CN216721756U - Intelligent control box for road and bridge snow melting and deicing - Google Patents

Intelligent control box for road and bridge snow melting and deicing Download PDF

Info

Publication number
CN216721756U
CN216721756U CN202123110569.8U CN202123110569U CN216721756U CN 216721756 U CN216721756 U CN 216721756U CN 202123110569 U CN202123110569 U CN 202123110569U CN 216721756 U CN216721756 U CN 216721756U
Authority
CN
China
Prior art keywords
box
wiring port
road
weak current
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123110569.8U
Other languages
Chinese (zh)
Inventor
裴尧尧
黎伦鹏
肖衡林
马强
陈智
李文涛
周鑫隆
罗振源
潘慧敏
杨楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN202123110569.8U priority Critical patent/CN216721756U/en
Application granted granted Critical
Publication of CN216721756U publication Critical patent/CN216721756U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

The utility model discloses an intelligent control box for road and bridge snow melting and deicing, which comprises a base, a box body arranged on the base and a box cover arranged at the top of the box body and capable of being opened, wherein a plurality of wiring ports are arranged on the periphery of the box body and are respectively a front wiring port, a rear wiring port, a left wiring port and a right wiring port; the box is characterized in that a strong and weak current isolation plate which divides the interior of the box into a strong current area and a weak current area is arranged on a base in the box body, at least one rail steel sheet used for installing road and bridge snow and ice melting control equipment is arranged on the base in the strong current area, and weak current installation holes used for installing weak current equipment are formed in the base in the weak current area. The utility model is installed in different areas, has good impact resistance, fire resistance, corrosion resistance and weather resistance, and can well protect the integrity of the devices in the control box.

Description

Intelligent control box for road and bridge snow melting and deicing
Technical Field
The utility model belongs to the field of intelligent construction, relates to a control box, and particularly relates to an intelligent control box for snow melting and ice melting of roads and bridges.
Background
With the development of society and the improvement of technology level, the application of intelligent traffic has made a great breakthrough in recent years. The intelligent snow and ice melting system for roads and bridges as one of intelligent transportation has also been applied to a plurality of projects. However, the control and management of the snow and ice melting equipment are still in the manual control or remote control stage, and the equipment still needs to be managed in a manual control mode, and the manual monitoring mode cannot achieve real-time monitoring and automatic management on whether the equipment normally operates. The utility model designs an intelligent control box for road and bridge snow melting and deicing. The box can be used for intelligently monitoring and managing the snow and ice melting equipment, when a threshold value is reached, the box can be used for automatically opening or closing the snow and ice melting equipment, intelligent control is realized, and manual control is not needed. When the lines of the snow and ice melting equipment are in fault, the box can diagnose the lines and automatically shut down the snow and ice melting equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims to intelligently monitor and manage snow and ice melting equipment through an intelligent control box for melting snow and ice on roads and bridges.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides an intelligent control box that is used for road bridge snow melt ice which characterized in that: the box comprises a base, a box body arranged on the base and a box cover which is arranged at the top of the box body and can be opened, wherein a plurality of wiring ports are arranged on the periphery of the box body and are respectively a front wiring port, a rear wiring port, a left wiring port and a right wiring port;
the box is characterized in that a strong and weak current isolation plate which divides the interior of the box into a strong current area and a weak current area is arranged on a base in the box body, at least one rail steel sheet used for installing road and bridge snow and ice melting control equipment is arranged on the base in the strong current area, and weak current installation holes used for installing weak current equipment are formed in the base in the weak current area.
Furthermore, the front wiring port and the rear wiring port are oppositely arranged on the periphery of the box body of the strong current region, the right wiring port is arranged on the side face of the box body of the weak current region, and the left wiring port is arranged on the side face of the box body of the weak current region opposite to the right wiring port; the front wiring port, the rear wiring port and the left wiring port are respectively provided with a signal distribution terminal for the power line to pass in and out, and the strong and weak current isolation plates are provided with notches convenient for wiring.
Furthermore, there are two groups of weak current mounting holes in the weak current area, one group is used for mounting the signal transfer module, and the other group is used for mounting the communication module.
Furthermore, be equipped with two track steel sheets that are used for installing road bridge snow melt deicing equipment on the base in high-voltage electricity district, all be equipped with a plurality of circuit fixed pipelines that are used for the power cord wiring between track steel sheet and preceding wiring mouth, back wiring mouth and the left wiring mouth.
Furthermore, the line fixing pipeline is connected with the base through a hot melt adhesive, and the line fixing pipeline is a cuboid hollow pipeline.
Furthermore, the base outside both sides is equipped with the extension border around the box body, be equipped with a plurality of screws that are used for hanging in the block terminal on the extension border.
Further, the box cover is a transparent cover which is convenient for observing the internal condition.
Furthermore, the box cover, the box body, the base, the strong and weak electric isolation plates and the line fixing pipeline are all made of ABS/PC composite materials with good mechanical and chemical properties.
Furthermore, four corners of the box cover are fixedly connected with four corners of the box body through plastic screws.
Compared with the prior art, the utility model has the beneficial effects that:
(1) compared with the common ABS material, the ABS/PC composite material used by the utility model has good fire resistance and weather resistance. Compared with iron, the material has the characteristics of light weight, high strength, convenience in use, insulation and the like.
(2) The utility model is internally provided with a circuit fixing pipeline and a strong and weak current isolation plate to separate the circuits and prevent the problems of short circuit and the like caused by the damage and the intersection of the circuit skins.
(3) Compared with the monitoring system directly placed in the distribution box, the monitoring system has integrity and can better protect internal devices.
Drawings
FIG. 1 is a three-dimensional view of an embodiment of the present invention.
FIG. 2 is a top view of an embodiment of the present invention.
Fig. 3 is a front view of an embodiment of the present invention.
Fig. 4 is a left side view of an embodiment of the present invention.
Fig. 5 is a right side view of an embodiment of the present invention.
Fig. 6 is an overall layout diagram of the embodiment of the present invention.
Fig. 7 is a schematic cross-sectional view of a line fixing pipe according to an embodiment of the present invention.
In the figure: 1-a box cover, 2-a box body, 3-a base, 4-a strong and weak electric isolation plate, 5-a line fixing pipeline, 6-a front wiring port, 7-a rear wiring port, 8-a left wiring port, 9-a strong and weak electric isolation plate notch, 10-a right wiring port, 11-an extension edge, 12-a snow melting and deicing equipment fault diagnosis and automatic circuit breaking module, 13-a track steel sheet, 14-a signal transfer module, 15-a communication module, 16-a power supply, 17-snow melting and deicing equipment, 18-a communication power supply, 19-a signal distribution terminal and 20-a wiring hole.
Detailed Description
The utility model will be described in detail below with reference to the drawings and examples, which are given by way of illustration only and are not intended to limit the utility model.
As shown in fig. 1-7, the utility model is an intelligent control box for melting snow and ice on roads and bridges. Mainly constitute by lid 1, box body 2 and base 3, both sides are equipped with extension border 11 around the intelligent control box, are equipped with a plurality of screws on the extension border 11, hang in the block terminal through the screw fixation. Because of the inside space of block terminal is less, lid 1 and box body 2 select to fix through the mode of four corners screw.
The box body 2 is provided with a front wiring port 6, a rear wiring port 7, a left wiring port 8 and a right wiring port 10 which are convenient for power line input and output on four sides. Wherein, the front wiring port 6 and the rear wiring port 7 are provided with signal distribution terminals 19 for accessing power lines, and the power lines are wired in and out through the signal distribution terminals 19.
A strong and weak current isolation plate for dividing the interior of the box body into a strong current area and a weak current area is arranged on the base 3 in the box body 2, two rail steel sheets 13 for installing road and bridge snow and ice melting control equipment are arranged on the base in the strong current area, in the embodiment, the road and bridge snow and ice melting control equipment is a snow and ice melting equipment fault diagnosis and automatic circuit breaking module 12, and the space on each rail steel sheet 13 is enough for installing 3 snow and ice melting equipment fault diagnosis and automatic circuit breaking modules 12;
the base in weak current district is equipped with the weak current mounting hole that is used for installing weak current equipment, the weak current mounting hole has two sets ofly, and a set of is used for installing signal relay module 14, and another group is used for installing communication module 15.
The zero line and the live line of the power supply 16 can be connected to the snow and ice melting equipment fault diagnosis and automatic circuit breaking module 12 through the front wiring port 6 and the rear wiring port 7 respectively through the signal distribution terminal 19. And a signal distribution terminal 19 for connecting a power line is arranged at the left wiring port 8, and a zero line and a live line of one or more snow melting and deicing equipment fault diagnosis and automatic circuit breaking modules 12 are connected to the snow melting and deicing equipment 17 from the left wiring port 10 through the signal distribution terminal 19. In order to prevent the zero line and the live line from crossing to cause line faults, the zero line and the live line are separated through two sides of the line fixing pipeline 5. The signal distribution terminal 19 and the base 3 are fixed by screws.
The snow and ice melting equipment fault diagnosis and automatic circuit break module 12 is fixed on the base 3 through a rail steel sheet 13 by screws.
The line fixing pipeline 5 is a cuboid, wiring holes 20 with different heights are formed in two sides of the cuboid, a zero line is arranged on one side, a live line is arranged on one side, as shown in fig. 7, the cross section of the line fixing pipeline 5 is schematically shown, the size of the cross section of the line fixing pipeline 5 is selected according to the number of power lines in the required layout, and the limitation is not specifically made. The line fixing pipeline 5 is connected with the base 3 through hot melt adhesive.
Strong and weak electric isolation board 4 is used for separating snow melt ice equipment fault diagnosis and automatic circuit break module 12 and signal transfer module 14, communication module 15, strong and weak electric isolation board 4 top is equipped with strong and weak electric isolation board notch 9, snow melt ice equipment fault diagnosis and automatic circuit break module 12's BVR circuit is connected with signal transfer module 14 through strong and weak electric isolation board notch 9, signal transfer module 14 forms the closed loop through the line connection with communication module 15 again and carries out remote monitoring management.
The communication module 15 is connected with a communication power supply 18 through the right wiring port 10.
The extending edge 11 is a section of bottom plate exposed from the front side and the rear side of the base 3, and a reserved hole site is arranged on the bottom plate and used for fixing the control box in the distribution box by screws. In being fixed in the block terminal through the screw with the bottom plate, this intelligent control box is hung in the block terminal, and the lid faces the distribution box door.
The box cover 1, the box body 2, the base 3, the strong and weak electric isolation plates 4 and the line fixing pipeline 5 are all made of ABS/PC composite materials (such as materials disclosed in CN 108504062A), and have good mechanical and chemical properties.
It should be noted that, in the embodiment of the present invention, 6 fault diagnosis and automatic circuit breaking modules 12 of the snow melting and ice melting device are installed through the rail steel sheets 13, but the present invention is not limited to only installing the device, and may also install other control devices for melting and ice melting on roads and bridges, mainly power controllers (such as electrothermal regulators or ABB electric heating power controllers DCT880,20A, etc.), so that the fault diagnosis and automatic circuit breaking modules 12 of the snow melting and ice melting device are not the inventive point of the present invention, the present invention provides a device installation location, and may install other types of control devices in the prior art, two installation locations provided by the weak current area of the present invention, which are used for the signal transit module 14 (such as a signal analog-to-digital conversion module) and the communication module 15 (such as a wireless communication module or a signal transceiver), and the above are only examples, and other devices may also be installed, the present invention does not limit the specific shape and function of the signal relay module 14 and the communication module 15, and the installation positions are provided by the installation space and the screw holes for fixing, so the specific structure of the signal relay module 14 and the communication module 15 is not within the protection scope of the present invention, and the specific structure thereof does not have any influence on the implementation of the technical solution of the present invention.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "front", "back", and the like used herein refer to the orientation and positional relationship shown in the drawings, and are used for convenience of description only, and do not imply that a particular orientation of a device or element is required. And therefore should not be construed as limiting the utility model.
The above embodiments and examples are only illustrative and should not be construed as limiting the present invention, and those skilled in the art will understand that all the modifications, variations, combinations, or equivalent substitutions made on the new embodiments or drawings of the present invention are included in the scope of the new patent protection of the present invention.

Claims (9)

1. The utility model provides an intelligent control box that is used for road bridge snow melt ice which characterized in that: the box comprises a base, a box body arranged on the base and a box cover which is arranged at the top of the box body and can be opened, wherein a plurality of wiring ports are arranged on the periphery of the box body and are respectively a front wiring port, a rear wiring port, a left wiring port and a right wiring port;
the box is characterized in that a strong and weak current isolation plate which divides the interior of the box into a strong current area and a weak current area is arranged on a base in the box body, at least one rail steel sheet used for installing road and bridge snow and ice melting control equipment is arranged on the base in the strong current area, and weak current installation holes used for installing weak current equipment are formed in the base in the weak current area.
2. The intelligent control box for road and bridge snow and ice melting of claim 1, wherein: the front wiring port and the rear wiring port are oppositely arranged on the periphery of the box body of the strong current area, the right wiring port is arranged on the side surface of the box body of the weak current area, and the left wiring port is arranged on the side surface of the box body of the weak current area opposite to the right wiring port; the front wiring port, the rear wiring port and the left wiring port are respectively provided with a signal distribution terminal for the power line to pass in and out, and the strong and weak current isolation plates are provided with notches convenient for wiring.
3. The intelligent control box for road and bridge snow and ice melting of claim 2, wherein: and the weak current mounting holes of the weak current area are divided into two groups, one group is used for mounting the signal transfer module, and the other group is used for mounting the communication module.
4. The intelligent control box for road and bridge snow and ice melting of claim 3, wherein: the base in high-voltage area is equipped with two track steel sheets that are used for installing road bridge snow melt deicing equipment, all be equipped with a plurality of circuit fixed pipelines that are used for the power cord wiring between track steel sheet and preceding wiring mouth, back wiring mouth and the left side wiring mouth.
5. The intelligent control box for road and bridge snow and ice melting of claim 4, wherein: the circuit fixing pipeline is connected with the base through hot melt adhesive and is a cuboid hollow pipeline.
6. The intelligent control box for road and bridge snow and ice melting according to any one of claims 1 to 5, wherein: the base outside both sides is equipped with the extension border around the box body, be equipped with a plurality of screws that are used for hanging in the block terminal on the extension border.
7. The intelligent control box for road and bridge snow and ice melting according to any one of claims 1 to 5, wherein: the box cover is a transparent cover which is convenient for observing the internal condition.
8. The intelligent control box for road and bridge snow and ice melting of claim 4, wherein: the box cover, the box body, the base, the strong and weak current isolation plates and the line fixing pipeline are all made of ABS/PC composite materials with good mechanical and chemical properties.
9. The intelligent control box for road and bridge snow and ice melting of claim 8, wherein: the four corners of the box cover are fixedly connected with the four corners of the box body through plastic screws.
CN202123110569.8U 2021-12-13 2021-12-13 Intelligent control box for road and bridge snow melting and deicing Expired - Fee Related CN216721756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123110569.8U CN216721756U (en) 2021-12-13 2021-12-13 Intelligent control box for road and bridge snow melting and deicing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123110569.8U CN216721756U (en) 2021-12-13 2021-12-13 Intelligent control box for road and bridge snow melting and deicing

Publications (1)

Publication Number Publication Date
CN216721756U true CN216721756U (en) 2022-06-10

Family

ID=81883313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123110569.8U Expired - Fee Related CN216721756U (en) 2021-12-13 2021-12-13 Intelligent control box for road and bridge snow melting and deicing

Country Status (1)

Country Link
CN (1) CN216721756U (en)

Similar Documents

Publication Publication Date Title
CN206114993U (en) Towards complete professional multi -functional optical cable distributing box of managing in rural area
CN204497713U (en) Without bus compact protective relaying device
CN206225830U (en) Electric power box
CN107124038A (en) High-efficiency real-time comprehensive management and control system for power distribution room
CN216721756U (en) Intelligent control box for road and bridge snow melting and deicing
CN205159875U (en) Low -voltage distribution box
CN107394653A (en) A kind of intelligent compact substation
CN105552730A (en) Intelligent comprehensive power distribution box
CN106786024B (en) Generator car access case
CN208063620U (en) A kind of cabinet for the on-line monitoring equipment on steel tower
CN102595835B (en) Embedded optical-cable communication access device
CN212648874U (en) Comprehensive distribution box
CN107508380A (en) A kind of electric power power transformation big data system
CN207782243U (en) A kind of ring main unit
CN107508149A (en) A kind of high-tension switch gear of single busbar system
CN104617540B (en) The small-sized protective relaying device used suitable for outdoor installation
CN206693713U (en) A kind of underground garage distribution busbar
CN203278057U (en) Intelligent prefabricated transformer substation
CN107768993A (en) A kind of high-low voltage electric power distribution cabinet
CN207651853U (en) A kind of outdoor AC comprehensive distribution box for integrated transformer platform
CN215600879U (en) Automatic monitoring device of electric substation
CN207303710U (en) High voltage power distributing cabinet and system
CN205389060U (en) Intelligent block terminal of synthesizing
CN207542578U (en) A kind of branching switchgear
CN207409999U (en) A kind of cable branch box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220610

CF01 Termination of patent right due to non-payment of annual fee