CN213202080U - Prefabricated case roof beam external mold hoist construction equipment - Google Patents
Prefabricated case roof beam external mold hoist construction equipment Download PDFInfo
- Publication number
- CN213202080U CN213202080U CN202021932009.3U CN202021932009U CN213202080U CN 213202080 U CN213202080 U CN 213202080U CN 202021932009 U CN202021932009 U CN 202021932009U CN 213202080 U CN213202080 U CN 213202080U
- Authority
- CN
- China
- Prior art keywords
- hoist
- pipe
- template
- square
- square pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 230000003014 reinforcing effect Effects 0.000 claims description 17
- 229910000831 Steel Inorganic materials 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005303 weighing Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a prefabricated box girder external mold hoist construction equipment. When the precast box girder is constructed, the external mould of the box girder is bound by workers before the hoisting is moved, which wastes time and labor, the working efficiency is low, and the hoisting point stress is too concentrated when the template is hoisted and moved, so that the template is easy to deform. The utility model provides a prefabricated box girder external mold hoist construction equipment which constitutes and includes: hoist square pipe (1), bear template side pipe (4), bearing side pipe (3), crossbeam (5) and perpendicular roof beam (2), hoist square pipe, bear template side pipe and bear the end of square pipe respectively with perpendicular roof beam vertical fixation is connected, the both ends of crossbeam and two inboard vertical fixation who erects the roof beam are connected, the top intermediate position department of hoist square pipe is connected with hoist board A (6), five groups of hole for hoist has been seted up on hoist board A, the end connection of hoist square pipe has hoist board B (8), the head of hoist square pipe is connected with shrouding (12). The utility model discloses be applied to the construction field.
Description
The technical field is as follows:
the utility model relates to a prefabricated box girder external mold hoist construction equipment.
Background art:
with the rapid development of national infrastructure, the assembly type construction is applied to each field, and during the construction of the prefabricated box girder, the key step, namely the speed of installing and removing the template directly influences the speed of the construction progress of the prefabricated box girder, the conventional process is that the outer mould of the box girder is bound by a steel wire rope manually and then is hoisted and moved back and forth in the air by using a gantry crane, or 2 hooks are arranged at the back rib of the outer mould of the box girder and then are hoisted by using the gantry crane. The outer die of the box girder is bound by workers before the template is hung and moved, which wastes time and labor, the working efficiency is low, and the stress of a hanging point is too concentrated when the template is hung and moved, so that the template is easy to deform, and the safety is poor.
The invention content is as follows:
the utility model aims at providing a prefabricated box girder external mold hoist construction equipment solves the box girder template external mold and hangs and move hard, warp, unsafe problem, improves the efficiency that the installation of box girder template and demolishd.
The above purpose is realized by the following technical scheme:
the utility model provides a prefabricated box girder external mold hoist construction equipment which constitutes and includes: the ends of the hoisting square pipe, the bearing template square pipe, the bearing square pipe, the cross beam and the vertical beam are respectively and fixedly connected with the vertical beam, the two ends of the cross beam are vertically and fixedly connected with the inner sides of the two vertical beams, the middle position above the hoisting square tube is connected with a hoisting plate A, five groups of hoisting holes are arranged on the hoisting plate A, the tail part of the hoisting square tube is connected with a hoisting plate B, the head of the lifting square tube is connected with a sealing plate, one side of the lifting square tube and one side of the vertical beam are connected with a reinforcing plate A, the utility model discloses a bearing formwork square tube, including bearing formwork square tube, backing plate A, two stiffening plate B pass through backing plate B and connect.
The construction device for the prefabricated box girder external mold lifting appliance is characterized in that the lifting square pipe and the vertical beam form an outer frame.
The construction device for the prefabricated box girder external mold lifting appliance is characterized in that the bearing template square tube, the backing plate B and the reinforcing plate B form a supporting plate.
The construction device for the prefabricated box girder external mold lifting appliance is characterized in that the bearing square tube and the base plate A form a reinforcing plate.
The utility model has the advantages that:
1. the utility model discloses when to hoist and mount case roof beam template, the installation is simple, and is time-saving, has not only improved the efficiency of equipment operation between the template and the quality of piece. Meanwhile, the appearance quality of the concrete forming surface of the prefabricated box girder is also ensured, the safety in the whole hoisting process is also greatly improved, and compared with the prior art, the method is convenient and flexible, and labor and time are saved.
The utility model discloses mainly by square pipe and steel sheet spelling formation, the materials are simple, and every case roof beam template only needs a hoist, greatly reduced construction cost, improved the efficiency of template spelling, shortened construction cycle greatly, provide sufficient prerequisite for case roof beam construction preparation in earlier stage.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a right-middle view of fig. 1.
Fig. 3 is a schematic structural view of the hoisting plate a.
Fig. 4 is a schematic structural view of the hoisting plate B.
Fig. 5 is a schematic view of the outer frame.
Fig. 6 is a schematic structural view of a pallet.
Fig. 7 is a schematic structural view of the reinforcing plate.
In the figure: 1. hoisting square tubes, 2 vertical beams, 3 weighing square tubes, 4 bearing template square tubes, 5 cross beams, 6 hoisting plates A, 7 reinforcing plates A, 8 hoisting plates B, 9, base plates A, 10, reinforcing plates B, 11, base plates B, 12, sealing plates, 13 and rib plates.
The specific implementation mode is as follows:
example 1:
the utility model provides a prefabricated box girder external mold hoist construction equipment which constitutes and includes: the square lifting pipe comprises a square lifting pipe 1, a square bearing template pipe 4, a square bearing pipe 3, a cross beam 5 and a vertical beam 2, wherein the square lifting pipe, the square bearing template pipe and the square bearing pipe are respectively and fixedly connected with the vertical beam at the ends, the two ends of the cross beam are fixedly connected with the two vertical beams at the inner sides, a lifting plate A6 is connected at the middle position above the square lifting pipe, five groups of lifting holes are formed in the lifting plate A, the tail part of the square lifting pipe is connected with a lifting plate B8, the head part of the square lifting pipe is connected with a sealing plate 12, one side of the square lifting pipe and the vertical beam is connected with a reinforcing plate A7, the two sides of the square bearing template pipe are connected with two reinforcing plates B10, a base plate A9 is installed between the square bearing template pipe and the square bearing pipe, and the base plate A is connected with a rib plate 13, the two reinforcing plates B are connected through a backing plate B11.
Example 2:
according to the construction device for the prefabricated box girder external mold lifting appliance in the embodiment 1, the lifting square pipes and the vertical beams form an external frame.
Example 3:
according to the construction device for the prefabricated box girder outer mold lifting appliance in the embodiment 1 or 2, the bearing template square pipe, the backing plate B and the reinforcing plate B form a supporting plate.
Example 4:
according to the construction device for the prefabricated box girder external mold lifting appliance in the embodiment 1, 2 or 3, the bearing square pipe, the rib plate and the base plate A form a reinforcing plate.
Example 5:
the box girder template lifting appliance is an F-shaped lifting appliance framework mainly composed of a lifting square pipe, a vertical girder, a weighing square pipe, a bearing template square pipe, a cross beam, a lifting plate A, a reinforcing plate B, a lifting plate B, a base plate A, a base plate B, a sealing plate and a rib plate. The main structure is divided into four parts:
(1) the hoisting plate is composed of a hoisting plate A and a hoisting plate B, and mainly plays a role in penetrating a steel wire rope and hoisting the whole hoisting tool by utilizing the steel wire rope, wherein the hoisting plate A is welded at the middle position right above a hoisting square pipe, and five groups of hoisting holes are arranged in the hoisting plate A, so that the gravity center of the hoisting tool is mainly adjusted according to the weight of the template, and the stability of the hoisting tool is ensured. The hoisting plate B is welded at the tail part of the hoisting square tube, so that the hoisting effect and the square tube plugging effect are achieved.
(2) Outer frame is by hoist and mount side pipe, erect roof beam, crossbeam, stiffening plate A, and the shrouding is constituteed, and hoist and mount side pipe, erect roof beam and crossbeam play the effect of supporting whole hoist, and stiffening plate A makes the frame more stable for hoist and mount side pipe and the stiffening plate of erecting the roof beam junction, and the shrouding plays the effect of shutoff side pipe, mainly is in order to prevent that the inside debris such as entering dust of side pipe from influencing the use.
(3) The supporting plate mainly comprises a bearing template square pipe, a reinforcing plate B and a backing plate B, wherein the bearing template square pipe is a main component of the bearing template, and the reinforcing plate B and the backing plate B play a role of a baffle and mainly prevent the template from falling off.
(4) The reinforcing plate mainly comprises a bearing square pipe, a base plate A and a rib plate, and mainly aims to enhance the bearing capacity of the supporting plate.
Claims (4)
1. The utility model provides a prefabricated box girder external mold hoist construction equipment which constitutes and includes: hoist and mount side pipe, bear template side pipe, bearing side pipe, crossbeam and perpendicular roof beam, characterized by: hoist square pipe bear template side pipe with the tip of bearing side pipe respectively with perpendicular fixed connection of roof beam, the both ends and two of crossbeam the inboard perpendicular fixed connection of perpendicular roof beam, the top intermediate position department of hoist square pipe be connected with hoist board A, hoist board A on seted up five groups of hole for hoist, the afterbody of hoist square pipe be connected with hoist board B, the head of hoist square pipe be connected with the shrouding, hoist square pipe with one side of perpendicular roof beam be connected with a stiffening plate A, the both sides of bearing template side pipe be connected with two stiffening plates B, bearing square pipe template with bearing side pipe between install backing plate A, two stiffening plate B pass through backing plate B and connect.
2. The precast box girder external mold lifting appliance construction device is characterized in that: the lifting square pipe and the vertical beam form an outer frame.
3. The precast box girder external mold lifting appliance construction device is characterized in that: the bearing template square tube, the backing plate B and the reinforcing plate B form a supporting plate.
4. The precast box girder external mold lifting appliance construction device is characterized in that: the bearing square tube and the backing plate A form a reinforcing plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021932009.3U CN213202080U (en) | 2020-09-07 | 2020-09-07 | Prefabricated case roof beam external mold hoist construction equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021932009.3U CN213202080U (en) | 2020-09-07 | 2020-09-07 | Prefabricated case roof beam external mold hoist construction equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN213202080U true CN213202080U (en) | 2021-05-14 |
Family
ID=75844177
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202021932009.3U Active CN213202080U (en) | 2020-09-07 | 2020-09-07 | Prefabricated case roof beam external mold hoist construction equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN213202080U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116902740A (en) * | 2023-06-19 | 2023-10-20 | 中建八局第二建设有限公司 | Prefabricated T-beam template hoisting auxiliary device and use method |
-
2020
- 2020-09-07 CN CN202021932009.3U patent/CN213202080U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116902740A (en) * | 2023-06-19 | 2023-10-20 | 中建八局第二建设有限公司 | Prefabricated T-beam template hoisting auxiliary device and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
| CN109555257B (en) | Combined supporting and hanging rod type suspended ceiling and construction method | |
| CN207268073U (en) | Novel flexible formwork bearing frame | |
| CN110526153B (en) | A jack-assisted pile foundation steel cage lifting structure and construction method thereof | |
| CN213836318U (en) | Bridge floor wet joint hangs mould structure | |
| CN202945798U (en) | Overhanging type scaffold corner device | |
| CN216340904U (en) | High-rise outer wall opening plugging template | |
| CN215854574U (en) | Quick mounting and dismounting fixture for box girder template | |
| CN114275662A (en) | Construction method and hoisting structure of stainless steel module of nuclear power station | |
| CN212428008U (en) | Lower supporting type overhanging scaffold construction device | |
| CN214785840U (en) | Temporary support device for silo type structures | |
| CN212428870U (en) | Supporting device for tunnel construction | |
| CN114348888A (en) | Auxiliary device and construction technology for the conversion of the lifting point of the steel cage of the underground continuous wall | |
| CN110820569B (en) | A hoistable suspension platform device for mold-turning construction and its working method | |
| CN210508326U (en) | A liftable shaft operating platform | |
| CN218950808U (en) | Be used for prefabricated T roof beam template to install and remove hoist | |
| CN115045505A (en) | Device for pouring concrete platform on steel structure frame and construction method | |
| CN113336087A (en) | Hoisting tool for bridge transverse wet joint template and template installation method | |
| CN223048204U (en) | Sectional cantilever mounting device for high-altitude large-span steel girder | |
| CN218953310U (en) | Lifting platform for shaft wall construction | |
| CN217840874U (en) | Outer wall constructional column formwork tool | |
| CN215798266U (en) | Wall formula guardrail template installation and disassembly tools | |
| CN223687929U (en) | Auxiliary supporting beam structure for hoisting equipment | |
| CN220166688U (en) | Cantilever lifting die support for deck bridge deck slab | |
| CN219773603U (en) | Large-bay large-depth template supporting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |