CN216787141U - 一种斜向钢混组合支撑桩 - Google Patents
一种斜向钢混组合支撑桩 Download PDFInfo
- Publication number
- CN216787141U CN216787141U CN202122536970.1U CN202122536970U CN216787141U CN 216787141 U CN216787141 U CN 216787141U CN 202122536970 U CN202122536970 U CN 202122536970U CN 216787141 U CN216787141 U CN 216787141U
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- concrete combined
- concrete
- combined supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 239000011178 precast concrete Substances 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 12
- 238000003466 welding Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 9
- 238000009412 basement excavation Methods 0.000 abstract description 6
- 238000003825 pressing Methods 0.000 abstract description 5
- 230000006835 compression Effects 0.000 abstract description 2
- 238000007906 compression Methods 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 239000011150 reinforced concrete Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122536970.1U CN216787141U (zh) | 2021-10-21 | 2021-10-21 | 一种斜向钢混组合支撑桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122536970.1U CN216787141U (zh) | 2021-10-21 | 2021-10-21 | 一种斜向钢混组合支撑桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216787141U true CN216787141U (zh) | 2022-06-21 |
Family
ID=81998851
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122536970.1U Active CN216787141U (zh) | 2021-10-21 | 2021-10-21 | 一种斜向钢混组合支撑桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216787141U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045293A (zh) * | 2022-06-29 | 2022-09-13 | 浙江大学 | 一种深基坑竖向斜撑结构及其施工方法 |
-
2021
- 2021-10-21 CN CN202122536970.1U patent/CN216787141U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045293A (zh) * | 2022-06-29 | 2022-09-13 | 浙江大学 | 一种深基坑竖向斜撑结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612110B (zh) | 一种地铁车站深基坑复合式支护施工方法 | |
CN201843129U (zh) | 带肋混凝土复合桩芯管 | |
CN203879506U (zh) | 一种岩质地层大断面深竖井的支护结构体系 | |
CN216787141U (zh) | 一种斜向钢混组合支撑桩 | |
CN102535458A (zh) | 一种加筋水泥土锚杆及其施工方法 | |
CN111636417A (zh) | 一种注浆型钢管桩及其施工方法 | |
CN104632250A (zh) | 圆形基坑倒挂管片装配式衬砌结构及其施工方法 | |
CN216041201U (zh) | 一种先撑后挖双层斜向支撑基坑围护体系 | |
CN111997669A (zh) | 一种双曲面穹顶地下罐室的支护体系及其施工方法 | |
CN116988838A (zh) | 一种超高压地下储气洞室环形隧洞式布置结构及施工方法 | |
CN110528532A (zh) | 一种预制拼装式钢砼组合支撑桩及其施工方法 | |
CN212270943U (zh) | 一种预制拼装式钢砼组合支撑桩 | |
CN204941551U (zh) | 一种曲线顶管支护结构扩建盾构施工的地铁车站 | |
CN111560951A (zh) | 一种载体劲性复合桩及施工方法 | |
CN201857608U (zh) | 合成桩 | |
CN216713040U (zh) | 一种全预制墩式门架斜向支撑桩结构体系 | |
CN110725309A (zh) | 处理基桩顶部缩颈问题的护筒结构及施工方法 | |
CN112879010B (zh) | 一种市政工程的地基施工方法 | |
CN102235003B (zh) | 预制混凝土管桩用扩张型钢桩尖及沉桩施工方法 | |
CN204199279U (zh) | 预制钢筋混凝土锚杆 | |
CN201162229Y (zh) | 抗浮地坑结构 | |
CN211312546U (zh) | 一种开槽护壁使用的环形工字钢结构 | |
CN113756333A (zh) | 一种全预制k型围护结构体系及其施工方法 | |
CN201896321U (zh) | 应用于地下变电站的逆作法施工装置 | |
CN205259175U (zh) | 一种下部扩大直径段复合基桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231109 Address after: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018 Patentee after: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd. Address before: 201806 room j404, 3 / F, No. 5358, Huyi Road, Jiading District, Shanghai Patentee before: Chengdi Construction Group Co.,Ltd. Patentee before: Shanghai chengdixiangjiang Data Technology Co.,Ltd. Patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240201 Address after: 201306 floor 2, No. 979, Yunhan Road, Lingang xinpian District, Pudong New Area, Shanghai Patentee after: Shanghai Teyu Technology Co.,Ltd. Country or region after: China Address before: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018 Patentee before: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd. Country or region before: China |