CN216741342U - Drilling equipment for road construction - Google Patents
Drilling equipment for road construction Download PDFInfo
- Publication number
- CN216741342U CN216741342U CN202123291336.2U CN202123291336U CN216741342U CN 216741342 U CN216741342 U CN 216741342U CN 202123291336 U CN202123291336 U CN 202123291336U CN 216741342 U CN216741342 U CN 216741342U
- Authority
- CN
- China
- Prior art keywords
- fixed
- threaded rod
- base
- road construction
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000004080 punching Methods 0.000 claims abstract description 19
- 230000010405 clearance mechanism Effects 0.000 claims abstract description 6
- 238000004140 cleaning Methods 0.000 claims description 15
- 239000000428 dust Substances 0.000 claims description 11
- 244000309464 bull Species 0.000 claims description 3
- 238000010030 laminating Methods 0.000 abstract description 4
- 239000007858 starting material Substances 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 23
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000003915 air pollution Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Road Repair (AREA)
Abstract
The utility model discloses a punching device for road construction, and relates to the technical field of road construction. Including fixed frame, the bottom of fixed frame is fixed with the base, the lateral wall of base is fixed with pushes away the handle, the top of fixed frame is fixed with the motor, the output of motor is fixed with the threaded rod, the bottom of threaded rod is rotated and is installed the top at the base, the outer wall threaded connection of threaded rod has the thread bush. This drilling equipment for road construction, after perforating device punches, and then starter motor, the reversal of control threaded rod, make the thread bush upward movement on the threaded rod, make the thread bush drive the fixed plate upward movement, make the fixed plate drive perforating device upward movement, when the threaded rod is rotatory, through drive mechanism, clearance mechanism's cooperation, the drilling rod that makes on the clean brush laminating perforating device rotates, and then when drilling rod upward movement, make clean brush can clear up perforating device's drilling rod.
Description
Technical Field
The utility model relates to the technical field of road construction, in particular to punching equipment for road construction.
Background
In the road construction process, the punching sampling is usually needed when the road engineering quality is detected, and the punching is also needed when accessories such as guardrails, road piles and the like are installed on roads.
Through retrieval, chinese patent No. CN207332757U discloses a drilling device for road construction with high practicability. The device can prevent that the produced dust can not fly to everywhere outside when drilling, reduces the air pollution of job site, has reached the effect that the practicality is high.
The above patents suffer from the following drawbacks: above-mentioned device can make on the drilling rod on the drilling machine attached to things such as a large amount of dust earth when drilling equipment changes the hole after, and then needs clear up the drilling rod, nevertheless can beat very porous when road construction, and then go through the manual work when clearing up the drilling rod, and is more time-consuming and energy-consuming, inconvenient staff's operation.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides punching equipment for road construction, which solves the problems mentioned in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a drilling equipment for road construction, includes fixed frame, the bottom of fixed frame is fixed with the base, the lateral wall of base is fixed with pushes away the handle, the top of fixed frame is fixed with the motor, the output of motor is fixed with the threaded rod, the bottom of threaded rod is rotated and is installed the top at the base, the outer wall threaded connection of threaded rod has the thread bush, one side slidable mounting of thread bush is at the inner wall of fixed frame, the opposite side of thread bush is fixed with the fixed plate, the bottom of fixed plate is fixed with perforating device, set up drive mechanism on the threaded rod, the bottom of base is fixed with the dust cover, be provided with clearance mechanism in the dust cover, clearance mechanism includes the bracing piece.
Preferably, the transmission mechanism comprises a first transmission wheel, a transmission belt is wound on the first transmission wheel, one side, far away from the first transmission wheel, of the transmission belt is wound on a second transmission wheel, a rotating rod is fixed on the inner wall of the second transmission wheel, and a first gear is fixed at the bottom of the rotating rod.
Preferably, a sliding block is fixed at the bottom of the supporting rod and is slidably mounted in a sliding groove, the sliding groove is formed in the top of the disc, a cleaning brush is fixed on the inner wall of the disc, and a second gear is fixed on the outer wall of the disc
Preferably, the base is provided with a through hole, and the bottom of the base is fixed with a universal wheel.
(III) advantageous effects
The utility model provides a punching device for road construction. The method has the following beneficial effects:
(1) this drilling equipment for road construction, after perforating device punches, and then starter motor, the reversal of control threaded rod makes the thread bush rebound on the threaded rod, makes the thread bush drive fixed plate rebound, makes the fixed plate drive perforating device rebound, when the threaded rod is rotatory, through drive mechanism, clearance mechanism's cooperation, make the drilling rod on the cleaning brush laminating perforating device rotate, and then when drilling rod rebound, make cleaning brush can clear up perforating device's drilling rod.
(2) This drilling equipment for road construction through the dust cover that the base bottom set up, plays dirt-proof effect, and the bottom of base is fixed with the universal wheel, and then can remove perforating device by the baffle.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1 according to the present invention;
FIG. 3 is a schematic top view of the cleaning mechanism of the present invention.
In the figure: 1. a fixing frame; 2. a base; 3. a universal wheel; 4. a push handle; 5. a motor; 6. a threaded rod; 7. a threaded sleeve; 8. a fixing plate; 9. a punching device; 10. a through hole; 11. a dust cover; 12. a transmission mechanism; 121. a first drive pulley; 122. a transmission belt; 123. a second transmission wheel; 124. a rotating rod; 125. A first gear; 13. a cleaning mechanism; 131. a support bar; 132. a slider; 133. a chute; 134. a disc; 135. cleaning the brush; 136. a second gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a punching device for road construction comprises a fixed frame 1, a base 2 is fixed at the bottom of the fixed frame 1, a through hole 10 is formed in the base 2, a universal wheel 3 is fixed at the bottom of the base 2, the universal wheel 3 is convenient to move a punching device 9, a push handle 4 is fixed on the side wall of the base 2, a motor 5 is fixed at the top of the fixed frame 1, a threaded rod 6 is fixed at the output end of the motor 5, the bottom of the threaded rod 6 is rotatably installed at the top of the base 2, a threaded sleeve 7 is connected to the outer wall of the threaded rod 6 in a threaded manner, one side of the threaded sleeve 7 is slidably installed on the inner wall of the fixed frame 1, a fixed plate 8 is fixed at the other side of the threaded sleeve 7, the punching device 9 is fixed at the bottom of the fixed plate 8, a transmission mechanism 12 is arranged on the threaded rod 6, a dust cover 11 is fixed at the bottom of the base 2, the dust cover 11 can play a dust-proof role during punching, and a cleaning mechanism 13 is arranged in the dust cover 11, clearance mechanism 13 includes bracing piece 131, and after perforating device 9 punched, and then starter motor 5, the reversal of control threaded rod 6 makes thread bush 7 rebound on threaded rod 6, makes thread bush 7 drive fixed plate 8 rebound, makes fixed plate 8 drive perforating device 9 rebound.
The transmission mechanism 12 includes a first transmission wheel 121, a transmission belt 122 is wound on the first transmission wheel 121, one side of the transmission belt 122 far from the first transmission wheel 121 is wound on a second transmission wheel 123, a rotating rod 124 is fixed on the inner wall of the second transmission wheel 123, the rotating rod 124 penetrates through the base 2, the rotating rod 124 is rotatably connected with the 2 penetrating position of the base, a first gear 125 is fixed at the bottom of the rotating rod 124, a sliding block 132 is fixed at the bottom of the support rod 131, and the support rod 131 plays a role of supporting a disc 134. Slider 132 slidable mounting is in spout 133, spout 133 sets up the top at disc 134, the inner wall of disc 134 is fixed with cleaning brush 135, the outer wall of disc 134 is fixed with second gear 136, when threaded rod 6 is rotatory, it is rotatory to drive first drive wheel 121, through drive belt 122, it is rotatory to make second drive wheel 123, and then make bull stick 124 drive first gear 125 rotatory, be the intermeshing form because of first gear 125 and second gear 136, and then make second gear 136 rotatory, make cleaning brush 135 laminating perforating device 9's drilling rod rotatory, and then when making perforating device 9's drilling rod laminating cleaning brush 135 rebound, can clear up adnexed thing on the drilling rod, make the drilling rod keep clean state, increase the life of drilling rod.
When the drilling machine is in operation (or in use), when the motor 5 is started, the threaded rod 6 is rotated forwards, the threaded sleeve 7 is further moved downwards on the threaded rod 6, the punching device 9 is driven to move downwards for punching, when punching is finished, the motor 5 is started, the threaded rod 6 is rotated backwards, the threaded sleeve 7 is further moved upwards on the threaded rod 6, the punching device 9 is driven to move upwards, when the threaded rod 6 is rotated, the first transmission wheel 121 is driven to rotate, the second transmission wheel 123 is driven to rotate through the transmission belt 122, the rotating rod 124 drives the first gear 125 to rotate, as the first gear 125 and the second gear 136 are meshed with each other, the second gear 136 is driven to rotate, the disc 134 is driven to rotate, the cleaning brush 135 is attached to a drill rod of the punching device 9 to rotate, and as the cleaning brush 135 is rotated when the drill rod of the punching device 9 is attached to the cleaning brush 135 to move upwards, and then can clear up the adnexed thing on the drilling rod, make the drilling rod keep clean state, increase the life of drilling rod.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a drilling equipment for road construction, includes fixed frame (1), its characterized in that: the bottom of fixed frame (1) is fixed with base (2), the lateral wall of base (2) is fixed with pushes away (4), the top of fixed frame (1) is fixed with motor (5), the output of motor (5) is fixed with threaded rod (6), the bottom of threaded rod (6) is rotated and is installed at the top of base (2), the outer wall threaded connection of threaded rod (6) has thread bush (7), one side slidable mounting of thread bush (7) is at the inner wall of fixed frame (1), the opposite side of thread bush (7) is fixed with fixed plate (8), the bottom of fixed plate (8) is fixed with perforating device (9), set up drive mechanism (12) on threaded rod (6), the bottom of base (2) is fixed with dust cover (11), be provided with clearance mechanism (13) in dust cover (11), the cleaning mechanism (13) comprises a support rod (131).
2. The punching apparatus for road construction according to claim 1, wherein: drive mechanism (12) include first drive wheel (121), around being equipped with drive belt (122) on first drive wheel (121), one side that first drive wheel (121) was kept away from in drive belt (122) is around establishing on second drive wheel (123), the inner wall of second drive wheel (123) is fixed with bull stick (124), the bottom of bull stick (124) is fixed with first gear (125).
3. The boring apparatus for road construction according to claim 1, wherein: the bottom of bracing piece (131) is fixed with slider (132), slider (132) slidable mounting is in spout (133), the top at disc (134) is seted up in spout (133), the inner wall of disc (134) is fixed with cleaning brush (135), the outer wall of disc (134) is fixed with second gear (136).
4. The punching apparatus for road construction according to claim 1, wherein: the base (2) is provided with a through hole (10), and the bottom of the base (2) is fixed with a universal wheel (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123291336.2U CN216741342U (en) | 2021-12-25 | 2021-12-25 | Drilling equipment for road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123291336.2U CN216741342U (en) | 2021-12-25 | 2021-12-25 | Drilling equipment for road construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216741342U true CN216741342U (en) | 2022-06-14 |
Family
ID=81938006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123291336.2U Expired - Fee Related CN216741342U (en) | 2021-12-25 | 2021-12-25 | Drilling equipment for road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216741342U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115370298A (en) * | 2022-10-27 | 2022-11-22 | 河北筑凯建筑工程有限公司 | Highway construction drilling machine |
-
2021
- 2021-12-25 CN CN202123291336.2U patent/CN216741342U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115370298A (en) * | 2022-10-27 | 2022-11-22 | 河北筑凯建筑工程有限公司 | Highway construction drilling machine |
CN115370298B (en) * | 2022-10-27 | 2023-01-06 | 河北筑凯建筑工程有限公司 | Highway construction drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207976303U (en) | A kind of soil remediation sampler | |
CN216741342U (en) | Drilling equipment for road construction | |
CN113665005B (en) | Cement wall prefabricated hole processing equipment for building construction | |
CN110465999B (en) | Lightweight template drilling equipment | |
CN210483523U (en) | Automatic drilling machine | |
CN116337511A (en) | Sand sampler for investigation | |
CN111707497A (en) | Rotatory integral type soil acquisition reaming device | |
CN211527884U (en) | Core drilling sampling equipment for detecting concrete | |
CN210293765U (en) | Road bridge detects with sampling device that punches | |
CN210334530U (en) | Cutting device convenient to move for color sandwich plate | |
CN208468606U (en) | A kind of wood boring machine convenient for adjusting | |
CN221094696U (en) | Drilling device for urban rail | |
CN220302091U (en) | Municipal works construction perforating device | |
CN221415087U (en) | Aluminium wheel hub drilling equipment | |
CN216197883U (en) | Drilling tool for hole forming and pipe following of slope reinforcing anchor cable | |
CN221639825U (en) | Numerical control engraving machine convenient for cleaning scraps | |
CN218694103U (en) | Drilling equipment is used in rail production | |
CN212957766U (en) | Wall construction breaker | |
CN214659927U (en) | Drilling machine for road construction that flexibility is high | |
CN219902777U (en) | Inverted notching equipment | |
CN221220410U (en) | Drilling machine for geotechnical engineering | |
CN221734868U (en) | Flange apparatus for producing | |
CN114232706B (en) | Water conservancy underground cut-off wall slotting equipment | |
CN114960671B (en) | Foundation pit collapse-preventing supporting structure for building construction | |
CN217872630U (en) | Soil drilling machine for garden engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220614 |