CN108817547B (en) Steel cutting equipment of high stability
CN211993457U (en) Board-like forming device is used in gypsum board production
CN211101542U (en) Metal casting mold with melting box
CN215594893U (en) Descending plate formwork device
CN107214819B (en) Building constructional column shaping moulding box
CN212826026U (en) Adjustable production mold for prefabricated clear water concrete
CN213198095U (en) Precast concrete mould of accurate positioning
CN208305325U (en) A kind of precast concrete mold
CN217521854U (en) Transformer coil casting mold capable of overflowing materials
CN215254587U (en) Shaping die device for arc-shaped concrete protection pier of pipeline out of roof
CN220882778U (en) Prefabricated component template
CN214833779U (en) Prefabricated component exterior wall panel mould of assembly type structure
CN211891361U (en) Multi-specification combined beam-column integrated die
CN221639506U (en) Metal joint mould processing forming device
CN221160854U (en) Mould convenient to change
CN218969911U (en) External mold trolley in square water return channel
CN217871813U (en) Framework column formwork structure with chamfer
CN215212449U (en) Prefabricated stair embedded bolt mounting and positioning device
CN217670000U (en) Precast beam and precast beam mould of fire hose block terminal
CN221774815U (en) Assembled wallboard door and window manufacturing die
CN209867149U (en) Manual sleeve automatic molding die
CN210116012U (en) Special-shaped boss gasket tool