CN216835041U - Draw gear is used in production of glass steel sand inclusion pipe - Google Patents

Draw gear is used in production of glass steel sand inclusion pipe Download PDF

Info

Publication number
CN216835041U
CN216835041U CN202123182151.8U CN202123182151U CN216835041U CN 216835041 U CN216835041 U CN 216835041U CN 202123182151 U CN202123182151 U CN 202123182151U CN 216835041 U CN216835041 U CN 216835041U
Authority
CN
China
Prior art keywords
traction
sand inclusion
fiber reinforced
glass fiber
reinforced plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123182151.8U
Other languages
Chinese (zh)
Inventor
董洪张
董洪友
李森
姜永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dahua New Material Group Co ltd
Original Assignee
Shandong Dahua New Material Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dahua New Material Group Co ltd filed Critical Shandong Dahua New Material Group Co ltd
Priority to CN202123182151.8U priority Critical patent/CN216835041U/en
Application granted granted Critical
Publication of CN216835041U publication Critical patent/CN216835041U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a traction device for producing a glass fiber reinforced plastic sand inclusion pipe, which belongs to the technical field of glass fiber reinforced plastic sand inclusion pipe production, and the technical proposal is characterized in that the traction device comprises a glass fiber reinforced plastic sand inclusion pipe, the left and right sides of the outer wall of the glass fiber reinforced plastic sand inclusion pipe are respectively provided with a traction fixing device and an auxiliary fixing device, the traction fixing device and the auxiliary fixing device both comprise fixing rings, the traction fixing device and the auxiliary fixing device are connected with external traction equipment through traction hooks, the traction hooks are connected with the fixing rings of the traction fixing device through a plurality of traction ropes, the bottoms of the traction fixing device and the auxiliary fixing device are both provided with idler wheels, the traction fixing device and the auxiliary fixing device are convenient to move in the traction process, the movement is more convenient, thereby the glass fiber reinforced plastic sand inclusion pipe is convenient to be dragged and carried, the time and labor are saved, the fixation is convenient, the traction work efficiency is effectively improved, the traction work of the glass fiber reinforced plastic sand inclusion pipe in the prior art is completed manually, the work efficiency is low, the labor intensity is high, and the overall production efficiency of the glass fiber reinforced plastic sand inclusion pipe is reduced.

Description

Draw gear is used in production of glass steel sand inclusion pipe
Technical Field
The utility model relates to a glass steel sand inclusion pipe production technical field, in particular to draw gear is used in glass steel sand inclusion pipe production.
Background
The glass fiber reinforced plastic sand inclusion pipe is a novel composite material prepared by taking resin as a base material, glass fiber and products thereof as reinforcing materials and quartz sand as a filling material. The sand pipe has the advantages of excellent corrosion resistance, excellent hydraulic characteristics, light weight, high strength, large conveying flow, convenient installation, short construction period, low comprehensive investment and the like, becomes the best choice for chemical industry, drainage engineering and pipeline engineering, and needs to be dragged and carried in the production process of the glass fiber reinforced plastic sand inclusion pipe.
In the prior art, the traction work of the glass fiber reinforced plastic sand inclusion pipe is manually completed, the work efficiency is low, the labor intensity is high, and the overall production efficiency of the glass fiber reinforced plastic sand inclusion pipe is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to above problem, provide a glass steel presss from both sides draw gear for sand pipe production and solve above-mentioned problem.
The utility model is realized in such a way, the traction device for producing the glass fiber reinforced plastic sand inclusion pipe comprises the glass fiber reinforced plastic sand inclusion pipe, the left and right sides of the outer wall of the glass fiber reinforced plastic sand inclusion pipe are respectively provided with a traction fixing device and an auxiliary fixing device, the traction fixing device and the auxiliary fixing device both comprise fixing rings, the left and right sides of the top part of the outer wall of the fixing ring are respectively provided with air cylinders, the output ends of the two air cylinders all penetrate through the outer wall of the fixing ring and extend to the inner side of the fixing ring, the output ends of the two air cylinders are respectively fixedly connected with a clamping block, the lower end surface of the fixing ring is fixedly connected with a stand column, the lower end surface of the stand column is fixedly connected with a bottom plate, the lower end surface of the bottom plate is provided with a plurality of rollers, the outer wall of the fixing ring of the traction fixing device is fixedly connected with a plurality of connectors which are uniformly distributed, and the outer walls of the connectors are respectively fixedly connected with traction ropes, the other ends of the plurality of traction ropes are converged at one point and fixedly connected with a fixed block, and the outer wall of the fixed block is fixedly connected with a traction hook.
In order to support glass steel sand inclusion pipe from the bottom, as the utility model discloses a glass steel sand inclusion pipe production is with preferably draw gear, the collet of two symmetric distributions of solid fixed ring's inboard bottom fixedly connected with.
Grip when supplementary removal of workman and drawing, conduct the utility model discloses a glass steel presss from both sides sand pipe production with draw gear preferred, two connecting rods of the equal fixedly connected with in both ends around solid fixed ring's the outer wall, two the connecting rod is kept away from solid fixed ring's the equal fixedly connected with handle of one end.
In order to improve haulage rope intensity, conduct the utility model discloses a glass steel presss from both sides sand production with draw gear preferred, the haulage rope is wire rope.
In order to make the bottom plate more stable, as the utility model discloses a glass steel sandpipe production is with draw gear preferred, the gyro wheel of bottom plate bottom is provided with four and is located the lower terminal surface four corners department of bottom plate respectively.
In order to with glass steel sand inclusion pipe adaptation more, conduct the utility model discloses a glass steel sand inclusion pipe production is with draw gear preferred, the grip block inboard is the arc structure.
In order to avoid damaging glass steel sand inclusion pipe outer wall, conduct the utility model discloses a glass steel sand inclusion pipe production is with draw gear preferred, the collet is the hard rubber material.
Compared with the prior art, the beneficial effects of the utility model are that:
when the traction is carried out, the traction fixing device and the auxiliary fixing device are respectively sleeved on the outer walls of the left end and the right end of the glass fiber reinforced plastic sand inclusion pipe, specifically, one end of the glass fiber reinforced plastic sand inclusion pipe is sleeved on the inner side of the fixing ring, the bottom of the glass fiber reinforced plastic sand inclusion pipe is supported by the two bottom supports, then the two cylinders are started to drive the clamping block to move towards the center, so that the glass fiber reinforced plastic sand inclusion pipe is clamped and fixed from the outer wall of the glass fiber reinforced plastic sand inclusion pipe, the glass fiber reinforced plastic sand inclusion pipe is firmly fixed with the fixing ring, the clamping block can be flexibly adjusted according to the diameter of the glass fiber reinforced plastic sand inclusion pipe, and can adapt to pipelines with different specifications, after the traction fixing device and the auxiliary fixing device are sleeved according to the same method, the traction hook is connected with external traction equipment, the traction hook is connected with the fixing ring of the traction fixing device through a plurality of traction ropes, rollers are arranged at the bottoms of the traction fixing device and the auxiliary fixing device, so that the rollers are convenient to move in the traction process, it is more convenient to remove to conveniently pull transport glass steel sand inclusion pipe, labour saving and time saving and fixed convenient effectively improve and pull work efficiency.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the first retaining ring of the present invention;
FIG. 3 is a side view of the second retainer ring of the present invention;
in the figure, 1, a glass fiber reinforced plastic sand inclusion pipe; 2. a traction fixing device; 3. an auxiliary fixing device; 4. a cylinder; 5. a clamping block; 6. a column; 7. a base plate; 8. a roller; 9. a connector; 10. a hauling rope; 11. a fixed block; 12. a towing hook; 13. a bottom support; 14. a connecting rod; 15. a handle; 16. and (4) fixing the ring.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention. In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1-3, a traction device for producing a glass fiber reinforced plastic sand inclusion pipe comprises a glass fiber reinforced plastic sand inclusion pipe 1, wherein a traction fixing device 2 and an auxiliary fixing device 3 are respectively installed on the left side and the right side of the outer wall of the glass fiber reinforced plastic sand inclusion pipe 1, the traction fixing device 2 and the auxiliary fixing device 3 both comprise a fixing ring 16, air cylinders 4 are respectively installed on the left side and the right side of the top of the outer wall of the fixing ring 16, the output ends of the two air cylinders 4 penetrate through the outer wall of the fixing ring 16 and extend to the inner side of the fixing ring 16, the output ends of the two air cylinders 4 are respectively and fixedly connected with a clamping block 5, the lower end face of the fixing ring 16 is fixedly connected with an upright post 6, the lower end face of the upright post 6 is fixedly connected with a bottom plate 7, a plurality of rollers 8 are installed on the lower end face of the bottom plate 7, the outer wall of the fixing ring 16 of the traction fixing device 2 is fixedly connected with a plurality of connectors 9 which are uniformly distributed, and the outer walls of the plurality of connectors 9 are respectively and fixedly connected with traction ropes 10, the other ends of the plurality of hauling ropes 10 are converged at one point and fixedly connected with a fixing block 11, and the outer wall of the fixing block 11 is fixedly connected with a hauling hook 12.
In this embodiment: when the traction work is carried out, the traction fixing device 2 and the auxiliary fixing device 3 are respectively sleeved on the outer walls of the left end and the right end of the glass fiber reinforced plastic sand inclusion pipe 1, specifically, one end of the glass fiber reinforced plastic sand inclusion pipe 1 is sleeved on the inner side of the fixing ring 16, the bottom of the glass fiber reinforced plastic sand inclusion pipe is supported by the two bottom supports 13, then the two cylinders 4 are started to drive the clamping block 5 to move towards the center, so that the glass fiber reinforced plastic sand inclusion pipe 1 is clamped and fixed from the outer wall of the glass fiber reinforced plastic sand inclusion pipe 1, the glass fiber reinforced plastic sand inclusion pipe 1 and the fixing ring 16 are firmly fixed, the clamping block 5 can be flexibly adjusted according to the diameter of the glass fiber reinforced plastic sand inclusion pipe 1, and therefore the traction fixing device can adapt to pipelines with different specifications, after the traction fixing device 2 and the auxiliary fixing device 3 are sleeved by the same method, the traction hook 12 is connected with external traction equipment, the traction hook 12 is connected with the fixing ring 16 of the traction fixing device 2 through a plurality of traction ropes 10, the bottom of the traction fixing device 2 and the auxiliary fixing device 3 are both provided with rollers 8, be convenient for remove at the in-process that pulls, it is more convenient to remove to conveniently pull transport glass steel sand inclusion pipe 1, labour saving and time saving and fixed convenient effectively improve and pull work efficiency.
As a technical optimization scheme of the utility model, the collet 13 of two symmetric distributions of the inboard bottom fixedly connected with of solid fixed ring 16.
In this embodiment: two collet 13 support fixedly from the bottom to glass steel sand inclusion pipe 1, improve the fixed effect to glass steel sand inclusion pipe 1.
As a technical optimization scheme of the utility model, two connecting rods 14 of the equal fixedly connected with in both ends around the outer wall of solid fixed ring 16, the equal fixedly connected with handle 15 of one end of solid fixed ring 16 is kept away from to two connecting rods 14.
In this embodiment: the connecting rod 14 is used for connecting a fixed handle 15, and the handle 15 is convenient for workers to hold in a traction process in an auxiliary mode, so that the fixing and traction work is facilitated.
As a technical optimization scheme of the present invention, the hauling cable 10 is a steel cable.
In this embodiment: the hauling rope 10 is a steel wire rope, the structural strength is high, and the hauling rope 10 is prevented from being broken in the hauling process.
As a technical optimization scheme of the utility model, gyro wheel 8 of bottom plate 7 bottom is provided with four and is located bottom plate 7's lower terminal surface four corners department respectively.
In this embodiment: the gyro wheel 8 is provided with four and is located bottom plate 7's lower terminal surface four corners department respectively to firm supporting baseplate 7 more improves the holistic stability of equipment.
As a technical optimization scheme of the utility model, 5 inboards of grip block are the arc structure.
In this embodiment: 5 inboards of grip block are the arc structure, with 1 outer wall adaptation more of columniform glass steel sand inclusion pipe to be convenient for fix.
As a technical optimization scheme of the utility model, collet 13 is the hard rubber material.
In this embodiment: collet 13 is the hard rubber material, avoids collet 13 to harm the outer wall, and improves and the glass steel presss from both sides the frictional force between the sand pipe 1.
The utility model discloses a theory of operation and use flow: when the traction work is carried out, the traction fixing device 2 and the auxiliary fixing device 3 are respectively sleeved on the outer walls of the left end and the right end of the glass fiber reinforced plastic sand inclusion pipe 1, specifically, one end of the glass fiber reinforced plastic sand inclusion pipe 1 is sleeved on the inner side of the fixing ring 16, the bottom of the glass fiber reinforced plastic sand inclusion pipe is supported by the two bottom supports 13, then the two cylinders 4 are started to drive the clamping block 5 to move towards the center, so that the glass fiber reinforced plastic sand inclusion pipe 1 is clamped and fixed from the outer wall of the glass fiber reinforced plastic sand inclusion pipe 1, the glass fiber reinforced plastic sand inclusion pipe 1 and the fixing ring 16 are firmly fixed, the clamping block 5 can be flexibly adjusted according to the diameter of the glass fiber reinforced plastic sand inclusion pipe 1, and therefore the traction fixing device can adapt to pipelines with different specifications, after the traction fixing device 2 and the auxiliary fixing device 3 are sleeved by the same method, the traction hook 12 is connected with external traction equipment, the traction hook 12 is connected with the fixing ring 16 of the traction fixing device 2 through a plurality of traction ropes 10, the bottom of the traction fixing device 2 and the auxiliary fixing device 3 are both provided with rollers 8, be convenient for remove at the in-process that pulls, it is more convenient to remove to conveniently pull transport glass steel sand inclusion pipe 1, labour saving and time saving and fixed convenient effectively improve and pull work efficiency.
The above description is only exemplary of the present invention and should not be construed as limiting the present invention, and any modifications, equivalents and improvements made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (7)

1. The utility model provides a draw gear is used in production of glass steel sand inclusion pipe, includes glass steel sand inclusion pipe (1), its characterized in that: the glass fiber reinforced plastic sand inclusion pipe comprises a glass fiber reinforced plastic sand inclusion pipe body (1), wherein a traction fixing device (2) and an auxiliary fixing device (3) are respectively installed on the left side and the right side of the outer wall of the glass fiber reinforced plastic sand inclusion pipe body (1), the traction fixing device (2) and the auxiliary fixing device (3) respectively comprise a fixing ring (16), air cylinders (4) are respectively installed on the left side and the right side of the top of the outer wall of the fixing ring (16), the output ends of the two air cylinders (4) penetrate through the outer wall of the fixing ring (16) and extend to the inner side of the fixing ring (16), the output ends of the two air cylinders (4) are respectively and fixedly connected with a clamping block (5), the lower end face of the fixing ring (16) is fixedly connected with an upright post (6), the lower end face of the upright post (6) is fixedly connected with a bottom plate (7), a plurality of idler wheels (8) are installed on the lower end face of the bottom plate (7), the outer wall of the fixing ring (16) of the traction fixing device (2) is fixedly connected with a plurality of connectors (9) which are uniformly distributed, a plurality of the equal fixedly connected with haulage rope (10) of outer wall of connector (9), it is a plurality of the other end of haulage rope (10) assembles in a bit and fixedly connected with fixed block (11), the outer wall fixedly connected with of fixed block (11) pulls hook (12).
2. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe according to claim 1, is characterized in that: the bottom of the inner side of the fixing ring (16) is fixedly connected with two symmetrically distributed bottom supports (13).
3. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe according to claim 1, is characterized in that: two connecting rods (14) and two connecting rods (14) are fixedly connected to the front end and the rear end of the outer wall of the fixing ring (16), and the connecting rods (14) are fixedly connected with handles (15) far away from the fixing ring (16).
4. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe according to claim 1, is characterized in that: the hauling cable (10) is a steel wire rope.
5. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe according to claim 1, is characterized in that: the four rollers (8) at the bottom of the bottom plate (7) are arranged at the four corners of the lower end face of the bottom plate (7) respectively.
6. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe as claimed in claim 1, wherein: the inner side of the clamping block (5) is of an arc-shaped structure.
7. The traction device for producing the glass fiber reinforced plastic sand inclusion pipe as claimed in claim 2, wherein: the bottom support (13) is made of hard rubber.
CN202123182151.8U 2021-12-17 2021-12-17 Draw gear is used in production of glass steel sand inclusion pipe Active CN216835041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123182151.8U CN216835041U (en) 2021-12-17 2021-12-17 Draw gear is used in production of glass steel sand inclusion pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123182151.8U CN216835041U (en) 2021-12-17 2021-12-17 Draw gear is used in production of glass steel sand inclusion pipe

Publications (1)

Publication Number Publication Date
CN216835041U true CN216835041U (en) 2022-06-28

Family

ID=82107458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123182151.8U Active CN216835041U (en) 2021-12-17 2021-12-17 Draw gear is used in production of glass steel sand inclusion pipe

Country Status (1)

Country Link
CN (1) CN216835041U (en)

Similar Documents

Publication Publication Date Title
CN216835041U (en) Draw gear is used in production of glass steel sand inclusion pipe
CN212609237U (en) Dismounting and moving device for large valve
CN209954054U (en) Auxiliary transfer device for steel pipe welding machine tool
CN214383393U (en) Pole transfer car (buggy)
CN113147863B (en) Electric pole conveyer for electric power construction
CN211442368U (en) Steel travelling bogie
CN218907257U (en) Dual-purpose tool bogie suitable for road engineering curb installation
CN2222048Y (en) Stripping device for sand-adding pipe
CN214935852U (en) Scale formula jack-up handling instrument
CN215553366U (en) Multifunctional reinforcing steel bar transferring tool
CN217917949U (en) Pipeline transportation device
CN210365965U (en) Large-scale fragment of brick transfer device
CN220926048U (en) Concrete finished product transfer device
CN215663462U (en) Simple tool for lifting and transporting heavy object in longer distance
CN219429473U (en) Building tower crane steel bar clamp
CN209956029U (en) Light asphalt barrel transfer tool
CN212668969U (en) Hoisting device
CN220594907U (en) Pump pipe transfer trolley
CN220485160U (en) Lifting hanger device
CN220467285U (en) Portable lifting appliance suitable for reinforced concrete steel bellmouth pipe
CN212556301U (en) Novel stone material hoist and mount carrier
CN216105606U (en) Quick curb stone loader
CN220204915U (en) Pipeline hanger for building construction
CN218431337U (en) Pipeline carrier
CN219636729U (en) Electric pole lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant