CN216787141U - 一种斜向钢混组合支撑桩 - Google Patents

一种斜向钢混组合支撑桩 Download PDF

Info

Publication number
CN216787141U
CN216787141U CN202122536970.1U CN202122536970U CN216787141U CN 216787141 U CN216787141 U CN 216787141U CN 202122536970 U CN202122536970 U CN 202122536970U CN 216787141 U CN216787141 U CN 216787141U
Authority
CN
China
Prior art keywords
pile
steel
concrete combined
concrete
combined supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122536970.1U
Other languages
English (en)
Inventor
谢晓东
刘国锋
周玉石
潘文进
鲍国强
汪建钢
张群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Teyu Technology Co ltd
Original Assignee
Shanghai Chengdi Rock Soil Design Co ltd
Shanghai Chengdixiangjiang Data Technology Co ltd
Chengdi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chengdi Rock Soil Design Co ltd, Shanghai Chengdixiangjiang Data Technology Co ltd, Chengdi Construction Group Co ltd filed Critical Shanghai Chengdi Rock Soil Design Co ltd
Priority to CN202122536970.1U priority Critical patent/CN216787141U/zh
Application granted granted Critical
Publication of CN216787141U publication Critical patent/CN216787141U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种斜向钢混组合支撑桩,钢混组合支撑是通过高压旋喷机在高压注浆切割土体成孔后用斜向压桩机把钢混组织支撑桩压入土层中。本实用新型采用上节格构柱与下节预制混凝土桩相结合的形式,上节格构柱在基坑内,方便挖土及止水施工,下节预制混凝土桩在坑底以下,充分发挥了高压旋喷桩跟预制混凝土桩结合提升抗压性能及土体的摩擦力,施工简单,效率高,钢材可循环利用,节约成本等优点。

Description

一种斜向钢混组合支撑桩
技术领域
本实用新型属于基坑工程技术领域,涉及一种斜向钢混组合支撑桩。
背景技术
随着城市的发展,土地供应越来紧张,空间利用率随之提高,出现了众多的超高层建筑,对基坑开挖的要求越来越高,不仅要确保边坡的稳定,也要满足变形控制的要求,从而确保基坑周围建筑物、地下管线、道路、地铁等安全。
同时,为了适应行业市场的发展,还要考虑提高土方挖运的机械化成度、提高施工效率、缩短开挖工期、降低工程造价、提高经济效益等多方面的因素,我们引进了钢筋混凝土结构支撑,但考虑到钢筋混凝土结构支撑自重大、布置面积大、材料不能重复利用,安装拆卸需要较长工期,爆破拆除时会产生噪音、振动、扬尘,工艺施工流程工期长不能随挖随撑从而导致基坑变形控制不利等缺点。
实用新型内容
针对上述缺点,本实用新型涉及一种斜向钢混组合支撑桩,该技术采用高压旋喷桩机在高压注浆切割土体成孔后用斜桩机把钢混组合支撑桩压入土层中。
所述一种斜向钢混组合支撑桩,其特征在于,所述斜向钢混组合支撑桩由上节钢格构柱与下节预制混凝土桩通过焊接连接而成;所述上节钢格构柱长度是6m-15m,下节预制混凝土桩长度是6m-20m,其中混凝土预制桩周围被高压旋喷桩包裹。
所述的一种斜向钢混组合支撑桩,其特征在于,所述的下节预制混凝土桩是满足桩基承载力设计值的预制方桩,预制方桩边长为 300mm、350mm、400mm、450mm、500mm,上节钢格构柱桩,刚格构柱边长为300mm、350mm、400mm、450mm、500mm。
所述的一种斜向钢混组合支撑桩,其特征在于,所述的预制桩插入到高压旋喷桩内,被高压旋喷包裹而成。
所述的一种斜向钢混组合支撑桩,其特征在于,所述的高压旋喷桩,先行成孔,成孔直径为0.5m-0.8m。
所述的一种斜向钢混组合支撑桩,其特征在于,所述的斜向钢混组合支撑桩按角度施工,与地面施工角度为0°-45°。
采用钢格构柱与预制混凝土桩相结合的形式,上节桩在基坑内,方便挖土及止水施工,下节桩在坑底,充分发挥预制混凝土桩与高压旋喷桩形成一个整体,发挥了预制桩的抗压性能及高压旋喷桩与土体的摩擦力,基坑完工后,钢格构柱拆除后可以重复利用,施工简单,施工效率高,钢材可以循环利用,预制混凝土桩厂家生产,绿色节能等优点。
附图说明
图1为斜向钢混组合支撑桩剖面示意图;
图2为斜向钢混组合支撑桩横切面示意图;
图中标识:1钢格构柱2预制混凝土桩3高压旋喷桩
具体实施方式
下面结合附图和具体实施案例对本实用新型进行详细说明。本实施案例以本实用新型技术方案为前提进行实施,给出了详细的实施案例和具体操作过程。
实施案例
一种斜向钢混组合支撑桩及施工方法,高压旋喷桩按照设计要求先行施工到指定位置,通过高压注浆切割土体达到设计直径,后通过压桩机把钢混组合支撑桩压入指定位置。所述钢混组合支撑桩由上节钢格构柱1与下节预制混凝土桩2通过焊接连接而成。
一种斜向钢混组合支撑桩的施工方法,其特征在于,包括以下步骤:
(1)放样,根据施工图放出实样;
(2)根据设计要求,先把高压旋喷桩机移至指定位置,将钢格构柱1与预制混凝土桩2组装拼接形成钢混组合支撑桩;
(3)启动高压旋喷机后台注浆泵、空压机,为高压旋喷机提供浆液空气压力,完成高压旋喷桩3,直至设计桩底标高;
(4)压桩机就位,吊放钢混组合支撑桩至指定位置,压桩机把钢混组合支撑桩压入土层中,直至压到设计桩底标高;高压旋喷桩3 与钢混凝组合支撑桩形成劲性复合桩。
(5)高压旋喷机、压桩机移位,重复步骤(2)-(4)施工下一根钢混组合支撑桩。

Claims (5)

1.一种斜向钢混组合支撑桩,其特征在于,所述斜向钢混组合支撑桩由上节钢格构柱与下节预制混凝土桩通过焊接连接而成;所述上节钢格构柱长度是6m-15m,下节预制混凝土桩长度是6m-20m,其中混凝土预制桩周围被高压旋喷桩包裹。
2.根据权利要求1所述的一种斜向钢混组合支撑桩,其特征在于,所述的下节预制混凝土桩是满足桩基承载力设计值的预制方桩,预制方桩边长为300mm、350mm、400mm、450mm、500mm,上节钢格构柱桩,刚格构柱边长为300mm、350mm、400mm、450mm、500mm。
3.根据权利要求1所述的一种斜向钢混组合支撑桩,其特征在于,所述的预制桩插入到高压旋喷桩内,被高压旋喷包裹而成。
4.根据权利要求1所述的一种斜向钢混组合支撑桩,其特征在于,所述的高压旋喷桩,先行成孔,成孔直径为0.5m-0.8m。
5.根据权利要求1所述的一种斜向钢混组合支撑桩,其特征在于,所述的斜向钢混组合支撑桩按角度施工,与地面施工角度为0°-45°。
CN202122536970.1U 2021-10-21 2021-10-21 一种斜向钢混组合支撑桩 Active CN216787141U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122536970.1U CN216787141U (zh) 2021-10-21 2021-10-21 一种斜向钢混组合支撑桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122536970.1U CN216787141U (zh) 2021-10-21 2021-10-21 一种斜向钢混组合支撑桩

Publications (1)

Publication Number Publication Date
CN216787141U true CN216787141U (zh) 2022-06-21

Family

ID=81998851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122536970.1U Active CN216787141U (zh) 2021-10-21 2021-10-21 一种斜向钢混组合支撑桩

Country Status (1)

Country Link
CN (1) CN216787141U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045293A (zh) * 2022-06-29 2022-09-13 浙江大学 一种深基坑竖向斜撑结构及其施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115045293A (zh) * 2022-06-29 2022-09-13 浙江大学 一种深基坑竖向斜撑结构及其施工方法

Similar Documents

Publication Publication Date Title
CN108612110B (zh) 一种地铁车站深基坑复合式支护施工方法
CN201843129U (zh) 带肋混凝土复合桩芯管
CN203879506U (zh) 一种岩质地层大断面深竖井的支护结构体系
CN216787141U (zh) 一种斜向钢混组合支撑桩
CN102535458A (zh) 一种加筋水泥土锚杆及其施工方法
CN111636417A (zh) 一种注浆型钢管桩及其施工方法
CN104632250A (zh) 圆形基坑倒挂管片装配式衬砌结构及其施工方法
CN216041201U (zh) 一种先撑后挖双层斜向支撑基坑围护体系
CN111997669A (zh) 一种双曲面穹顶地下罐室的支护体系及其施工方法
CN116988838A (zh) 一种超高压地下储气洞室环形隧洞式布置结构及施工方法
CN110528532A (zh) 一种预制拼装式钢砼组合支撑桩及其施工方法
CN212270943U (zh) 一种预制拼装式钢砼组合支撑桩
CN204941551U (zh) 一种曲线顶管支护结构扩建盾构施工的地铁车站
CN111560951A (zh) 一种载体劲性复合桩及施工方法
CN201857608U (zh) 合成桩
CN216713040U (zh) 一种全预制墩式门架斜向支撑桩结构体系
CN110725309A (zh) 处理基桩顶部缩颈问题的护筒结构及施工方法
CN112879010B (zh) 一种市政工程的地基施工方法
CN102235003B (zh) 预制混凝土管桩用扩张型钢桩尖及沉桩施工方法
CN204199279U (zh) 预制钢筋混凝土锚杆
CN201162229Y (zh) 抗浮地坑结构
CN211312546U (zh) 一种开槽护壁使用的环形工字钢结构
CN113756333A (zh) 一种全预制k型围护结构体系及其施工方法
CN201896321U (zh) 应用于地下变电站的逆作法施工装置
CN205259175U (zh) 一种下部扩大直径段复合基桩

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231109

Address after: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018

Patentee after: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd.

Address before: 201806 room j404, 3 / F, No. 5358, Huyi Road, Jiading District, Shanghai

Patentee before: Chengdi Construction Group Co.,Ltd.

Patentee before: Shanghai chengdixiangjiang Data Technology Co.,Ltd.

Patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240201

Address after: 201306 floor 2, No. 979, Yunhan Road, Lingang xinpian District, Pudong New Area, Shanghai

Patentee after: Shanghai Teyu Technology Co.,Ltd.

Country or region after: China

Address before: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018

Patentee before: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd.

Country or region before: China