CN216370782U - Full-automatic welding machine for aluminum alloy ceiling ventilation frame - Google Patents

Full-automatic welding machine for aluminum alloy ceiling ventilation frame Download PDF

Info

Publication number
CN216370782U
CN216370782U CN202122761316.0U CN202122761316U CN216370782U CN 216370782 U CN216370782 U CN 216370782U CN 202122761316 U CN202122761316 U CN 202122761316U CN 216370782 U CN216370782 U CN 216370782U
Authority
CN
China
Prior art keywords
screw rod
rod group
aluminum alloy
full
moving assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122761316.0U
Other languages
Chinese (zh)
Inventor
刘青波
刘青飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Zhunfa Machinery Technology Co ltd
Original Assignee
Foshan Zhunfa Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Zhunfa Machinery Technology Co ltd filed Critical Foshan Zhunfa Machinery Technology Co ltd
Priority to CN202122761316.0U priority Critical patent/CN216370782U/en
Application granted granted Critical
Publication of CN216370782U publication Critical patent/CN216370782U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a full-automatic welding machine for an aluminum alloy ceiling ventilation frame, which aims to solve the technical problems that the full-automatic welding treatment cannot be carried out on the aluminum alloy ceiling ventilation frame and the aluminum alloy ceiling ventilation frame is inconvenient to use in the prior art. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame comprises an equipment base; the upper end fixed mounting of equipment base has table surface, table surface's upper end is provided with the anchor clamps subassembly, equipment base's upper end is provided with the lateral shifting subassembly. This aluminum alloy furred ceiling ventilation frame full-automatic welding machine only needs to drive the welding rifle head through the setting of lateral shifting subassembly and removes about, drives the welding rifle head back-and-forth movement through the setting of back-and-forth movement subassembly, drives the welding rifle head through the setting that reciprocates the subassembly and reciprocates and handle, carries out welding process through the part of welding rifle head to anchor clamps subassembly department, has realized the full-automatic welding process to aluminum alloy furred ceiling ventilation frame.

Description

Full-automatic welding machine for aluminum alloy ceiling ventilation frame
Technical Field
The utility model belongs to the field of production and processing equipment tools, and particularly relates to a full-automatic welding machine for an aluminum alloy ceiling ventilation frame.
Background
Nowadays, along with the development of industry, the welding machine has extensive application in the production and processing field, and the welding is the process of using various fusible alloy hookups metal parts, and the welding has guaranteed the continuity of metal, and aluminum alloy furred ceiling ventilation frame is a frame by four aluminum alloy metal sheets welding, specifically is an aluminum alloy furred ceiling ventilation frame welding machine.
At present, the prior art adopts artificial mode to weld mostly, and efficiency is lower, can not carry out full-automatic welding treatment to aluminum alloy furred ceiling ventilation frame, and it is comparatively inconvenient to use.
Therefore, aiming at the problem that the daily full-automatic welding machine for the aluminum alloy ceiling ventilation frame cannot perform full-automatic welding treatment when in use, the problem needs to be solved urgently so as to improve the practicability of the device.
SUMMERY OF THE UTILITY MODEL
(1) Technical problem to be solved
Aiming at the defects of the prior art, the utility model aims to provide a full-automatic welding machine for an aluminum alloy ceiling ventilation frame, which aims to solve the technical problems that the full-automatic welding treatment cannot be carried out on the aluminum alloy ceiling ventilation frame and the use is inconvenient in the prior art.
(2) Technical scheme
In order to solve the technical problem, the utility model provides a full-automatic welding machine for an aluminum alloy ceiling ventilation frame, which comprises an equipment base; the welding gun comprises an equipment base and is characterized in that a working table top is fixedly mounted at the upper end of the equipment base, a clamp assembly is arranged at the upper end of the working table top, a transverse moving assembly is arranged at the upper end of the equipment base, a front-and-back moving assembly is arranged at the upper end of the transverse moving assembly, the transverse moving assembly is connected with the front-and-back moving assembly in a sliding mode, an up-and-down moving assembly is arranged on the outer side of the front-and-back moving assembly and is connected with the front-and-back moving assembly in a sliding mode, a welding gun head is arranged on the outer side of the up-and-down moving assembly, a side plate is fixedly mounted at the upper end of the front-and-back moving assembly, and an aluminum welding wire is arranged on the outer side of the side plate.
When the full-automatic welding machine for the aluminum alloy ceiling ventilation frame is used, the frame body part is placed in the position of the clamp assembly, the welding gun head is driven to move left and right through the arrangement of the transverse moving assembly, the welding gun head is driven to move front and back through the arrangement of the front and back moving assembly, the welding gun head is driven to move up and down through the arrangement of the up and down moving assembly, welding materials are assembled through the side plates, the welding gun head is used for welding parts at the position of the clamp assembly, and the full-automatic welding treatment for the aluminum alloy ceiling ventilation frame is realized.
Preferably, the inside of anchor clamps subassembly includes the spacing groove, the spacing groove is seted up in table surface's upper end, table surface's upper end is provided with the cylinder, the cylinder in the both sides of spacing groove are provided with two sets ofly, table surface's upper end is provided with the clamp plate, through placing the frame part spare in spacing groove department, compresses tightly the processing through cylinder drive clamp plate to the part.
Preferably, the inside of the transverse moving assembly comprises a first screw rod group, the first screw rod group is arranged at the upper end of the equipment base, a first motor is arranged at the outer side of the first screw rod group, a first sliding block is arranged at the upper end of the first motor, the first motor is connected with the first sliding block in a sliding mode, and the first motor is started to drive the first sliding block to move left and right along the first screw rod group, so that the welding gun head is driven to move left and right.
Furthermore, a second screw rod group is arranged inside the front-back moving assembly, the second screw rod group is arranged above the first sliding block, a second motor is arranged outside the second screw rod group, and the second motor is started to drive the second screw rod group to move back and forth along the second sliding block, so that the welding gun head is driven to move back and forth.
Furthermore, the back-and-forth moving assembly comprises a second slider inside, the second slider is arranged at the bottom end of the second screw rod group, the second slider is in sliding connection with the second screw rod group, the second slider is fixedly connected with the first slider, and the welding gun head is moved through the sliding connection between the second screw rod group and the second slider.
Still further, the inside of the up-down moving assembly comprises a third screw rod group, the third screw rod group is fixedly installed on the outer side of the second screw rod group, a third motor is arranged at the upper end of the third screw rod group, and the third screw rod group is driven and processed through the third motor.
Furthermore, the up-down moving assembly comprises a third sliding block inside, the third sliding block is arranged on the outer side of the third screw rod group, the third screw rod group is connected with the third sliding block in a sliding mode, the outer side of the third sliding block is fixedly connected with the outer side of the welding gun head, and the third sliding block is driven to move up and down along the third screw rod group by starting a third motor, so that the welding gun head is driven to move up and down.
(3) Advantageous effects
Compared with the prior art, the utility model has the beneficial effects that: according to the full-automatic welding machine for the aluminum alloy ceiling ventilation frame, the frame body part is placed at the limiting groove, the pressing plate is driven by the air cylinder to compress the part, the first motor is started to drive the first sliding block to move left and right along the first screw rod group, so that the welding gun head is driven to move left and right, the second motor is started to drive the second screw rod group to move front and back along the second sliding block, so that the welding gun head is driven to move front and back, the third motor is started to drive the third sliding block to move up and down along the third screw rod group, so that the welding gun head is driven to move up and down, the welding material is assembled through the side plates, the part at the clamp assembly is welded through the welding gun head, and the full-automatic welding treatment of the aluminum alloy ceiling ventilation frame is realized.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, it is obvious that the drawings in the following description are only one embodiment of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic perspective view of an embodiment of the present invention;
FIG. 2 is a schematic top view of an embodiment of the present invention;
FIG. 3 is a partial perspective view of an embodiment of the present invention;
the labels in the figures are: 1. an equipment base; 2. a work table; 3. a clamp assembly; 4. a lateral movement assembly; 5. a forward and backward movement assembly; 6. an up-and-down moving assembly; 7. welding the gun head; 8. a side plate; 9. an aluminum welding wire; 10. a limiting groove; 11. a cylinder; 12. pressing a plate; 13. a first screw rod group; 14. a first motor; 15. a first slider; 16. a second screw rod group; 17. a second motor; 18. a second slider; 19. a third screw rod group; 20. a third motor; 21. and a third slide block.
Detailed Description
In order to make the technical means, the original characteristics, the achieved purposes and the effects of the utility model easily understood and obvious, the technical solutions in the embodiments of the present invention are clearly and completely described below to further illustrate the utility model, and obviously, the described embodiments are only a part of the embodiments of the present invention, but not all the embodiments.
Example 1
The specific embodiment is a full-automatic welding machine for an aluminum alloy ceiling ventilation frame, the three-dimensional structure schematic diagram of the full-automatic welding machine is shown in fig. 1, the overlooking structure schematic diagram of the full-automatic welding machine is shown in fig. 2, and the full-automatic welding machine for the aluminum alloy ceiling ventilation frame comprises an equipment base 1; equipment base 1's upper end fixed mounting has table surface 2, table surface 2's upper end is provided with anchor clamps subassembly 3, equipment base 1's upper end is provided with lateral shifting subassembly 4, lateral shifting subassembly 4's upper end is provided with back-and-forth movement subassembly 5, lateral shifting subassembly 4 and back-and-forth movement subassembly 5 sliding connection, back-and-forth movement subassembly 5's the outside is provided with reciprocates subassembly 6, back-and-forth movement subassembly 5 and the subassembly 6 sliding connection that reciprocates, the outside that reciprocates subassembly 6 is provided with welding rifle head 7, back-and-forth movement subassembly 5's upper end fixed mounting has curb plate 8, the outside of curb plate 8 is provided with aluminium welding wire 9.
For the present embodiment, the shape and structure of the apparatus base 1 are set according to practical application, for example, the apparatus base 1 may have a rectangular structure, a circular structure, a polygonal structure, and the like.
Wherein, the inside of anchor clamps subassembly 3 is including spacing groove 10, the upper end of table surface 2 is seted up to spacing groove 10, the upper end of table surface 2 is provided with cylinder 11, cylinder 11 is provided with two sets ofly in the both sides of spacing groove 10, the upper end of table surface 2 is provided with clamp plate 12, through placing the frame part in spacing groove 10 department, it compresses tightly the processing to the part to drive clamp plate 12 through cylinder 11, the inside of lateral shifting subassembly 4 is including first lead screw group 13, first lead screw group 13 sets up in the upper end of equipment base 1, the outside of first lead screw group 13 is provided with first motor 14, the upper end of first motor 14 is provided with first slider 15, first motor 14 and first slider 15 sliding connection, control along first lead screw group 13 through starting first motor 14 and drive first slider 15, thereby control the removal about driving welding rifle head 7.
The specific embodiment is a full-automatic welding machine for an aluminum alloy ceiling ventilation frame, a schematic partial three-dimensional structure of the full-automatic welding machine is shown in fig. 3, a second screw rod group 16 is arranged inside a front-back moving assembly 5, the second screw rod group 16 is arranged above a first sliding block 15, a second motor 17 is arranged outside the second screw rod group 16, the second motor 17 is started to drive the second screw rod group 16 to move back and forth along a second sliding block 18, so that a welding gun head 7 is driven to move back and forth, a second sliding block 18 is arranged inside the front-back moving assembly 5, the second sliding block 18 is arranged at the bottom end of the second screw rod group 16, the second sliding block 18 is in sliding connection with the second screw rod group 16, the second sliding block 18 is fixedly connected with the first sliding block 15, and the welding gun head 7 is moved through the sliding connection between the second screw rod group 16 and the second sliding block 18.
Meanwhile, the inside of the up-down moving assembly 6 comprises a third screw rod group 19, the third screw rod group 19 is fixedly installed on the outer side of the second screw rod group 16, a third motor 20 is arranged at the upper end of the third screw rod group 19, the third screw rod group 19 is driven and processed through the arrangement of the third motor 20, the inside of the up-down moving assembly 6 comprises a third sliding block 21, the third sliding block 21 is arranged on the outer side of the third screw rod group 19, the third screw rod group 19 is in sliding connection with the third sliding block 21, the outer side of the third sliding block 21 is fixedly connected with the outer side of the welding gun head 7, and the third sliding block 21 is driven to move up and down along the third screw rod group 19 by starting the third motor 20, so that the welding gun head 7 is driven to move up and down.
When the full-automatic welding machine for the aluminum alloy ceiling ventilation frame is used, the frame body part is placed in the position of the limiting groove 10, the air cylinder 11 drives the pressing plate 12 to compress the part, the first motor 14 is started to drive the first sliding block 15 to move left and right along the first screw rod group 13, the welding gun head 7 is driven to move left and right, the second motor 17 is started to drive the second screw rod group 16 to move front and back along the second sliding block 18, the welding gun head 7 is driven to move front and back, the third motor 20 is started to drive the third sliding block 21 to move up and down along the third screw rod group 19, the welding gun head 7 is driven to move up and down, welding materials are assembled through the side plates 8, the part at the position of the clamp assembly 3 is welded through the welding gun head 7, and full-automatic welding treatment for the aluminum alloy ceiling ventilation frame is realized.
Having thus described the principal technical features and basic principles of the utility model, and the advantages associated therewith, it will be apparent to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description is described in terms of various embodiments, not every embodiment includes only a single embodiment, and such descriptions are provided for clarity only, and those skilled in the art will recognize that the embodiments described herein can be combined as a whole to form other embodiments as would be understood by those skilled in the art.

Claims (7)

1. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame comprises an equipment base; the welding gun is characterized in that a workbench top is fixedly mounted at the upper end of the equipment base, a clamp assembly is arranged at the upper end of the workbench top, a transverse moving assembly is arranged at the upper end of the equipment base, a front and rear moving assembly is arranged at the upper end of the transverse moving assembly, the transverse moving assembly is in sliding connection with the front and rear moving assembly, an up and down moving assembly is arranged on the outer side of the front and rear moving assembly, the front and rear moving assembly is in sliding connection with the up and down moving assembly, a welding gun head is arranged on the outer side of the up and down moving assembly, a side plate is fixedly mounted at the upper end of the front and rear moving assembly, and an aluminum welding wire is arranged on the outer side of the side plate.
2. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 1, wherein the clamp assembly comprises a limiting groove, the limiting groove is formed in the upper end of the working table, two groups of air cylinders are arranged at two sides of the limiting groove, and a pressing plate is arranged at the upper end of the working table.
3. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 1, wherein a first screw rod group is arranged inside the transverse moving assembly, the first screw rod group is arranged at the upper end of the equipment base, a first motor is arranged on the outer side of the first screw rod group, a first sliding block is arranged at the upper end of the first motor, and the first motor is connected with the first sliding block in a sliding mode.
4. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 3, wherein a second screw rod group is arranged inside the front-back moving assembly, the second screw rod group is arranged above the first sliding block, and a second motor is arranged on the outer side of the second screw rod group.
5. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 4, wherein a second sliding block is arranged at the bottom end of the second screw rod group and is arranged in the front-back moving assembly, the second sliding block is connected with the second screw rod group in a sliding mode, and the second sliding block is fixedly connected with the first sliding block.
6. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 5, wherein a third screw rod group is arranged in the up-down moving assembly, the third screw rod group is fixedly installed on the outer side of the second screw rod group, and a third motor is arranged at the upper end of the third screw rod group.
7. The full-automatic welding machine for the aluminum alloy ceiling ventilation frame according to claim 6, wherein a third sliding block is arranged inside the up-down moving assembly, the third sliding block is arranged on the outer side of the third screw rod group, the third screw rod group is connected with the third sliding block in a sliding mode, and the outer side of the third sliding block is fixedly connected with the outer side of the welding gun head.
CN202122761316.0U 2021-11-11 2021-11-11 Full-automatic welding machine for aluminum alloy ceiling ventilation frame Active CN216370782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122761316.0U CN216370782U (en) 2021-11-11 2021-11-11 Full-automatic welding machine for aluminum alloy ceiling ventilation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122761316.0U CN216370782U (en) 2021-11-11 2021-11-11 Full-automatic welding machine for aluminum alloy ceiling ventilation frame

Publications (1)

Publication Number Publication Date
CN216370782U true CN216370782U (en) 2022-04-26

Family

ID=81251023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122761316.0U Active CN216370782U (en) 2021-11-11 2021-11-11 Full-automatic welding machine for aluminum alloy ceiling ventilation frame

Country Status (1)

Country Link
CN (1) CN216370782U (en)

Similar Documents

Publication Publication Date Title
CN216370782U (en) Full-automatic welding machine for aluminum alloy ceiling ventilation frame
CN212419210U (en) Bending equipment for processing street lamp pole
CN217193587U (en) Aluminum alloy container door frame welding frock
CN210280997U (en) Be used for welded special spot welder of circuit board copper wire
CN213318253U (en) Quick plasma cutting device of electromechanical accessory
CN213002657U (en) Dial plate processing lathe
CN209773853U (en) Manipulator for full-automatic gear welding machine
CN211841551U (en) Trimming machine grinding wheel trimming structure
CN100556609C (en) Double station compound knife billet welding machine
CN209811333U (en) Efficient cutting machine for metal tube machining
CN210413619U (en) Clamp for producing dust collector parts
CN209736513U (en) Cylindrical capacitor double-pin synchronous bending and shaping equipment
CN114101835A (en) Automatic soldering tin machine with collect function
JP2018126769A (en) Corner automated welding device
CN113210822A (en) Double-end spot welding mechanism
CN214798147U (en) Wire harness terminal and metal elastic sheet assembling mechanism
CN215616674U (en) Hydraulic rack locking rear jaw device
CN220050562U (en) Automatic welding device for die
CN217700704U (en) Draw processingequipment convenient to remove dust
CN220161655U (en) Adjustable friction stir welding fixture
CN214291257U (en) Frame of automatic welding machine
CN213107272U (en) Adjustable car roof cutting tool
CN218983745U (en) Projection welding fixture
CN218776020U (en) Welding equipment behind edge rolling of handle rod
CN217370924U (en) Laser welding head with positioning function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant