CN216791197U - Electric power engineering cost construction check out test set - Google Patents

Electric power engineering cost construction check out test set Download PDF

Info

Publication number
CN216791197U
CN216791197U CN202123257026.9U CN202123257026U CN216791197U CN 216791197 U CN216791197 U CN 216791197U CN 202123257026 U CN202123257026 U CN 202123257026U CN 216791197 U CN216791197 U CN 216791197U
Authority
CN
China
Prior art keywords
fixedly connected
electric power
power engineering
platform
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123257026.9U
Other languages
Chinese (zh)
Inventor
朱炳泉
吴志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123257026.9U priority Critical patent/CN216791197U/en
Application granted granted Critical
Publication of CN216791197U publication Critical patent/CN216791197U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction detection device for construction cost of electric power engineering, which comprises a mobile detection platform, wherein the middle part of the upper side of the mobile detection platform is fixedly connected with a lifting component, leveling components are arranged at four corners of the mobile detection platform, the end part of the lifting component is connected with a rotating platform, the upper side of the rotating platform is fixedly connected with a bubble level meter, and the middle part of the rotating platform is provided with a sliding chute in a penetrating way. The second bolt is unscrewed, the horizontal graduated scale can be pulled out for a certain distance, and the coverage range can be enlarged.

Description

Electric power engineering cost construction check out test set
Technical Field
The utility model relates to the technical field of electric power engineering, in particular to construction detection equipment for electric power engineering cost.
Background
The electric power engineering, namely the engineering related to the production, transmission and distribution of electric energy, also comprises the engineering applying electricity as power and energy in various fields in a broad sense, and can understand the transmission and transformation power business expansion engineering, and the engineering construction is a special subject for accounting the collection and accounting of the engineering cost of a building installation enterprise, and is the activity of newly building, expanding and reconstructing the construction engineering according to the requirements of a construction engineering design file;
when the construction quality of the electric power engineering cost is detected, the flatness of the ground needs to be detected, the traditional detection method needs an engineer to hold a measuring ruler to detect at multiple points on the ground, but the detection method is low in detection precision and large in limitation, and the engineer needs to frequently squat down to operate and consumes physical power, so that the construction detection equipment for the electric power engineering cost is provided.
SUMMERY OF THE UTILITY MODEL
The utility model provides construction detection equipment for construction cost of electric power engineering, which solves the technical problems that the traditional detection method needs engineers to hold a measuring ruler to detect at multiple points on the ground, but the detection method has low detection precision and large limitation, and the engineers need to frequently squat down to operate and consume physical power.
In order to solve the technical problem, the construction detection equipment for the construction cost of the electric power engineering comprises a movable detection table, wherein a lifting assembly is fixedly connected to the middle of the upper side of the movable detection table, leveling assemblies are mounted at four corners of the movable detection table, the end portion of the lifting assembly is connected with a rotating table, a bubble level meter is fixedly connected to the upper side of the rotating table, a sliding groove penetrates through the middle of the rotating table, a horizontal graduated scale is embedded in the sliding groove in a sliding mode, a sliding sleeve is fixedly connected to the end portion of the horizontal graduated scale, and a longitudinal graduated scale is vertically inserted in the sliding sleeve.
Preferably, a first thread groove is formed in one side of the rotating platform, a first bolt is connected to the first thread groove in an internal thread mode, a connecting rod is fixedly connected to the lower side of the rotating platform, and a limiting circular plate is fixedly connected to the bottom end of the connecting rod.
Preferably, the cross section of the sliding chute is in a concave structural design, a second thread groove is formed in the upper side of one end of the sliding chute, a second bolt is connected to the second thread groove in an internal thread mode, and a first scale mark is arranged on the back face of the sliding chute.
Preferably, one side of the horizontal graduated scale is provided with a second graduated line, and one side of the longitudinal graduated scale is provided with a third graduated line.
Preferably, the lifting assembly comprises a sleeve, the sleeve is fixedly connected to the mobile detection table, a lifting column is slidably embedded in the upper side of the sleeve, a first handle is rotatably embedded in one side of the bottom end of the sleeve, a first bevel gear is fixedly connected to the inner end of the first handle, a second bevel gear is meshed with the first bevel gear, a lead screw is fixedly connected to the middle of the second bevel gear, the bottom end of the lead screw is rotatably connected to the bottom wall of the sleeve, an inner thread groove is formed in the lower side of the lifting column, the top end of the lead screw is in threaded connection with the inner thread groove, and the top end of the lifting column is rotatably connected with a limiting circular plate.
Preferably, the leveling subassembly includes the threaded rod, threaded rod threaded connection is in the corner of removal detection platform, the top fixedly connected with second handle of threaded rod, the bottom of threaded rod is rotated and is connected with the universal wheel, just install the wheel on the universal wheel and stop.
Compared with the related technology, the electric power engineering cost construction detection equipment provided by the utility model has the following beneficial effects: the utility model provides electric power engineering cost construction detection equipment, which can help a mobile detection table to be quickly leveled through the arrangement of a leveling component and a bubble level meter, can enable constructors to reasonably adjust the height of a rotary table according to self heights through the arrangement of a lifting component, does not need to bend down to observe whether the ground is horizontal, can extract a certain distance from a sliding groove through the arrangement of the sliding groove and a horizontal graduated scale by unscrewing a first bolt and unscrewing a second bolt, can extract a certain distance from the horizontal graduated scale, can expand the coverage range, enables the constructors to observe the position scale of the intersection point of a longitudinal graduated scale and a sliding sleeve to obtain the contour data of the ground height, and can obtain the integral leveling data of the ground by comparing the contour data of a plurality of positions, and is accurate in data and convenient to operate.
Drawings
FIG. 1 is an external view of an electric power engineering cost construction inspection apparatus according to the present invention;
FIG. 2 is a cross-sectional view of an electric power engineering cost construction inspection apparatus of the present invention;
FIG. 3 is an enlarged view of a structure at A in FIG. 2 of the construction cost detection apparatus for electric power engineering of the present invention;
fig. 4 is an enlarged view of a structure at B in fig. 2 of the construction cost detection apparatus for electric power engineering of the present invention.
Reference numbers in the figures: 1. moving the detection table; 2. a lifting assembly; 201. a sleeve; 202. a lifting column; 203. a first handle; 204. a first bevel gear; 205. a second bevel gear; 206. a screw rod; 207. an internal thread groove; 3. a leveling assembly; 301. a threaded rod; 302. a second handle; 303. a universal wheel; 4. a rotating table; 401. a first thread groove; 402. a first bolt; 403. a connecting rod; 404. a limiting circular plate; 5. a bubble level; 6. a chute; 601. a second thread groove; 602. a second bolt; 603. a first scale mark; 7. a horizontal scale; 701. a sliding sleeve; 702. a second scale mark; 8. a longitudinal scale; 801. and a third scale line.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments; all other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment is shown in fig. 1-4, and the construction detection equipment for the electric power engineering cost comprises a mobile detection platform 1, wherein a lifting component 2 is fixedly connected to the middle of the upper side of the mobile detection platform 1, leveling components 3 are respectively installed at four corners of the mobile detection platform 1, the end of the lifting component 2 is connected with a rotating platform 4, a bubble level 5 is fixedly connected to the upper side of the rotating platform 4, a sliding chute 6 is arranged in the middle of the rotating platform 4 in a penetrating manner, a horizontal graduated scale 7 is embedded in the sliding chute 6 in a sliding manner, a sliding sleeve 701 is fixedly connected to the end of the horizontal graduated scale 7, a longitudinal graduated scale 8 is vertically inserted in the sliding sleeve 701, after the mobile detection platform 1 is leveled, the longitudinal graduated scale 8 is abutted to the upper side of a point to be detected, and thus the graduation of the intersection point position of a third graduated line 801 and the sliding sleeve 701 can be directly observed and recorded, in a similar way, the height can be measured at any point in a certain area, so that the height information is matched with the ground coordinate information, the overall leveling data of the ground can be obtained, the data is accurate, and the operation is convenient.
Wherein, a first thread groove 401 has been seted up to one side of revolving stage 4, first thread groove 401 female connection has first bolt 402, just the downside fixedly connected with connecting rod 403 of revolving stage 4, the spacing plectane 404 of bottom fixedly connected with of connecting rod 403 unscrews first bolt 402, can take out certain distance with spout 6, and revolving stage 4 is rotatable, can form the scope of circular shape coverage, can carry out the height detection to the arbitrary point in this coverage.
Wherein, the cross-section of spout 6 is "concave" font structural design, second thread groove 601 has been seted up to the one end upside of spout 6, second thread groove 601 internal thread connection has second bolt 602, just the back of spout 6 is provided with first scale mark 603, unscrews second bolt 602, can take out certain distance with horizontal scale 7, can change the detection position, screws up second bolt 602, can restrict horizontal scale 7's the length that stretches out.
Wherein, one side of the horizontal graduated scale 7 is provided with a second graduated line 702, one side of the longitudinal graduated scale 8 is provided with a third graduated line 801, and the lengths of the staggered positions of the second graduated line 702 and the third graduated line 801 are added to obtain the total length of extension, thereby being convenient for detection and recording.
The lifting assembly 2 comprises a sleeve 201, the sleeve 201 is fixedly connected to the mobile detection table 1, a lifting column 202 is slidably embedded in the upper side of the sleeve 201, a first handle 203 is rotatably embedded in one side of the bottom end of the sleeve 201, a first bevel gear 204 is fixedly connected to the inner end of the first handle 203, a second bevel gear 205 is meshed with the first bevel gear 204, a lead screw 206 is fixedly connected to the middle of the second bevel gear 205, the bottom end of the lead screw 206 is rotatably connected to the bottom wall of the sleeve 201, an inner thread groove 207 is formed in the lower side of the lifting column 202, the top end of the lead screw 206 is in threaded connection with the inner thread groove 207, and the top end of the lifting column 202 is rotatably connected with a limiting circular plate 404.
Wherein, leveling subassembly 3 includes threaded rod 301, threaded rod 301 threaded connection is in the corner of mobile test platform 1, threaded rod 301's top fixedly connected with second handle 302, threaded rod 301's bottom is rotated and is connected with universal wheel 303, just install the wheel on the universal wheel 303 and stop, and the setting of universal wheel 303 can conveniently remove and detect the removal of platform 1, revolves wrong different second handle 302, can adjust the mobile test platform 1 to the level.
The working principle is as follows: firstly, moving the mobile detection platform 1 to the vicinity of an area to be detected, rotating the second handle 302, driving the threaded rod 301 to rotate by the second handle 302, adjusting the extension length of the threaded rod 301, further adjusting the levelness of the mobile detection platform 1, judging whether the mobile detection platform 1 is horizontal according to whether the bubble level meter 5 is centered, locking a wheel brake of the universal wheel 303 after leveling is finished, positioning the mobile detection platform 1, then rotating the first handle 203, driving the first bevel gear 204 to rotate by the first handle 203, driving the first bevel gear 204 to be meshed with the second bevel gear 205 to rotate, driving the screw rod 206 to rotate by the second bevel gear 205, driving the lifting column 202 to linearly ascend by the screw rod 206 through threads, enabling constructors to reasonably adjust the height of the rotating platform 4 according to the self height, then unscrewing the first bolt 402, extracting the chute 6 for a certain distance, unscrewing the second bolt 602, extracting the horizontal scale 7 for a certain distance, can enlarge coverage, the handheld vertical scale 8 of constructor removes to waiting to detect the point after, supports vertical scale 8 and waits to detect a point upside, like this the point position scale of nodical of direct observation record third scale mark 801 and sliding sleeve 701 can, like this, can be to arbitrary point measurement height in the certain region, with height information cooperation ground coordinate information like this, then can obtain the whole smooth data on ground, data accuracy, the simple operation.

Claims (6)

1. The utility model provides an electric power engineering cost construction check out test set, includes that the removal detects platform (1), its characterized in that, the upside middle part fixedly connected with lifting unit (2) of platform (1) is detected in the removal, the four corners department that the removal detected platform (1) all installs leveling subassembly (3), wherein, the end connection of lifting unit (2) has revolving stage (4), upside fixedly connected with bubble spirit level (5) of revolving stage (4), the middle part of revolving stage (4) is run through and is provided with spout (6), it is equipped with horizontal scale (7) to slide to inlay in spout (6), the tip fixedly connected with sliding sleeve (701) of horizontal scale (7), vertical inserting is equipped with vertical scale (8) in sliding sleeve (701).
2. The electric power engineering cost construction detection equipment according to claim 1, wherein a first thread groove (401) is formed in one side of the rotating platform (4), a first bolt (402) is connected to the first thread groove (401) in a threaded manner, a connecting rod (403) is fixedly connected to the lower side of the rotating platform (4), and a limiting circular plate (404) is fixedly connected to the bottom end of the connecting rod (403).
3. The electric power engineering cost construction detection device according to claim 1, wherein the cross section of the sliding chute (6) is designed in a concave structure, a second thread groove (601) is formed in the upper side of one end of the sliding chute (6), a second bolt (602) is connected to the second thread groove (601) in an internal thread mode, and a first scale mark (603) is arranged on the back face of the sliding chute (6).
4. An electric power engineering cost construction detection device according to claim 1, characterized in that one side of the horizontal scale (7) is provided with a second scale mark (702), and one side of the longitudinal scale (8) is provided with a third scale mark (801).
5. The electric power engineering construction cost detection device according to claim 1, wherein the lifting assembly (2) comprises a sleeve (201), the sleeve (201) is fixedly connected to the movable detection platform (1), a lifting column (202) is slidably embedded on the upper side of the sleeve (201), a first handle (203) is rotatably embedded on one side of the bottom end of the sleeve (201), a first bevel gear (204) is fixedly connected to the inner end of the first handle (203), a second bevel gear (205) is engaged and connected to the first bevel gear (204), a lead screw (206) is fixedly connected to the middle of the second bevel gear (205), the bottom end of the lead screw (206) is rotatably connected to the bottom wall of the sleeve (201), an inner thread groove (207) is arranged on the lower side of the lifting column (202), and the top end of the lead screw (206) is in threaded connection with the inner thread groove (207), and the top end of the lifting column (202) is rotationally connected with a limiting circular plate (404).
6. The electric power engineering cost construction detection equipment of claim 1, wherein the leveling component (3) comprises a threaded rod (301), the threaded rod (301) is in threaded connection with a corner of the mobile detection platform (1), a second handle (302) is fixedly connected to the top end of the threaded rod (301), a universal wheel (303) is rotatably connected to the bottom end of the threaded rod (301), and a wheel brake is installed on the universal wheel (303).
CN202123257026.9U 2021-12-22 2021-12-22 Electric power engineering cost construction check out test set Active CN216791197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123257026.9U CN216791197U (en) 2021-12-22 2021-12-22 Electric power engineering cost construction check out test set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123257026.9U CN216791197U (en) 2021-12-22 2021-12-22 Electric power engineering cost construction check out test set

Publications (1)

Publication Number Publication Date
CN216791197U true CN216791197U (en) 2022-06-21

Family

ID=82009034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123257026.9U Active CN216791197U (en) 2021-12-22 2021-12-22 Electric power engineering cost construction check out test set

Country Status (1)

Country Link
CN (1) CN216791197U (en)

Similar Documents

Publication Publication Date Title
CN201622036U (en) Inspection tool for detecting comprehensive true position of shell
CN205228375U (en) Experimental lining deformation monitoring devices of tunnel model
CN209147885U (en) Height measurement device in a kind of container
CN216791197U (en) Electric power engineering cost construction check out test set
CN204988096U (en) Mould slip rotation measurement device
CN207395649U (en) A kind of bearing ring height detecting device
CN107726955B (en) Multifunctional altimeter measuring head
CN104713458A (en) Countersunk head angle gauge for counterbore and measurement method of countersunk head angle gauge
CN202494422U (en) Silica gel flatness detection tool for LED display screen module
CN208476126U (en) Multi-coordinate measuring scale
CN103499259A (en) 360-degree conductive pole mounting plate positioning ruler and positioning method
CN207423039U (en) A kind of subframe hole position gauge
CN206756061U (en) A kind of adjustable tile thickness measuring instrument
CN215888355U (en) Device for monitoring vertical displacement of earth surface around deep foundation pit
CN204902746U (en) A detect auxiliary device that is used for a bolt word groove symmetry
CN201535661U (en) Special gauge for gauging engine cylinder hole perpendicularity
CN203231728U (en) Multidirectional right angle rapid measuring device
CN209512754U (en) A kind of construction account turns ruler with right angle
CN204043568U (en) Cotton leaf dip stick
CN203605885U (en) Crankcase comprehensive test tool
CN207751421U (en) A kind of polymer cement waterproof paint measurer for thickness
CN203811172U (en) Building perpendicularity tester
CN203881237U (en) Pitch diameter measuring device for large-size thread ring gage
CN207556465U (en) A kind of yoke detection instrument
CN203405147U (en) Measuring tool specially used for detecting stand hole of iron seat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant