CN216380436U - Construction tool device for building outer wall - Google Patents
Construction tool device for building outer wall Download PDFInfo
- Publication number
- CN216380436U CN216380436U CN202122517196.XU CN202122517196U CN216380436U CN 216380436 U CN216380436 U CN 216380436U CN 202122517196 U CN202122517196 U CN 202122517196U CN 216380436 U CN216380436 U CN 216380436U
- Authority
- CN
- China
- Prior art keywords
- construction
- wall
- fixedly connected
- slurry
- tool device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction tool device for a building outer wall, which comprises a construction hanging bracket, wherein a slide rail is arranged on the inner wall of the construction hanging bracket, a slide block is connected inside the slide rail in a sliding manner, one side, away from the inside of the slide rail, of the slide block is fixedly connected with a moving frame for placing a powder slurry barrel, steel wire ropes are symmetrically and fixedly connected to the outer part of the moving frame, driving motors are further symmetrically arranged on the inner wall of the construction hanging bracket, the output ends of the driving motors are fixedly connected with rotating shafts, one ends, away from the driving motors, of the rotating shafts are rotatably connected to the inner wall of the construction hanging bracket, and one ends, away from the moving frame, of the two steel wire ropes are respectively wound outside the two rotating shafts. According to the utility model, the movable frame drives the slurry barrel to move through the matching use of the driving motor, the steel wire rope, the movable frame and the sliding block, so that the slurry barrel moves along with the construction position of a worker, the worker does not need to manually carry the slurry barrel, the labor intensity of the worker is reduced, and the use is more convenient.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a construction tool device for a building outer wall.
Background
Building outer wall directly exposes in the outside air, and daily geomantic omen sun can lead to the fact certain injury to the wall body, and the building outer wall can whitewash the processing usually, and the principle of whitewashing is exactly to protect the outer wall with a rete, can make the holistic great enhancement in life-span of building outer wall, also can satisfy the requirement of decorating.
When the existing construction tool device for the building outer wall is used, a worker is required to carry out construction on a suspended construction platform, and for a large construction platform, the worker is required to carry a mortar barrel on the platform according to the construction position, so that the operation is inconvenient; and a large amount of slurry drops in the construction process, so that raw materials are wasted, and meanwhile, when the construction of the building outer wall with higher height is carried out, certain safety threat is brought to ground personnel by the slurry dropped from the high position.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem that in the prior art, workers are required to carry a mortar barrel on a platform according to the construction position, and the operation is inconvenient.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a construction tool device for building outer wall, includes the construction gallows, the slide rail is installed to the inner wall of construction gallows, the inside sliding connection of slide rail has the slider, the slider is kept away from the inside one side fixedly connected with of slide rail is used for placing the removal frame of whitewashed thick liquid bucket, the outside symmetry fixedly connected with wire rope of removal frame, driving motor is still installed to the inner wall of construction gallows symmetry, driving motor's output fixedly connected with pivot, the pivot is kept away from driving motor's one end is rotated and is connected the inner wall of construction gallows, two wire rope keeps away from the one end of removal frame is twined respectively two the outside of pivot.
The above technical solution further comprises:
the top of the construction hanger is fixedly connected with a hanging ring, and a lifting rope is arranged outside the hanging ring.
The bottom of construction gallows is provided with the recovery mechanism that is used for retrieving the whitewashed thick liquid, retrieve the mechanism including fixed connection in the whitewashed thick liquid recovery storehouse of construction gallows bottom, the opening has been seted up to the outside in whitewashed thick liquid recovery storehouse, the board is retrieved to open-ended outside fixedly connected with whitewashed thick liquid, the outside symmetry fixedly connected with baffle of whitewashed thick liquid recovery board.
One side of the powder slurry recovery bin, which is far away from the construction hanging bracket, is provided with a discharge pipe, and the outside of the discharge pipe is provided with a valve.
The powder slurry recovery bin is of a hollow cavity structure.
Electric telescopic links are symmetrically installed on the outer portion of the construction hanging bracket, the electric telescopic links and the powder slurry recovery plate are located on the same side, and rollers are arranged at one ends, far away from the construction hanging bracket, of the electric telescopic links.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the movable frame drives the slurry barrel to move through the matching use of the driving motor, the steel wire rope, the movable frame and the sliding block, so that the slurry barrel moves along with the construction position of a worker, the worker does not need to manually carry the slurry barrel, the labor intensity of the worker is reduced, and the use is more convenient.
2. The recovery mechanism is arranged in the utility model, when the building outer wall is constructed, the dropped slurry can enter the slurry recovery bin through the opening for recovery through the close fit of the slurry recovery plate and the building outer wall, the waste of the slurry is avoided, and the damage to ground personnel caused by the slurry dropping on the ground is avoided.
3. According to the utility model, the electric telescopic rod and the roller are matched for use, so that the mortar recovery plate can be far away from the building outer wall in the up-and-down moving process of the construction crane, and the mortar recovery plate is prevented from being damaged due to friction between the mortar recovery plate and the building outer wall.
Drawings
FIG. 1 is a schematic structural view of a construction tool device for an exterior wall of a building according to the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is a cross-sectional view of a construction tool apparatus for an exterior wall of a building according to the present invention;
FIG. 4 is an enlarged view of the structure at B in FIG. 1;
fig. 5 is a schematic structural view of the recovery mechanism in the present invention.
In the figure: 1. constructing a hanging bracket; 2. a slide rail; 3. a slider; 4. a movable frame; 5. a wire rope; 6. a drive motor; 7. a rotating shaft; 8. a hoisting ring; 9. a lifting rope; 10. a recovery mechanism; 101. a powder slurry recovery bin; 102. an opening; 103. a slurry recovery plate; 104. a baffle plate; 105. a discharge pipe; 106. a valve; 11. an electric telescopic rod; 12. and a roller.
Detailed Description
The technical solution of the present invention is further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1, 3 and 4, the construction tool device for the building outer wall provided by the utility model comprises a construction hanger 1, wherein the top of the construction hanger 1 is fixedly connected with a hanging ring 8, a hanging rope 9 is arranged outside the hanging ring 8, the hanging rope 9 is connected with a hoisting device, a sliding rail 2 is installed on the inner wall of the construction hanger 1, a sliding block 3 is slidably connected inside the sliding rail 2, a moving frame 4 for placing a powder slurry barrel is fixedly connected to one side of the sliding block 3 away from the inside of the sliding rail 2, and steel wire ropes 5 are symmetrically and fixedly connected to the outside of the moving frame 4;
the inner wall of the construction hanger 1 is also symmetrically provided with a driving motor 6, the driving motor 6 adopts a forward and reverse rotating motor in the prior art and is arranged by adopting a connecting mode and a coding mode in the prior art, the output end of the driving motor 6 is fixedly connected with a rotating shaft 7, one end of the rotating shaft 7, far away from the driving motor 6, is rotatably connected to the inner wall of the construction hanger 1, and one ends of the two steel wire ropes 5, far away from the moving frame 4, are respectively wound outside the two rotating shafts 7;
the movable frame 4 drives the powder slurry barrel to move through the matched use of the driving motor 6, the steel wire rope 5, the movable frame 4 and the sliding block 3, so that the powder slurry barrel moves along with the construction position of a worker;
in this embodiment, at first place the powder thick liquid bucket on removing frame 4, when the powder thick liquid bucket needs to remove along with workman's construction position, start two driving motor 6's operating condition simultaneously, two driving motor 6 rotate and make 7 tight wire rope 5 of rolling up of a pivot, another pivot 7 release wire rope 5, make to remove frame 4 and drive slider 3 in the inside horizontal slip of slide rail 2, the powder thick liquid bucket is followed and is removed frame 4 and remove, thereby make the powder thick liquid bucket remove along with workman's construction position emergence, need not workman manual transport powder thick liquid bucket, thereby workman's intensity of labour has been reduced, it is also more convenient to use.
Example two
As shown in fig. 1, 3 and 5, based on the first embodiment, a recovery mechanism 10 for recovering slurry is disposed at the bottom of the construction hanger 1, the recovery mechanism 10 includes a slurry recovery bin 101 fixedly connected to the bottom of the construction hanger 1, the slurry recovery bin 101 is a hollow chamber structure, an opening 102 is disposed at the outside of the slurry recovery bin 101, a slurry recovery plate 103 is fixedly connected to the outside of the opening 102, and baffles 104 are symmetrically and fixedly connected to the outside of the slurry recovery plate 103;
a discharging pipe 105 is arranged on one side of the slurry recovery bin 101, which is far away from the construction hanging bracket 1, the discharging pipe 105 is used for discharging slurry recovered in the slurry recovery bin 101, and a valve 106 is arranged outside the discharging pipe 105;
in this embodiment, when the building outer wall is constructed, the dropped mortar can enter the mortar recovery bin 101 through the opening 102 to be recovered through the close attachment of the mortar recovery plate 103 and the building outer wall, so that the waste of the mortar is avoided, and meanwhile, the mortar is prevented from dropping on the ground to cause injury to ground personnel.
EXAMPLE III
As shown in fig. 1-2, based on the first or second embodiment, the electric telescopic rods 11 are symmetrically installed outside the construction hanger 1, in order to ensure the stability of the construction hanger 1 and the safety of workers, the extension lengths of the two electric telescopic rods 11 are very short, the two electric telescopic rods 11 and the slurry recovery plate 103 are located on the same side, and the ends of the two electric telescopic rods 11 away from the construction hanger 1 are both provided with the rollers 12;
through the cooperation use of electric telescopic handle 11 and gyro wheel 12 for construction gallows 1 reciprocates the in-process, and the building outer wall can be kept away from to whitewash recovery board 103.
In this embodiment, when construction gallows 1 need reciprocate, start electric telescopic handle 11, make gyro wheel 12 contact building outer wall, continue to start electric telescopic handle 11, make construction gallows 1 drive whitewash recovery board 103 towards the direction motion of keeping away from building outer wall, until whitewash recovery board 103 no longer with the contact of building outer wall, thereby can prevent that whitewash recovery board 103 from causing the damage of whitewash recovery board 103 with the friction of building outer wall, it can to utilize the hoisting device to hoist construction gallows 1 afterwards.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.
Claims (6)
1. A construction tool device for building outer walls comprises a construction hanger (1) and is characterized in that, a slide rail (2) is arranged on the inner wall of the construction hanging bracket (1), a slide block (3) is connected inside the slide rail (2) in a sliding way, one side of the sliding block (3) far away from the inside of the sliding rail (2) is fixedly connected with a movable frame (4) for placing a powder slurry barrel, the outer part of the movable frame (4) is symmetrically and fixedly connected with steel wire ropes (5), the inner wall of the construction hanging frame (1) is also symmetrically provided with driving motors (6), the output end of the driving motor (6) is fixedly connected with a rotating shaft (7), one end, far away from the driving motor (6), of the rotating shaft (7) is rotatably connected to the inner wall of the construction hanging bracket (1), and one ends, far away from the moving frame (4), of the two steel wire ropes (5) are respectively wound on the outer portions of the two rotating shafts (7).
2. The construction tool device for the external wall of the building as claimed in claim 1, wherein a lifting ring (8) is fixedly connected to the top of the construction hanger (1), and a lifting rope (9) is arranged outside the lifting ring (8).
3. The construction tool device for the external wall of the building as recited in claim 1, wherein a recovery mechanism (10) for recovering the slurry is arranged at the bottom of the construction hanger (1), the recovery mechanism (10) comprises a slurry recovery bin (101) fixedly connected to the bottom of the construction hanger (1), an opening (102) is formed in the exterior of the slurry recovery bin (101), a slurry recovery plate (103) is fixedly connected to the exterior of the opening (102), and a baffle plate (104) is symmetrically and fixedly connected to the exterior of the slurry recovery plate (103).
4. The construction tool device for the external wall of the building as claimed in claim 3, wherein a discharging pipe (105) is arranged on one side of the slip recovery bin (101) far away from the construction hanger (1), and a valve (106) is arranged outside the discharging pipe (105).
5. The construction tool device for the external wall of the building as claimed in claim 3, wherein the slip recovery bin (101) is a hollow chamber structure.
6. The construction tool device for the external wall of the building as claimed in claim 3, wherein the construction hanger (1) is externally and symmetrically provided with electric telescopic rods (11), two electric telescopic rods (11) and the mortar recovery plate (103) are located on the same side, and one ends of the two electric telescopic rods (11) far away from the construction hanger (1) are respectively provided with a roller (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122517196.XU CN216380436U (en) | 2021-10-19 | 2021-10-19 | Construction tool device for building outer wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122517196.XU CN216380436U (en) | 2021-10-19 | 2021-10-19 | Construction tool device for building outer wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216380436U true CN216380436U (en) | 2022-04-26 |
Family
ID=81246660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122517196.XU Active CN216380436U (en) | 2021-10-19 | 2021-10-19 | Construction tool device for building outer wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216380436U (en) |
-
2021
- 2021-10-19 CN CN202122517196.XU patent/CN216380436U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113800359B (en) | Mine steel wire rope dust and dirt removing robot and working method | |
CN215322694U (en) | Building construction brick masonry material handling device machines | |
CN115783971A (en) | Reinforcing bar stone tongs for construction | |
CN216380436U (en) | Construction tool device for building outer wall | |
CN212769476U (en) | Electric hoist bridge crane | |
CN214527774U (en) | A masonry hoisting accessory for high-rise building construction | |
CN211894522U (en) | Automatic warehouse cleaning device | |
CN216004959U (en) | Electric single-beam portal crane for building construction | |
CN108435729B (en) | Intelligent flexible warehouse cleaning machine for cement warehouse | |
CN209740274U (en) | Clear storehouse equipment of intelligent mechanical arm | |
CN211255030U (en) | Hoisting mechanism for integrated pump station | |
CN108160231B (en) | Rod adding and taking machine | |
CN215439468U (en) | Liftable support for construction engineering construction | |
CN219138479U (en) | Building demolishing device for demolishing recycled brick wall | |
CN217868019U (en) | House building safety construction platform | |
CN218748479U (en) | Automatic surplus thick liquid device falls | |
CN109205476B (en) | Portal crane | |
CN111288803A (en) | Full-automatic feeding system is retrieved to metallic copper for power transmission | |
CN216105669U (en) | Double-beam bridge crane upper and lower hanging scaffold device for loading and unloading grouped bulk cast pipes | |
CN110714728A (en) | Device for moving drilling tool on electric remote control catwalk and using method thereof | |
CN214935474U (en) | Hoisting device for air conditioner production | |
CN217350419U (en) | Hoisting device is used in machine parts production | |
CN214692998U (en) | Mobilizable perpendicular conveyer of mortar of building by laying bricks or stones | |
CN213836801U (en) | A device for transporting sump silt in pit | |
CN112428414B (en) | A conveyer for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |