CN216690103U - Stuffy gourd wall concrete cushion block and forming die thereof - Google Patents

Stuffy gourd wall concrete cushion block and forming die thereof Download PDF

Info

Publication number
CN216690103U
CN216690103U CN202121368583.5U CN202121368583U CN216690103U CN 216690103 U CN216690103 U CN 216690103U CN 202121368583 U CN202121368583 U CN 202121368583U CN 216690103 U CN216690103 U CN 216690103U
Authority
CN
China
Prior art keywords
gourd
stuffy
half circular
cushion block
calabash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121368583.5U
Other languages
Chinese (zh)
Inventor
窦长亮
蔡锦波
王晓阳
张傲
李琪圣
孙擎宇
魏佳琪
陈兆中
郑美娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Electric Power Engineering Supervision Co ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
Tianjin Electric Power Engineering Supervision Co ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Engineering Supervision Co ltd, State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical Tianjin Electric Power Engineering Supervision Co ltd
Priority to CN202121368583.5U priority Critical patent/CN216690103U/en
Application granted granted Critical
Publication of CN216690103U publication Critical patent/CN216690103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model relates to the technical field of power transmission equipment, in particular to a stuffy gourd wall concrete cushion block and a forming die thereof. The double-layer threaded steel plug-in device comprises a left half circular stuffy gourd, a right half circular stuffy gourd and two pieces of threaded steel, wherein the two pieces of threaded steel are respectively inserted into the left half circular stuffy gourd and the right half circular stuffy gourd and are connected together. Aiming at the defects of the prior art, the utility model provides the method which is convenient to operate and easy to construct. Compared with the traditional wall cushion block, the screw rod combined wall cushion block is time-saving, trouble-saving, safe, reliable, low in investment, good in effect and easy to popularize, the prefabricated block and the floor slab are good in combination effect and free of cracks, and the strength of the prefabricated block meets the requirement through the test of a resiliometer.

Description

Stuffy gourd wall concrete cushion block and forming die thereof
Technical Field
The utility model relates to the technical field of power transmission equipment, in particular to a stuffy gourd wall concrete cushion block and a forming die thereof.
Background
At present, in a building site, two types of mortar cushion blocks and plastic cushion blocks are mostly adopted for cushion blocks for controlling the thicknesses of wall and column protective layers during concrete on-site pouring, the plastic cushion blocks can be directly clamped on the reinforcing steel bars on the outer sides of the wall and the column through plastic clamps to be fixed, and the mortar cushion blocks are required to be fixed on the reinforcing steel bars through reserved binding wires on the cushion blocks. In the process of manufacturing the mortar cushion block, the strength is often not guaranteed, the cushion block is crushed after binding due to vibrating concrete, and in addition, binding wires are often bound on the inner side of the cushion block during binding, so that the operation is inconvenient; the plastic cushion block is convenient to mount and dismount, but the appearance size of the plastic cushion block is large, the effect is poor after the plastic and the concrete are combined, and the appearance of the plastic cushion block is partially exposed after the mold is dismounted. Therefore, the plastic cushion block is not popularized and applied generally. Simultaneously, present plastics cushion and mortar cushion can satisfy the effect of control wall post protective layer thickness, but it still has following defect: 1. although the plastic cushion block is convenient and quick to operate, the whole material of the plastic cushion block is polyethylene plastic, and the forming strength of concrete can be influenced when the plastic cushion block is completely placed in a concrete wall body; 2. although the mortar cushion blocks do not influence the forming strength of walls and columns in the later period, the mortar cushion blocks need to be bound by burning wires in the installation process, which not only consumes working hours, but also easily causes the falling phenomenon due to infirm binding, thereby causing the insufficient thickness of the steel bar protective layer.
SUMMERY OF THE UTILITY MODEL
In order to effectively solve the problems in the background art, the utility model provides a concrete cushion block for a closed calabash wall body, and the concrete technical scheme is as follows;
the utility model provides a vexed calabash wall body concrete cushion which characterized in that: the double-layer threaded steel plug-in device comprises a left half circular stuffy gourd, a right half circular stuffy gourd and two pieces of threaded steel, wherein the two pieces of threaded steel are respectively inserted into the left half circular stuffy gourd and the right half circular stuffy gourd and are connected together.
Preferably, the two screw-thread steels are positioned in an eccentric position between the left half round stuffy block and the right half round stuffy block.
The forming die for the concrete cushion block of the smoldering gourd wall body is characterized by comprising a left PVC template for forming a left half circular smoldering gourd, a right PVC template for forming a right half circular smoldering gourd and steel dies, wherein the steel dies are provided with a plurality of pairs of through holes, and the number of the steel dies is at least two.
Compared with the prior art, the utility model has the beneficial effects that: aiming at the defects of the prior art, the utility model provides the method which is convenient to operate and easy to construct. Compared with the traditional wall cushion block, the screw rod combined wall cushion block is time-saving, trouble-saving, safe, reliable, low in investment, good in effect and easy to popularize, the prefabricated block and the floor slab are good in combination effect and free of cracks, and the strength of the prefabricated block meets the requirement through the test of a resiliometer. And then, the thickness of the floor slab after the floor slab is removed is detected on site by using a thickness detector, the control effect analysis is carried out, and the qualified rate of the floor slab thickness reaches the optimum creation standard.
Drawings
FIG. 1 is a perspective view of the present invention;
fig. 2 is a perspective view of the forming die of the present invention.
Detailed Description
The following detailed description of the preferred embodiments will be made with reference to the accompanying drawings. As shown in fig. 1, the stuffy gourd wall concrete cushion block comprises a left half circular stuffy gourd 1, a right half circular stuffy gourd 2 and two screw-thread steels 3, wherein the two screw-thread steels are respectively inserted into the left half circular stuffy gourd and the right half circular stuffy gourd and are connected together. In order to be convenient for being tightly bound with the reinforcing steel bars, the two screw-thread steels are positioned in the middle eccentric positions of the left half circular stuffy gourd and the right half circular stuffy gourd.
When the prefabricated concrete block is used, 1, the concrete prefabricated blocks are arranged on a floor slab according to the interval of 1.5m multiplied by 1.5mm, the lower reinforcing steel bars are placed on the concrete surface of the lower column of the prefabricated blocks, and the reinforcing steel bars of the prefabricated blocks and the reinforcing steel bars of the bottom plate are firmly bound by binding wires to prevent displacement.
2. And checking the arranged area to determine whether the prefabricated block has displacement and damage, and if so, adjusting and replacing the prefabricated block in time.
3. After the concrete precast block is installed, the floor concrete can be poured. The thickness of the plate can be well controlled by combining elevation control measures used at ordinary times during concrete pouring, the installation is simple, and the construction progress and the engineering quality are not influenced.
4. Through observation, the precast block and the floor slab have good combination effect and no crack, and the strength also meets the requirement through the test of a resiliometer. And then, the thickness of the floor slab after the floor slab is removed is detected on site by using a thickness detector, the control effect analysis is carried out, and the qualified rate of the floor slab thickness reaches the optimum creation standard.
As shown in fig. 2, a forming die of vexed calabash wall concrete cushion, including left PVC template 4 that is used for the circular vexed calabash of shaping left half, right PVC template 5 and the steel mould 6 that is used for the circular vexed calabash of shaping right half, have a plurality ofly on the steel mould to through-hole 7, the steel mould is two at least. When the concrete is used, the right PVC template (20mm high) is firstly placed into a row, then two square steel molds are used for fixing the two sides, then the fine aggregate concrete is poured into the right PVC template, the concrete is vibrated to be compact, and the upper surface is trowelled. And placing the steel die on the poured concrete, controlling the distance, and inserting the steel bars 8 according to the reserved holes of the steel die. After the reinforcing steel bar is inserted, the measurement height needs to meet the design requirement. And after final setting, curing the concrete until the strength meets the design strength, and performing the next procedure construction after the semi-finished concrete member is measured to be qualified. Put into one row with left PVC template according to first step, then fix the square steel in both sides, then pour the pea gravel concrete into left PVC mould, tamp the concrete to trowel the upper surface, arrange 2 steel moulds side by side in the centre of a circle position of PVC, leave 10 mm's space in the middle so that insert the reinforcing bar of semi-manufactured goods component. And aligning the initial semi-finished member with the concrete members in the lower left PVC template one by one, inserting the reinforcing steel bars, vibrating tightly, controlling the height, and ensuring that the design requirements are met. And curing the lower concrete until the strength meets the formwork removal requirement, removing the left PVC formwork, continuing curing until the strength meets the design strength requirement, and then measuring the components one by one to ensure that the components meet the requirement.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (3)

1. The utility model provides a vexed calabash wall body concrete cushion which characterized in that: the double-layer threaded steel plug-in device comprises a left half circular stuffy gourd, a right half circular stuffy gourd and two pieces of threaded steel, wherein the two pieces of threaded steel are respectively inserted into the left half circular stuffy gourd and the right half circular stuffy gourd and are connected together.
2. The closed calabash wall concrete spacer of claim 1, wherein the two deformed steel bars are positioned eccentrically between the left half round closed calabash and the right half round closed calabash.
3. The forming die for manufacturing the concrete cushion block of the closed calabash wall body in the claim 1 or 2 is characterized by comprising a left PVC template for forming a left half circular closed calabash, a right PVC template for forming a right half circular closed calabash and steel dies, wherein the steel dies are provided with a plurality of pairs of through holes, and the number of the steel dies is at least two.
CN202121368583.5U 2021-06-18 2021-06-18 Stuffy gourd wall concrete cushion block and forming die thereof Active CN216690103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121368583.5U CN216690103U (en) 2021-06-18 2021-06-18 Stuffy gourd wall concrete cushion block and forming die thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121368583.5U CN216690103U (en) 2021-06-18 2021-06-18 Stuffy gourd wall concrete cushion block and forming die thereof

Publications (1)

Publication Number Publication Date
CN216690103U true CN216690103U (en) 2022-06-07

Family

ID=81814931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121368583.5U Active CN216690103U (en) 2021-06-18 2021-06-18 Stuffy gourd wall concrete cushion block and forming die thereof

Country Status (1)

Country Link
CN (1) CN216690103U (en)

Similar Documents

Publication Publication Date Title
CN107217790B (en) Prefabricated reinforced concrete frame hollow column and construction method thereof
CN110616838A (en) Assembled composite floor slab with height limiting device and production process thereof
CN112726878A (en) Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN216690103U (en) Stuffy gourd wall concrete cushion block and forming die thereof
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN111537359B (en) Test device and method for in-situ detection of compressive strength of extruded side wall
CN108756248A (en) A kind of slab thickness control tool, production method and slab thickness control method
CN210216896U (en) Prefabricated plate skeleton and prefabricated plate
CN107214819B (en) Building constructional column shaping moulding box
CN112324009A (en) Precast concrete hollow heat-insulation wall structure and construction process
CN111136763A (en) Manufacturing method of air conditioner hole and exhaust hole concrete precast block
CN215760524U (en) Main structure floor thickness control block
CN211873406U (en) Precast concrete hollow wall structure
CN114274306A (en) Production process of prefabricated steel structure exterior wall cladding
CN212176547U (en) Building floor bathroom falls board construction template device in building
CN210049265U (en) Cup-shaped foundation integral mold sectional pouring one-time integral forming structure
CN105839824B (en) Shed deckhead construction method
CN221567542U (en) Built-in heat preservation building outer wall body
CN105507370A (en) Shaft well tubular pump flow channel concrete special-shaped steel mould one-stage molding construction method
CN110578298A (en) Concrete pouring process for top of viaduct upright post
CN112518959A (en) Wall triangular roof brick precast block mold and construction method
CN219508887U (en) Precast concrete hollow wall with built-in split bolt set
CN110965769A (en) Building floor bathroom falls board construction template device in building
CN217501049U (en) A can have enough to meet need design mould for building wall body air conditioner hole
CN209911091U (en) A mould for preparing quick corrosion test piece of concrete reinforcement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant