CN216838973U - Full-automatic pier integrated construction hanging flower basket - Google Patents
Full-automatic pier integrated construction hanging flower basket Download PDFInfo
- Publication number
- CN216838973U CN216838973U CN202220153632.1U CN202220153632U CN216838973U CN 216838973 U CN216838973 U CN 216838973U CN 202220153632 U CN202220153632 U CN 202220153632U CN 216838973 U CN216838973 U CN 216838973U
- Authority
- CN
- China
- Prior art keywords
- transverse
- underframe
- longitudinal
- full
- side frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a full-automatic pier integrated construction hanging basket, wherein a transverse bottom frame and a longitudinal bottom frame are connected to form a returning frame; reinforcing rods are arranged on the transverse underframe and the longitudinal underframe, and steel wire meshes are paved at the tops of the reinforcing rods; the inner side of the bottom of the transverse side frame is connected with the transverse underframe through a hinge; the inner side of the bottom of the longitudinal side frame is connected with the longitudinal underframe through a hinge; the switch doors are arranged on two sides of the transverse side frame and are connected with the transverse side frame through hinge pieces; all be equipped with electric capstan on two horizontal chassis, the last winding cable wire of electric capstan, the pier top is walked around to the cable wire, and electric capstan is connected at both ends. The utility model automatically raises the height of the hanging basket through the matching of the electric capstan and the pier, is convenient for the construction of workers, and improves the operation efficiency; the hanging basket is provided with a safety rope to prevent the hanging basket from falling accidentally; lay the wire net on the chassis, trample when making things convenient for the workman to be under construction, increase the security.
Description
Technical Field
The utility model relates to a bridge construction technical field specifically indicates a full-automatic pier integrated construction hanging flower basket.
Background
In the bridge construction process, for the convenience of bridge overhaul and guarantee maintainer's safety, often set up the hanging flower basket at the edge at pier top, block maintainer through the hanging flower basket, and then ensure the safety of maintainer and equipment. Traditional hanging flower basket mount is established on the pier, can't reciprocate, influences workman's work efficiency.
Therefore, the full-automatic pier integrated construction hanging basket becomes a problem to be solved urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a low cost, operate steadily, the security is high, can promote the full-automatic pier integrated construction hanging flower basket of operating efficiency and quality.
In order to achieve the above purpose, the utility model provides a technical scheme does: a full-automatic bridge pier integrated construction hanging basket comprises an underframe assembly and a side frame assembly, wherein the underframe assembly comprises a transverse underframe and a longitudinal underframe which are symmetrically arranged; the transverse underframe and the longitudinal underframe are connected to form a return frame; reinforcing rods are arranged on the transverse underframe and the longitudinal underframe, and steel wire meshes are paved on the tops of the reinforcing rods;
the side frame assembly comprises symmetrically arranged transverse side frames, symmetrically arranged longitudinal side frames and a switch door; the inner side of the bottom of the transverse side frame is connected with the transverse underframe through a hinge; the inner side of the bottom of the longitudinal side frame is connected with the longitudinal underframe through a hinge; the switch doors are arranged on two sides of the transverse side frame and are connected with the transverse side frame through hinge pieces;
all be equipped with electric capstan on two horizontal chassis, electric capstan goes up the winding cable wire, the pier top is walked around to the cable wire, and electric capstan is connected at both ends.
As an improvement, the transverse side frames are wound with safety ropes, and the safety ropes are connected with the transverse side frames on the other side by bypassing the tops of the bridge piers.
As an improvement, reinforcing plates are paved on the transverse underframe and the longitudinal underframe, and the reinforcing plates are positioned below the steel wire mesh.
As an improvement, the switch door is connected with the outer side of the transverse side frame through a hinge.
As a refinement, the hinge comprises a hinge.
As an improvement, reinforcing beams are arranged on the transverse side frames and the longitudinal side frames.
As an improvement, the underframe assembly and the side frame assembly are both made of hollow square steel.
Compared with the prior art, the utility model the advantage lie in: the utility model automatically raises the height of the hanging basket through the matching of the electric capstan and the pier, is convenient for the construction of workers, and improves the operation efficiency; the hanging basket is provided with a safety rope to prevent the hanging basket from falling accidentally; lay the wire net on the chassis, trample when making things convenient for the workman to be under construction, increase the security.
Drawings
Fig. 1 is the utility model relates to a structural schematic diagram of full-automatic pier integrated construction hanging flower basket.
Fig. 2 is the utility model relates to a top view of full-automatic pier integrated construction hanging flower basket.
Fig. 3 is the utility model discloses a front view of full-automatic pier integrated construction hanging flower basket.
Fig. 4 is the utility model discloses a right side view of full-automatic pier integrated construction hanging flower basket.
Fig. 5 is a schematic view of the connection between the transverse bottom frame and the transverse side frame of the full-automatic pier integrated construction hanging basket of the utility model.
Fig. 6 is the utility model discloses a horizontal chassis structure sketch map of full-automatic pier integrated construction hanging flower basket.
Fig. 7 is a schematic structural view of a lateral side frame of the full-automatic pier integrated construction hanging basket of the utility model.
As shown in the figure: 1. the device comprises an underframe assembly, 2 a side frame assembly, 3 a transverse underframe, 4 a longitudinal underframe, 5 a reinforcing rod, 6 a steel wire mesh, 7 a transverse side frame, 8 a longitudinal side frame, 9 a switch door, 10 a hinge element, 11 an electric winch, 12 a steel cable, 13 a safety rope, 14 a reinforcing sheet, 15 and a reinforcing beam.
Detailed Description
The following combines the attached drawing to do further detailed description to the utility model relates to a full-automatic pier integrated construction hanging flower basket.
The present invention will be described in detail with reference to the accompanying drawings 1-7.
A full-automatic bridge pier integrated construction hanging basket comprises an underframe assembly 1 and a side frame assembly 2, wherein the underframe assembly 1 comprises transverse underframe 3 and longitudinal underframe 4 which are symmetrically arranged; the transverse underframe 3 and the longitudinal underframe 4 are connected to form a return frame; reinforcing rods 5 are arranged on the transverse underframe 3 and the longitudinal underframe 4, and steel wire meshes 6 are paved on the tops of the reinforcing rods;
the side frame assembly 2 comprises symmetrically arranged transverse side frames 7, symmetrically arranged longitudinal side frames 8 and an opening and closing door 9; the inner side of the bottom of the transverse side frame 7 is connected with the transverse underframe 3 through a hinge part 10; the inner side of the bottom of the longitudinal side frame 8 is connected with the longitudinal underframe 4 through a hinge part 10; the switch doors 9 are arranged at two sides of the transverse side frame 7 and are connected with the transverse side frame through hinge pieces 10;
all be equipped with electric capstan 11 on two horizontal chassis 3, electric capstan 11 goes up winding cable 12, and cable 12 walks around pier top, and electric capstan 11 is connected at both ends.
The utility model relates to a concrete implementation process of full-automatic pier integrated construction hanging flower basket as follows:
the bottom of the hanging basket is a square-shaped frame which is enclosed outside the pier, and the underframe assembly 1 is hinged with the side frame assembly 2 and is convenient to transport before installation; the transverse underframe 3, the longitudinal underframe 4, the transverse side frame 7 and the longitudinal side frame 8 are all formed by assembling and welding a plurality of frame bodies; the transverse underframe 3 and the longitudinal underframe 4 are respectively provided with a reinforcing rod 5, a reinforcing sheet 14 and a steel wire mesh 6, so that the reinforcement of the hanging basket is improved, and the treading and improving safety of workers during operation are facilitated; the two sides of the transverse side frame 7 are provided with switch doors 9, so that workers can conveniently get in and out; at least one group of electric winches 11 are arranged on the transverse underframe 3, steel cables 12 are wound on the electric winches 11, and the other sides of the steel cables 12 are connected with the electric winches 11 at the corresponding positions on the other sides after bypassing the tops of the piers through traction of an unmanned aerial vehicle; the automatic lifting of the hanging basket is realized through the electric winch 11, and the electric winch 11 is cut off and self-locked; safety ropes are bound on the transverse side frames 7, and the transverse side frames 7 on the other side are connected after the transverse side frames are pulled to bypass the tops of the piers by an unmanned aerial vehicle, so that the construction safety is further guaranteed. The underframe assembly 1 and the side frame assembly 2 are both made of hollow square steel, so that the frame is firm and durable, has light weight and is convenient to carry and weld. The device changes the size of the back-shaped frame according to the size of the pier in an integrated mode and adopts plug-in pin connection; the safe payload is 4 tons.
The present invention and its embodiments have been described above, but the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (7)
1. The utility model provides a full-automatic integrated construction hanging flower basket of pier which characterized in that: the frame comprises a base frame assembly (1) and a side frame assembly (2), wherein the base frame assembly (1) comprises a transverse base frame (3) and a longitudinal base frame (4), which are symmetrically arranged; the transverse underframe (3) and the longitudinal underframe (4) are connected to form a return frame; reinforcing rods (5) are arranged on the transverse underframe (3) and the longitudinal underframe (4), and steel wire meshes (6) are paved on the tops of the reinforcing rods;
the side frame assembly (2) comprises symmetrically arranged transverse side frames (7), symmetrically arranged longitudinal side frames (8) and an opening and closing door (9); the inner side of the bottom of the transverse side frame (7) is connected with the transverse underframe (3) through a hinge piece (10); the inner side of the bottom of the longitudinal side frame (8) is connected with the longitudinal underframe (4) through a hinge (10); the switch doors (9) are arranged on two sides of the transverse side frame (7) and are connected with the transverse side frame through hinge pieces (10);
all be equipped with electric capstan (11) on two horizontal chassis (3), electric capstan (11) are gone up winding cable wire (12), pier top is walked around in cable wire (12), and electric capstan (11) are connected at both ends.
2. The full-automatic bridge pier integrated construction hanging basket according to claim 1, characterized in that: safety ropes (13) are wound on the transverse side frames (7), and the safety ropes (13) are connected with the transverse side frames (7) on the other side by bypassing the tops of piers.
3. The full-automatic bridge pier integrated construction hanging basket according to claim 2, characterized in that: reinforcing plates (14) are paved on the transverse underframe (3) and the longitudinal underframe (4), and the reinforcing plates (14) are located below the steel wire meshes (6).
4. The full-automatic bridge pier integrated construction hanging basket according to claim 3, characterized in that: the switch door (9) is connected with the outer side of the transverse side frame (7) through a hinge piece (10).
5. The full-automatic bridge pier integrated construction hanging basket according to claim 4, characterized in that: the hinge (10) comprises a hinge.
6. The full-automatic bridge pier integrated construction hanging basket according to claim 5, characterized in that: and reinforcing beams (15) are arranged on the transverse side frames (7) and the longitudinal side frames (8).
7. The full-automatic pier integrated construction hanging basket according to any one of claims 1-6, characterized in that: the underframe assembly (1) and the side frame assembly (2) are both made of hollow square steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220153632.1U CN216838973U (en) | 2022-01-20 | 2022-01-20 | Full-automatic pier integrated construction hanging flower basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220153632.1U CN216838973U (en) | 2022-01-20 | 2022-01-20 | Full-automatic pier integrated construction hanging flower basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216838973U true CN216838973U (en) | 2022-06-28 |
Family
ID=82084202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220153632.1U Active CN216838973U (en) | 2022-01-20 | 2022-01-20 | Full-automatic pier integrated construction hanging flower basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216838973U (en) |
-
2022
- 2022-01-20 CN CN202220153632.1U patent/CN216838973U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110747736B (en) | Rigid skeleton integrated device integrated with lifting appliance and steel reinforcement cage lifting construction method | |
CN104192735B (en) | A kind of minor crane | |
CN208777998U (en) | A kind of multifunctional tunnel construction operation trolley | |
CN216838973U (en) | Full-automatic pier integrated construction hanging flower basket | |
CN210658368U (en) | Concrete pouring operation rack for underground continuous wall | |
CN216739582U (en) | Multifunctional auxiliary device for binding reinforcing steel bars of slide-resistant piles | |
CN214327029U (en) | Prefabricated grooved link plate hoist and mount transfer device of assembling | |
CN211255027U (en) | Large-piece equipment long-distance translation hoisting auxiliary device | |
CN210236924U (en) | Automatic multiplying power changing conversion device of swing arm tower crane | |
CN114412213A (en) | Protection device and method for steel structure roof installation | |
CN212025920U (en) | Beam transporting crane | |
CN211726908U (en) | Material stacking device | |
CN210260897U (en) | Hoisting device for prefabricated part | |
CN210127053U (en) | Concrete lifting device for building construction | |
CN203544828U (en) | Rain-leakage-preventing structure of open top container | |
CN2419248Y (en) | Horizontally moving isolated platform for steel beam maintaining vehicle | |
CN217730321U (en) | Unilateral column freight train waterproof cloth covers equipment | |
CN220317144U (en) | Stable protection device of crane and crane | |
CN211078293U (en) | High-altitude hoisting prefabricated part symmetrical equipment | |
CN214850102U (en) | Automatic high-altitude line-releasing pulley | |
CN219603079U (en) | Construction elevator installs auxiliary device and construction building | |
CN220538433U (en) | Bent cap stretch-draw operation platform | |
CN219860176U (en) | Generator wooden case hoisting clamping tool | |
CN211498497U (en) | Operation platform in hollow pier | |
CN211169608U (en) | Hanging basket prismatic sheet hoisting device |