CN216780848U - Positioning welding device for air conditioner gas collecting pipe production - Google Patents

Positioning welding device for air conditioner gas collecting pipe production Download PDF

Info

Publication number
CN216780848U
CN216780848U CN202123305874.2U CN202123305874U CN216780848U CN 216780848 U CN216780848 U CN 216780848U CN 202123305874 U CN202123305874 U CN 202123305874U CN 216780848 U CN216780848 U CN 216780848U
Authority
CN
China
Prior art keywords
fixedly connected
gas collecting
plate
movable
welding device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123305874.2U
Other languages
Chinese (zh)
Inventor
刘宏达
尹显著
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Boyimei Metal Products Co ltd
Original Assignee
Chuzhou Boyimei Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Boyimei Metal Products Co ltd filed Critical Chuzhou Boyimei Metal Products Co ltd
Priority to CN202123305874.2U priority Critical patent/CN216780848U/en
Application granted granted Critical
Publication of CN216780848U publication Critical patent/CN216780848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses a positioning welding device for production of an air conditioner gas collecting tube, which relates to the technical field of gas collecting tube processing, and aims at solving the problems that manual welding is poor in effect and low in accuracy, so that the efficiency is low and the labor cost is increased; the top of the base is fixedly connected with a guide rod, a guide plate is movably sleeved on the guide rod, and an adjusting plate is fixedly connected between the guide plate and the moving plate; and a rack groove is formed in the rear of the adjusting plate. The air-conditioner gas collecting pipe processing device can rapidly fix and clamp the gas collecting pipe to be processed through the movable plate, and can rapidly position the gas collecting pipe through the adjusting bolt, so that the processing efficiency and effect of the air-conditioner gas collecting pipe are effectively improved.

Description

Positioning welding device for air conditioner gas collecting pipe production
Technical Field
The utility model relates to the technical field of gas collecting pipe processing, in particular to a positioning welding device for air conditioner gas collecting pipe production.
Background
The air conditioner gas collecting pipe mainly has the advantages that gas in an evaporator is collected completely in the air conditioner, and then the air conditioner gas collecting pipe is connected to an external machine through the gas collecting pipe, so that a circulating effect is achieved, the air conditioner gas collecting pipe generally comprises a main gas collecting pipe and a plurality of gas collecting branch pipes, the main gas collecting pipe is generally a straight pipe, the application scene of the air conditioner gas collecting pipe with the regular structure is limited, the adaptability is weak, the existing air conditioner gas collecting pipe is mainly welded by one person holding the main gas collecting pipe, then another operator conducts welding treatment on the gas collecting branch pipes, the welding accuracy is low through manual welding, and the welding effect is not ideal.
SUMMERY OF THE UTILITY MODEL
The positioning welding device for air conditioner gas collecting pipe production provided by the utility model solves the problems of low efficiency and increased labor cost caused by poor welding effect and low accuracy caused by manual operation.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a positioning welding device for air conditioner gas collecting tube production comprises a base, wherein a motor is fixedly connected inside the base, an output shaft of the motor is fixedly connected with a threaded rod, a movable plate is sleeved on the threaded rod in a threaded manner, and a limiting mechanism is arranged on the threaded rod;
the top of the base is fixedly connected with a guide rod, a guide plate is movably sleeved on the guide rod, and an adjusting plate is fixedly connected between the guide plate and the movable plate;
a rack groove is formed in the rear of the adjusting plate, a rack is fixedly connected inside the rack groove, a plurality of movable blocks are movably sleeved on the adjusting plate, and positioning plates are fixedly connected to the front ends of the movable blocks respectively;
the adjustable gear box is characterized in that an adjusting screw rod is movably sleeved on the movable block, a gear is fixedly sleeved below the adjusting screw rod, and the gear is meshed with the rack.
Preferably, the top left and right sides of base is fixedly connected with connecting block respectively, two the board is placed to the top fixedly connected with arc respectively of connecting block.
Preferably, the bottoms of the moving plate and the guide plate are respectively and fixedly connected with arc-shaped clamping plates, and the two arc-shaped clamping plates are respectively closely attached to the two arc-shaped placing plates.
Preferably, the limiting mechanism comprises a limiting baffle fixedly connected with a threaded rod, a limiting spring is fixedly connected to the top of the limiting baffle, and the threaded rod is movably sleeved inside the limiting spring.
Preferably, a plurality of positioning plates are respectively provided with a positioning hole, a plurality of movable blocks are respectively provided with a movable hole, and a plurality of adjusting screws are respectively movably sleeved in the movable holes.
Preferably, it is a plurality of the movable block is last to have seted up the activity groove respectively, the regulating plate movable sleeve is established in the inside in activity groove, and is a plurality of the gear is established in the inside in activity groove respectively in the activity, the bottom fixedly connected with four support columns of base.
Compared with the prior art, the utility model has the beneficial effects that: the utility model is provided with the motor; a threaded rod; moving the plate; a guide bar; a guide plate; an adjusting plate; a movable block; adjusting the screw rod; a gear; positioning a plate; an arc-shaped clamping plate; connecting blocks; an arc-shaped placing plate; a limit baffle; a limiting spring; the mechanism such as rack drives the threaded rod through the motor and rotates, adjusts the processing through adjusting bolt simultaneously, and this device modern design, easy operation, this equipment not only can treat the discharge of processing through the movable plate and carry out quick fixed centre gripping and handle, can carry out quick location through adjusting bolt simultaneously and handle, the effectual efficiency and the effect that improves air conditioner discharge processing.
Drawings
Fig. 1 is a schematic left side perspective view of a positioning welding device for air-conditioning gas collecting tube production according to the present invention;
fig. 2 is a schematic front sectional view of a positioning welding device for air-conditioning gas collecting tube production according to the present invention;
fig. 3 is a schematic rear side view of a positioning welding device for air-conditioning gas collecting tube production according to the present invention;
fig. 4 is a schematic structural diagram of a movable block of a positioning welding device for air-conditioning gas collecting tube production according to the present invention.
In the figure: 1. a base; 2. a motor; 3. a threaded rod; 4. moving the plate; 5. a guide bar; 6. a guide plate; 7. an adjusting plate; 8. a movable block; 9. adjusting the screw rod; 10. a gear; 11. positioning a plate; 12. an arc-shaped clamping plate; 13. connecting blocks; 14. an arc-shaped placing plate; 15. a limit baffle; 16. a limiting spring; 17. a rack.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, an embodiment provided by the scheme is a positioning welding device for air-conditioning gas collecting tube production, and the positioning welding device comprises a base 1, wherein a motor 2 is fixedly connected inside the base 1, an output shaft of the motor 2 is fixedly connected with a threaded rod 3, a movable plate 4 is sleeved on the threaded rod 3 in a threaded manner, and a limiting mechanism is arranged on the threaded rod 3;
the top of the base 1 is fixedly connected with a guide rod 5, a guide plate 6 is movably sleeved on the guide rod 5, and an adjusting plate 7 is fixedly connected between the guide plate 6 and the moving plate 4;
a rack groove is formed in the rear of the adjusting plate 7, a rack 17 is fixedly connected inside the rack groove, a plurality of movable blocks 8 are movably sleeved on the adjusting plate 7, and the front ends of the movable blocks 8 are respectively and fixedly connected with a positioning plate 11;
an adjusting screw 9 is movably sleeved on the movable block 8, a gear 10 is fixedly sleeved below the adjusting screw 9, and the gear 10 is meshed with a rack 17.
In this embodiment, the top left and right sides of base 1 is fixedly connected with connecting block 13 respectively, and board 14 is placed to the top of two connecting blocks 13 fixedly connected with arcs respectively.
In this embodiment, the bottom of the moving plate 4 and the bottom of the guide plate 6 are respectively and fixedly connected with an arc-shaped clamping plate 12, and the two arc-shaped clamping plates 12 are respectively and closely attached to the two arc-shaped placing plates 14.
In this embodiment, the limiting mechanism includes a limiting baffle 15 fixedly connected with the threaded rod 3, a limiting spring 16 is fixedly connected to the top of the limiting baffle 15, and the threaded rod 3 is movably sleeved inside the limiting spring 16.
In this embodiment, the positioning holes are respectively formed in the positioning plates 11, the movable holes are formed in the movable blocks 8, and the adjusting screws 9 are respectively movably sleeved in the movable holes.
In this embodiment, a plurality of movable blocks 8 are respectively provided with a movable groove, an adjusting plate 7 is movably sleeved in the movable groove, a plurality of gears 10 are respectively movably sleeved in the movable groove, and the bottom of the base 1 is fixedly connected with four supporting columns.
The working principle is that firstly, an air conditioner gas collecting pipe main pipe to be processed is placed on a placing plate 14, a motor 2 is started to drive a threaded rod 3 to rotate, a moving plate 4 is driven to move downwards by the rotation of the threaded rod 3, an adjusting plate 7 is driven to stably move downwards along a guide rod 5 by a guide plate 6 by the downward movement of the moving plate 4, an arc-shaped clamping plate 12 is driven to synchronously move downwards by the synchronous downward movement of the moving plate 4 and the guide plate 6 to clamp and fix the air conditioner gas collecting pipe main pipe on the placing plate 14, meanwhile, a movable block 8 and a positioning plate 11 are driven to synchronously move downwards by the downward movement of the adjusting plate 7, a gear 10 is meshed with a rack 17 by manually rotating an adjusting screw 9 to adjust the movable block 8, the positioning plate 11 is driven to move by the movement of the movable block 8, and a welding piece is quickly positioned by a positioning hole on the positioning plate 11, the equipment can be used for not only rapidly clamping and fixing the main pipe of the air-conditioning gas collecting pipe to be processed, but also rapidly positioning the main pipe of the air-conditioning gas collecting pipe to be processed through the positioning plate 11, so that the welding effect and efficiency of the air-conditioning gas collecting pipe are effectively improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. A positioning welding device for air conditioner gas collecting tube production comprises a base (1) and is characterized in that a motor (2) is fixedly connected to the inside of the base (1), a threaded rod (3) is fixedly connected to an output shaft of the motor (2), a movable plate (4) is sleeved on the threaded rod (3) in a threaded manner, and a limiting mechanism is arranged on the threaded rod (3);
the top of the base (1) is fixedly connected with a guide rod (5), a guide plate (6) is movably sleeved on the guide rod (5), and an adjusting plate (7) is fixedly connected between the guide plate (6) and the moving plate (4);
a rack groove is formed in the rear of the adjusting plate (7), a rack (17) is fixedly connected inside the rack groove, a plurality of movable blocks (8) are movably sleeved on the adjusting plate (7), and positioning plates (11) are fixedly connected to the front ends of the movable blocks (8) respectively;
the adjustable gear is characterized in that an adjusting screw rod (9) is movably sleeved on the movable block (8), a gear (10) is fixedly sleeved below the adjusting screw rod (9), and the gear (10) is meshed with the rack (17).
2. The positioning welding device for the production of the air-conditioning gas collecting tube according to claim 1, characterized in that the left and right sides of the top of the base (1) are fixedly connected with connecting blocks (13), and the tops of the two connecting blocks (13) are fixedly connected with arc-shaped placing plates (14).
3. The positioning welding device for the production of the air-conditioning gas collecting tube is characterized in that the bottom parts of the moving plate (4) and the guide plate (6) are respectively fixedly connected with an arc-shaped clamping plate (12), and the two arc-shaped clamping plates (12) are respectively closely attached to two arc-shaped placing plates (14).
4. The positioning welding device for the production of the air-conditioning gas collecting tube according to claim 1, wherein the limiting mechanism comprises a limiting baffle (15) fixedly connected with a threaded rod (3), a limiting spring (16) is fixedly connected to the top of the limiting baffle (15), and the threaded rod (3) is movably sleeved inside the limiting spring (16).
5. The positioning welding device for the production of the air-conditioning gas collecting pipe according to claim 1, wherein a plurality of positioning plates (11) are respectively provided with a positioning hole, a plurality of movable blocks (8) are respectively provided with a movable hole, and a plurality of adjusting screws (9) are respectively movably sleeved inside the movable holes.
6. The positioning welding device for the production of the air-conditioning gas collecting pipe according to claim 1, wherein a plurality of the movable blocks (8) are respectively provided with a movable groove, the adjusting plate (7) is movably sleeved inside the movable grooves, a plurality of the gears (10) are respectively movably sleeved inside the movable grooves, and four support columns are fixedly connected to the bottom of the base (1).
CN202123305874.2U 2021-12-27 2021-12-27 Positioning welding device for air conditioner gas collecting pipe production Active CN216780848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123305874.2U CN216780848U (en) 2021-12-27 2021-12-27 Positioning welding device for air conditioner gas collecting pipe production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123305874.2U CN216780848U (en) 2021-12-27 2021-12-27 Positioning welding device for air conditioner gas collecting pipe production

Publications (1)

Publication Number Publication Date
CN216780848U true CN216780848U (en) 2022-06-21

Family

ID=82009667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123305874.2U Active CN216780848U (en) 2021-12-27 2021-12-27 Positioning welding device for air conditioner gas collecting pipe production

Country Status (1)

Country Link
CN (1) CN216780848U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116871808A (en) * 2023-08-26 2023-10-13 诸暨市铭阳金属股份有限公司 Air conditioner gas collecting tube assembly welding set of accurate location

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116871808A (en) * 2023-08-26 2023-10-13 诸暨市铭阳金属股份有限公司 Air conditioner gas collecting tube assembly welding set of accurate location
CN116871808B (en) * 2023-08-26 2024-01-19 诸暨市铭阳金属股份有限公司 Air conditioner gas collecting tube assembly welding set of accurate location

Similar Documents

Publication Publication Date Title
CN216780848U (en) Positioning welding device for air conditioner gas collecting pipe production
CN110976983A (en) Steel plate edge milling machine
CN104972169A (en) Full-automatic pipe cutter
CN203765066U (en) Full-automatic pipe cutter
CN115106552A (en) Precision machining equipment for hard turning machine special-shaped alloy and working method thereof
CN213888261U (en) Processing device for anti-corrosion battery box sealing plate
CN212351096U (en) Vertical and horizontal combined gantry machining tool
CN113828821A (en) Drilling machine for machining
CN218696394U (en) Tool changing device of numerical control machining center
CN216661516U (en) Automatic calibration auxiliary equipment for section steel processing
CN216971223U (en) Automatic tube penetrating machine for tube type heat exchanger
CN219853309U (en) Multistation clamping frock
CN219703682U (en) Metal device cutting device
CN219562242U (en) Automatic clamp convenient for telescopic adjustment
CN211360793U (en) Steel plate edge milling machine
CN220094213U (en) Draw-bar box pipe burnishing machine
CN219561608U (en) Clamping device for cutting copper pipe of air conditioner
CN219465236U (en) Auxiliary welding device for metal plate
CN204603899U (en) A kind of rectangular tube inclined-plane sawing recruitment dress
CN220407653U (en) Pre-positioning mechanism for welding frame of electric tricycle
CN215510031U (en) Rail vehicle bogie structure processing mounting fixture
CN219768174U (en) Can assist equipment platform that improves process velocity
CN219725380U (en) Accurate machining positioning mechanism of horizontal machining center
CN220296055U (en) Multidirectional adjustable tapping mechanism of tapping machine
CN220260274U (en) Valve body processing positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant