CN216739806U - Excavator bucket for excavator and excavator - Google Patents

Excavator bucket for excavator and excavator Download PDF

Info

Publication number
CN216739806U
CN216739806U CN202123029988.9U CN202123029988U CN216739806U CN 216739806 U CN216739806 U CN 216739806U CN 202123029988 U CN202123029988 U CN 202123029988U CN 216739806 U CN216739806 U CN 216739806U
Authority
CN
China
Prior art keywords
plate
excavator
bottom plate
back plate
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123029988.9U
Other languages
Chinese (zh)
Inventor
雷峰娃
张亚龙
张航
罗旭帆
郭自超
黄许伟
陈金鹏
郭荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Engineering Co Ltd Of Cccc First Highway Engineering Co ltd
Original Assignee
Northwest Engineering Co Ltd Of Cccc First Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Engineering Co Ltd Of Cccc First Highway Engineering Co ltd filed Critical Northwest Engineering Co Ltd Of Cccc First Highway Engineering Co ltd
Priority to CN202123029988.9U priority Critical patent/CN216739806U/en
Application granted granted Critical
Publication of CN216739806U publication Critical patent/CN216739806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Shovels (AREA)

Abstract

The application relates to the technical field of engineering machinery, in particular to an excavator bucket for an excavator and the excavator, wherein the excavator bucket comprises a back plate, a bottom plate, a top plate and two side plates; the bottom plate is connected with the back plate, the top plate is connected with one side of the back plate, which is far away from the bottom plate, and the bottom plate and the top plate are positioned at the same side of the back plate; the two side plates are respectively connected with two opposite ends of the back plate, the two side plates are positioned on the same side of the back plate, two sides of each side plate are respectively connected with the bottom plate and the top plate, and the distance between the two side plates is gradually reduced from the top plate to one side of the bottom plate; the excavator bucket for excavator of design through the common excavator bucket that constitutes of backplate, bottom plate, roof and two blocks of curb plates, can realize once taking shape of trapezoidal escape canal construction, need not the manual work and digs the triangle region in trapezoidal escape canal once more, has also got rid of the influence of human factor to ditch excavation construction simultaneously, has guaranteed construction quality to greatly improved escape canal construction speed.

Description

Excavator bucket for excavator and excavator
Technical Field
The application relates to the technical field of engineering machinery, in particular to an excavator bucket for an excavator and the excavator.
Background
The drainage engineering is an engineering for collecting and discharging various waste water, redundant surface water and underground water in human domestic sewage and production, the main facilities are drainage channels or pipelines at all levels and auxiliary buildings thereof, in the construction of a highway project of Wuyi in Xinjiang with the total length of twenty kilometers, the drainage engineering is used as a main engineering for attaching a roadbed, the trapezoidal drainage ditch occupies a large part of the drainage engineering, and in the construction process of the trapezoidal drainage ditch, the ditch excavation is an important link in the drainage ditch construction.
Application number 201420663042.9's patent document discloses an excavator bucket, and it includes two lateral walls, fixes being equipped with a bottom plate between the cambered surface limit of two lateral walls, the fixed lip that is equipped with in bottom plate one side, two lateral walls, bottom plate and lip constitute a concave type can hold the space, be equipped with an extension plate in the lip, one side of extension plate is equipped with the bucket tooth, and some and the extension plate of bucket tooth link to each other to imbed in the lip, and another part of bucket tooth stretches out the lip and extends to surpassing the opening part of lateral wall, the border that the lip is close to the lateral wall is equipped with the lip locating hole, be equipped with first locating hole and second locating hole on the extension plate.
In view of the above-mentioned related technologies, the inventor thinks that when the excavator bucket is designed to construct a ladder-shaped drainage ditch, because the shape of the excavator bucket is greatly different from the cross-sectional shape of the ladder-shaped drainage ditch, after the excavation is completed, a large number of workers are required to be invested to trim the drainage ditch, which affects the construction speed of the ladder-shaped drainage ditch.
SUMMERY OF THE UTILITY MODEL
In order to improve the construction speed of trapezoidal escape canal, this application provides an excavator is with bucket and excavator, adopts following technical scheme:
in a first aspect, the present application provides a bucket for an excavator, which adopts the following technical scheme:
a bucket for an excavator comprises a back plate, a bottom plate, a top plate and two side plates;
the bottom plate is connected with the back plate, the top plate is connected with one side of the back plate, which is far away from the bottom plate, and the bottom plate and the top plate are positioned on the same side of the back plate;
the two side plates are respectively connected with two opposite ends of the back plate and are positioned at the same side of the back plate, two sides of each side plate are respectively connected with the bottom plate and the top plate, and the distance between the two side plates is gradually reduced from the top plate to one side of the bottom plate.
By adopting the technical scheme, blanking is carried out according to the section size of the trapezoidal drainage ditch, then the back plate, the bottom plate, the top plate and the two side plates are welded according to the preset position and angle, the section size of the welded excavator bucket for the excavator is almost the same as that of the drainage ditch, an operator discharges an excavation sideline of the drainage ditch before excavation, then the designed excavator bucket is used for excavation, and after the excavation is finished, the next procedure can be carried out only by slightly correcting the operator; the excavator bucket for excavator of design through the common excavator bucket that constitutes of backplate, bottom plate, roof and two blocks of curb plates, can realize once taking shape of trapezoidal escape canal construction, need not the manual work and digs the triangle region in trapezoidal escape canal once more, has reduced artifical quantity, has also got rid of the influence of human factor to ditch excavation construction simultaneously, has guaranteed construction quality to greatly improved escape canal construction speed.
Optionally, a plurality of reinforcing plates are connected to the back plate, the planes of the reinforcing plates are parallel to each other, and two ends of each reinforcing plate are connected to the bottom plate and the top plate respectively.
Through adopting above-mentioned technical scheme, the reinforcing plate of design can improve the connection structure intensity between bottom plate and roof and the backplate, prolongs the life of excavator bucket for the excavator.
Optionally, the side plate is connected with a plurality of first reinforcing ribs, one end of each first reinforcing rib, which is far away from the side plate, is connected with the reinforcing plate, and the first reinforcing ribs are connected with the back plate.
Through adopting above-mentioned technical scheme, the first strengthening rib plate of design can improve the connection structure intensity between curb plate and the reinforcing plate, can improve the connection structure intensity of curb plate and backplate simultaneously, and then the life of extension excavator bucket for the excavator.
Optionally, a plurality of second reinforcing rib plates are connected between two adjacent reinforcing plates, and the second reinforcing rib plates are connected with the back plate.
Through adopting above-mentioned technical scheme, the second reinforcing floor of design can further improve the structural strength of excavator bucket for the excavator.
Optionally, the first reinforcing rib and the second reinforcing rib are both arranged in an inclined manner from high to low from the side close to the top plate to the side close to the bottom plate.
Through adopting above-mentioned technical scheme, the first reinforcement floor and the second reinforcement floor that the slope set up are convenient for pour the earth in the bucket inner chamber.
Optionally, the bottom plate gradually increases in distance from the side close to the back plate to the side far away from the back plate.
By adopting the technical scheme, the bottom plate is obliquely arranged, so that soil in the inner cavity of the bucket can be poured out conveniently.
Optionally, the distance between the two side plates gradually increases from the side close to the back plate to the side far away from the back plate.
Through adopting above-mentioned technical scheme, the curb plate that the slope set up can prevent that the curb plate from scraping the lateral wall of trapezoidal escape canal when the bucket is under construction along trapezoidal escape canal length direction, has avoided needing artifical follow-up to carry out extensive renovation to the lateral wall of trapezoidal escape canal, and then has improved the construction speed in escape canal.
In a second aspect, the present application provides an excavator, which adopts the following technical solutions:
an excavator comprises an excavator bucket for the excavator, and the excavator bucket is mounted on the excavator.
Through adopting above-mentioned technical scheme, use the excavator of excavator bucket for the excavator, can improve the construction speed of trapezoidal escape canal.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the designed excavator bucket for the excavator is formed by the back plate, the bottom plate, the top plate and the two side plates together, so that one-step forming of trapezoidal drainage ditch construction can be realized, a triangular area of the trapezoidal drainage ditch does not need to be dug out again manually, the manual consumption is reduced, meanwhile, the influence of human factors on water ditch excavation construction is eliminated, the construction quality is ensured, and the construction speed of the drainage ditch is greatly improved;
2. according to the designed excavator bucket for the excavator, the strength of the connecting structure between the side plate and the reinforcing plate can be improved through the first reinforcing rib plate, and meanwhile, the strength of the connecting structure between the side plate and the back plate can be improved, so that the service life of the excavator bucket for the excavator is prolonged;
3. the excavator bucket for excavator of design through the curb plate that the slope set up, can prevent that the curb plate from scraping the lateral wall in trapezoidal escape canal when the excavator bucket carries out construction along trapezoidal escape canal length direction, has avoided needing artifical follow-up to carry out extensive renovation to the lateral wall in trapezoidal escape canal, and then has improved the construction speed in escape canal.
Drawings
Fig. 1 is a schematic view of an overall structure of a bucket for an excavator according to an embodiment of the present application;
fig. 2 is a side view of a bucket for an excavator according to an embodiment of the present application.
Reference numerals: 1. a back plate; 2. a base plate; 3. a top plate; 4. a side plate; 5. a reinforcing plate; 6. a first reinforcing rib; 7. a second reinforcing rib.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses excavator bucket and excavator for excavator.
In a first aspect, the embodiment of the application discloses a bucket for an excavator.
Referring to fig. 1 and 2, a bucket for an excavator includes a back plate 1, a bottom plate 2, a top plate 3, and two side plates 4; the bottom plate 2 is welded with the back plate 1, the top plate 3 is welded with one side of the back plate 1, which is far away from the bottom plate 2, the plane of the top plate 3 is vertical to the plane of the back plate 1, and the bottom plate 2 and the top plate 3 are positioned at the same side of the back plate 1; two blocks of curb plates 4 respectively with the relative both ends welding of backplate 1, and two blocks of curb plates 4 lie in the same one side of backplate 1, bottom plate 2 lies in the same one side of backplate 1 with curb plate 4, the relative both ends of curb plate 4 respectively with bottom plate 2 and roof 3 welding, and the interval between two blocks of curb plates 4 is reduced by roof 3 to bottom plate 2 one side gradually.
Referring to fig. 1 and 2, in order to facilitate dumping of soil in the bucket, the distance between the bottom plate 2 and the top plate 3 gradually increases from the side close to the back plate 1 to the side far away from the back plate 1.
Referring to fig. 1, in order to prevent that in trapezoidal escape canal work progress, the lateral wall of trapezoidal escape canal is scraped to curb plate 4 and leads to artifical follow-up to carry out extensive renovation to the lateral wall of trapezoidal escape canal, and the interval between two blocks of curb plates 4 is by being close to 1 one side of backplate to keeping away from 1 one side of backplate and increase gradually.
Referring to fig. 1, a plurality of reinforcing plates 5 are welded on a back plate 1, planes of the plurality of reinforcing plates 5 are arranged in parallel, two ends of each reinforcing plate 5 are respectively welded with one side, close to each other, of a bottom plate 2 and a top plate 3, the plane of each reinforcing plate 5 is perpendicular to the plane of the back plate 1, and the plane of each reinforcing plate 5 is perpendicular to the plane of the top plate 3; in this application, the number of the reinforcing plate 5 may be two, or may be three, and the number of the reinforcing plate 5 in this embodiment is two.
Referring to fig. 1, a plurality of first reinforcing ribs 6 are welded on a side plate 4, one end, away from the side plate 4, of each first reinforcing rib 6 is welded with a reinforcing plate 5, the first reinforcing ribs 6 are welded with a back plate 1, the plane where the first reinforcing ribs 6 are located is perpendicular to the plane where the back plate 1 is located, and the number of the first reinforcing ribs 6 welded on each side plate 4 is one in the embodiment.
Referring to fig. 1, a plurality of second reinforcing ribs 7 are welded between two adjacent reinforcing plates 5, the second reinforcing ribs 7 are welded to the back plate 1, and the second reinforcing ribs 7 are coplanar with the first reinforcing ribs 6.
Referring to fig. 1, in order to prevent soil from being stuck in the inner cavity of the bucket, the first reinforcing rib 6 is obliquely arranged from the side close to the top plate 3 to the side close to the bottom plate 2 from high to low; the second reinforcing rib 7 is inclined from the side close to the top plate 3 to the side close to the bottom plate 2 from high to low.
The implementation principle of the excavator bucket for the excavator in the embodiment of the application is as follows: the construction method comprises the following steps of blanking according to the section size of a trapezoid drainage ditch, welding a back plate 1, a bottom plate 2, a top plate 3 and two side plates 4 according to preset positions and angles, welding a reinforcing plate 5, a first reinforcing rib plate 6 and a second reinforcing rib plate 7 according to preset positions and angles, wherein the welded excavator bucket is almost the same as the section size of the drainage ditch, before excavation, workers give out the excavation sidelines of the trapezoid drainage ditch, then excavation is carried out by using the designed excavator bucket, and after the excavation of the trapezoid drainage ditch is finished, the workers only need to slightly repair to carry out construction of the next procedure.
In a second aspect, an embodiment of the present application discloses an excavator, which includes an excavator bucket for the excavator.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A bucket for an excavator is characterized by comprising a back plate (1), a bottom plate (2), a top plate (3) and two side plates (4);
the bottom plate (2) is connected with the back plate (1), the top plate (3) is connected with one side, far away from the bottom plate (2), of the back plate (1), and the bottom plate (2) and the top plate (3) are located on the same side of the back plate (1);
the two side plates (4) are respectively connected with two opposite ends of the back plate (1), the two side plates (4) are located on the same side of the back plate (1), two sides of each side plate (4) are respectively connected with the bottom plate (2) and the top plate (3), and the distance between the two side plates (4) is gradually reduced from one side of the top plate (3) to one side of the bottom plate (2).
2. The bucket for the excavator according to claim 1, wherein a plurality of reinforcing plates (5) are connected to the back plate (1), the planes of the plurality of reinforcing plates (5) are arranged in parallel, and both ends of the reinforcing plates (5) are respectively connected with the bottom plate (2) and the top plate (3).
3. The bucket for the excavator according to claim 2, wherein a plurality of first reinforcing ribs (6) are connected to the side plate (4), one end of the first reinforcing rib (6) away from the side plate (4) is connected to the reinforcing plate (5), and the first reinforcing rib (6) is connected to the back plate (1).
4. The bucket for the excavator according to claim 3, wherein a plurality of second reinforcing ribs (7) are connected between two adjacent reinforcing plates (5), and the second reinforcing ribs (7) are connected to the back plate (1).
5. The bucket for an excavator according to claim 4, wherein the first reinforcing floor (6) and the second reinforcing floor (7) are each provided so as to be inclined from high to low from the side close to the top plate (3) to the side close to the bottom plate (2).
6. The excavator bucket of claim 1, wherein the distance between the bottom plate (2) and the top plate (3) increases from the side close to the back plate (1) to the side far from the back plate (1).
7. The excavator bucket of claim 1, wherein the distance between the side plates (4) increases from the side close to the back plate (1) to the side far from the back plate (1).
8. An excavator comprising an excavator bucket according to any one of claims 1 to 7.
CN202123029988.9U 2021-12-03 2021-12-03 Excavator bucket for excavator and excavator Active CN216739806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123029988.9U CN216739806U (en) 2021-12-03 2021-12-03 Excavator bucket for excavator and excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123029988.9U CN216739806U (en) 2021-12-03 2021-12-03 Excavator bucket for excavator and excavator

Publications (1)

Publication Number Publication Date
CN216739806U true CN216739806U (en) 2022-06-14

Family

ID=81933607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123029988.9U Active CN216739806U (en) 2021-12-03 2021-12-03 Excavator bucket for excavator and excavator

Country Status (1)

Country Link
CN (1) CN216739806U (en)

Similar Documents

Publication Publication Date Title
CN111734457B (en) Construction method of tunnel water-drainage-preventing system
CN105256810A (en) Construction method for round underground continuous wall two-in-one structure
CN105256854A (en) Excavator bucket suitable for construction of trapezoid channel and construction method
CN106812131A (en) A kind of permanent sheet pile underground structure and its construction method
CN216739806U (en) Excavator bucket for excavator and excavator
CN210766942U (en) Shaping and excavating device for drainage ditch
CN203878638U (en) Bucket for excavating and quickly forming drainage ditch
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN216691101U (en) Low side wall of tunnel lining and whole construction formwork of side ditch
CN213952253U (en) Assembled roadbed slope protection structure
CN212103531U (en) Environment-friendly temporary road system
CN210857327U (en) Scraper bowl is used in trapezoidal slot excavation
CN211548122U (en) Cable trench expansion joint structure
CN211200755U (en) Basement roof movement joint waterproof construction structure
CN221399147U (en) Bucket suitable for roadbed drainage ditch construction
CN111155530A (en) A shovel mud ware for underground continuous wall connects processing
CN210421216U (en) Excavator for municipal construction
CN210507582U (en) Trapezoidal ditch excavation construction equipment of road bed
CN110725322A (en) Foundation pit slope tower crane construction method
CN211200519U (en) A device that is used for quick excavation construction of triangle side ditch foundation ditch
CN109555130A (en) Plate doubles as temporary support structure and construction method in subway main body structure
CN111877429B (en) Grooving device, grooving machine and grooving method suitable for construction of local diaphragm wall under cable trench
CN205077535U (en) Light section tu gou excavates machines
CN217231931U (en) Circular-square-connected pile plate type retaining wall pile foundation structure
CN218027898U (en) Excavator bucket for excavating backfilled slag of arc-shaped bottom plate of hydraulic tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant