CN216740623U - Split clamping plate assembly - Google Patents

Split clamping plate assembly Download PDF

Info

Publication number
CN216740623U
CN216740623U CN202220217932.1U CN202220217932U CN216740623U CN 216740623 U CN216740623 U CN 216740623U CN 202220217932 U CN202220217932 U CN 202220217932U CN 216740623 U CN216740623 U CN 216740623U
Authority
CN
China
Prior art keywords
plate
clamping plate
upper anchor
guide
anchor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220217932.1U
Other languages
Chinese (zh)
Inventor
杨薛亮
何滢
陈建东
余登敏
韦廷辉
谢树琛
何建宏
尚玉龙
刘海棠
陈绍志
吴军
汪航
黎光军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202220217932.1U priority Critical patent/CN216740623U/en
Application granted granted Critical
Publication of CN216740623U publication Critical patent/CN216740623U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The utility model discloses a split clamping plate assembly, which comprises the following steps in sequence: mounting the clamping plate and the upper anchor plate; and (5) disassembling the clamping plate and the upper anchor plate. The clamping plate is clamped on the upper anchor plate through the guide of the guide plate, and the limiting columns are clamped into the guide plate and limiting through holes on the side edges of the clamping plate for limiting, so that the clamping plate and the upper anchor plate are quickly installed; the guide plate is hung to the upper edge and the lower edge of the bayonet and is not in contact with the inner diameter edge of the upper anchor plate in a matching mode, and the clamping plate slides towards the center of the inner diameter of the upper anchor plate in the guide plate, so that the clamping plate is quickly separated from the upper anchor plate. The problem of the connecting piece use bolt and go up anchor slab fixed connection have can not with last anchor slab quick assembly disassembly fixed connection is solved.

Description

Split clamping plate assembly
Technical Field
The utility model relates to a split clamping plate assembly, and belongs to the technical field of fan installation and construction.
Background
When assembling last anchor plate, lower anchor plate, crab-bolt to aerogenerator, prior art is that the crane will go up the anchor plate and mention, and 1 ~ 2 staff go up to the last anchor plate apart from ground about 4m height, and staff's safety belt is hung on the crane lifting hook, because the safety belt hangs the point and has 2m more apart from the lifting hook plumb line, very easily takes place to fall the swing collision, has the potential safety hazard greatly. In order to eliminate safety accidents caused by workers going to the upper anchor plate, a construction platform needs to be installed on the upper anchor plate.
The traditional connection mode of the construction platform and the upper anchor plate is directly connected with the upper anchor plate by using bolts, for example, the Chinese patent publication No. CN110616732B is used for a fastening leveling device of an anchor bolt cage, and the connecting piece is fixedly connected with the upper anchor plate by using bolts.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a split clamping plate component.
The utility model is realized by the following technical scheme.
The utility model provides a split chuck plate component, which comprises:
a guide plate;
the cardboard, the penetrating slidable fit in cardboard inside cavity both ends is installed on the deflector, and the cardboard outer end is equipped with the bayonet socket that clamps with last anchor slab internal diameter limit.
And limiting through holes are formed in the side edges of the guide plate and the clamping plate, and are clamped with limiting columns.
The width of the bayonet at the outer end of the clamping plate is larger than the axial thickness of the inner diameter of the upper anchor plate.
And a handle which is convenient for the clamping plate to slide on the guide plate is fixed on the side edge of the clamping plate.
The clamping plate is welded and fixed with the handle.
The utility model has the beneficial effects that: the bayonet at the outer end of the clamping plate is aligned with the axial thickness of the inner diameter of the upper anchor plate, the clamping plate is clamped on the upper anchor plate through the guide of the guide plate, the limiting through hole of the guide plate is aligned with the limiting through hole of the clamping plate, and the limiting column is clamped into the guide plate and the limiting through holes on the side edges of the clamping plate for limiting, so that the clamping plate and the upper anchor plate are quickly installed; the upper anchor plate is fixed, the guide plate is hung to the upper edge and the lower edge of the bayonet and is not in contact with the inner diameter edge of the upper anchor plate in a matching mode, and the clamping plate slides to the center of the inner diameter of the upper anchor plate through the guide plate, so that the clamping plate is quickly separated from the upper anchor plate. The problem of connecting piece use bolt and last anchor slab fixed connection exist can not with last anchor slab quick assembly disassembly fixed connection is solved.
Drawings
FIG. 1 is a schematic structural diagram of a fan foundation anchor bolt quick-mounting system hoisting device of the utility model;
FIG. 2 is a schematic view of the mounting structure of the platform assembly of the present invention;
FIG. 3 is a schematic structural view of the platform assembly, the split clamping plate assembly and the fence of the present invention;
FIG. 4 is a schematic view of the hoist of the present invention mounted to the platform assembly;
FIG. 5 is a schematic view of the hoist of the present invention at the inner diameter of the upper anchor plate;
FIG. 6 is a schematic view of the hoisting rope hoisting anchor bolt of the utility model installed on the upper anchor plate and the lower anchor plate;
figure 7 is a schematic structural view of the split card assembly of the present invention.
In the figure: 11-anchor bolts; 12-upper anchor plate; 13-lower anchor plate; 21-a support; 23-a winch; 24-hoisting ropes; 31-a first edge platform; 32-a second edge platform; 33-cover plate; 34-a lifting lug; 35-a hoisting disc; 41-a guide plate; 42-a clamping plate; 43-a limiting column; 44-a handle; and 5-fencing.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1-7.
The utility model relates to a split card assembly, comprising: the guide plates 41 fixed on the first side platform 31 and the second side platform 32 at intervals in a welding manner, so that the split clamping plate assembly and the platform assembly are fixedly installed; the number of the guide plates 41 may be four or more, two guide plates 41 are distributed on the first edge platform 31, and the other two guide plates 41 are distributed on the second edge platform 32; the number of the guide plates 41 may be plural;
the clamping plate 42 is hollow inside and has two through ends, and the outer end of the clamping plate 42 is provided with a bayonet clamped with the inner diameter side of the upper anchor plate 12;
limiting through holes are formed in the side edges of the guide plate 41 and the clamping plate 42, and limiting columns 43 are clamped in the limiting through holes;
the width of the bayonet at the outer end of the clamping plate 42 is larger than the axial thickness of the inner diameter of the upper anchor plate 12, when the clamping plate 42 slides on the guide plate 41 to clamp the bayonet with the inner diameter of the upper anchor plate 12, the limiting through hole of the guide plate 41 is aligned with the limiting through hole of the clamping plate 42, and the limiting column 43 is clamped into the limiting through holes on the side edges of the guide plate 41 and the clamping plate 42 for limiting;
when the upper anchor plate 12 is fixed, the guide plate 41 is lifted to a state that the upper edge and the lower edge of the bayonet are not matched with the inner diameter edge of the upper anchor plate 12 by a crane, so that the clamping plate 42 slides towards the center of the inner diameter of the upper anchor plate 12 on the guide plate 41, and the clamping plate 42 is quickly separated from the upper anchor plate 12; the split clamping plate assembly and the upper anchor plate 12 can be quickly disassembled.
Handles 44 for sliding the clamping plates 42 on the guide plates 41 are welded and fixed on the side edges of the clamping plates 42.
The bayonet at the outer end of the clamping plate 42 is aligned with the axial thickness of the inner diameter of the upper anchor plate 12, the clamping plate 42 is clamped on the upper anchor plate 12 through the guide of the guide plate 41, the limiting through hole of the guide plate 41 is aligned with the limiting through hole of the clamping plate 42, and the limiting column 43 is clamped into the limiting through holes on the side edges of the guide plate 41 and the clamping plate 42 for limiting, so that the clamping plate 42 and the upper anchor plate 12 are quickly installed;
the upper anchor plate 12 is fixed, the guide plate 41 is hung to the upper side and the lower side of the bayonet and is not in contact with the inner diameter edge of the upper anchor plate 12 in a matching mode, and the clamping plate 42 slides towards the center of the inner diameter of the upper anchor plate 12 on the guide plate 41, so that the clamping plate 42 is quickly separated from the upper anchor plate 12. The problem of the connecting piece use bolt and go up anchor slab fixed connection have can not with last anchor slab quick assembly disassembly fixed connection is solved.
A fan basis crab-bolt fast-assembling system includes:
the split clamping plate component is fixedly arranged with the platform component and is detachably arranged with the upper anchor plate 12;
the hoisting component can hoist the anchor bolt 11 to be installed with the upper anchor plate 12 and the lower anchor plate 13;
the hoisting component comprises a supporting piece 21, the supporting piece 21 is composed of telescopic rods with controllable telescopic length, for example, telescopic rods formed by controlling at least two sections of rods to be sleeved together in a telescopic way at intervals through screws;
the fixed pulley is arranged at the end part of the supporting piece 21 extending out of the outer diameter of the upper anchor plate 12;
the rotating power piece 23 is placed on the platform assembly and positioned at the inner diameter of the upper anchor plate 12, the rotating power piece 23 is a winch, and the end part of the supporting piece 21 positioned at the inner diameter of the upper anchor plate 12 is hinged with the base of the rotating power piece 23 in a way of rotating up and down along the axial direction of the anchor bolt 11;
the hoisting rope 24 is composed of steel wire ropes, and the hoisting rope 24 can also adopt synthetic fiber hanging strips, such as a single 1t/2m terylene flat hanging strip; hoisting rope 24 one end winding is located rotatory power part 23, and hoisting rope 24 walks around the fixed pulley and installs the lifting hook that is used for hoisting crab-bolt 11, and the lifting hook can adopt to choose for use 1t steel lifting hook.
The platform assembly provides a stress foundation for the hoisting assembly, and a worker can step on the platform assembly to work;
the platform assembly comprises a first side platform 31 and a second side platform 32 which are formed by welding or installing bolts by rigid materials such as steel plates and/or steel beams, and the like, wherein the first side platform 31 and the second side platform 32 are detachably assembled through bolts;
one or more operation through holes for operators to go up and down are arranged on the platform component, the operation through holes can be arranged on the first side platform 31 or the second side platform 32, and cover plates 33 are arranged on the operation through holes through loose-leaf flip covers;
lifting lugs 34 are welded and fixed on the platform assembly, the lifting lugs 34 are welded on the first side platform 31 and the second side platform 32, and a crane can conveniently lift the whole system from the upper anchor plate 12 to the ground through the lifting lugs 34 for disassembly and assembly;
the hoisting disc 35 is rotatably arranged on the platform assembly through a bearing or a shaft hole in clearance fit, the hoisting disc 35 is arranged on the first side platform 31 or the second side platform 32, the rotary power piece 23 is arranged on the hoisting disc 35 to achieve the purpose that the platform assembly provides a stress base for the hoisting assembly, and the hoisting disc 35 can drive the rotary power piece 23 to rotate along the circumferential direction of the upper anchor plate 12 when rotating; the rotary power member 23 may be directly mounted on the first side platform 31 or the second side platform 32.
The split clamping plate assembly comprises guide plates 41 which are welded and fixed on the first side platform 31 and the second side platform 32 at intervals, and the split clamping plate assembly and the platform assembly are fixedly installed; the number of the guide plates 41 may be four or more, two guide plates 41 are distributed on the first side platform 31, and the other two guide plates 41 are distributed on the second side platform 32; the number of the guide plates 41 may be plural;
the clamping plate 42 is hollow inside and has two through ends, and the outer end of the clamping plate 42 is provided with a bayonet clamped with the inner diameter side of the upper anchor plate 12;
limiting through holes are formed in the side edges of the guide plate 41 and the clamping plate 42, and limiting columns 43 are clamped in the limiting through holes;
the width of the bayonet at the outer end of the clamping plate 42 is larger than the axial thickness of the inner diameter of the upper anchor plate 12, when the clamping plate 42 slides on the guide plate 41 to clamp the bayonet with the inner diameter of the upper anchor plate 12, the limiting through hole of the guide plate 41 is aligned with the limiting through hole of the clamping plate 42, and the limiting column 43 clamps the limiting through holes on the side edges of the guide plate 41 and the clamping plate 42 for limiting;
when the upper anchor plate 12 is fixed, the guide plate 41 is lifted to a state that the upper edge and the lower edge of the bayonet are not matched with the inner diameter edge of the upper anchor plate 12 by a crane, so that the clamping plate 42 slides towards the center of the inner diameter of the upper anchor plate 12 on the guide plate 41, and the clamping plate 42 is quickly separated from the upper anchor plate 12; the split clamping plate assembly and the upper anchor plate 12 can be detachably mounted.
Handles 44 for sliding the clamping plates 42 on the guide plates 41 are welded and fixed on the side edges of the clamping plates 42.
A fence 5 mounted on the outer edge of the platform assembly, the fence protecting personnel on the platform assembly.
A method for installing and constructing a fan foundation anchor bolt anchor plate by using a fan foundation anchor bolt fast-assembling system comprises the following steps:
system installation: the fast assembling system of the fan foundation anchor bolt is arranged on the inner diameter of an upper anchor plate 12 above a lower anchor plate 13, a small slow-speed rotating power piece 23 is arranged on a hoisting disc 35 of a platform assembly, a supporting rod 21 is arranged, a fixed pulley is arranged at the top of the supporting rod 21, the rotating power piece 23 emits a hoisting rope 24 along the direction of the supporting rod 21, the hoisting rope 24 penetrates through the fixed pulley at the top of the supporting rod 21, and a lifting hook is arranged at the head of the hoisting rope 24; the length of the telescopic movable section of the support rod 21 is adjusted to ensure that the support rod 21 extends out of the outer edge of the outer diameter of the upper anchor plate 12 by a distance of 100mm, and the movable section is fixed by fastening screws to ensure that the support rod 21 can not be stretched any more;
hoisting preparation: the hoisting rope 24 is lowered by rotating the power part 23, so that the lifting hook at the tail end of the hoisting rope 24 is lowered to the ground; meanwhile, ground workers make the installation preparation of the anchor bolts 11, place all the anchor bolts 11 in a combined place orderly, screw a thin locking nut at the lower end (short thread end) of each anchor bolt 11, and screw a nylon adjusting nut at the upper end of each positioned anchor bolt 11; the ground worker binds the anchor bolt 11 with a synthetic fiber sling, the hanging point is about 1/3 (upper end) of the anchor bolt, and the hook is hooked with the synthetic fiber sling.
Hoisting construction: the rotating power piece 23 is started to lift the anchor bolt 11; when the upper end of the anchor bolt 11 is about 100mm away from the lower part of the upper anchor plate 12, the lifting is stopped; at the moment, ground workers adjust the angle of the anchor bolt 11, the anchor bolt 11 is lifted manually, the upper end of the anchor bolt penetrates into the anchor hole of the upper anchor plate 12, and then the lower end of the anchor bolt penetrates into the corresponding anchor hole of the lower anchor plate 13; after the anchor bolts 11 in the same region are installed, the supporting rod 21 retracts, and the rotating power piece 23 is started to retract the hoisting rope 24 and the lifting hook; the rotating power part 23 rotates the rotating platform on the winding disc 23 to face the next area, the steps are repeated again, and all anchor bolts are hoisted and threaded in sequence.

Claims (5)

1. A split card assembly, comprising:
a guide plate (41);
the clamping plate (42), the hollow two ends inside the clamping plate (42) are arranged on the guide plate (41) in a penetrating and slidable fit mode, and the outer end of the clamping plate (42) is provided with a bayonet clamped with the inner diameter side of the upper anchor plate (12).
2. The split card assembly of claim 1, wherein: all be equipped with spacing through-hole on deflector (41) and cardboard (42) side, spacing through-hole clamps has spacing post (43).
3. The split card assembly of claim 1, wherein: the width of the bayonet at the outer end of the clamping plate (42) is larger than the axial thickness of the inner diameter of the upper anchor plate (12).
4. The split card assembly of claim 1, wherein: and a handle (44) which is convenient for the clamping plate (42) to slide on the guide plate (41) is fixed on the side edge of the clamping plate (42).
5. The split card assembly of claim 4, wherein: the clamping plate (42) and the handle (44) are fixed in a welding mode.
CN202220217932.1U 2022-01-26 2022-01-26 Split clamping plate assembly Active CN216740623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220217932.1U CN216740623U (en) 2022-01-26 2022-01-26 Split clamping plate assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220217932.1U CN216740623U (en) 2022-01-26 2022-01-26 Split clamping plate assembly

Publications (1)

Publication Number Publication Date
CN216740623U true CN216740623U (en) 2022-06-14

Family

ID=81917023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220217932.1U Active CN216740623U (en) 2022-01-26 2022-01-26 Split clamping plate assembly

Country Status (1)

Country Link
CN (1) CN216740623U (en)

Similar Documents

Publication Publication Date Title
CN107697818B (en) Construction method and special construction equipment for wall of prestressed concrete wind power tower
CN110902579A (en) Hydraulic lifting device for construction
CN113023600B (en) Prefabricated post location guider of assembled building concrete
CN216740623U (en) Split clamping plate assembly
CN112110347A (en) Hoisting device for operation site
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN114427288B (en) Installation construction method of split clamping plate assembly and anchor plate and split clamping plate assembly
CN216865922U (en) Fan basis crab-bolt fast-assembling system
CN113585860B (en) Method for assembling and disassembling double-arm holding pole
CN114278073A (en) Fan basis crab-bolt fast-assembling system
CN115057336A (en) Installation device for boom tray and boom nut of beam lifting machine
CN114411797A (en) Installation and construction method of anchor plate of anchor bolt of fan foundation
CN112499486A (en) Portable transformer lifter and operation method thereof
CN216865945U (en) Flexible fence structure
CN110626960A (en) Mechanical equipment hoisting frame
CN111924725A (en) Building templates hoist device for house construction
CN219732715U (en) Novel building construction frame
CN113829290A (en) Sector block disassembly tool and disassembly inspection method thereof
CN211850382U (en) Device for ensuring thickness of beam bottom steel bar protective layer
CN215974684U (en) High-altitude portable tower dismantling derrick mast
CN215711265U (en) Temporary support hoisting device utilizing existing support under bridge
CN114436133B (en) High-altitude tower crane arm rod self-disassembly auxiliary device and construction method thereof
CN219992449U (en) Pile head breaking device
CN217051414U (en) Hoisting accessory is used in assembly shop
CN216764072U (en) Vertical hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant