CN214868365U - High-rise residential building shear wall vertical steel bar positioning tool - Google Patents
High-rise residential building shear wall vertical steel bar positioning tool Download PDFInfo
- Publication number
- CN214868365U CN214868365U CN202121499061.9U CN202121499061U CN214868365U CN 214868365 U CN214868365 U CN 214868365U CN 202121499061 U CN202121499061 U CN 202121499061U CN 214868365 U CN214868365 U CN 214868365U
- Authority
- CN
- China
- Prior art keywords
- positioning
- positioning plate
- vertical steel
- residential building
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the technical field of concrete structure construction auxiliary tools, and discloses a high-rise residential building shear wall vertical steel bar positioning tool, which comprises two positioning plates, wherein the two positioning plates are arranged in parallel, the positioning plates comprise a half positioning plate I and a half positioning plate II, the left and right sides inside the half positioning plate I and the half positioning plate II are both provided with threaded holes, the threaded holes are internally and threadedly connected with threaded rods, one end of the threaded rod between the two positioning plates is fixedly connected with a loop bar, the interior of the loop bar is slidably connected with a connecting rod, the outer surface of the loop bar is threadedly connected with an adjusting bolt, the positioning tool is convenient for adjusting the distance between two rows of vertical steel bars and determining the distance, thereby being convenient to use and needing not to measure by taking a ruler additionally, and being convenient to extend and disassemble, thereby making the positioning tool convenient for repeated use and stronger in practicability.
Description
Technical Field
The utility model relates to a concrete structure construction appurtenance technical field specifically is high-rise residential building shear force wall erects reinforcing bar positioning tool.
Background
Shear walls are also known as wind resistant walls, seismic walls or structural walls. The wall body mainly bears horizontal load and vertical load (gravity) caused by wind load or earthquake action in a house or a structure, prevents the structure from being sheared and damaged, generally uses reinforced concrete to manufacture the shear wall structure construction, is a common construction project in the building construction field, carries out concrete pouring operation on a steel bar frame body structure consisting of vertical steel bars and transverse steel bars, and completes the shear wall structure construction through vibration operation, maintenance operation and the like. However, the vertical steel bar positioning tool for most of the existing high-rise residential building shear walls is inconvenient to adjust and determine the distance between two rows of vertical steel bars when positioning the vertical steel bars, so that the positioning tool is inconvenient to use and cannot meet more use requirements, and meanwhile, the vertical steel bar positioning tool for most of high-rise residential building shear walls is inconvenient to extend and disassemble after being used up when being used, so that the positioning tool is inconvenient to reuse and is low in practicability.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a high-rise residential building shear force wall erects reinforcing bar positioning tool has solved the problem among the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the positioning tool for the vertical steel bars of the shear wall of the high-rise residential building comprises two positioning plates, wherein the two positioning plates are arranged in parallel, the positioning plates comprise a first half positioning plate and a second half positioning plate, the left side and the right side of the inner part of the first half positioning plate and the second half positioning plate are respectively provided with a threaded hole, the inner part of the threaded hole is in threaded connection with a threaded rod, one end of the threaded rod, which is positioned between the two positioning plates, is fixedly connected with a sleeve rod, the inner part of the sleeve rod is in sliding connection with a connecting rod, the outer surface of the sleeve rod is in threaded connection with an adjusting bolt, the outer surfaces of the sleeve rod and the connecting rod are respectively provided with a scale mark, the inner parts of the first half positioning plate and the second half positioning plate are respectively provided with a plurality of penetrating positioning holes, the left side of the first half positioning plate and the second half positioning plate is provided with a first clamping groove, and one side, which is opposite to the first half positioning plate and the second positioning plate, is fixedly connected with a fixing block, the fixing block is internally provided with a second clamping groove, the interior of the second clamping groove is communicated with the interior of the first clamping groove, the right sides of the first half positioning plate and the second half positioning plate are fixedly connected with a first clamping block, an inner groove is formed in the first clamping block, a spring is fixedly connected in the inner groove, and one end of the spring is fixedly connected with a second clamping block.
Preferably, the first clamping block and the first clamping groove are both arranged in an L shape.
Preferably, the first clamping block is matched with the first clamping groove.
Preferably, the second clamping block and the second clamping groove are both arc-shaped.
Preferably, the second clamping block is matched with the second clamping groove.
Preferably, the distance between every two positioning holes is the same.
Preferably, one end of the threaded rod, which is far away from the loop bar, is in threaded connection with a nut.
(III) advantageous effects
The utility model provides a high-rise residential building shear force wall erects reinforcing bar positioning tool possesses following beneficial effect:
(1) the position of reinforcing bar is fixed through locating plate and locating hole, and make the connecting rod slide in the inside emergence of loop bar through adjusting bolt, just so can make the distance between two locating plates change, and can confirm the distance size between two rows of vertical reinforcement through the scale mark, the distance between two rows of vertical reinforcement of so both being convenient for adjust, the size of being convenient for confirm the distance again to make convenient to use and need not to take in addition the ruler to measure.
(2) The locating plate can realize the extension of length through the joint of the first clamping block and the first clamping groove, and the second clamping groove is connected with the second clamping block when the first clamping block is connected with the first clamping groove, so that the locating plate can be stably installed without fastening a fastener when the length is extended, and is convenient to detach, time and labor are saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic view of the three-dimensional structure of the present invention.
In the figure: 1. positioning a plate; 2. a first semi-positioning plate; 3. a second semi-positioning plate; 4. a fixed block; 5. a first clamping groove; 6. a second clamping groove; 7. positioning holes; 8. a threaded hole; 9. a threaded rod; 10. a first clamping block; 11. a loop bar; 12. adjusting the bolt; 13. a connecting rod; 14. scale lines; 15. a second clamping block; 16. an inner tank; 17. a spring; 18. and a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, the utility model provides a technical solution: the positioning tool for the vertical steel bars of the shear wall of the high-rise residential building comprises two positioning plates 1, wherein the two positioning plates 1 are arranged in parallel, the positioning plates 1 comprise a first half positioning plate 2 and a second half positioning plate 3, threaded holes 8 are formed in the left side and the right side of the inner parts of the first half positioning plate 2 and the second half positioning plate 3 respectively, threaded rods 9 are connected in the threaded holes 8 in a threaded manner, one ends, located between the two positioning plates 1, of the threaded rods 9 are fixedly connected with sleeve rods 11, connecting rods 13 are connected in the sleeve rods 11 in a sliding manner, adjusting bolts 12 are connected in the threaded manner on the outer surfaces of the sleeve rods 11 and the connecting rods 13 respectively, a plurality of penetrating positioning holes 7 are formed in the inner parts of the first half positioning plate 2 and the second half positioning plate 3 respectively, a first clamping groove 5 is formed in the left sides of the first half positioning plate 2 and the second half positioning plate 3, and fixing blocks 4 are fixedly connected on one sides, opposite to the first half positioning plate 2 and the second half positioning plate 3, the inside of the fixing block 4 is provided with a second clamping groove 6, the inside of the second clamping groove 6 is communicated with the inside of the first clamping groove 5, the right sides of the first half positioning plate 2 and the second half positioning plate 3 are fixedly connected with a first clamping block 10, the inside of the first clamping block 10 is provided with an inner groove 16, the inside of the inner groove 16 is fixedly connected with a spring 17, one end of the spring 17 is fixedly connected with a second clamping block 15, the vertical steel bars to be positioned are firstly inserted into the positioning holes 7, the positions of the steel bars are fixed through the positioning plates 1 and the positioning holes 7, then when the distance between two rows of vertical steel bars needs to be adjusted, the connecting rod 13 slides in the loop rod 11 through the adjusting bolt 12, so that the distance between the two positioning plates 1 can be changed, and the distance between the two rows of vertical steel bars can be determined through the scale marks 14 arranged on the outer surfaces of the loop rod 11 and the connecting rod 13, so that the distance between the two rows of vertical steel bars can be adjusted, the distance can be conveniently determined, the use is convenient, the ruler is not required to be additionally taken for measurement, meanwhile, the positioning plate 1 can be used for extending the length by clamping the first clamping block 10 and the first clamping groove 5, and the second clamping block 15 is clamped with the second clamping groove 6 when the first clamping block 10 is clamped with the first clamping groove 5, so that the positioning plate 1 can be stably installed without fastening by a fastener when extending the length, the disassembly is convenient, the time and the labor are saved, the positioning plate 1 is composed of the first half positioning plate 2 and the second half positioning plate 3, the first half positioning plate 2 and the second half positioning plate 3 are connected with a threaded hole 8 formed in the first half positioning plate 2 and the second half positioning plate 3 through a threaded rod 9 fixedly connected with the sleeve rod 11 and a threaded hole 8 formed in the second half positioning plate 3 in a threaded manner, the connecting rod 13 is taken out of the sleeve rod 11 firstly during the disassembly, then the sleeve rod 11 is rotated to enable the threaded rod 9 to be screwed out of the threaded hole 8, just so can be so that convenient to detach and installation between half registration plate 2 and half registration plate two 3 and the threaded rod 9 to make this positioning tool convenient to detach get off and reuse after erecting the steel bar welding, and then make this positioning tool can used repeatedly, and the practicality is stronger.
Furthermore, the first clamping block 10 and the first clamping groove 5 are both in an L shape, so that the first clamping block 10 and the first clamping groove 5 are in a T shape together, and the clamping effect is good.
Furthermore, the first clamping block 10 is matched with the first clamping groove 5, so that the positioning plate 1 is convenient to mount and extend.
Furthermore, the second clamping block 15 and the second clamping groove 6 are both arc-shaped, so that the second clamping block 15 and the second clamping groove 6 can be clamped and separated conveniently.
Furthermore, the second clamping block 15 is matched with the second clamping groove 6, so that the second clamping block 15 is clamped by the second clamping groove 6, and the first clamping block 10 is clamped by the first clamping groove 5 more stably.
Furthermore, the distance between every two positioning holes 7 is the same, so that the vertical steel bars in each row are arranged at equal intervals.
Furthermore, a nut 18 is screwed on one end of the threaded rod 9 far away from the sleeve rod 11, so that the nut 18 can reinforce the connection between the threaded rod 9 and the positioning plate 1.
To sum up, the utility model discloses a work flow: when the ruler is used, firstly, the vertical steel bars to be positioned are inserted into the positioning holes 7, the positions of the steel bars are fixed through the positioning plates 1 and the positioning holes 7, then when the distance between two rows of vertical steel bars needs to be adjusted, the connecting rod 13 slides in the loop rod 11 through the adjusting bolt 12, so that the distance between the two positioning plates 1 can be changed, and the distance between the two rows of vertical steel bars can be determined through the loop rod 11 and the scale marks 14 arranged on the outer surface of the connecting rod 13, so that the distance between the two rows of vertical steel bars can be adjusted conveniently, the distance can be determined conveniently, the ruler is convenient to use and does not need to be additionally taken for measuring, meanwhile, the positioning plates 1 can extend the length by clamping the clamping blocks one 10 and the clamping grooves one 5, and the clamping blocks two 15 are clamped with the clamping grooves two 6 when the clamping blocks one 10 and the clamping grooves one 5 are clamped, this allows the location plate 1 to be securely mounted during the length extension without the need for fasteners to fasten, thereby being convenient to disassemble, saving time and labor, and because the positioning plate 1 consists of the half positioning plate I2 and the half positioning plate II 3, and the half positioning plate I2 and the half positioning plate II 3 are in threaded connection with a threaded hole 8 arranged inside the half positioning plate I2 and the half positioning plate II 3 through a threaded rod 9 fixedly connected with a loop bar 11, so that, during disassembly, the connecting rod 13 is first removed from the inside of the sleeve 11, and then the sleeve 11 is rotated so as to unscrew the threaded rod 9 from the inside of the threaded hole 8, therefore, the half positioning plate I2 and the half positioning plate II 3 can be conveniently detached and installed with the threaded rod 9, thereby make this positioning tool convenient to detach get off and reuse after the vertical reinforcement welding, and then make this positioning tool can used repeatedly, and the practicality is stronger.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. High-rise residential building shear force wall erects reinforcing bar positioning tool, including locating plate (1), its characterized in that: the positioning plates (1) are arranged in two, the two positioning plates (1) are arranged in parallel, each positioning plate (1) comprises a first half positioning plate (2) and a second half positioning plate (3), threaded holes (8) are formed in the left side and the right side of the inner portion of each first half positioning plate (2) and each second half positioning plate (3), threaded rods (9) are connected to the inner portions of the threaded holes (8) in a threaded manner, one ends, located between the two positioning plates (1), of the threaded rods (9) are fixedly connected with sleeve rods (11), connecting rods (13) are connected to the inner portions of the sleeve rods (11) in a sliding manner, adjusting bolts (12) are connected to the outer surfaces of the sleeve rods (11) in a threaded manner, scale marks (14) are arranged on the outer surfaces of the sleeve rods (11) and the connecting rods (13), a plurality of penetrating positioning holes (7) are formed in the inner portions of the first half positioning plates (2) and the second half positioning plates (3), the semi-positioning plate I (2) and the semi-positioning plate II (3) are provided with a first clamping groove (5) on the left side, the semi-positioning plate I (2) and the semi-positioning plate II (3) are mutually opposite to each other on one side and fixedly connected with a fixed block (4), a second clamping groove (6) is formed in the fixed block (4), the second clamping groove (6) is formed in the inner part and communicated with the first clamping groove (5), the semi-positioning plate I (2) and the semi-positioning plate II (3) are fixedly connected with a first clamping block (10) on the right side, an inner groove (16) is formed in the first clamping block (10), a spring (17) is fixedly connected in the inner groove (16), and a second clamping block (15) is fixedly connected to one end of the spring (17).
2. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 1, wherein: the first clamping block (10) and the first clamping groove (5) are both arranged in an L shape.
3. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 2, wherein: the first clamping block (10) is matched with the first clamping groove (5).
4. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 1, wherein: the second clamping block (15) and the second clamping groove (6) are both arc-shaped.
5. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 4, wherein: the second clamping block (15) is matched with the second clamping groove (6).
6. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 1, wherein: the distance between every two positioning holes (7) is the same.
7. The tool for positioning the vertical steel bars of the shear wall of the high-rise residential building according to claim 1, wherein: and a nut (18) is connected to one end of the threaded rod (9) far away from the loop bar (11) in a threaded manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121499061.9U CN214868365U (en) | 2021-07-02 | 2021-07-02 | High-rise residential building shear wall vertical steel bar positioning tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121499061.9U CN214868365U (en) | 2021-07-02 | 2021-07-02 | High-rise residential building shear wall vertical steel bar positioning tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214868365U true CN214868365U (en) | 2021-11-26 |
Family
ID=78929303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121499061.9U Active CN214868365U (en) | 2021-07-02 | 2021-07-02 | High-rise residential building shear wall vertical steel bar positioning tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214868365U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837442A (en) * | 2022-06-20 | 2022-08-02 | 中建八局第二建设有限公司 | Fixing device for vertical reserved steel bars of hollow shear wall and construction method of fixing device |
CN115126217A (en) * | 2022-07-12 | 2022-09-30 | 江苏通州四建集团有限公司 | Adopt construction equipment of shear force wall and floor template of aluminum alloy template |
-
2021
- 2021-07-02 CN CN202121499061.9U patent/CN214868365U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837442A (en) * | 2022-06-20 | 2022-08-02 | 中建八局第二建设有限公司 | Fixing device for vertical reserved steel bars of hollow shear wall and construction method of fixing device |
CN115126217A (en) * | 2022-07-12 | 2022-09-30 | 江苏通州四建集团有限公司 | Adopt construction equipment of shear force wall and floor template of aluminum alloy template |
CN115126217B (en) * | 2022-07-12 | 2024-04-12 | 江苏通州四建集团有限公司 | Construction device for shear wall and floor slab formwork by adopting aluminum alloy formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214868365U (en) | High-rise residential building shear wall vertical steel bar positioning tool | |
US10472823B2 (en) | Formwork system | |
CN208733666U (en) | A kind of fixing bolt preformed hole template tool | |
CN202047580U (en) | Bolt pin type wall connecting piece for scaffold | |
CN112240098A (en) | Multipurpose template reinforcing structure | |
CN201753482U (en) | Embedded part in cast-in-place concrete member | |
CN104805910A (en) | Embedded part for cast-in-place concrete component and construction method of embedded part | |
CN216196756U (en) | Positioning installation steel structure for constructional engineering | |
CN216613830U (en) | Recoverable tower crane adheres to and buries a structure | |
CN206144150U (en) | Aluminum mould board connecting piece | |
CN212866842U (en) | Frame structure type building scaffold | |
CN115262966A (en) | Building template locking equipment for pouring reinforced concrete | |
CN210658445U (en) | Municipal administration underground pipe gallery | |
CN210007652U (en) | photovoltaic mounting system | |
CN218061424U (en) | Fish-bellied profile steel supporting beam mold supporting system for cast-in-place floor | |
CN204781462U (en) | Anti wall fixing sub -assembly that splits | |
CN216840605U (en) | Pouring auxiliary device for ring beam concrete component with foundation bolts | |
CN204626714U (en) | A kind of dismantled and assembled stealthy partition wall system | |
CN110593562A (en) | Steel frame shaping building template system | |
CN211597740U (en) | Improved device for combining and separating skin concrete facing layer material and external template | |
CN217897270U (en) | Forming template device | |
CN212562498U (en) | Special buckle connecting piece for building formwork support | |
CN212802538U (en) | Column template reinforcing unit structure for capital construction | |
CN111002432A (en) | Prefabricated constructional column template and using method thereof | |
CN217602130U (en) | Aluminum alloy template thickness control concrete prefabricated part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220225 Address after: 511458 Qingsheng hub comprehensive development project of China Railway 25th bureau group, Xingye Road, guantan village, Dongyong Town, Nansha District, Guangzhou City, Guangdong Province Patentee after: China Railway Construction Dawan District Construction Co.,Ltd. Address before: 545500 No. 344, tangchaotun, tangchao village, Dudong Township, Sanjiang Dong Autonomous County, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee before: Long Xinmao |