CN216866060U - Interim protective structure of building wall post - Google Patents
Interim protective structure of building wall post Download PDFInfo
- Publication number
- CN216866060U CN216866060U CN202220615179.1U CN202220615179U CN216866060U CN 216866060 U CN216866060 U CN 216866060U CN 202220615179 U CN202220615179 U CN 202220615179U CN 216866060 U CN216866060 U CN 216866060U
- Authority
- CN
- China
- Prior art keywords
- supporting
- compression spring
- connecting rod
- building wall
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 title abstract description 7
- 230000006835 compression Effects 0.000 claims abstract description 34
- 238000007906 compression Methods 0.000 claims abstract description 34
- 239000004744 fabric Substances 0.000 claims abstract description 5
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 6
- 239000000049 pigment Substances 0.000 abstract description 4
- 238000003756 stirring Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a temporary protection structure for a building wall column, and belongs to the technical field of building protection. This interim protective structure of building wall post includes: at least three supporting and protecting frames are sequentially connected end to form an annular column body, and waterproof cloth is pasted on each supporting and protecting frame; one side frame of each supporting and protecting frame is provided with a connecting groove, and two side surfaces of each connecting groove are provided with limiting holes; the other side frame relative with the spread groove is equipped with connecting device, and connecting device includes connecting rod and compression spring, connecting rod fixed connection frame locates along its length direction's through-hole on the connecting rod, wears to be equipped with compression spring in the through-hole, and a terminal surface of spacing axle is all connected at compression spring's both ends. The temporary protection structure for the building wall column can prevent pigment from splashing on the wall column and can also avoid the problem that a construction tool collides with the wall column in the carrying process to damage the cylindrical surface of the wall column.
Description
Technical Field
The utility model relates to the technical field of building protection, in particular to a temporary protection structure for a building wall column.
Background
The building needs to be supported by the wall columns during construction, but the wall columns not only have the function of bearing but also have the function of improving the attractiveness of the building;
however, some pigments are easily splashed onto the wall column in the process of decorating other wall surfaces, and the construction tools are easily collided with the wall column in the process of carrying the construction tools, so that the cylindrical surface of the wall column is damaged.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the problems in the prior art and provides a temporary protection structure for a building wall column.
The utility model provides a temporary protection structure for a building wall column, which comprises: at least three supporting and protecting frames are sequentially connected end to form an annular cylinder, and waterproof cloth is pasted on each supporting and protecting frame; one side frame of each supporting and protecting frame is provided with a connecting groove, and two side surfaces of each connecting groove are provided with limiting holes; the opposite side frame relative with the spread groove is equipped with connecting device, and connecting device includes connecting rod and compression spring, connecting rod fixed connection frame locates along its length direction's through-hole on the connecting rod, wears to be equipped with compression spring in the through-hole, and the terminal surface of spacing axle is all connected at compression spring's both ends, and another terminal surface of spacing axle can stretch into spacing downthehole.
Preferably, the hole wall of the through hole is fixedly connected with a supporting block, the upper side and the lower side of the supporting block are respectively connected with one end of a compression spring, and the other end of each compression spring is connected with a limiting shaft.
Preferably, the connecting device further comprises a toggle block, the toggle block is arranged between the compression spring and the limiting shaft, one end of the toggle block is connected with the compression spring, and the other end of the toggle block is fixedly connected with the end face of the toggle block; the connecting rod is provided with two sliding grooves, the side surface of the poking block penetrates out of the sliding grooves, and the poking block is connected in a sliding manner along the length direction of the connecting rod.
Preferably, the side surface of the poking block penetrating through the sliding groove is provided with anti-skid grains.
Preferably, the number of the supporting and protecting frames is four.
Compared with the prior art, the utility model has the beneficial effects that: according to the temporary protection structure for the building wall column, the supporting and protecting frames are sequentially connected end to end, the wall column to be protected is surrounded, the wall column is located in the middle of the annular column body, and when the two adjacent supporting and protecting frames are connected and disconnected, only two shifting blocks need to fluctuate in the direction of approaching each other, so that pigment can be prevented from splashing on the wall column, and the problem that the cylindrical surface of the wall column is damaged due to the fact that a construction tool collides with the wall column in the carrying process can be solved.
Drawings
FIG. 1 is a schematic connection diagram of the present invention;
FIG. 2 is a schematic view of a supporting and protecting frame according to the present invention;
FIG. 3 is a cross-sectional view of the interior of the connecting rod of the present invention;
FIG. 4 is an external view of the connecting rod of the present invention.
Description of reference numerals:
1. the waterproof structure comprises a supporting and protecting frame, 2 waterproof cloth, 3 connecting grooves, 4 connecting devices, 5 limiting holes, 40 connecting rods, 41 supporting blocks, 42 limiting shafts, 43 shifting blocks, 44 compression springs, 45 through holes and 46 sliding grooves.
Detailed Description
The following detailed description of specific embodiments of the utility model is provided, but it should be understood that the scope of the utility model is not limited to the specific embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
The utility model provides a temporary protection structure of a building wall column, which comprises the following components in figures 1-2-3: at least three supporting and protecting frames 1 are arranged, the supporting and protecting frames 1 are sequentially connected end to form an annular column, and waterproof cloth 2 is pasted on each supporting and protecting frame 1; one side frame of each supporting and protecting frame 1 is provided with a connecting groove 3, and two side surfaces of each connecting groove 3 are provided with limiting holes 5; the frame of the other side relative with spread groove 3 is equipped with connecting device 4, and connecting device 4 includes connecting rod 40 and compression spring 44, the through-hole 45 along its length direction is located to the connecting rod 40 fixed connection frame on, wears to be equipped with compression spring 44 in the through-hole 45, and spacing axle 42's a terminal surface is all connected at compression spring 44's both ends, and another terminal surface of spacing axle 42 can stretch into in the spacing hole 5.
Preferably, the hole wall of the through hole 45 is fixedly connected with the supporting block 41, the upper side and the lower side of the supporting block 41 are respectively connected with one end of a compression spring 44, and the other end of each compression spring 44 is connected with a limit shaft 42.
During the use will respectively support protective frame 1 end to end in proper order, enclose the wall post that needs the protection, the wall post is located in the middle of the annular cylinder, can enough prevent that pigment from splashing on the wall post, can prevent again that construction tool from colliding the wall post at the in-process of transport, causes the problem of damage to the cylinder of wall post.
When two adjacent supporting and protecting frames 1 are connected, the two limiting shafts 42 are extruded towards the direction close to each other until the end faces of the two limiting shafts 42 coincide with the two end faces of the connecting rod 40 (the compression spring 44 has the tendency of pushing the limiting shafts 42 out of the through hole 45), at the moment, the connecting rod 40 is placed into the connecting groove 3 of the other supporting and protecting frame 1, and the compression spring 44 pushes the limiting shafts 42 to enter the limiting holes 5, so that the two adjacent supporting and protecting frames 1 are rotatably connected.
Preferably, as shown in fig. 3, the hole wall of the through hole 45 is fixedly connected to the supporting block 41, the upper side and the lower side of the supporting block 41 are respectively connected to one end of a compression spring 44, and the other end of each compression spring 44 is connected to a limiting shaft 42.
Replacing one longer compression spring 44 with two shorter compression springs 44 prevents the compression springs 44 from bending within the through holes 45, which could affect use.
Preferably, as shown in fig. 1-2-3-4, the connecting device 4 further includes a toggle block 43, the toggle block 43 is disposed between the compression spring 44 and the limiting shaft 42, one end of the toggle block 43 is connected to the compression spring 44, and the other end is fixedly connected to an end surface of the toggle block 43; the connecting rod 40 is provided with two sliding grooves 46, the side surface of the toggle block 43 penetrates through the sliding grooves 46, and the toggle block 43 is connected in a sliding manner along the length direction of the connecting rod 40.
This interim protective structure of building wall post uses the completion back, with two stirring blocks 43 towards the direction promotion that is close to each other, two stirring blocks 43 drive two spacing axles 42 and are close to each other, remove spacing axle 42 and get into spacing hole 5 spacing each other, can part two support protective frame 1, easy operation.
Preferably, the side of the toggle block 43 penetrating through the sliding slot 46 is provided with anti-slip threads.
Preferably, the number of the supporting and protecting frames 1 is four.
The use method of the temporary protective structure for the building wall column comprises the following steps:
firstly, when two adjacent supporting and protecting frames 1 are connected, two shifting blocks 43 are extruded towards the direction of mutual approaching until the end surfaces of two limiting shafts 42 coincide with the two end surfaces of a connecting rod 40 (a compression spring 44 has the tendency of pushing the limiting shafts 42 out of a through hole 45), at the moment, the connecting rod 40 is placed into a connecting groove 3 of the other supporting and protecting frame 1, the acting force of hands on the shifting blocks 43 is relieved, and the compression spring 44 pushes the limiting shafts 42 into limiting holes 5, so that the rotary connection of the two adjacent supporting and protecting frames 1 is realized; then, sequentially connecting the four supporting and protecting frames 1 end to end around the wall column; finally, after the use is finished, the two shifting blocks 43 are pushed towards the mutually approaching direction, the two shifting blocks 43 drive the two limiting shafts 42 to mutually approach, the mutual limiting of the limiting shafts 42 entering the limiting holes 5 is released, and the two mutually connected supporting and protecting frames 1 can be separated.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A building wall post temporary protection structure, comprising:
at least three supporting and protecting frames (1), wherein the supporting and protecting frames (1) are sequentially connected end to form an annular column, and waterproof cloth (2) is stuck on each supporting and protecting frame (1);
one side frame of each supporting and protecting frame (1) is provided with a connecting groove (3), and two side surfaces of each connecting groove (3) are provided with limiting holes (5); the frame of the other side relative with spread groove (3) is equipped with connecting device (4), and connecting device (4) include connecting rod (40) and compression spring (44), connecting rod (40) fixed connection frame is located along its length direction's through-hole (45) on connecting rod (40), wears to be equipped with compression spring (44) in through-hole (45), and a terminal surface of spacing axle (42) is all connected at the both ends of compression spring (44), and another terminal surface of spacing axle (42) can stretch into in spacing hole (5).
2. A temporary protection structure for a building wall column according to claim 1, wherein the wall of the through hole (45) is fixedly connected with a supporting block (41), the upper and lower sides of the supporting block (41) are respectively connected with one end of a compression spring (44), and the other end of each compression spring (44) is connected with a limit shaft (42).
3. A temporary protection structure for a building wall column according to claim 1, wherein said connecting means (4) further comprises a toggle block (43), said toggle block (43) is disposed between said compression spring (44) and said limit shaft (42), one end of said toggle block (43) is connected to said compression spring (44), and the other end is fixedly connected to the end face of said toggle block (43); the connecting rod (40) is provided with two sliding grooves (46), the side surface of the poking block (43) penetrates out of the sliding grooves (46) and is in sliding connection with the poking block (43) along the length direction of the connecting rod (40).
4. A temporary protection structure for building wall columns according to claim 3, characterized in that the side of the shifting block (43) penetrating out of the sliding groove (46) is provided with anti-slip lines.
5. A temporary protection structure for building wall studs according to claim 1, characterized in that said supporting and protecting frame (1) is four in number.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220615179.1U CN216866060U (en) | 2022-03-18 | 2022-03-18 | Interim protective structure of building wall post |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220615179.1U CN216866060U (en) | 2022-03-18 | 2022-03-18 | Interim protective structure of building wall post |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216866060U true CN216866060U (en) | 2022-07-01 |
Family
ID=82122267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220615179.1U Expired - Fee Related CN216866060U (en) | 2022-03-18 | 2022-03-18 | Interim protective structure of building wall post |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216866060U (en) |
-
2022
- 2022-03-18 CN CN202220615179.1U patent/CN216866060U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206633280U (en) | A kind of dust cover Semiautomatic demolding mould | |
CN107344614A (en) | A kind of undercarriage buffer unit | |
CN216866060U (en) | Interim protective structure of building wall post | |
CN105537906A (en) | Device for rapidly pressing pin shaft into rolling wheel body | |
CN108758179B (en) | Electrical equipment with anti-collision function | |
CN209585817U (en) | A kind of construction safety plate firm banking | |
CN214241219U (en) | Oil gas field unmanned aerial vehicle safety landing gear | |
CN210947639U (en) | Mobile building construction platform with noise reduction function | |
CN212683671U (en) | Clamping device for processing computer case plate | |
CN210761034U (en) | Intelligent processing and transporting robot | |
CN210685483U (en) | Support frame for civil engineering | |
CN210912563U (en) | Electric pole mould transportation equipment | |
CN217625036U (en) | Environment-friendly bicycle fender carton that can expand and prop | |
CN215663475U (en) | Conveying device for automatic production robot | |
CN220291457U (en) | Underground portable mobile substation | |
CN215470741U (en) | Steel construction box post processing agency | |
CN206678346U (en) | A kind of full-automatic production pushes away clod of earth bullet block | |
CN205438332U (en) | A anchor clamps that is used for round pin axle of impressing on gyro wheel body | |
CN205932080U (en) | Aluminium is rolled up and is promoted translation mechanism | |
CN210422088U (en) | Space-saving parking system supporting device | |
CN216711541U (en) | Adjustable section of jurisdiction upset machine | |
CN212668259U (en) | Production line panel conveyor | |
CN213079696U (en) | Movable punch press equipment for carburetor production | |
CN214046270U (en) | Wisdom venue operation management equipment | |
CN208760722U (en) | A kind of mobile bracket of vehicle side part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220701 |
|
CF01 | Termination of patent right due to non-payment of annual fee |