Novel dismouting tower machine adheres to frame device Download PDFInfo
- Publication number
- CN205132954U CN205132954U CN201520957827.1U CN201520957827U CN205132954U CN 205132954 U CN205132954 U CN 205132954U CN 201520957827 U CN201520957827 U CN 201520957827U CN 205132954 U CN205132954 U CN 205132954U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- bolt
- plane
- frame device
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
本实用新型公开了一种新型拆装塔机附着架装置,包括设置在结构面(6)下方的下钢板(7),所述的下钢板(7)固定有螺栓(3);螺栓(3)上方内穿上钢板(2),通过螺母(1)与螺栓(3)固定;所述的上钢板(2)上固定有耳板(8),耳板(8)上开有耳孔(9)。本实用新型实现了结构简单,杆件定型,安装方便,施工便捷,固定牢固,节点受力、传力明确;能够满足安全要求;同时杆件可反复使用,造价低,经济性好,节约材料,为企业增加经济效益。
The utility model discloses a novel tower crane attachment frame device, which comprises a lower steel plate (7) arranged below the structural surface (6), and the lower steel plate (7) is fixed with bolts (3); the bolts (3 ) above the steel plate (2), fixed by nuts (1) and bolts (3); the upper steel plate (2) is fixed with an ear plate (8), and an ear hole (9) is opened on the ear plate (8) ). The utility model has the advantages of simple structure, stereotyped rods, convenient installation, convenient construction, firm fixation, clear node force and force transmission; it can meet safety requirements; at the same time, the rods can be used repeatedly, with low cost, good economy and material saving , to increase economic benefits for the enterprise.
Description
技术领域 technical field
本实用新型涉及建筑施工设备领域,具体为一种新型拆装塔机附着架装置。 The utility model relates to the field of building construction equipment, in particular to a novel detachable tower crane attachment frame device.
背景技术 Background technique
近几年来,随着社会的不断发展,尤其是城镇化的高度发展,我国正处在大规模经济建设时期,随着经济的持续、健康、快速发展,建筑业在国民经济中支柱产业的地位日益突出,特别是建筑行业的塔式起重机在加高至独立高度以上时,结合实际情况必需加附墙装置,现有技术一般都是采用附着框架拉杆和连接板,操作比较麻烦。 In recent years, with the continuous development of society, especially the rapid development of urbanization, our country is in the period of large-scale economic construction. It is becoming more and more prominent, especially when tower cranes in the construction industry are heightened to more than the independent height, it is necessary to add wall-attaching devices in combination with the actual situation. The prior art generally adopts attachment frame tie rods and connecting plates, which is troublesome to operate.
因此,提供一种结构简单,杆件定型,安装方便,施工便捷,固定牢固,节点受力、传力明确的拆装机附着装置,已经是一个值得研究的问题。 Therefore, it is already a problem worthy of research to provide a dismantling machine attachment device with simple structure, shaped rods, convenient installation, convenient construction, firm fixation, clear node force and force transmission.
发明内容 Contents of the invention
本实用新型的目的是这样实现的: The purpose of this utility model is achieved in that:
新型拆装塔机附着架装置,包括设置在结构面6下方的下钢板7,所述的下钢板7固定有螺栓3;螺栓3上方内穿上钢板2,通过螺母1与螺栓3固定;所述的上钢板2上固定有耳板8,耳板8上开有耳孔9; The new type of tower crane attachment frame device includes a lower steel plate 7 arranged below the structural surface 6, the lower steel plate 7 is fixed with a bolt 3; An ear plate 8 is fixed on the above-mentioned upper steel plate 2, and an ear hole 9 is opened on the ear plate 8;
所述的螺栓3穿透位于上钢板2与下钢板7之间的预埋进结构面5和结构面6;位于预埋进结构面5和结构面6内的螺栓3外套有PVC套管4,通过PVC套管4与预埋进结构面5和结构面6接触; The bolt 3 penetrates the pre-embedded structural surface 5 and the structural surface 6 between the upper steel plate 2 and the lower steel plate 7; the bolt 3 located in the pre-embedded structural surface 5 and the structural surface 6 is covered with a PVC sleeve 4 , contacting the pre-embedded structural surface 5 and the structural surface 6 through the PVC sleeve 4;
所述的PVC套管4的长度等于上钢板2、下钢板7以及位于上钢板2和下钢板7之间的预埋进结构面5和结构面6的厚度之和; The length of the PVC casing 4 is equal to the sum of the thicknesses of the upper steel plate 2, the lower steel plate 7, and the pre-embedded structural surface 5 and structural surface 6 between the upper steel plate 2 and the lower steel plate 7;
所述的螺栓3上方内穿上钢板2,且内穿设置在上钢板2上的通孔直径大于螺栓3的直径,小于螺母1的直径; A steel plate 2 is inserted inside the top of the bolt 3, and the diameter of the through hole arranged on the upper steel plate 2 is larger than the diameter of the bolt 3 and smaller than the diameter of the nut 1;
所述的耳板8为U形或方钢板。 The ear plate 8 is a U-shaped or square steel plate.
积极有益效果:本实用新型实现了结构简单,杆件定型,安装方便,施工便捷,固定牢固,节点受力、传力明确;能够满足安全要求;同时杆件可反复使用,造价低,经济性好,节约材料,为企业增加经济效益。 Positive and beneficial effects: the utility model realizes simple structure, shaped rods, convenient installation, convenient construction, firm fixation, clear node force and force transmission; it can meet safety requirements; at the same time, the rods can be used repeatedly, and the cost is low and economical Good, saving materials and increasing economic benefits for enterprises.
附图说明 Description of drawings
图1为本实用新型的主视结构示意图; Fig. 1 is the main view structure schematic diagram of the utility model;
图2为本实用新型的侧视结构示意图; Fig. 2 is the side view structural representation of the utility model;
图3为本实用新型的俯视结构示意图; Fig. 3 is the top view structure schematic diagram of the utility model;
图中为:螺母1、上钢板2、螺栓3、PVC套管4、预埋进结构面5、结构面6、下钢板7、耳板8、耳孔9。 The figure shows: nut 1, upper steel plate 2, bolt 3, PVC casing 4, pre-embedded structural surface 5, structural surface 6, lower steel plate 7, ear plate 8, ear hole 9.
具体实施方式 detailed description
下面结合附图,对本实用新型做进一步的说明: Below in conjunction with accompanying drawing, the utility model is described further:
如图1、图2、图3所示,所示,新型拆装塔机附着架装置,包括设置在结构面6下方的下钢板7,所述的下钢板7固定有螺栓3;螺栓3上方内穿上钢板2,通过螺母1与螺栓3固定;所述的上钢板2上固定有耳板8,耳板8上开有耳孔9; As shown in Figure 1, Figure 2, and Figure 3, as shown in Figure 1, the new attachment frame device for disassembling tower cranes includes a lower steel plate 7 arranged below the structural surface 6, and the lower steel plate 7 is fixed with bolts 3; The steel plate 2 is put on inside, and fixed by the nut 1 and the bolt 3; the ear plate 8 is fixed on the upper steel plate 2, and the ear plate 8 is provided with an ear hole 9;
所述的螺栓3穿透位于上钢板2与下钢板7之间的预埋进结构面5和结构面6;位于预埋进结构面5和结构面6内的螺栓3外套有PVC套管4,通过PVC套管4与预埋进结构面5和结构面6接触; The bolt 3 penetrates the pre-embedded structural surface 5 and the structural surface 6 between the upper steel plate 2 and the lower steel plate 7; the bolt 3 located in the pre-embedded structural surface 5 and the structural surface 6 is covered with a PVC sleeve 4 , contacting the pre-embedded structural surface 5 and the structural surface 6 through the PVC sleeve 4;
所述的PVC套管4的长度等于上钢板2、下钢板7以及位于上钢板2和下钢板7之间的预埋进结构面5和结构面6的厚度之和; The length of the PVC casing 4 is equal to the sum of the thicknesses of the upper steel plate 2, the lower steel plate 7, and the pre-embedded structural surface 5 and structural surface 6 between the upper steel plate 2 and the lower steel plate 7;
所述的螺栓3上方内穿上钢板2,且内穿设置在上钢板2上的通孔直径大于螺栓3的直径,小于螺母1的直径; A steel plate 2 is inserted inside the top of the bolt 3, and the diameter of the through hole arranged on the upper steel plate 2 is larger than the diameter of the bolt 3 and smaller than the diameter of the nut 1;
所述的耳板8为U形或方钢板。 The ear plate 8 is a U-shaped or square steel plate.
实施例 Example
将下钢板7上分别开φ24mm下钢板孔,孔的直径应大于螺栓直径小于螺帽大小,确保φ20,长350mm的螺栓3可顺利穿过同时有方便用螺帽1固定,把两个φ20,长350mm的螺栓3穿入600mmX400mmX2mm下钢板7,用φ22mm的PVC套管4罩住φ20,长350mm的螺栓3,避免使用过程中螺栓与混凝土粘在一起,PVC套管4起到隔离作用,塔机扶壁高强杆拆除后,方便φ20,长350mm的螺栓3取出,浇筑混凝土之前将600mmX400mmX2mm下钢板7和φ20,长350mm的螺栓3与PVC套管组成的部分锚固在预埋的位置,在600mmX400mmX2mm上钢板2上面分别通孔将600mmX400mmX2mm上钢板2穿入φ20,长350mm的螺栓3,用上钢板2做压顶,再用螺帽1将600mmX400mmX2mm上钢板2固定牢固。混凝土浇筑完毕后,将200mmX200mmX2mm耳板8焊接在600mmX400mmX2mm上钢板2上,采用双面焊接,并将200mmX200mmX2mm耳板8中间位置开300mm耳孔9连接塔机扶壁高强杆,最后一步上好高强插销。 Open the φ24mm lower steel plate holes on the lower steel plate 7 respectively. The diameter of the holes should be larger than the bolt diameter and smaller than the size of the nut to ensure that the φ20, 350mm long bolt 3 can pass through smoothly and it is convenient to fix it with the nut 1. Put two φ20, The bolt 3 with a length of 350mm penetrates the lower steel plate 7 of 600mmX400mmX2mm, and the φ20 and 350mm long bolt 3 are covered with a φ22mm PVC sleeve 4 to prevent the bolt from sticking to the concrete during use. The PVC sleeve 4 plays an isolation role, and the tower After the high-strength pole of the buttress is removed, it is convenient to take out the bolt 3 with a length of φ20 and 350mm. Before pouring concrete, the part consisting of the lower steel plate 7 of 600mmX400mmX2mm, the bolt 3 with a length of φ20 and a length of 350mm and the PVC sleeve is anchored at the pre-embedded position, at 600mmX400mmX2mm 600mmX400mmX2mm upper steel plate 2 is penetrated into the φ20, long 350mm bolt 3 through holes respectively on the upper steel plate 2, and the upper steel plate 2 is used to press the top, and then the 600mmX400mmX2mm upper steel plate 2 is fixed firmly with the nut 1. After the concrete is poured, weld the 200mmX200mmX2mm lug plate 8 to the 600mmX400mmX2mm upper steel plate 2, using double-sided welding, and open a 300mm ear hole 9 in the middle of the 200mmX200mmX2mm lug plate 8 to connect the high-strength pole of the buttress of the tower crane, and install the high-strength bolt in the last step.
本实用新型采取一种新型拆装塔机附着架耳板,紧固装置,浇筑混凝土之前将此连接好的螺栓、PVC管、钢板安装到位,由于该装置是定型化的,所以在浇筑混凝土过程中不宜造成移位。安装工人可将钢板的预埋件,放入此装置上部用盖板做压顶增大受力面积,然后用螺帽将盖板固定,将钢板上面用工地上的旧模板制作成一个扣盒扣在钢板上简单完成的整改工序,即可达到锚固的目的。由于将圆钢套在PVC套管内,这样钢板拆除后,可以将该装置可以直接取出,周转利用,方便快捷又节约成本。本实用新型比较了现行常用的几种附着框架拉杆和连接板,并对其进行了有效的改进,两块包括U形或方钢板耳板,紧固装置焊接在上部钢板上件,组合焊接构成省料、省工、强度高、结构稳定,便于市场推广。 The utility model adopts a new type of detachable tower crane attachment frame lug plate, fastening device, and the connected bolts, PVC pipes, and steel plates are installed in place before pouring concrete. It should not cause displacement. The installer can put the embedded parts of the steel plate into the upper part of the device and use the cover plate as a top to increase the force-bearing area, and then fix the cover plate with a nut, and use the old template on the construction site to make a buckle box on the steel plate. The simple rectification process on the steel plate can achieve the purpose of anchoring. Since the round steel is sheathed in the PVC casing, after the steel plate is removed, the device can be taken out directly for turnover and utilization, which is convenient, quick and cost-saving. The utility model compares several currently commonly used attached frame pull rods and connecting plates, and effectively improves them. The two pieces include U-shaped or square steel plate lugs, and the fastening device is welded on the upper steel plate. The combination welding constitutes Material saving, labor saving, high strength, stable structure, easy for market promotion.
以上实施案例仅用于说明本实用新型的优选实施方式,但本实用新型并不限于上述实施方式,在所述领域普通技术人员所具备的知识范围内,本实用新型的精神和原则之内所作的任何修改、等同替代及改进等,均应视为本申请的保护范围。 The above implementation cases are only used to illustrate the preferred implementation of the present utility model, but the utility model is not limited to the above-mentioned implementation, within the scope of knowledge possessed by those of ordinary skill in the art, within the spirit and principles of the utility model Any amendments, equivalent substitutions and improvements, etc., shall be considered as the scope of protection of this application.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520957827.1U CN205132954U (en) | 2015-11-26 | 2015-11-26 | Novel dismouting tower machine adheres to frame device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520957827.1U CN205132954U (en) | 2015-11-26 | 2015-11-26 | Novel dismouting tower machine adheres to frame device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205132954U true CN205132954U (en) | 2016-04-06 |
Family
ID=55618768
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520957827.1U Expired - Fee Related CN205132954U (en) | 2015-11-26 | 2015-11-26 | Novel dismouting tower machine adheres to frame device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205132954U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115512A (en) * | 2016-08-26 | 2016-11-16 | 甘肃第四建设集团有限责任公司 | A kind of fixing device of steel house tower crane attachment detachable steel box beam |
-
2015
- 2015-11-26 CN CN201520957827.1U patent/CN205132954U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106115512A (en) * | 2016-08-26 | 2016-11-16 | 甘肃第四建设集团有限责任公司 | A kind of fixing device of steel house tower crane attachment detachable steel box beam |
| CN106115512B (en) * | 2016-08-26 | 2018-01-16 | 甘肃第四建设集团有限责任公司 | A kind of fixing device of steel house tower crane attachment detachable steel box beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202090586U (en) | Assembly type steel bar truss formwork | |
| CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
| CN204098253U (en) | A kind of modified air-entrained concrete building block exterior wall insulated structure | |
| CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
| CN211279058U (en) | A kind of prefabricated prefabricated concrete structure quick-installed sleeve embedded part | |
| CN201809963U (en) | Fixing type profile steel anchor clamp for suspended external scaffold | |
| CN104047419A (en) | Wall linking method of scaffold and wall-linking member used by scaffold | |
| CN204081445U (en) | To encorbelment i iron anchor device | |
| CN215760469U (en) | Building structure movement joint position shear force wall aluminum mould board location reinforcement device | |
| CN205132954U (en) | Novel dismouting tower machine adheres to frame device | |
| CN204609300U (en) | A kind of fixed sleeving for construction drainage pipeline preformed hole hole | |
| CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
| CN211283408U (en) | Combined hoisting stress piece | |
| CN204139596U (en) | Reserving hole sleeve pipe and get pipe device | |
| CN207934434U (en) | Steel pipe flange disk turnover type connects wall drawknot device | |
| CN217053788U (en) | Large-tonnage embedded part | |
| CN217326403U (en) | Reusable scaffold wall connecting rod anchoring device | |
| CN104295082A (en) | Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method | |
| CN201268945Y (en) | Casing tube reserved pre-burying system | |
| CN104863347A (en) | Building scaffold wall connecting structure and construction process | |
| CN204895173U (en) | Fixing device of expansion bolts and channel combination | |
| CN202181614U (en) | Steel pipe fixing device for joist steel | |
| CN103556813B (en) | Steel pipe scaffold wall-connecting piece | |
| CN203891449U (en) | Wall connecting piece for wall connection of scaffold | |
| CN203247591U (en) | Deep foundation pit steel support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160406 Termination date: 20161126 |
|