CN216712750U - Hanging basket formwork for bridge construction - Google Patents

Hanging basket formwork for bridge construction Download PDF

Info

Publication number
CN216712750U
CN216712750U CN202123157426.2U CN202123157426U CN216712750U CN 216712750 U CN216712750 U CN 216712750U CN 202123157426 U CN202123157426 U CN 202123157426U CN 216712750 U CN216712750 U CN 216712750U
Authority
CN
China
Prior art keywords
bottom plate
hanging basket
plate
bridge construction
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123157426.2U
Other languages
Chinese (zh)
Inventor
丛卫国
张超
尹文耀
刘传礼
陈壮
王世茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ruihong Heavy Industry Machinery Co ltd
Original Assignee
Shandong Ruihong Heavy Industry Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Ruihong Heavy Industry Machinery Co ltd filed Critical Shandong Ruihong Heavy Industry Machinery Co ltd
Priority to CN202123157426.2U priority Critical patent/CN216712750U/en
Application granted granted Critical
Publication of CN216712750U publication Critical patent/CN216712750U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the field of bridge construction, in particular to a hanging basket template for bridge construction, which comprises a bridge concrete body, wherein the bottom end of the bridge concrete body is connected with a bottom plate in a sliding manner, the inner side of the bottom plate is provided with a moving structure, the top end of the moving structure is provided with a side plate, the bottom end of the inner side of the bridge concrete body is provided with an inner bottom plate, the top end of the inner bottom plate is provided with a vertical rod structure, and the top end of the vertical rod structure is provided with an inner top plate. Thereby improving the overall stability and being simple and quick to install.

Description

Hanging basket formwork for bridge construction
Technical Field
The utility model relates to the field of bridge construction, in particular to a hanging basket template for bridge construction.
Background
In the bridge construction process, the hanging basket is an extremely important project, the construction quality of the bridge and the safety of the working environment of constructors are related, the subsequent construction can be carried out only by assembling the template on the bridge hanging basket, and the hanging basket template comprises a bottom plate, a side plate and an inner plate.
The existing hanging basket template for bridge construction needs to be assembled in the air after being hoisted to the height of a bridge due to the fact that the hanging basket template is divided into a plurality of assemblies, the installation difficulty is high, the installation time is long, meanwhile, the inner plate of the existing hanging basket template for bridge construction is integrally formed by welding, the follow-up disassembly is difficult, and resources are wasted.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the related art, the utility model provides a hanging basket template for bridge construction, which aims to overcome the technical problems in the prior art.
The technical scheme of the utility model is realized as follows:
the utility model provides a bridge construction is with hanging basket template, includes the bridge concrete body, the bottom sliding connection of the bridge concrete body has the bottom plate, the inboard of bottom plate is equipped with the removal structure, the top of removing the structure is equipped with the curb plate, the inboard bottom of the bridge concrete body is equipped with the infrabasal plate, the top of infrabasal plate is equipped with the pole setting structure, the top of pole setting structure is equipped with interior roof.
Furthermore, the top end of the side plate is fixedly connected with a hook.
Further, an inner side plate is connected between the inner bottom plate and the inner top plate in a sliding mode.
Furthermore, the moving structure comprises a servo motor, the servo motor is fixedly connected with the bottom plate, a lead screw is fixedly connected to the tail end of a main shaft of the servo motor, and a lead screw sleeve is spirally connected to the outer side of the lead screw.
Further, the screw rod is rotatably connected with the bottom plate, the screw rod sleeve is slidably connected with the bottom plate, and the screw rod sleeves are horizontally and symmetrically arranged.
Furthermore, the pole setting structure includes the pole sleeve, the inboard screwed connection of pole sleeve has the threaded rod, the top of threaded rod is rotated and is connected the top and hold in the palm.
Furthermore, the front side of the upper end of the side plate is rotatably connected with an inclined strut, the other end of the inclined strut is provided with a bolt, and the inclined strut is arranged in a cross manner.
The utility model provides a hanging basket template for bridge construction, which has the following beneficial effects:
1. according to the utility model, the steel cable is fixed on the hook through the arranged bottom plate, the side plate, the moving structure and the like, and the whole body of the side plate and the bottom plate is quickly hoisted through the crane, so that the bottom plate is placed on the hanging basket horizontally and is positioned outside the concrete body of the bridge;
2. according to the device, through the arrangement of the inner side plate, the inner bottom plate, the upright rod structure and the like, when the device is used for installing the inner formwork, the inner bottom plate is firstly placed at the bottom of the inner side of a concrete body of a bridge, the upright rod structure is placed above the inner bottom plate, the threaded rod is rotated after the inner bottom plate is vertically placed, so that the height of the jacking support is quickly adjusted, after the height of the upright rod structure is adjusted, the inner top plate is placed at the top of the jacking support, the inner side plate is inserted into the end part between the inner bottom plate and the inner top plate, after the assembly is completed, the inner formwork is riveted with the inclined stay bar to be quickly fixed, the inner formwork is installed, and the inner formwork is detached simply and quickly in the later period.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic overall structure diagram of a hanging basket formwork for bridge construction according to an embodiment of the utility model;
FIG. 2 is a schematic diagram of the structure at A of FIG. 1 according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of the structure at B of FIG. 1 according to an embodiment of the present invention;
fig. 4 is a schematic diagram of a concrete body of a bridge with a cradle template for bridge construction according to an embodiment of the utility model.
In the figure:
1-bridge concrete body, 2-bottom plate, 3-moving structure, 31-servo motor, 32-lead screw, 33-lead screw sleeve, 4-side plate, 5-diagonal brace, 6-hook, 7-inner bottom plate, 8-upright structure, 81-rod sleeve, 82-threaded rod, 83-top support, 9-inner top plate and 10-inner side plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model is further described with reference to the following drawings and detailed description:
the first embodiment is as follows:
referring to fig. 1, 2 and 4, a hanging basket formwork for bridge construction according to an embodiment of the present invention includes a bridge concrete body 1, a bottom plate 2 is slidably connected to a bottom end of the bridge concrete body 1, a moving structure 3 is disposed inside the bottom plate 2, a side plate 4 is disposed at a top end of the moving structure 3, an inner bottom plate 7 is disposed at a bottom end of an inside of the bridge concrete body 1, a vertical rod structure 8 is disposed at a top end of the inner bottom plate 7, and an inner top plate 9 is disposed at a top end of the vertical rod structure 8.
Top fixedly connected with couple 6 of curb plate 4, removal structure 3 includes servo motor 31, servo motor 31 and 2 fixed connection of bottom plate, servo motor 31's the terminal fixedly connected with lead screw 32 of main shaft, the outside screwed connection of lead screw 32 has lead screw sleeve 33, lead screw 32 rotates with bottom plate 2 to be connected, lead screw sleeve 33 and 2 sliding connection of bottom plate, lead screw sleeve 33 is the horizontal symmetry setting, the upper end front side rotation of curb plate 4 is connected with diagonal brace 5, the other end of diagonal brace 5 is equipped with the bolt, diagonal brace 5 is the setting of crossing.
On being fixed in couple 6 with the cable wire, hoist fast curb plate 4 and bottom plate 2's whole through the loop wheel machine, thereby place bottom plate 2 in hanging the basket upper level and place and be in the outside of the bridge concrete body 1, then through opening servo motor 31, servo motor 31 drives lead screw 32 and rotates, lead screw 32 rotates back and drives lead screw sleeve 33 rotatory and relative slip in bottom plate 2, and then drive curb plate 4 through lead screw sleeve 33 and be close to and press from both sides tightly to the bridge concrete body 1, can fix through the bolt through rotating diagonal brace 5 after the completion, thereby improve holistic stability.
Example two:
referring to fig. 1 and 3, a hanging basket formwork for bridge construction according to an embodiment of the present invention includes a bridge concrete body 1, a bottom plate 2 is slidably connected to a bottom end of the bridge concrete body 1, a moving structure 3 is disposed inside the bottom plate 2, a side plate 4 is disposed at a top end of the moving structure 3, an inner bottom plate 7 is disposed at a bottom end of an inside of the bridge concrete body 1, a vertical rod structure 8 is disposed at a top end of the inner bottom plate 7, and an inner top plate 9 is disposed at a top end of the vertical rod structure 8.
An inner side plate 10 is connected between the inner bottom plate 7 and the inner top plate 9 in a sliding mode, the vertical rod structure 8 comprises a rod sleeve 81, a threaded rod 82 is spirally connected to the inner side of the rod sleeve 81, and the top end of the threaded rod 82 is rotatably connected with a jacking 83.
This device carries out when the interior sheathing installation, at first place interior bottom plate 7 in the inboard bottom of bridge concrete body 1, place pole setting structure 8 in the top of interior bottom plate 7, vertically place the back through rotating threaded rod 82, thereby the height of quick adjustment top support 83, after the height control of pole setting structure 8 finishes, roof 9 in placing at the top of top support 83, then inside board 10 is inserted to the tip between interior bottom plate 7 and the interior roof 9, accomplish to rivet or weld with diagonal brace 5 after the equipment and carry out the quick fixation, the interior sheathing installation finishes.
For the convenience of understanding the technical solutions of the present invention, the following detailed description will be made on the working principle or the operation mode of the present invention in the practical process.
In practical application, when the device is used, a steel cable is fixed on the hook 6, the whole body of the side plate 4 and the bottom plate 2 is quickly hoisted by a crane, so that the bottom plate 2 is placed on a hanging basket horizontally and is positioned at the outer side of a bridge concrete body 1, then the servo motor 31 is opened, the servo motor 31 drives the screw rod 32 to rotate, the screw rod 32 drives the screw rod sleeve 33 to rotate and relatively slide in the bottom plate 2 after rotating, the side plate 4 is driven to approach and clamp the bridge concrete body 1 through the screw rod sleeve 33, the inclined strut 5 can be rotated to be fixed through a bolt after the completion, so that the stability of the whole body is improved, when the device is used for installing an inner template, firstly, the inner bottom plate 7 is placed at the bottom of the inner side of the bridge concrete body 1, the upright rod structure 8 is placed above the inner bottom plate 7, and the threaded rod 82 is rotated after the upright placement, so that the height of the top support 83 is quickly adjusted, after the height of the vertical rod structure 8 is adjusted, the inner top plate 9 is placed at the top of the top support 83, then the inner side plate 10 is inserted into the end part between the inner bottom plate 7 and the inner top plate 9, after the assembly, the inner side plate is riveted or welded with the inclined stay bar 5 for quick fixation, and the installation of the inner formwork is finished.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (7)

1. The utility model provides a bridge construction is with hanging basket template, includes bridge concrete body (1), its characterized in that: the bottom sliding connection of the bridge concrete body (1) has bottom plate (2), the inboard of bottom plate (2) is equipped with removal structure (3), the top of removing structure (3) is equipped with curb plate (4), the inboard bottom of the bridge concrete body (1) is equipped with interior bottom plate (7), the top of interior bottom plate (7) is equipped with pole setting structure (8), the top of pole setting structure (8) is equipped with interior roof (9).
2. The hanging basket formwork for bridge construction according to claim 1, wherein: the top end of the side plate (4) is fixedly connected with a hook (6).
3. The hanging basket formwork for bridge construction according to claim 1, wherein: an inner side plate (10) is connected between the inner bottom plate (7) and the inner top plate (9) in a sliding way.
4. The hanging basket formwork for bridge construction according to claim 1, wherein: remove structure (3) including servo motor (31), servo motor (31) and bottom plate (2) fixed connection, servo motor (31)'s the terminal fixedly connected with lead screw (32) of main shaft, the outside spiral connection of lead screw (32) has lead screw sleeve (33).
5. The hanging basket formwork for bridge construction according to claim 4, wherein: the lead screw (32) is rotatably connected with the bottom plate (2), the lead screw sleeve (33) is slidably connected with the bottom plate (2), and the lead screw sleeve (33) is horizontally and symmetrically arranged.
6. The hanging basket formwork for bridge construction according to claim 1, wherein: pole setting structure (8) are including pole sleeve (81), the inboard threaded connection of pole sleeve (81) has threaded rod (82), the top of threaded rod (82) is rotated and is connected top support (83).
7. The hanging basket formwork for bridge construction according to claim 1, wherein: the front side of the upper end of the side plate (4) is rotatably connected with an inclined strut (5), the other end of the inclined strut (5) is provided with a bolt, and the inclined strut (5) is arranged in a crossed manner.
CN202123157426.2U 2021-12-16 2021-12-16 Hanging basket formwork for bridge construction Active CN216712750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123157426.2U CN216712750U (en) 2021-12-16 2021-12-16 Hanging basket formwork for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123157426.2U CN216712750U (en) 2021-12-16 2021-12-16 Hanging basket formwork for bridge construction

Publications (1)

Publication Number Publication Date
CN216712750U true CN216712750U (en) 2022-06-10

Family

ID=81883465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123157426.2U Active CN216712750U (en) 2021-12-16 2021-12-16 Hanging basket formwork for bridge construction

Country Status (1)

Country Link
CN (1) CN216712750U (en)

Similar Documents

Publication Publication Date Title
CN212832530U (en) Electric plate wall erecting vehicle
CN216712750U (en) Hanging basket formwork for bridge construction
CN110482405A (en) A kind of hanging method
CN215287687U (en) Lifting appliance for lifting anode carbon blocks
CN207108299U (en) A kind of loop wheel machine
CN210176323U (en) Simple and easy installation device of fog dispersal tower heat exchanger
CN211473339U (en) High-rise scaffold pipe concatenation auxiliary device
CN208815412U (en) A kind of device for installing bridge concrete guardrail external mold
CN207483168U (en) A kind of car floor frame tool special for hoisting
CN216638641U (en) Anti-drop's hoist device for skylight glass
CN205985971U (en) Special link plate structure of unwrapping wire coaster
CN220351562U (en) Cable-stayed device of tower crane
CN221716082U (en) Supporting device of reinforcement cage
CN209585766U (en) A kind of coal bunker umbrella steel platform support device of ease of assembly
CN210669424U (en) Bridge bidirectional anti-seismic supporting and hanging structure
CN220815138U (en) Auxiliary mounting rack for street lamp post
CN213202080U (en) Prefabricated case roof beam external mold hoist construction equipment
CN209618731U (en) A kind of frequency conversion type speed regulation derrick crane
CN215854739U (en) Submersible water impeller mounting structure
CN213144492U (en) Adjusting device for mounting tunnel construction steel arch frame
CN215592387U (en) Electric hoist switching device
CN211815664U (en) Road and bridge beam pile reinforcing device
CN221119126U (en) Construction frame for construction site
CN210617903U (en) Tunnel davit convenient to installation
CN217634229U (en) Exhaust treatment device with pipeline anti-drop structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Hanging basket formwork for bridge construction

Effective date of registration: 20230220

Granted publication date: 20220610

Pledgee: Shandong Qufu Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG RUIHONG HEAVY INDUSTRY MACHINERY Co.,Ltd.

Registration number: Y2023980032976

PE01 Entry into force of the registration of the contract for pledge of patent right