CN216765980U - Sinking construction device for bottom on-site construction of upper assembled underground building - Google Patents

Sinking construction device for bottom on-site construction of upper assembled underground building Download PDF

Info

Publication number
CN216765980U
CN216765980U CN202122535605.9U CN202122535605U CN216765980U CN 216765980 U CN216765980 U CN 216765980U CN 202122535605 U CN202122535605 U CN 202122535605U CN 216765980 U CN216765980 U CN 216765980U
Authority
CN
China
Prior art keywords
chain
building
cutter
chain cutter
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122535605.9U
Other languages
Chinese (zh)
Inventor
章天杨
臧延伟
于淼
陈金苗
徐杭杰
王燏斌
王树生
邬紫珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
PowerChina Huadong Engineering Corp Ltd
Original Assignee
JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd, PowerChina Huadong Engineering Corp Ltd filed Critical JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
Priority to CN202122535605.9U priority Critical patent/CN216765980U/en
Application granted granted Critical
Publication of CN216765980U publication Critical patent/CN216765980U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a sinking construction device of an upper assembly type underground building for bottom on-site construction, which relates to the technical field of underground building construction, wherein the construction device of the building comprises a chain cutter digging device, a hanging device, a pouring device and an assembly device, the building comprises a bottom and an upper assembly type part which are constructed on site, the bottom is poured on the ground in full length through the pouring device, the assembly of the upper part is completed above the bottom part through an assembly device, the chain cutter excavating device comprises a chain cutter and a chain cutter driving device, the chain cutter comprises a chain and a cutter arranged on the chain, the chain cutter is transversely or longitudinally enveloped at the outer side of the cross section of the building, the chain cutter driving device is started when the building is in a suspended state through the hanging device, the chain cutter at the bottom of the building excavates rock soil, and the chain cutter running from bottom to top brings the excavated rock soil to the top, so that sinking construction of the building is realized.

Description

Sinking construction device for bottom on-site construction of upper assembled underground building
Technical Field
The utility model relates to the technical field of underground building construction, in particular to a sinking construction device for constructing an upper assembly type underground building on the bottom site.
Background
The existing large-scale underground building is constructed by an open cut method commonly used, the open cut method needs to firstly cut a foundation pit for supporting, then pour or assemble the underground building in the foundation pit, needs to make temporary supporting and precipitation of the foundation pit, and has long construction period and high construction cost; at present, the chain cutter is adopted to excavate the rock soil at the bottom, the whole sinking technical scheme, and the sinking construction device without a hanging device has the following defects because the self load of the underground building is too heavy: the inclination and the deviation are easy to generate, a deviation rectifying device needs to be additionally arranged when the device sinks, and once the deviation is generated, the deviation rectification is difficult to realize; the large load is pressed on the bottom chain cutter, so that the power of the driving device is too large, and the chain cutter is easy to break; the descent speed is difficult to control; the cutter feeding amount of the bottom chain cutter is out of control, so that the cutter is easily damaged; to this end we propose a sinking construction device for bottom field construction of top-mounted underground structures to solve the above problems.
SUMMERY OF THE UTILITY MODEL
In view of the problems in the prior art, it is an object of the present invention to provide a sinking construction apparatus for bottom-in-place construction of an upper fabricated underground structure, which solves the above-mentioned problems in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: the construction device of the underground building comprises a chain cutter excavating device, a hanging device, a pouring device and an assembling device, the building comprises a bottom and an assembled upper portion which are constructed on site, the bottom is poured on the ground in full length through the pouring device, the assembly of the upper portion is completed above the bottom through the assembling device, the chain cutter excavating device comprises a chain cutter and a chain cutter driving device, the chain cutter comprises a chain and a cutter installed on the chain, the chain cutter is transversely or longitudinally enveloped outside the cross section of the building, the building is in a hanging state through the hanging device, the chain cutter driving device is started, the chain cutter at the bottom of the building excavates rock soil, the excavated rock soil is brought to the upper side through the chain cutter which runs from bottom to top, and the sinking construction of the building is achieved.
As a further scheme of the utility model: the assembling device comprises a tensioning device, and the upper part of the assembling device comprises a plurality of middle plate modules, a top plate module, a side wall module and an end wall module.
As a further scheme of the utility model: the building comprises an outer wall with a chain cutter side, the outer wall comprises a lower wall and an upper wall, the lower wall comprises a vertical chain cutter hole, the chain cutter hole comprises an entrance oblique conical surface, the chain cutter passes through the hole to envelop the building, and the thickness of the lower wall is greater than the sum of the thickness of the upper wall and the thickness of the chain cutter; when the chain cutter carries rock soil larger than the gap between the lower hole and the chain cutter, the rock soil is crushed through the inclined conical surface of the inlet.
As a further scheme of the utility model: the building sinks to a set depth, and when the buoyancy of underground water to the building and the friction of rock soil to the building are equal to the dead weight of the building including the chain cutter digging device, the building is in a critical state, and the building is always in a suspension state in the sinking process by weighting the building.
As a further scheme of the utility model: the chain cutter comprises a chain plate, the chain plate is arranged on the chain, and the cutter is arranged on the chain plate.
As a further scheme of the utility model: the chain cutter comprises a plurality of groups of tapered strip chain cutters, the cutters in the strip chain cutters comprise head cutters positioned at the front ends, middle cutters positioned in the middle and scraping plates positioned at the tail ends, the head cutters comprise long cutters, the middle cutters comprise two short cutters, the height of the scraping plates is slightly lower than that of the head cutters and the middle cutters, the head cutters and the middle cutters excavate rock soil, and the excavated rock soil is brought to the front by the scraping plates.
As a further scheme of the utility model: when the chain cutter excavates rock soil, different geological conditions are met by controlling the descending speed of the hanging device, and when the cutter is worn, the chain cutter is replaced at the top.
As a further scheme of the utility model: the building is totally sunk after all construction is finished.
As a further scheme of the utility model: the building is characterized in that after the bottom of the building sinks to a set depth, the building is assembled with the upper part, wherein the upper part comprises a lower section, a middle section and an upper section, and after the lower section sinks to the set depth, the building is assembled with the middle section; and after the middle section sinks to the set depth, assembling the upper section, and finally completing the section-by-section sinking of the building.
In conclusion, according to the technical scheme, the strength and the integrity of the bottom structure are improved by casting the bottom component in situ, the upper part adopts the assembly type structure, the construction speed of building ground construction is improved, and the environment of a construction site can be improved by modular assembly construction.
This technical scheme has adopted cable suspension device, and underground building's dead weight is balanced by cable suspension device, has following advantage: because the underground building is extremely heavy and cannot deviate, a deviation rectifying device is not needed; the dead weight of the underground building is not pressed on the chain cutter, so that the power of the driving device is smaller, the tension of the chain is smaller, and the chain is not easy to break; the descending speed is controllable; different geological conditions can be adapted by controlling the amount of feed.
Drawings
Fig. 1 is a schematic structural view of a structure 1 for sinking construction with the aid of a chain cutter excavating device 21 and a hanging device 22 of a construction device 2;
fig. 2 is a schematic structural view in which the chain blade 3 of the chain blade excavating device 21 is wrapped outside the section of the building 1, the chain blade 3 positioned at the bottom of the building 1 excavates rock soil, and the building 1 and the construction device 2 sink together;
fig. 3 is a structural schematic diagram of the chain cutter 3 which is fully distributed in the longitudinal direction of the comprehensive pipe rack;
FIG. 4 is a schematic structural diagram of the hanging device 22 for synchronously and slowly lifting the building 1 by the plurality of steel strand hydraulic lifting jacks 4;
fig. 5 is a schematic view of the construction of the bottom 1A by the pouring device 23;
FIG. 6 is a side wall module 1BC and an end wall module 1BD which are hoisted by a hanging device 22 and are all connected and fixed by a bolt and nut pair;
fig. 7 is a schematic structural diagram of the hanging device 22 hanging all the middle plate modules 1BA and inserting steel strands, and the tensioning device 241 tensioning and anchoring the steel strands by using a tensioning method to connect the middle plate modules 1BA into a whole;
fig. 8 is a schematic structural diagram of the middle plate module 1BA, the side wall module 1BC and the end wall module 1BD integrally connected by bolts and nuts;
fig. 9 is a schematic structural view showing that all the roof modules 1BB are suspended by the suspending device 22, and the steel strands are inserted and tensioned for anchoring;
fig. 10 is a schematic structural view of the side wall module 1BC and the end wall module 1BD at the bottom layer and the bottom of the top plate module 1BB integrally connected by a bolt-nut pair;
fig. 11 is a schematic view of a part i of fig. 10 enlarged, in which a middle plate module 1BA covers a side wall module 1BC at the bottom layer, and is fixedly connected by a bolt and nut pair, and a concave-convex embedded interface is arranged in the middle to increase the connection strength and the waterproof effect;
fig. 12 is a schematic structural view of the chain 31 of the chain knife 3 being a ring chain, and is also a schematic structural view of the knife 32 being mounted on the link plate 33;
fig. 13 is a schematic structural view of the strip-shaped chain cutter 5;
FIG. 14 is a schematic structural view of the chain cutter 3 enveloping the building 1 through the chain cutter hole 11A1, wherein the thickness of the lower wall 11A is larger than the sum of the thickness of the upper wall 11B and the thickness of the chain cutter 3;
fig. 15 is a schematic structural view showing that the chain cutter excavating device 21 is installed to sink in a height direction in a sectional manner after the concrete reaches a designed strength after the bottom 1A is poured;
fig. 16 is a schematic structural view of the chain cutter excavating device 21 excavating the soil at the bottom of the building 1 after installing the lower section 1B1 and the middle section 1B2 on the bottom 1A, and sinking as a whole;
FIG. 1 is a building; 11 is an outer wall; 11A is the lower wall; 11B is an upper wall; 11A1 is a chain cutter hole; 11A11 is an entrance beveled surface; 1A is a bottom; 1B is an upper portion comprising a lower section 1B1, a middle section 1B2, and an upper section 1B 3; 1B1 is the lower section; 1B2 is the middle section; 1B3 is the upper section; 1BA is a middle plate module; 1BB is a ceiling module; 1BC is a sidewall module; 1BD is a headwall module; 2 is a construction device; 21 is a chain cutter excavating device; 211 is a chain cutter drive; 22 is a hanging device; 23 is a casting device; 24 is an assembly device; 241 is a tensioning device; 3 is a chain cutter; 31 is a chain; 32 is a knife; 33 is a link plate; 4 is a steel strand lifting jack; 5 is a strip chain cutter; 51 is a head knife; 52 is an intermediate knife; 522 is a short knife; 53 is a squeegee; and 6 is an internal structure.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
Referring to fig. 1 to 16, in the embodiment of the present invention, a construction apparatus 2 of a building 1 located underground includes a chain cutter excavating apparatus 21, a hanging apparatus 22, a casting apparatus 23 and an assembling apparatus 24, the building 1 includes a bottom portion 1A and an assembled upper portion 1B for on-site construction, the bottom portion 1A is cast over the entire length of the ground through the casting apparatus 23, the assembling apparatus 24 is used to assemble the upper portion 1B over the bottom portion 1A, the chain cutter excavating apparatus 21 includes a chain cutter 3 and a chain cutter driving apparatus 211, the chain cutter 3 includes a chain 31 and a cutter 32 mounted on the chain 31, the chain cutter 3 is laterally or longitudinally wrapped at the outer side of the cross section of the building 1, the hanging apparatus 22 is used to suspend the building 1, the chain cutter driving apparatus 211 is started, the chain cutter 3 at the bottom of the building 1 excavates rock soil, the rock soil is brought to the top by the chain cutter 3 operating from bottom to top, the sinking construction of the building 1 is realized.
As shown in fig. 5 to 10, the assembling device 24 includes a tensioning device 241, the upper portion 1B includes a plurality of middle plate modules 1BA, a top plate module 1BB, a side wall module 1BC and an end wall module 1BD, and the main construction steps of the building 1 in the height direction are as follows:
1) the construction of the bottom 1A is completed through a pouring device 23;
2) the side wall modules 1BC at the bottom layer, the end wall modules 1BD, the side wall modules 1BC and the end wall modules 1BD are connected into a whole by a construction device 2 through bolt and nut pairs;
3) the bottom 1A and the side wall module 1BC and the bottom 1A and the end wall module 1BD are connected into a whole by bolt and nut pairs or welding;
4) all the middle plate modules 1BA are in a hanging state through the hanging device 22, the middle plate modules 1BA are connected into a whole through the tensioning device 241 by adopting a tensioning method, the middle plate modules 1BA are placed at the tops of the side wall modules 1BC and the end wall modules 1BD at the bottom layer, and the tops of the side wall modules 1BC and the end wall modules 1BD at the bottom layer are connected into a whole with the bottom of the middle plate modules 1BA by using a bolt and nut pair;
5) completing the construction of all the middle layers except the top plate;
6) all the top plate modules 1BB are in a hanging state through the hanging device 22, the top plate modules 1BB are connected into a whole through the tensioning device 241 by adopting a tensioning method, the top plate modules 1BB are placed at the tops of the top layer side wall modules 1BC and the end wall modules 1BD, the tops of the top layer side wall modules 1BC and the top of the end wall modules 1BD are connected into a whole with the bottoms of the top plate modules 1BB through bolt and nut pairs, and therefore the assembly of the building 1 is completed.
It should be noted that: the middle plate module 1BA and the top plate module 1BB can also be coupled by a bolt and nut pair without using a stretching method.
The building 1 comprises an outer wall 11 on the side of the chain cutter 3, the outer wall 11 comprises a lower wall 11A and an upper wall 11B, the lower wall 11A comprises a vertical chain cutter hole 11A1, the chain cutter hole 11A1 comprises an entrance oblique conical surface 11A11, the chain cutter 3 envelopes the building 1 through the chain cutter hole 11A1, and the thickness of the lower wall 11A is larger than the sum of the thickness of the upper wall 11B and the thickness of the chain cutter 3; when the chain cutter 3 carries rock soil such as cobblestones or boulders larger than the gap between the cutter hole 11a1 and the chain cutter 3, it is crushed by the entrance beveled surface 11a 11.
It should be noted that: the lower wall 11A may also be considered as a cover for the chain cutter 3, and the upper wall 11B may be devoid of a chain cutter cover.
Hanging device 22 include steel strand wires lifting jack 4, steel strand wires lifting jack 4 goes up and down slowly in step, steel strand wires lifting jack 4 adopts cross core formula structure hydraulic pressure lifting mechanism as elevating gear, the wedge ground tackle at hydraulic pressure lifting mechanism both ends has one-way self-locking effect, when ground tackle work is tight, can automatic locking steel strand wires, when the ground tackle is out of work pine, release the steel strand wires, the steel strand wires can move about from top to bottom, can make building 1 wholly sink in step under the suspension state, because its self huge dead weight, be difficult to produce the skew, need not set up other deviation correcting device.
The building 1 is sunk to a set depth, and is in a critical state when the buoyancy of groundwater to the building 1 and the friction of rock soil to the building 1 are equal to the self weight of the building 1 including the chain cutter digging device 21, and the building 1 is always in a suspended state in the sinking process by adding weight to the building 1, for example, pouring water into the building 1.
The closed chain cutter 3 comprises a chain plate 33, the chain plate 33 is arranged on the chain 31, and the cutter 32 is arranged on the chain plate 33.
The chain cutter comprises a plurality of groups of conical strip-shaped chain cutters 5 of the chain cutter 3, wherein the cutters 32 in the strip-shaped chain cutters 5 comprise head cutters 51 positioned at the front ends, middle cutters 52 positioned in the middle and scrapers 53 positioned at the tail ends, the head cutters 51 comprise a long cutter 511, the middle cutters 52 comprise two short cutters 521, the height of the scrapers 53 is slightly lower than that of the head cutters 51 and the middle cutters 52, the head cutters 51 and the middle cutters 52 excavate rock soil, and the scrapers 53 bring the excavated rock soil to the front.
It should be noted that: assuming that the width of each group of chain cutters is B, the pitch of the chain is T, n middle cutters 52 are provided, and the length of the short cutter 521 is a, the length of the long cutter 511 is 2a, B = (2 n + 1) a, and the length of each group of strip-shaped chain cutters 5 is equal to (n + 2) T, so that the lengths of the cutters 32 for cutting rock soil on each chain plate 33 can be equal.
When the chain cutter 3 excavates rock soil, different geological conditions are met by controlling the descending speed of the hanging device 22, and when the cutter 32 is worn, the cutter is replaced at the top.
It should be noted that: when encountering the cobblestones and the boulders, the cobblestones and the boulders are scraped with the knives 32 by an extremely slow descending speed.
The building 1 is totally sunk after all construction is finished.
The building 1 is characterized in that after the bottom part 1A sinks to a set depth, the upper part 1B is assembled, the upper part 1B comprises a lower section 1B1, a middle section 1B2 and an upper section 1B3, and after the lower section 1B1 sinks to the set depth, the middle section 1B2 is assembled; after the middle section 1B2 sinks to a set depth, assembling the upper section 1B3, and finally completing the section-by-section sinking of the building 1; the building 1 may be constructed by directly assembling the upper part 1B after the bottom part 1A is poured and cured, and then sinking.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "front", "rear", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, only for the convenience of description of the present invention and simplification of description, rather than to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, therefore, the present invention should not be construed as being limited thereto, and it should be noted that the terms "mounted" and "connected" should be interpreted broadly, for example, as being able to be fixedly connected, detachably connected, or integrally formed, mechanically connected or indirectly connected through an intermediate, and the specific meaning of the terms in the utility model can be understood through specific situations.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (9)

1. A sinking construction device for bottom on-site construction of an upper assembly type underground building is characterized in that a construction device (2) of the underground building (1) comprises a chain cutter digging device (21), a hanging device (22), a pouring device (23) and an assembly device (24), the building (1) comprises a bottom (1A) and an upper assembly type (1B) which are constructed on site, the bottom (1A) is poured on the ground in the full length through the pouring device (23), the assembly of the upper part (1B) is completed above the bottom part (1A) through an assembly device (24), the chain cutter digging device (21) comprises a chain cutter (3) and a chain cutter driving device (211), the chain cutter (3) comprises a chain (31) and a cutter (32) arranged on the chain (31), the chain cutter (3) is transversely or longitudinally enveloped at the outer side of the section of the building (1), the building (1) is suspended by means of a suspension device (22).
2. A sinking construction unit for bottom-working above-fabricated underground building according to claim 1, characterized in that the assembly means (24) comprises a tensioning means (241), the upper part (1B) comprising a number of middle plate modules (1 BA), top plate modules (1 BB), side wall modules (1 BC) and end wall modules (1 BD).
3. A sinking construction unit for a top-mounted underground building for bottom-in-place construction according to claim 2, characterized in that the building (1) comprises an outer wall (11) with a chain cutter (3) side, the outer wall (11) comprises a lower wall (11A) and an upper wall (11B), the lower wall (11A) comprises a vertical chain cutter hole (11A 1), the chain cutter hole (11A 1) comprises an entrance oblique cone (11A 11), the chain cutter (3) envelopes the building (1) through the chain cutter hole (11A 1), the thickness of the lower wall (11A) is larger than the sum of the thickness of the upper wall (11B) and the thickness of the chain cutter (3); when the chain cutter (3) carries rock soil larger than the gap between the chain cutter hole (11A 1) and the chain cutter (3), the rock soil is crushed through the inclined conical surface (11A 11) of the inlet.
4. The sinking construction equipment for the upper assembled underground building constructed at the bottom of the field according to claim 3, wherein the building (1) is sunk to a predetermined depth, and is in a critical state when the buoyancy of the underground water to the building (1) and the friction of the rock soil to the building (1) are equal to the self weight of the building (1) including the chain cutter excavating device (21), and the building (1) is always in a suspended state during the sinking process by adding weight to the building (1).
5. A sinking construction unit for bottom-loading underground superstructure according to claim 4, wherein the scraper chain (3) comprises a scraper chain (33), the scraper chain (33) being mounted on the chain (31) and the scraper (32) being mounted on the scraper chain (33).
6. A sinking construction unit for bottom-in-place construction of an upper fabricated underground structure according to claim 5, wherein the chain cutter (3) comprises a plurality of sets of tapered chain cutters (5), the cutters (32) of the chain cutters (5) comprise a head cutter (51) at a front end, a middle cutter (52) at a middle end and a scraper (53) at a rear end, the head cutter (51) comprises a long cutter (511), the middle cutter (52) comprises two short cutters (521), the scraper (53) has a height slightly lower than the heights of the head cutter (51) and the middle cutter (52), the head cutter (51) and the middle cutter (52) excavate the earth, and the scraper (53) brings the excavated earth to the front.
7. A sinking construction unit for bottom-loading underground structure in situ according to claim 6, wherein the chain cutter (3) is adapted to meet different geological conditions by controlling the lowering speed of the hanger (22) when excavating the soil, and is replaced at the top when the cutter (32) is worn.
8. Sinking construction unit for bottom-in-place construction of an above-assembled underground structure according to claim 7, characterised in that the structure (1) is completely sunk after the completion of the entire construction.
9. The sinking construction unit of the upper fabricated underground building for the bottom-in-place construction according to claim 8, wherein the building (1) is assembled with the upper portion (1B) after the bottom (1A) is sunk to a set depth, and the upper portion (1B) includes the lower section (1B 1), the middle section (1B 2) and the upper section (1B 3).
CN202122535605.9U 2021-10-21 2021-10-21 Sinking construction device for bottom on-site construction of upper assembled underground building Active CN216765980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122535605.9U CN216765980U (en) 2021-10-21 2021-10-21 Sinking construction device for bottom on-site construction of upper assembled underground building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122535605.9U CN216765980U (en) 2021-10-21 2021-10-21 Sinking construction device for bottom on-site construction of upper assembled underground building

Publications (1)

Publication Number Publication Date
CN216765980U true CN216765980U (en) 2022-06-17

Family

ID=81960773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122535605.9U Active CN216765980U (en) 2021-10-21 2021-10-21 Sinking construction device for bottom on-site construction of upper assembled underground building

Country Status (1)

Country Link
CN (1) CN216765980U (en)

Similar Documents

Publication Publication Date Title
CN114164860A (en) Sinking frame foundation, ground prefabrication equipment thereof and sinking device
CN114164861A (en) Construction method for underground building composed of wall-sinking foundation
CN216765980U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN113863371A (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN216765974U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN216765983U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN216765979U (en) Sinking construction device for assembled underground building
CN218667632U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN114032956A (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN218175904U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN216765977U (en) Sinking construction device for assembled underground building
CN219080402U (en) Sinking construction device for bottom on-site construction upper assembly type underground building
CN218667631U (en) Sinking construction device for assembled underground building
CN113846675A (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN216765978U (en) Sinking construction device for assembled underground building
CN216765973U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN114108614A (en) Construction method for sublevel sinking of underground building composed of connecting piles
CN113846692A (en) Sinking construction device for cast-in-place underground building
CN114108797A (en) Wall foundation and construction device and method thereof
CN216765970U (en) Sinking construction device for assembled underground building
CN216765972U (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN113846679A (en) Sinking construction device for bottom on-site construction of upper assembled underground building
CN218204541U (en) Sinking construction device for assembled underground building
CN114032955A (en) Sinking construction device for assembled underground building
CN113846689A (en) Sinking construction device for bottom on-site construction of upper assembled underground building