CN216689223U - Emergency dam for community river channel - Google Patents

Emergency dam for community river channel Download PDF

Info

Publication number
CN216689223U
CN216689223U CN202122873544.7U CN202122873544U CN216689223U CN 216689223 U CN216689223 U CN 216689223U CN 202122873544 U CN202122873544 U CN 202122873544U CN 216689223 U CN216689223 U CN 216689223U
Authority
CN
China
Prior art keywords
baffle
dam
sides
flood discharge
emergency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122873544.7U
Other languages
Chinese (zh)
Inventor
舒博宁
徐昕
周芸
闻飞
沈蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Hehu Engineering Consulting Co ltd
Original Assignee
Jining Hehu Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Hehu Engineering Consulting Co ltd filed Critical Jining Hehu Engineering Consulting Co ltd
Priority to CN202122873544.7U priority Critical patent/CN216689223U/en
Application granted granted Critical
Publication of CN216689223U publication Critical patent/CN216689223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides an emergency dam for a river channel in a residential area, wherein a baffle I is arranged on a dam, a flood discharge port I is arranged on the baffle I, a flood discharge port II is arranged on the flood discharge port I, mounting bars are arranged on two sides of the baffle I, slide rails are arranged on the mounting bars, baffle II is arranged on two sides of the baffle I, slide blocks corresponding to the slide rails are arranged on one side of the baffle II, one end of an L-shaped fixed block arranged on two sides of the dam is fixed on the dam through bolts, the other end of the L-shaped fixed block is fixed in the river channel through bolts, the flood discharge port I and the flood discharge port II are arranged on the baffle I and can be used for responding to different water amounts, the baffle II is fixed on the slide rails through the slide blocks arranged on one side and can move up and down conveniently, the baffle II is arranged on two sides of the baffle I to increase the stability of the emergency dam, a water level detector is arranged on the baffle II, the sensing is carried out, an alarm is given, and the opening of the second baffle plates at the two sides is controlled.

Description

Emergency dam for community river channel
Technical Field
The utility model relates to the field of emergency dams, in particular to an emergency dam for a river channel of a residential area.
Background
Dykes, dikes and dams, also broadly refer to water-resistant and water-retaining structures and structures: for example, dykes and dams are to be built tightly to prevent water. Modern dams come in two main categories: earth and rockfill dams and concrete dams. The dam is constructed for the purpose of providing tap water and irrigation water for nearby areas; generating electricity with a hydroelectric generator on a dam; a portion of a canal system; in flood control, in recent years, large dam banks are constructed by using high-tech reinforced cement. Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotment nature, reaches the purpose of removing the evil and making good use of and builds the engineering, and in the district, the rainwater can be accumulated often in the time of the rainy day, when being district river course water, needs to use emergent dykes and dams, saves, and when the rainy day is too big, when the water level reachd certain water level, will use emergent dykes and dams to drain.
SUMMERY OF THE UTILITY MODEL
The utility model aims to design an emergency dam for a river channel of a residential area, which can be used for facilitating rainwater accumulation of the river channel and can also be used for discharging water and flood discharge.
In order to achieve the purpose of the utility model, the utility model adopts the technical scheme that: the utility model provides a district is emergent dykes and dams for river course, a serial communication port, including dykes and dams, support and baffle one, baffle one is installed on the dyke dam, be equipped with flood discharge mouth one on the baffle one, be equipped with flood discharge mouth two on the flood discharge mouth, baffle both sides are equipped with the mounting bar, be equipped with the slide rail on the mounting bar, baffle both sides are equipped with baffle two, two one sides of baffle are equipped with the slider that corresponds with the slide rail, two both ends of baffle are equipped with the lug, be equipped with the installation piece on the baffle two, be equipped with water level detector on the installation piece, support mounting is at baffle one both ends, the support mounting is on the dyke dam, support one side is equipped with the recess that corresponds with the lug, the dyke dam both sides are equipped with L shape fixed block, be equipped with the opening on the L shape fixed block, be equipped with the bolt on the opening.
Preferably, the number of the L-shaped fixing blocks arranged on the two sides of the dam is not less than three.
Preferably, the first flood discharge opening and the second flood discharge opening are arranged on the first baffle in an array.
Preferably, the two ends of one side of the baffle are provided with mounting bars.
Preferably, the height of the mounting bar is higher than that of the baffle.
Preferably, the number of the through openings arranged on the L-shaped fixing block is not less than four.
Preferably, the number of the grooves is not less than two on one side of the bracket.
The utility model has the beneficial effects that: this kind of district is emergent dykes and dams for river course, can make things convenient for the accumulation of river course internal water and make things convenient for the flood discharge during the use, fix on the dyke dam through the bolt in L shape fixed block one end of dyke both sides installation, the other end passes through the bolt fastening in the river course, set up flood discharge mouth one and flood discharge mouth two on baffle one, can be used for dealing with the size of the water yield when different, baffle two is fixed on the slide rail through the slider of a side-mounting, can conveniently reciprocate, baffle two is all installed to baffle one both sides, in order to increase the steadiness of emergent dykes and dams, be equipped with water level detector on the baffle two, when reacing certain water level, just can sense, report to the police, control opening of both sides baffle two.
Drawings
FIG. 1 is a front view of an emergency dam for a river of a residential area according to the present invention;
FIG. 2 is a left side view of an emergency dam for a river of a residential area according to the present invention;
fig. 3 is a top view of an emergency dam for a river of a residential area according to the present invention;
FIG. 4 is a right side view of an emergency dam support for a river of a residential area according to the present invention;
fig. 5 is a front view of an emergency dam barrier for a river of a residential area according to the present invention.
Reference symbol comparison table:
1. a dam; 2. a support; 3. a first baffle plate; 4. mounting a bar; 5. a slide rail; 6. a second baffle plate; 7. mounting blocks; 8. a water level detector; 9. a slider; 10. a bump; 11. a port; 12. a groove; 13. an L-shaped fixed block; 14. a bolt; 15. a flood discharge opening II; 16. and a flood discharge opening I.
Detailed Description
In order to make the content of the present invention more clearly understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. In which like parts are designated by like reference numerals. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in fig. 1, an emergency dam for a residential river comprises a dam 1, a support 2 and a first baffle plate 3, wherein the first baffle plate 3 is installed on the dam 1, the first baffle plate 3 is provided with a first flood discharge opening 16, the first flood discharge opening 16 is provided with a second flood discharge opening 15, two sides of the first baffle plate 3 are provided with installation bars 4, the installation bars 4 are provided with slide rails 5, two sides of the first baffle plate 3 are provided with second baffle plates 6, one side of each second baffle plate 6 is provided with a slide block 9 corresponding to the slide rail 5, two ends of each second baffle plate 6 are provided with convex blocks 10, the second baffle plate 6 on one side is provided with an installation block 7, the installation block 7 is provided with a water level detector 8, the support 2 is installed at two ends of the first baffle plate 3, the support 2 is installed on the dam 1, one side of the support 2 is provided with a groove 12 corresponding to the convex blocks 10, two sides of the dam 1 are provided with an L-shaped fixing block 13, the L-shaped fixing block 13 is provided with a through hole 11, the through hole 11 is provided with a bolt 14.
The number of the L-shaped fixing blocks 13 arranged on the two sides of the dam 1 is not less than three.
The first flood discharge opening 16 and the second flood discharge opening 15 are arranged on the first baffle plate 3 in an array.
And mounting strips 4 are arranged at two ends of two sides of the first baffle plate 3.
The height of the mounting strip 4 is higher than that of the baffle plate I3.
The number of the through holes 11 arranged on the L-shaped fixing block 13 is not less than four.
The number of the grooves 12 is not less than two on one side of the bracket 2.
When the dam works, the dam 1 is installed in a river channel through the L-shaped fixing blocks installed on the two sides, the bolts 14 are used for fixing, the baffle II 6 is installed on the slide rails 5 on the installation strips 4, the dam can rise conveniently during flood discharge and water discharge, meanwhile, the two ends of the baffle II 6 are provided with the protrusions 10 which are fixed in the grooves 12 on the support 2, when the flood discharge and water discharge are needed, the water level detector 8 on the baffle II 6 senses the water level, the flood discharge and water discharge are needed, an alarm is given, the baffle II 6 on the two sides is controlled to rise through the connection between the slide blocks 9 and the slide rails 5, the water level rises to the flood discharge opening I16 firstly, and when the water level is too high, the water level rises to the flood discharge opening II 15.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the present invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (7)

1. The emergency dam for the residential river is characterized by comprising a dam (1), a support (2) and a first baffle (3), wherein the first baffle (3) is installed on the dam (1), a first flood discharge opening (16) is formed in the first baffle (3), a second flood discharge opening (15) is formed in the first flood discharge opening (16), installation strips (4) are arranged on two sides of the first baffle (3), slide rails (5) are arranged on the installation strips (4), second baffles (6) are arranged on two sides of the first baffle (3), a sliding block (9) corresponding to the slide rails (5) is arranged on one side of each second baffle (6), protruding blocks (10) are arranged at two ends of each second baffle (6), an installation block (7) is arranged on one side of each second baffle (6), a water level detector (8) is arranged on each installation block (7), and the support (2) is installed at two ends of the first baffles (3), support (2) are installed on dykes and dams (1), support (2) one side is equipped with recess (12) that correspond with lug (10), dykes and dams (1) both sides are equipped with L shape fixed block (13), be equipped with on L shape fixed block (13) through hole (11), be equipped with bolt (14) on through hole (11).
2. The emergency dam for the riverway of the community according to claim 1, wherein the number of the L-shaped fixing blocks (13) installed on both sides of the dam (1) is not less than three.
3. The emergency dam for the riverway of the community according to claim 1, wherein the first flood discharge port (16) and the second flood discharge port (15) are installed on the first baffle plate (3) in an array.
4. The emergency dam for the riverway of the community according to claim 3, wherein the first baffle plate (3) is provided with mounting bars (4) at both ends of both sides.
5. The emergency dam for river channel of community according to claim 4, characterized in that the height of the mounting bar (4) is higher than the height of the baffle plate (3).
6. The emergency dam for riverways of communities according to claim 1, characterized in that the through openings (11) are provided with not less than four L-shaped fixing blocks (13).
7. An emergency embankment for riverways in small areas according to claim 1, characterized in that the number of the grooves (12) is not less than two on one side of the bracket (2).
CN202122873544.7U 2021-11-23 2021-11-23 Emergency dam for community river channel Active CN216689223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122873544.7U CN216689223U (en) 2021-11-23 2021-11-23 Emergency dam for community river channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122873544.7U CN216689223U (en) 2021-11-23 2021-11-23 Emergency dam for community river channel

Publications (1)

Publication Number Publication Date
CN216689223U true CN216689223U (en) 2022-06-07

Family

ID=81833431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122873544.7U Active CN216689223U (en) 2021-11-23 2021-11-23 Emergency dam for community river channel

Country Status (1)

Country Link
CN (1) CN216689223U (en)

Similar Documents

Publication Publication Date Title
CN216689223U (en) Emergency dam for community river channel
CN210597218U (en) Dam reinforcing structure for hydraulic engineering
CN214939820U (en) Dykes and dams for hydraulic engineering
CN213417721U (en) A breakwater for water conservancy construction
CN107119625B (en) Multifunctional ecological seawall architecture system
CN215105054U (en) Reinforced structure based on flood control dykes and dams
CN212452456U (en) Green anti-erosion sea wall with marine garbage collection capacity
CN210737457U (en) Retaining dam for hydraulic engineering
CN212865831U (en) Multi-functional ecological floodgate that keeps off tide
CN219604269U (en) Protective sea wall structure
CN213448332U (en) Water retaining device is used in hydraulic engineering construction
CN114960552B (en) Environment-friendly combined ecological gabion device beneficial to fish protection
CN213014200U (en) Hydraulic engineering is with trash device of being convenient for clearance
CN217870268U (en) Durable flood control dam for river regulation
CN218880721U (en) Dyke structure suitable for harbour channel engineering silt ground
CN214994054U (en) Stepped high-ecological retaining wall
CN217104905U (en) Hydroelectric engineering's flood control dyke
CN220057821U (en) Cut-off equipment for hydraulic engineering construction
CN217352312U (en) Erosion prevention protection device for river channel corners
CN217399874U (en) Intelligent shunting well for realizing sewage disposal and shunting functions of combined and shunted pipe network
CN221000855U (en) Hydraulic engineering river course slope protection structure
CN220284715U (en) Embankment engineering widens increases and uses anti-sedimentation structure
CN213773185U (en) River scour-resistant dike
CN218622092U (en) Novel seepage-proofing structure for key part of high core rockfill dam
CN213142939U (en) Flood control dam for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant