CN216638684U - Lifting and hanging device - Google Patents

Lifting and hanging device Download PDF

Info

Publication number
CN216638684U
CN216638684U CN202123369806.2U CN202123369806U CN216638684U CN 216638684 U CN216638684 U CN 216638684U CN 202123369806 U CN202123369806 U CN 202123369806U CN 216638684 U CN216638684 U CN 216638684U
Authority
CN
China
Prior art keywords
hanging
wall body
supporting
bearing sleeve
vertical bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123369806.2U
Other languages
Chinese (zh)
Inventor
黄立兵
肖立翠
谢晓芳
师璐婵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202123369806.2U priority Critical patent/CN216638684U/en
Application granted granted Critical
Publication of CN216638684U publication Critical patent/CN216638684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to high-rise construction of buildings, in particular to a lifting hanging device which saves space, avoids influencing the durability of a structure and is safe to use. The wall body is provided with a vertically-arranged supporting and positioning rod inside, the wall body is extended out of the upper portion of the supporting and positioning rod, a vertical bearing sleeve is arranged outside the portion, extending out of the wall body, of the supporting and positioning rod, a hanging cross beam horizontally arranged is arranged on the side face of the vertical bearing sleeve, a hanging ring is arranged on the hanging cross beam, a front-end hanging cross beam plate is arranged on the hanging cross beam relative to the other end of the vertical bearing sleeve, a supporting and connecting plate which is symmetrically arranged and is provided with two cross sections in an L shape is arranged at the corner on the wall body, and two inclined struts symmetrically arranged are arranged between the front-end hanging cross beam plate and the supporting and connecting plate. The hoisting device has the advantages that the vertical bearing sleeve, the hanging beam, the front-end hanging beam plate, the supporting connecting plate and the inclined strut are matched with one another, so that the structure is stable, and the hoisting ring is safe and reliable when being used as a hanging point of a hoisting machine tool.

Description

Lifting and hanging device
Technical Field
The utility model relates to high-place construction of buildings, in particular to a lifting and hanging device which saves space, avoids influencing the durability of a structure and is safe to use.
Background
In the construction of high-rise barrel and bin body structures, the lifting, structural installation and the like of platforms for the construction of the inside and outside of the barrel and the bin body often need to be hoisted. The traditional construction method is generally hoisting by a hoisting machine. However, due to the complexity of the building structure, the working conditions of the hoisting machine are often limited and cannot be used. In another method, an embedded part is provided on a structure, and a temporary bracket is welded to the embedded part or fixed to the structure by a chemical anchor bolt or the like to serve as a stress point to perform a lifting operation. The method needs to embed a plurality of embedded parts in the structure, welding or perforating operation on the structure is needed during installation, labor and time are wasted, the economy is poor, high-altitude operation is needed, and the danger is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems, thereby providing a lifting hanging device which saves space, avoids influencing the durability of the structure and is safe to use.
The utility model solves the problems and adopts the technical scheme that:
the utility model provides a promote cable suspension device, which comprises a wall body, the inside of wall body is provided with the vertical support positioning pole of arranging, the wall body is stretched out on the upper portion of support positioning pole, the outside that the support positioning pole stretches out the part of wall body is provided with vertical load sleeve, the telescopic side of vertical load is provided with the hanging crossbeam that the level was arranged, be provided with rings on the hanging crossbeam, it is provided with the front end for the telescopic other end of vertical load and hangs the crossbeam board to hang on the crossbeam, corner on the wall body is provided with the supporting connection board that just the cross-section was the L type that is the symmetry and arranges, it is provided with two bracing that the symmetry arranges to hang between crossbeam board and the supporting connection board to be provided with the symmetry at the front end.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
through the mutual matching of the vertical force bearing sleeve, the hanging beam, the front-end hanging beam plate, the supporting connecting plate and the inclined strut, the structure is stable, and when the hanging ring is used as a hanging point of a hoisting machine, the hoisting machine is safe and reliable.
And the vertical bearing sleeve is matched with the supporting and positioning rod, so that the assembly and disassembly are convenient, the overhead construction workload is reduced, the construction period is shortened, and the cost is reduced.
The device reduces the installation of the embedded part in the structure, avoids operations such as punching and installing chemical anchor bolts or expansion bolts on the structure, and has strong structural durability.
And fourthly, the device is directly arranged on the wall body, so that the space is saved.
After the device is manufactured once, the device can be used repeatedly, and the cost is greatly reduced.
Preferably, the further technical scheme of the utility model is as follows:
two lateral reinforcing rods which are symmetrically arranged are arranged on the side surface of the vertical bearing sleeve; further strengthen the strength of the vertical bearing sleeve.
A cross rod pull plate is arranged on one section of the hanging cross beam between the hanging ring and the vertical bearing sleeve, and two front pull rods which are symmetrically arranged are arranged between the cross rod pull plate and the supporting connecting plate; counteracts the negative bending moment generated in the hanging beam by the downward acting force generated after the hanging beam is loaded by the hanging ring.
The wall body is internally provided with a horizontally arranged wall-through pull rod, two ends of the wall-through pull rod extend out of the wall body, the side surface of the vertical bearing sleeve is provided with a tail reinforcing plate, and a rear pull rod is arranged between the tail reinforcing plate and the wall-through pull rod; the balance is hung the crossbeam, further increases the stability of hanging the crossbeam.
Two ends of the wall-through pull rod are provided with pins; the wall-through pull rod is prevented from sliding out of the wall body.
Corner reinforcing plates are arranged at the corners of the vertical bearing sleeve and the hanging beam; further increasing the stability of the hanging beam.
Drawings
FIG. 1 is a schematic perspective view of an embodiment of the present invention;
FIG. 2 is a schematic perspective view of an embodiment of the present invention;
FIG. 3 is a schematic top view of an embodiment of the present invention;
fig. 4 is a schematic front view of the embodiment of the present invention.
In the figure: a supporting and positioning rod 1; a vertical bearing sleeve 2; a cross bar pulling plate 3; hanging the beam 4; a hoisting ring 5; the front end is hung with a beam plate 6; a diagonal brace 7; a front pull rod 8; a support connection plate 9; a wall feed-through tie rod 10; a pin 11; a rear pull rod 12; a lateral reinforcement bar 13; corner reinforcing plates 14; and a tail reinforcing plate 15.
The specific implementation mode is as follows:
the utility model will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the utility model.
Referring to fig. 1 to 4, a lifting and hanging device comprises a wall body, wherein a supporting and positioning rod 1 which is vertically arranged is fixed inside the wall body, the upper part of the supporting and positioning rod 1 extends out of the wall body, a vertical bearing sleeve 2 is sleeved outside the part of the supporting and positioning rod 1 extending out of the wall body, two lateral reinforcing rods 13 which are symmetrically arranged are welded on the lateral surface of the vertical bearing sleeve 2, the strength of the vertical bearing sleeve 2 is further enhanced, a hanging cross beam 4 which is horizontally arranged is welded on the lateral surface of the vertical bearing sleeve 2, corner reinforcing plates 14 are welded at the corners of the vertical bearing sleeve 2 and the hanging cross beam 4, the stability of the hanging cross beam 4 is improved, a hanging ring 5 is installed on the hanging cross beam 4, the hanging ring 5 is made of round steel, rings are welded at two ends of the hanging ring 5, one end of each hanging ring is connected with the hanging cross beam 4, the other end of each hanging cross beam is used as a hanging point, a front hanging cross beam plate 6 is installed on the hanging cross beam 4 opposite to the other end of the vertical bearing sleeve 2, support connecting plates 9 which are symmetrically arranged and have L-shaped sections are arranged at corners of a wall body, two diagonal braces 7 which are symmetrically arranged are welded between a front-end hanging transverse beam plate 6 and the support connecting plates 9, a transverse beam pulling plate 3 is arranged on a section of a hanging transverse beam 4 which is positioned between a hanging ring 5 and a vertical bearing sleeve 2, two front pull rods 8 which are symmetrically arranged are arranged between the transverse beam pulling plate 3 and the support connecting plates 9 and can offset the negative bending moment generated in the hanging transverse beam 4 by the downward acting force generated by the hanging transverse beam 4 after being loaded by the hanging ring 5, a horizontally arranged wall penetrating pull rod 10 is arranged in the wall body, two ends of the wall penetrating pull rod 10 extend out of the wall body, a tail reinforcing plate 15 is arranged on the side surface of the vertical bearing sleeve 2, a round hole is formed in the tail reinforcing plate 15, a rear pull rod 12 is arranged between the tail reinforcing plate 15 and the wall penetrating pull rod 10, two ends of the rear pull rod 12 are both welded with round rings and are connected with the tail reinforcing plate 15 and the wall penetrating pull rod 10 through the round rings, the hanging beam 4 is balanced, the stability of the hanging beam 4 is further improved, the through holes of the wall penetrating pull rod 10 are formed in the two ends of the wall penetrating pull rod 10, the pins 11 are installed in the through holes, the wall penetrating pull rod 10 is prevented from sliding out of a wall body, and the device is suitable for lifting and hoisting of the construction operation of the upper structures of high-rise structures such as circular silos, square silo bodies and the like.
During wall body construction, when concrete structure is constructed to the top, set up the lifting point position as required, according to hanging the distance between crossbeam 4 and the wall-penetrating pull rod 10, reserve the hole that suits with wall-penetrating pull rod 10 in advance in the wall body to the wall-penetrating pull rod 10 penetrates, again at the pre-buried support locating lever 1 in top, support locating lever 1 is scaffold tube or thick diameter reinforcing bar.
During construction, the vertical bearing sleeve 2 is sleeved on the supporting and positioning rod 1, the supporting and connecting plate 9 is tightly attached to the corner of the wall body, the wall-through pull rod 10 is inserted into the wall body, the pins 11 are inserted into two ends of the wall-through pull rod 10, the wall-through pull rod 10 is prevented from sliding out of the wall body, and installation is completed; hoisting tools such as a chain block, an electric block, a pulley block and the like on the hoisting ring 5 according to construction requirements, sliding the hoisting ring 5 according to requirements when in use, and adjusting to a proper use position; the hoisting device can perform operations such as hoisting, vertical material transportation and the like, or a hoisting pulley block and a guide pulley block on the ground or other positions form a more complex hoisting and lifting system; a plurality of lifting hanging devices can be arranged, and corresponding lifting machines are arranged to be assisted, so that the steel structure assembled on the ground is integrally and synchronously lifted to high-altitude installation operation, and the construction efficiency is improved; after the hoisting and lifting operation is completed, lifting equipment is disassembled, the pin 11 is pulled out, the hoisting and lifting device is lifted from the supporting and positioning rod 1, ropes are bound on the hoisting and lifting device, the supporting and positioning rod 1 is used as a temporary rope fixing point, the dismounting safety is ensured, the hoisting and lifting device is slowly conveyed to the ground, and the protruding part of the supporting and positioning rod 1 is cut and removed or is used as a part of a top protective railing.
The vertical bearing sleeve 2, the hanging beam 4, the front-end hanging beam plate 6, the supporting connecting plate 9 and the inclined strut 7 are matched with each other, so that the structure is stable, when the hanging ring 5 is used as a hanging point of a hoisting machine, the lifting device is safe and reliable, through the matching of the vertical bearing sleeve 2 and the supporting and positioning rod 1, the dismounting is convenient, the high-altitude construction workload is reduced, the construction period is shortened, the cost is reduced, the installation of embedded parts in the structure is reduced, the operations of punching holes for installing chemical anchor bolts or expanding the structure and the like are avoided, the structural durability is strong, the device is directly installed on a wall body, the space is saved, the device can be repeatedly used after being manufactured once, and the cost is greatly reduced.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (6)

1. The utility model provides a promote cable suspension device, includes the wall body, its characterized in that: the inside of wall body is provided with the vertical supporting and positioning pole of arranging, the wall body is stretched out on the upper portion of supporting and positioning pole, the outside that the supporting and positioning pole stretches out the part of wall body is provided with vertical load sleeve, the telescopic side of vertical load is provided with the hanging crossbeam of level arrangement, be provided with rings on the hanging crossbeam, it is provided with the front end for the telescopic other end of vertical load and hangs the crossbeam board to hang on the crossbeam, corner on the wall body is provided with the supporting connection board that is the symmetry and arranges and the cross-section is the L type, the front end is hung and is provided with two bracing that are the symmetry and arranges between crossbeam board and the supporting connection board.
2. The lifting hanger of claim 1, wherein: two lateral reinforcing rods which are symmetrically arranged are arranged on the side surface of the vertical bearing sleeve.
3. The lifting hanger of claim 1, wherein: the section of the hanging beam between the hanging ring and the vertical bearing sleeve is provided with a cross rod pull plate, and two front pull rods which are symmetrically arranged are arranged between the cross rod pull plate and the supporting connecting plate.
4. Lifting and hanging device according to claim 1, characterised in that: the wall body is internally provided with a horizontally arranged wall penetrating pull rod, two ends of the wall penetrating pull rod extend out of the wall body, the side surface of the vertical bearing sleeve is provided with a tail reinforcing plate, and a rear pull rod is arranged between the tail reinforcing plate and the wall penetrating pull rod.
5. The lifting hanger of claim 4, wherein: both ends of the wall-through pull rod are provided with pins.
6. The lifting hanger of claim 1, wherein: corner reinforcing plates are arranged at the corners of the vertical bearing sleeve and the hanging beam.
CN202123369806.2U 2021-12-30 2021-12-30 Lifting and hanging device Active CN216638684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123369806.2U CN216638684U (en) 2021-12-30 2021-12-30 Lifting and hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123369806.2U CN216638684U (en) 2021-12-30 2021-12-30 Lifting and hanging device

Publications (1)

Publication Number Publication Date
CN216638684U true CN216638684U (en) 2022-05-31

Family

ID=81745113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123369806.2U Active CN216638684U (en) 2021-12-30 2021-12-30 Lifting and hanging device

Country Status (1)

Country Link
CN (1) CN216638684U (en)

Similar Documents

Publication Publication Date Title
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN111648585A (en) Construction method and device of suspended support type steel truss platform
CN210439705U (en) Precast concrete superimposed sheet hoist device
CN106988299B (en) The pay-off method of assembled steel reinforced cage descending frame and steel reinforcement cage
CN220223242U (en) Prefabricated box girder steel reinforcement skeleton lifting appliance
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN216638684U (en) Lifting and hanging device
CN111472531A (en) Cantilever support frame
CN114148908A (en) Lifting and hanging device
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN214574174U (en) Loading device for single-pile high-strain detection
CN112227378B (en) Auxiliary device for hoisting reinforcement cage
CN210340091U (en) Column main reinforcement hoisting tool of concrete cast-in-place steel rib column
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN216787105U (en) Operation platform of pile foundation
CN217172928U (en) Hoisting fixing device
CN217458557U (en) Attachment structure of main building tower crane
CN217629469U (en) High pier stud owner muscle hoist device
CN213569101U (en) Auxiliary lifting appliance for reinforcement cage
CN212428008U (en) Lower supporting type overhanging scaffold construction device
CN212613671U (en) Construction device of suspended support type steel truss platform
CN220868215U (en) Assembled steel frame type heavy steel casing temporary hanging bracket and positioning adjusting device
CN211396549U (en) Telescopic folding elevator shaft construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant