CN216840605U - Pouring auxiliary device for ring beam concrete component with foundation bolts - Google Patents

Pouring auxiliary device for ring beam concrete component with foundation bolts Download PDF

Info

Publication number
CN216840605U
CN216840605U CN202123306245.1U CN202123306245U CN216840605U CN 216840605 U CN216840605 U CN 216840605U CN 202123306245 U CN202123306245 U CN 202123306245U CN 216840605 U CN216840605 U CN 216840605U
Authority
CN
China
Prior art keywords
template
pouring
pour
concrete member
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123306245.1U
Other languages
Chinese (zh)
Inventor
李艳东
孙培栋
刘振刚
杨永龙
陈敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN202123306245.1U priority Critical patent/CN216840605U/en
Application granted granted Critical
Publication of CN216840605U publication Critical patent/CN216840605U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a take auxiliary device that pours of rag bolt's ring beam concrete component, pour the template including annular outer, inner circle, outer, inner circle are pour and are provided with the pouring reinforcing bar between the template, and the equipartition interval is provided with a plurality of locating beams between the top of template is pour to outer, inner circle, runs through the rag screw rod that is fixed with vertical setting on the locating beam, and the top of rag screw rod has fastening nut after passing the locating beam threaded connection. The utility model discloses device design science, rational in infrastructure, preparation are easy, low cost, convenient operation, can accurate efficient accomplish need install the foundation bolt's of the roof beam class concrete member of more quantity foundation bolt installation, economical and practical, labour saving and time saving economizes the manual work, and the while location is simple, and the later stage adjustment is convenient moreover, has greatly improved jumbo size concrete member foundation bolt's installation accuracy.

Description

Pouring auxiliary device for ring beam concrete component with foundation bolts
Technical Field
The utility model belongs to the technical field of the construction, in particular to concrete member rag bolt's installation field specifically is a take ring beam concrete member's of rag bolt auxiliary device that pours.
Background
At present, most foundation bolts are installed by welding or positioning by templates, and the method is suitable for the conditions of smaller component size and less bolts, and the welding method is adopted to position the beam components which are more in number and inconvenient to position, so that the time consumption is more, the labor consumption is more, the positioning is troublesome, and the later-stage adjustment is inconvenient; the method for positioning the template is also not suitable for concrete members with large size and a large number of bolts, and the positioning template needs to be prefabricated in advance, so that the manufacturing cost is high, the loss of labor and materials is caused, and the method is not particularly economical.
Disclosure of Invention
The utility model aims at providing a take auxiliary device that pours of foundation bolt's collar tie beam concrete component in order to overcome jumbo size concrete component when construction foundation bolt, technical problem such as traditional construction method is with high costs, inefficiency, consuming time length, accuracy are not high.
The utility model discloses a realize through following technical scheme:
the utility model provides a take foundation bolt's collar tie beam concrete member pour auxiliary device, pour template and inner circle including annular outer lane and pour the template, outer lane is pour and is provided with the pouring reinforcing bar between template and the inner circle pouring template, the equipartition interval is provided with a plurality of locating beams between the top of template and inner circle pouring template is pour to the outer lane, the both ends of locating beam pour the top of template and the top fixed connection of template with the outer lane respectively, run through the foundation screw who is fixed with vertical setting on the locating beam, foundation screw's bottom and pouring reinforcing bar fixed connection, threaded connection has fastening nut behind the locating beam is passed to foundation screw's top.
Furthermore, the top and the bottom of the outer side surface of the outer ring pouring template and the top and the bottom of the outer side surface of the inner ring pouring template are respectively provided with a circle of reinforcing beams.
Furthermore, the rod section of the foundation screw rod above the positioning beam and the whole outer part of the fastening nut are sleeved with a protective film.
Furthermore, the bottom of the foundation screw is provided with a bending section which is hooked on the pouring steel bar and is fixedly connected with the pouring steel bar.
Furthermore, the stiffening beam on the top of the outer side face of the outer ring pouring template and the stiffening beam on the top of the outer side face of the inner ring pouring template are provided with scale sizes.
Furthermore, the positioning beam is made of square wood.
The utility model discloses device design science, rational in infrastructure, preparation are easy, low cost, convenient operation, can accurate efficient accomplish need install the foundation bolt's of the roof beam class concrete member of more quantity foundation bolt installation, economical and practical, labour saving and time saving economizes the manual work, and the while location is simple, and the later stage adjustment is convenient moreover, has greatly improved jumbo size concrete member foundation bolt's installation accuracy.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate exemplary embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention in any way.
Fig. 1 is a schematic plan view of the device of the present invention.
Fig. 2 is a schematic cross-sectional structure diagram of the device of the present invention.
In the figure: the method comprises the following steps of 1-outer ring pouring template, 2-inner ring pouring template, 3-pouring reinforcing steel bar, 4-reinforcing beam, 5-positioning beam, 6-foundation screw and 7-fastening nut.
Detailed Description
In order to make the present invention better understood by those skilled in the art, the present invention will be further clearly and completely described below with reference to the accompanying drawings and embodiments. In addition, the features of the embodiments and examples in the present application may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected" and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
As shown in fig. 1 and 2, an auxiliary pouring device for a ring beam concrete component with foundation bolts comprises an annular outer ring pouring template 1 and an annular inner ring pouring template 2, pouring reinforcing steel bars 3 are arranged between the outer ring pouring template 1 and the inner ring pouring template 2, a circle of reinforcing beam 4 is arranged at the top and the bottom of the outer side surface of the outer ring pouring template 1 and at the top and the bottom of the outer side surface of the inner ring pouring template 2, and scale sizes are arranged on the reinforcing beam 4 at the top of the outer side surface of the outer ring pouring template 1 and the reinforcing beam 4 at the top of the outer side surface of the inner ring pouring template 2.
A plurality of positioning beams 5 are uniformly distributed between the top parts of the outer ring pouring template 1 and the inner ring pouring template 2 at intervals, the positioning beams 5 are made of square timber, and two ends of each positioning beam 5 are fixedly connected with the top part of the outer ring pouring template 1 and the top part of the inner ring pouring template 2 respectively; the utility model discloses a concrete structure, including the set beam 5, the set beam is fixed with the foundation screw 6 of vertical setting on running through on the set beam 5, the bottom of foundation screw 6 is provided with the section of bending, the section of bending collude hang on pouring reinforcing bar 3 and with pour reinforcing bar 3 fixed connection, threaded connection has fastening nut 7 behind the set beam 5 is passed at the top of foundation screw 6, the whole outside cover that foundation screw 6 is located the pole section more than set beam 5 and fastening nut 7 is equipped with the protection film.
The construction method of the pouring auxiliary device of the ring beam concrete member with the foundation bolts mainly comprises the following steps: the method comprises the steps of adopting common and cheap square timber in engineering as a positioning beam 5, taking the length corresponding to the size of a component, drilling a bolt hole slightly larger than the size of a foundation screw 6 at a proper position by using an electric drill, inserting the foundation screw 6 into the bolt hole, fixing the foundation screw 6 and the square timber through a nut, and making a fixing piece for later use. In the installation process, firstly, the positioning point of the foundation screw 6 is aligned through the known positioning point, the position of the positioning point can be quickly and accurately positioned through the scale size arranged on the reinforcing beam 4, after the position of the foundation screw 6 is compared, the square timber is fixed on a pouring template, the foundation screw 6 is fixed with the pouring steel bar 3, in order to prevent the fastening nut 7 on the foundation screw 6 from being buried when concrete is poured, and a protective film is sleeved outside the whole of the foundation screw 6 and the fastening nut 7; then pouring concrete, after the pouring is finished, rechecking the position of the foundation screw 6 before the concrete is solidified, and adjusting the position of the foundation screw 6 by square timber if the position has errors; after the concrete member is solidified and formed, the fastening nut 7, the square timber and the pouring template are removed; finally, the ring beam concrete member with the foundation bolt is obtained.
The scope of the invention is not limited to the above embodiments, and various modifications and changes can be made by those skilled in the art, and any modifications, improvements and equivalents made within the spirit and principle of the invention should be included in the scope of the invention.

Claims (7)

1. The utility model provides a take foundation bolt's collar beam concrete member pour auxiliary device which characterized in that: pour template and inner circle including annular outer lane and pour the template, the outer lane is pour and is provided with the pouring reinforcing bar between template and the inner circle and pour the template, the equipartition interval is provided with a plurality of locating beams between the top that template and inner circle were pour to the outer lane, the both ends of locating beam pour the top of template and the top fixed connection of inner circle respectively with the outer lane, run through the rag screw who is fixed with vertical setting on the locating beam, the bottom of rag screw with pour reinforcing bar fixed connection, the threaded connection has fastening nut behind the locating beam is passed at the top of rag screw.
2. The pouring assist device for a ring beam concrete member with anchor bolts according to claim 1, characterized in that: and the top and the bottom of the outer side surface of the outer ring pouring template and the top and the bottom of the outer side surface of the inner ring pouring template are respectively provided with a circle of reinforcing beams.
3. The cast-assist apparatus for a ring beam concrete member with anchor bolts according to claim 1 or 2, characterized in that: the rod section of the foundation screw rod above the positioning beam and the whole outer part of the fastening nut are sleeved with a protective film.
4. The cast-assist apparatus for a ring beam concrete member with anchor bolts according to claim 1 or 2, characterized in that: the bottom of the foundation screw is provided with a bending section which is hooked on the pouring steel bar and is fixedly connected with the pouring steel bar.
5. The pouring assist device for a ring beam concrete member with anchor bolts according to claim 3, characterized in that: the bottom of the foundation screw is provided with a bending section which is hooked on the pouring steel bar and is fixedly connected with the pouring steel bar.
6. The pouring assist device for a ring beam concrete member with anchor bolts according to claim 2, characterized in that: and the stiffening beam on the top of the outer side surface of the outer ring pouring template and the stiffening beam on the top of the outer side surface of the inner ring pouring template are provided with scale sizes.
7. The pouring assist device for a ring beam concrete member with anchor bolts according to claim 1, characterized in that: the positioning beam is made of square wood.
CN202123306245.1U 2021-12-27 2021-12-27 Pouring auxiliary device for ring beam concrete component with foundation bolts Active CN216840605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123306245.1U CN216840605U (en) 2021-12-27 2021-12-27 Pouring auxiliary device for ring beam concrete component with foundation bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123306245.1U CN216840605U (en) 2021-12-27 2021-12-27 Pouring auxiliary device for ring beam concrete component with foundation bolts

Publications (1)

Publication Number Publication Date
CN216840605U true CN216840605U (en) 2022-06-28

Family

ID=82111193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123306245.1U Active CN216840605U (en) 2021-12-27 2021-12-27 Pouring auxiliary device for ring beam concrete component with foundation bolts

Country Status (1)

Country Link
CN (1) CN216840605U (en)

Similar Documents

Publication Publication Date Title
CN206784951U (en) Concrete placement floor thickness control device
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN214868365U (en) High-rise residential building shear wall vertical steel bar positioning tool
CN205444456U (en) Precast concrete lotus root roof beam rebar positioning board
CN216840605U (en) Pouring auxiliary device for ring beam concrete component with foundation bolts
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN211446999U (en) Foundation bolt positioning die
CN216516828U (en) Triangular overhanging support base for slip form
CN205955197U (en) A fixing device that be used for prefabricated non - design of bench, can all rotary die boards
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN206144150U (en) Aluminum mould board connecting piece
CN215055273U (en) A assembled template for installing support bracket embedded box
CN212656227U (en) Static pressure steel pipe pile foundation with assembled positioning chuck
CN114809673A (en) Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring
CN114075871A (en) Triangular overhanging support base for slip form
CN114232983A (en) Construction method and system of pool wall template
CN203440827U (en) Bay bolt positioning mold for steel pipe support of overhead contact system of electric railway
CN210066813U (en) Pre-buried installation device who breathes out groove
CN207582978U (en) A kind of floorslab thickness control device
CN217760131U (en) Rear buried foundation bolt suspension positioning mechanism in road lamp concrete foundation pouring
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN111878636A (en) Positioning frame for installing wall-out waterproof casing and construction method thereof
CN206205289U (en) Rainwater hopper direct-buried reinforcing device
CN218375393U (en) Superimposed sheet installation check structure of taking one's place

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant