CN216475110U - Protector of hydraulic and hydroelectric engineering side slope - Google Patents

Protector of hydraulic and hydroelectric engineering side slope Download PDF

Info

Publication number
CN216475110U
CN216475110U CN202123188948.9U CN202123188948U CN216475110U CN 216475110 U CN216475110 U CN 216475110U CN 202123188948 U CN202123188948 U CN 202123188948U CN 216475110 U CN216475110 U CN 216475110U
Authority
CN
China
Prior art keywords
threaded
fixedly connected
fixing
piece
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123188948.9U
Other languages
Chinese (zh)
Inventor
邵阳
梁锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123188948.9U priority Critical patent/CN216475110U/en
Application granted granted Critical
Publication of CN216475110U publication Critical patent/CN216475110U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses a protector of hydraulic and hydroelectric engineering side slope, including fixed plate, mounting hole, first fixed establishment, pole setting, threaded rod and preforming. This protector of hydraulic and hydroelectric engineering side slope, during the use, at first the hole site of the mounted position cooperation mounting hole of fixed plate more pre-buries first fixed establishment, aim at the inserted bar bottom in pre-buried point this moment, strike the head through the hammer, make the inserted bar and strike in the head all inserts the ground, the barb plays the anticreep effect to the inserted bar this moment, make the inserted bar fixed more stable in the ground, then twist the threaded hole at inserted bar top with the threaded rod, and the hexagonal groove through the threaded rod top adopts fixing tool to fix, then the pole setting of taking, the mounting hole on the fixed plate corresponds with the threaded rod, make the threaded rod run through by the mounting hole, then take the preforming and twist on the threaded rod, make the preforming extrude fixed plate, make the pole setting fixed.

Description

Protector of hydraulic and hydroelectric engineering side slope
Technical Field
The utility model relates to a hydraulic and hydroelectric engineering field specifically is a protector of hydraulic and hydroelectric engineering side slope.
Background
The water conservancy and hydropower is the basic industry of national economy and social development, the construction period of the water conservancy and hydropower engineering is long, the investment is large, a plurality of cooperative departments exist, and the water conservancy and hydropower engineering is greatly influenced by natural resources, terrain, geology and hydrological meteorological conditions; the water conservancy and hydropower project is also influenced by the development level of local economy, traffic and other resource market conditions, so the water conservancy and hydropower project recommendation provides development targets and tasks on the basis of approved (censored) river basin (region) comprehensive utilization planning or professional planning according to the general requirements of national economy and social development planning and regional economy development planning, surveys and necessary surveying work on the construction conditions of the project, analyzes capital financing, preferentially selects the construction scale, place and construction time of the construction project and project, demonstrates the necessity of the construction of the engineering project, and primarily analyzes the feasibility and rationality of the project construction.
Slope protection is a slope protection measure of hydraulic and hydroelectric engineering, but the existing slope protection device only can protect a slope, cannot isolate and protect the edge above the slope, and has the risk of people or animals rolling down.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a protector of hydraulic and hydroelectric engineering side slope to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a protecting device for a water conservancy and hydropower engineering side slope comprises a fixing plate, wherein a plurality of fixing plates are arranged at equal intervals, vertical rods are fixedly connected to the top surface of each fixing plate, cross rods are arranged between the bottoms of the vertical rods, a protective net is fixedly connected to one side of each cross rod, mounting holes are formed in four corners of each fixing plate, a frame body is arranged between the upper portions of the vertical rods, first connecting plates are fixedly connected to two sides of each vertical rod at equal distances, second connecting plates are fixedly connected to two sides of each frame body at equal distances, the second connecting plates correspond to the first connecting plates, the second connecting plates are fixedly connected with the first connecting plates through bolts, an isolating net is arranged on the inner side of each frame body, a bulletin board is arranged on the outer side of each isolating net, a connecting mechanism is arranged on one side of each bulletin board, first fixing mechanisms are arranged at positions, corresponding to the mounting holes, second fixing mechanisms are uniformly distributed on the protective net, connecting pieces are symmetrically and fixedly connected to two sides of the tops of the cross rods through bolts, the connecting piece is fixedly connected with the corresponding upright stanchion through a bolt.
As a further aspect of the present invention: the bolt-free connecting structure is characterized in that through holes for the bolts to pass are formed in the second connecting plate and the first connecting plate, the connecting piece is L-shaped, the through holes for the bolts to pass are formed in the two sides of the connecting piece, threaded holes for threaded connection of the bolts are formed in the cross rod, and threaded holes for threaded connection of the bolts are formed in the vertical rods.
As a further aspect of the present invention: the connecting mechanism comprises a first L-shaped piece, a second L-shaped piece, a fixing piece and a threaded handle.
As a further aspect of the present invention: the first L-shaped pieces are symmetrically and fixedly connected to the bottom of the bulletin board, the second L-shaped pieces are symmetrically arranged at the top of the bulletin board, one end of each second L-shaped piece is attached to the side wall of the bulletin board, and the fixing pieces are arranged below the second L-shaped pieces and fixedly connected with the bulletin board. The threaded handle is in threaded connection with the fixing piece, and one end of the threaded handle penetrates through the fixing piece and is in rotating connection with the outer wall of the second L-shaped piece.
As a further aspect of the present invention: the first fixing mechanism comprises an inserted bar, a threaded rod, a knocking head and a pressing sheet.
As a further aspect of the present invention: the top of inserted bar is equipped with the screw hole, and threaded rod threaded connection is in the threaded hole, strikes first fixed connection at the top of inserted bar, strikes the head and has seted up the perforation corresponding to threaded hole department, and the middle part of preforming is equipped with the screw hole, and preforming threaded connection is on the threaded rod, the bottom symmetry fixedly connected with barb of inserted bar, and the hexagonal groove has been seted up on the top of threaded rod, and second fixed establishment is the same with first fixed establishment structure, only the diameter of preforming is greater than the diameter of preforming in the first fixed establishment in the second fixed establishment.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a cooperation between fixed plate, pole setting, horizontal pole, protection network, framework, first connecting plate, connecting piece, second connecting plate and the separation net is used for can carry out side slope top edge protection through pole setting cooperation separation net, carry out the side slope protection through the protection network simultaneously, have two kinds of protecting effects simultaneously.
2. The utility model discloses an inserted bar, threaded rod, strike the cooperation between head, preforming and the barb and use for can advance fixedly to the fixed plate through first fixed establishment, can fix the protection network through second fixed establishment simultaneously, thereby make the fixed mounting of device more convenient.
3. The utility model discloses a cooperation between bulletin board, coupling mechanism, first L shape piece, second L shape piece, mounting and the screw thread handle is used for can be convenient carry out knowledge propaganda through the bulletin board, conveniently carry out safe propaganda and lead, dismantle the bulletin board that simultaneously can be convenient through coupling mechanism, conveniently align and change.
Drawings
Fig. 1 is a schematic structural view of a protective device for a slope in hydraulic and hydroelectric engineering.
Fig. 2 is a front view of the position of a central pillar of a slope protection device for hydraulic and hydroelectric engineering.
Figure 3 is a side view of a bulletin board in a protector for a hydraulic and hydroelectric engineering side slope.
Figure 4 is a back view of a bulletin board in a protector for hydraulic and hydro-power engineering side slopes.
Fig. 5 is an enlarged view of a first securing mechanism in a slope protection device for hydraulic and hydroelectric engineering.
Fig. 6 is a combination diagram of a second fixing mechanism and a protective net in a protective device for a slope of a hydraulic and hydroelectric engineering.
In the figure: the fixing device comprises a fixing plate 1, a vertical rod 2, a cross rod 3, a protective net 4, a mounting hole 5, a frame 6, a first connecting plate 7, a second connecting plate 8, an isolation net 9, a bulletin board 10, a connecting mechanism 11, a first fixing mechanism 12, a second fixing mechanism 13, a connecting piece 14, a first L-shaped piece 15, a second L-shaped piece 16, a fixing piece 17, a threaded handle 18, an inserted rod 19, a threaded rod 20, a knocking head 21, a pressing piece 22 and a barb 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 6, in an embodiment of the present invention, a slope protection device for hydraulic and hydroelectric engineering comprises a fixing plate 1, a plurality of fixing plates 1 are equidistantly arranged, vertical rods 2 are fixedly connected to the top surface of the fixing plate 1, a cross rod 3 is arranged between the bottoms of the vertical rods 2, a protective net 4 is fixedly connected to one side of the cross rod 3, four corners of the fixing plate 1 are respectively provided with a mounting hole 5, a frame body 6 is arranged between the upper portions of the vertical rods 2, first connecting plates 7 are fixedly connected to both sides of the vertical rods 2 at equal distances, second connecting plates 8 are fixedly connected to both sides of the frame body 6 at equal distances, the second connecting plates 8 correspond to the first connecting plates 7, the second connecting plates 8 are fixedly connected to the first connecting plates 7 through bolts, a separation net 9 is arranged inside the frame body 6, a bulletin plate 10 is arranged outside the separation net 9, the bulletin plate 10 is used for slope protection and safety knowledge declaration, one side of bulletin board 10 is equipped with coupling mechanism 11, and the below of fixed plate 1 corresponds mounting hole 5 department and all is equipped with first fixed establishment 12, and the equipartition has second fixed establishment 13 on the protection network 4, and the top bilateral symmetry of horizontal pole 3 is through bolt fixedly connected with connecting piece 14, and connecting piece 14 passes through the bolt and corresponds pole setting 2 fixed connection.
All set up the perforation that has the bolt to be used for passing on second connecting plate and the first connecting plate 7, connecting piece 14 is L shape, and the perforation that is used for the bolt to pass is all seted up to the both sides of connecting piece 14, offers the screw hole that is used for bolt threaded connection on the horizontal pole 3, offers the screw hole that is used for bolt threaded connection on the pole setting 2.
The connecting mechanism 11 comprises a first L-shaped member 15, a second L-shaped member 16, a fixing member 17 and a threaded shank 18.
The first L-shaped members 15 are symmetrically and fixedly connected to the bottom of the bulletin board 10, the second L-shaped members 16 are symmetrically arranged on the top of the bulletin board 10, one ends of the second L-shaped members are attached to the side wall of the bulletin board 10, and the fixing members 17 are arranged below the second L-shaped members 16 and are fixedly connected to the bulletin board 10. A threaded shank 18 is threaded onto the fixing member 17, one end of the threaded shank 18 being threaded through the fixing member 17 and being in rotational connection with the outer wall of the second L-shaped member 16.
The first fixing mechanism 12 comprises an inserting rod 19, a threaded rod 20, a knocking head 21 and a pressing sheet 22.
The top of the inserted bar 19 is provided with a threaded hole, the inserted bar 19 is inserted into the ground, the threaded rod 20 is in threaded connection with the threaded hole, the knocking head 21 is fixedly connected with the top of the inserted bar 19, the knocking head 21 is embedded in the ground, the knocking head 21 is used for knocking the inserted bar 19 into the ground, damage to a threaded hole in the top of the inserted bar 19 caused by knocking is avoided, the knocking head 21 is provided with a through hole corresponding to the threaded hole, the diameter of the through hole is larger than the size of the threaded hole, the middle of the pressing piece 22 is provided with a threaded hole, the pressing piece 22 is in threaded connection with the threaded rod 20, the bottom of the inserted bar 19 is symmetrically and fixedly connected with a barb 23, the barb 23 is used for preventing the inserted bar 19 from falling off, a hexagonal groove is formed in the top of the threaded rod 20, the second fixing mechanism 13 is identical in structure with the first fixing mechanism 12, and only the diameter of the pressing piece 22 in the second fixing mechanism 13 is larger than the diameter of the pressing piece 22 in the first fixing mechanism 12.
The utility model discloses a theory of operation is:
when the fixing device is used, firstly, the mounting position of the fixing plate 1 is matched with the hole position of the mounting hole 5 to pre-embed the first fixing mechanism 12, at the moment, the bottom end of the inserting rod 19 is aligned to a pre-embedded point, the knocking head 21 is knocked by a hammer, so that the inserting rod 19 and the knocking head 21 are both inserted into the ground, at the moment, the barb 23 plays a role in preventing the inserting rod 19 from falling off, so that the inserting rod 19 is more stably fixed in the ground, then the threaded rod 20 is screwed into the threaded hole at the top of the inserting rod 19, the hexagonal groove at the top of the threaded rod 20 is used for fixing by a fixing tool, then the vertical rod 2 is taken, the mounting hole 5 on the fixing plate 1 corresponds to the threaded rod 20, so that the threaded rod 20 is penetrated through by the mounting hole 5, then the pressing sheet 22 is screwed on the threaded rod 20, so that the pressing sheet extrudes and fixes the fixing plate, so that the vertical rod 2 is fixed, then the transverse rod 3 is taken, the transverse rod 3 is fixed with the vertical rod 2 by the bolt through the matching of the connecting piece 14, then, the protection net 4 is laid on a side slope, then the frame 6 and the upright stanchion 2 are connected through the matching of the first connecting plate 7 and the second connecting plate 8 by bolts, so that the isolation net 9 is fixed, then the second fixing mechanism 13 is taken, the second fixing mechanism 13 is uniformly distributed in the area of the protection net 4, meanwhile, through the same operation of the first fixing mechanism 12, the pressing sheet 22 extrudes and fixes the protection net 4, so that the protection net 4 is stably fixed, then the bulletin board 10 is taken, the first L-shaped piece 15 at the bottom of the bulletin board 10 is hooked on the isolation net 9, then the second L-shaped piece 16 penetrates through the isolation net 9, then the second L-shaped piece 16 is driven to abut against the isolation net 9 through the matching of the threaded handle 18 and the fixing piece 17, so that the bulletin board 10 is fixed, and the installation work of the device is completed.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a protector of hydraulic and hydroelectric engineering side slope, includes fixed plate (1), its characterized in that: the fixing plate is characterized in that a plurality of fixing plates (1) are arranged at equal intervals, vertical rods (2) are fixedly connected to the top surface of each fixing plate (1), cross rods (3) are arranged between the bottoms of the vertical rods (2), a protective net (4) is fixedly connected to one side of each cross rod (3), mounting holes (5) are formed in four corners of each fixing plate (1), a frame body (6) is arranged between the upper portions of the vertical rods (2), first connecting plates (7) are fixedly connected to two sides of each vertical rod (2) at equal distances, second connecting plates (8) are fixedly connected to two sides of each frame body (6) at equal distances, the second connecting plates (8) correspond to the first connecting plates (7), the second connecting plates (8) are fixedly connected with the first connecting plates (7) through bolts, an isolation net (9) is arranged on the inner side of each frame body (6), bulletin boards (10) are arranged on the outer sides of the isolation net (9), and connecting mechanisms (11) are arranged on one sides of the bulletin boards (10), the lower part of the fixing plate (1) is provided with a first fixing mechanism (12) corresponding to the mounting hole (5), the protective net (4) is uniformly provided with a second fixing mechanism (13), the two sides of the top of the cross rod (3) are symmetrically connected with connecting pieces (14) through bolts, and the connecting pieces (14) are fixedly connected with the corresponding vertical rods (2) through bolts.
2. The protecting device for the slope of the water conservancy and hydropower engineering as claimed in claim 1, which is characterized in that: the bolt-free connecting device is characterized in that through holes for passing bolts are formed in the second connecting plate and the first connecting plate (7), the connecting piece (14) is L-shaped, the through holes for passing the bolts are formed in the two sides of the connecting piece (14), threaded holes for connecting the bolts in a threaded mode are formed in the cross rod (3), and threaded holes for connecting the bolts in a threaded mode are formed in the vertical rods (2).
3. The protecting device for the slope of the water conservancy and hydropower engineering as claimed in claim 1, which is characterized in that: the connecting mechanism (11) comprises a first L-shaped piece (15), a second L-shaped piece (16), a fixing piece (17) and a threaded handle (18).
4. A protector for a hydraulic and hydroelectric engineering slope according to claim 3, characterized in that: the novel bulletin board is characterized in that the first L-shaped piece (15) is symmetrically and fixedly connected to the bottom of the bulletin board (10), the second L-shaped piece (16) is symmetrically arranged at the top of the bulletin board (10) and one end of the second L-shaped piece is attached to the side wall of the bulletin board (10), the fixing piece (17) is arranged below the second L-shaped piece (16) and is fixedly connected with the bulletin board (10), the threaded handle (18) is in threaded connection with the fixing piece (17), and one end of the threaded handle (18) penetrates through the fixing piece (17) and is rotatably connected with the outer wall of the second L-shaped piece (16).
5. The protecting device for the slope of the water conservancy and hydropower engineering as claimed in claim 1, which is characterized in that: the first fixing mechanism (12) comprises an inserting rod (19), a threaded rod (20), a knocking head (21) and a pressing sheet (22).
6. A protection device for a hydraulic and hydroelectric engineering side slope according to claim 5, characterized in that: the top of inserted bar (19) is equipped with the screw hole, threaded rod (20) threaded connection is in the screw hole, strike head (21) fixed connection at the top of inserted bar (19), strike head (21) and seted up the perforation corresponding to threaded hole department, the middle part of preforming (22) is equipped with the screw hole, preforming (22) threaded connection is on threaded rod (20), the bottom symmetry fixedly connected with barb (23) of inserted bar (19), the hexagonal groove has been seted up on the top of threaded rod (20), second fixed establishment (13) are the same with first fixed establishment (12) structure, only the diameter of preforming (22) is greater than the diameter of preforming (22) in second fixed establishment (13).
CN202123188948.9U 2021-12-17 2021-12-17 Protector of hydraulic and hydroelectric engineering side slope Expired - Fee Related CN216475110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123188948.9U CN216475110U (en) 2021-12-17 2021-12-17 Protector of hydraulic and hydroelectric engineering side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123188948.9U CN216475110U (en) 2021-12-17 2021-12-17 Protector of hydraulic and hydroelectric engineering side slope

Publications (1)

Publication Number Publication Date
CN216475110U true CN216475110U (en) 2022-05-10

Family

ID=81425415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123188948.9U Expired - Fee Related CN216475110U (en) 2021-12-17 2021-12-17 Protector of hydraulic and hydroelectric engineering side slope

Country Status (1)

Country Link
CN (1) CN216475110U (en)

Similar Documents

Publication Publication Date Title
CN201786036U (en) Temporary protective barrier for building construction
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN216475110U (en) Protector of hydraulic and hydroelectric engineering side slope
CN205116768U (en) Superelevation layer instrument formula protection platform of encorbelmenting
CN214403061U (en) Civil engineering construction protection network
CN204676940U (en) Single column is outstanding draws Double Tops pin-connected panel reinforcing bar protection canopy
CN207079899U (en) A kind of construction coherent-wall scaffolding suspending apparatus
CN211974274U (en) No counter weight hanging flower basket structure for construction
CN210263929U (en) A preformed hole template for building civil engineering
CN203145488U (en) Limb protective railings of foundation pit and for building construction
CN114718298A (en) Installation structure and installation method of simple construction reserved hole plugging template
CN209603611U (en) A kind of band rushes the fence upright of hook
CN210947661U (en) Installation device of socket type overhanging scaffold
CN203821929U (en) Wind resistant building structure
CN207193974U (en) A kind of photovoltaic power station array support earth anchor
CN205894330U (en) Plug into waterproof board device of position department of curtain first floor and structure
CN207110421U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN209243955U (en) A kind of measurement control line positioning device
CN218565328U (en) Corrosion-resistant aluminium system view lamp pole base
CN218176901U (en) Urban and rural planning building construction baffle
CN204781871U (en) Scaffold
CN218758714U (en) Cast-in-place hidden post template installation fixing device of prefabricated wall
CN219568766U (en) Water flow blocking device for hydraulic engineering
CN103461146B (en) Building method of Tibetan sheep roadway house
CN205132954U (en) Novel dismouting tower machine adheres to frame device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220510

CF01 Termination of patent right due to non-payment of annual fee