CN2162495Y - Long-tube type automatic inner plastering plate - Google Patents
Long-tube type automatic inner plastering plate Download PDFInfo
- Publication number
- CN2162495Y CN2162495Y CN 92219489 CN92219489U CN2162495Y CN 2162495 Y CN2162495 Y CN 2162495Y CN 92219489 CN92219489 CN 92219489 CN 92219489 U CN92219489 U CN 92219489U CN 2162495 Y CN2162495 Y CN 2162495Y
- Authority
- CN
- China
- Prior art keywords
- plastering
- tube
- plate
- pipe
- plastering plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims abstract description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 19
- 235000004443 Ricinus communis Nutrition 0.000 claims description 7
- 238000010276 construction Methods 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 4
- 230000017105 transposition Effects 0.000 claims description 4
- 238000007906 compression Methods 0.000 claims description 3
- 240000000528 Ricinus communis Species 0.000 claims description 2
- 230000006835 compression Effects 0.000 claims description 2
- 238000009435 building construction Methods 0.000 abstract 1
- 238000005507 spraying Methods 0.000 abstract 1
- 239000011505 plaster Substances 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 3
- 208000031968 Cadaver Diseases 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000009877 rendering Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 208000005168 Intussusception Diseases 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A plastering plate for building construction is composed of a lifting internal and external frame, a double-connected long tube type perforated plastering tube supported by said internal and external frame, and a chain for driving said plastering tube to move automatically. The multi-direction caster is flexible and portable, the structure is simple, and one person can operate and change the working site. Compared with manual plastering, the working efficiency is improved by 30 times, the manual labor intensity is greatly reduced, compared with mechanical ash spraying, the manual plastering machine saves operators, reduces the floor ash and saves materials. The cost is low.
Description
The utility model relates to housing construction with interior wall, ceiling plastering (plastering in claiming usually) facility.
At present, China is limit by technical force of existing construction corps and mechanized equipment condition, and more building operations team adopts in the house inner wall finishing of building operations and manually plasters.The labour intensity of manually plastering is big, and labor productivity is low, has a strong impact on the construction period.And also to be equipped with more personnel operation simultaneously because of need multiple tracks process than the machinery spray ash that advanced construction corps adopts, and particularly interior less, changeableization of wall area, comprehensive economic analysis is not too suitable.The ash that lands when adding the spray ash is more, and working environment is relatively poor, and the workman is reluctant to use, and influence is applied.Thereby urgent need solves a kind of interior plasterer's equipment.
The purpose of this utility model provides a kind of simple in structure, light flexibly interior wall, the novel plastering facility of ceiling.It can alleviate physical labor intensity, saves the labour, and the efficient of plastering is higher, and a people can operate and the conversion work place.
The interior plastering plate that housing construction is used, by plaster, support and running part form, to be plastering plate (I) drive it by chain (II) to the technical scheme that the utility model solves moves the long tube formula of plastering pipe (27) of plastering voluntarily and be supported on the liftable cover machine drawing frame (II) and form.
Be described with reference to the accompanying drawings the utility model, accompanying drawing 1 is the organigram of the automatic plastering plate of long tube formula, and Fig. 2 is mortar tube and the organigram of pipe of plastering, and Fig. 3 is the generalized section of pipe of plastering.
Wherein: I-plastering plate II-cover machine drawing frame
III-chain 1,1 '-castor
4 ', 4-draw, press support 5 ', the inside and outside vertical rod of 5-
6-horizontal stand 7-set bolt
8-folding frame 9-compression spring
10-plummet 11-adjustable supports
12-scale 13-strut
14-spring 15-motor wheel or manual pulley
16-is adjustable to roll over support 17-switch
18-mortar conveying pump 19-flexible pipe
20-screw 21-transposition is bumped a little
22,22 '-fulcrum 23-mortar tube
24-sprocket wheel 25,25 ' 26,26 '-clamping plate
27-plasters and manages the 28-baffle plate
29,29 '-rubber tile
Long-tube automatic inner rendering board is by the mortar tube (23) of the round metal control of equal length and has the pipe (27) of plastering of a long round eye to become one by axially being connected that baffle plate (28) is arranged in it, consists of altogether the plastering plate (I) of doubly-linked long-tube. The pipe joint of mortar tube (23) one ends is connected into flexible pipe (19), and the switch (17) through being contained on the horizontal stand (6) inserts mortar conveying pump (18).
Sprocket wheel (24) is equipped with at the place in the middle of the back of mortar tube (23), is driven by chain (III) transmission, makes it and plasters pipe (27) together during automatic moving, and mortar extrudes, pushes away to put down from the eyelet of pipe (27) of plastering and plasters. Plaster can be in overhead more than the 15cm metope and ceiling carry out. Two symmetrical fulcrums (22) are equipped with at the back of the body end place of mortar tube (23), (22 ') can along the angle bar internal channel slippage of inside and outside vertical rod (5 '), (5), make the pipe (27) of plastering steadily mobile.
Plaster pipe (27) both ends and along a round eye up and down the position respectively be equipped with clamping plate (25), (25 '), (26), (26 ') in it plug-in mounting rubber tile (29), (29 ') plastering plate (I) end transposition is housed bumps point (21).After mortar is discharged from the eyelet of pipe (27) of plastering, the rubber tile (29 ') of the clamping plate at two ends (25), (25 ') and folder blocks mortar and outwards overflows, and the rubber tile (29) of last lower plate (26), (26 ') folder has been wipeed mortar off the plucking effect.Plastering plate (I) end even being equipped with transposition and bumping point (21), when the pipe (27) of plastering reaches top or operating position, bottom, bump point (21) and contact ceiling or ground, promptly touch its switch, switch open affects spring to make two ends and top and the bottom clamping plate mention and can replace, in order to avoid scratch the metope of having smeared.
The length of the mortar tube (23) and the pipe (27) of plastering is 05~08 meter is advisable, and material is advisable with metal circular tube, and also available polytetrafluoroethylmaterial material is made.
Liftable cover machine drawing frame of the present utility model (II) by the both sides angle less than 90 ° angle bar be inside and outside vertical rod (5 '), (5) with shoring (2), (2 ') and (
) the interior overcoat of making two rectangles draws framework to form.Draw back during use, for ease of people operation, intussusception during operation.
Base of frame is equipped with two multidirectional castors (1), can make the frame level multidirectional mobile.When framework drew back, set bolt (7) was equipped with in its inside and outside vertical rod (5 '), (5) lap-joint.It is to be advisable about 15 meters that interior overcoat draws frame height, highly is about 3 meters when drawing back.Inside and outside vertical rod (5 '), (5) one sides are equipped with plummet (10) and scale (12), the verticality of frame when checking work.The screw (20) of deciding thickness is arranged at following fagging (2) bottom, adjusts depth of plastering with control.
/ 2nd of an outer vertical rod (5) of frame is highly located fixing horizontal stand (6) is housed, and it draws, presses support (4), (4 ') up and down, to guarantee the fastness of support.The outer of horizontal stand (6) is equipped with and is with that multidirectional castor (1 ') is adjustable rolls over support (16), adjusts the verticality that its height can keep internal and external frame by screw, and castor (1 ') can drag the convertible work-yard of whole frame during 90 ° of foldings.One people can drag.Adjustable supports (11) is a sliding sleeve, and its two ends are hinged on horizontal stand (6) face respectively and stull (on 2 "), makes inside and outside two frameworks promote stretching when drawing back, so that the internal and external frame maintenance is vertical up and down.Driving motor (15) or manual pulley are installed on the face of horizontal stand (6), but motor rotating and speed governing.
The utility model drives chain (III) transmission by motor wheel transmission or manual pulley, shoring (2) (
) centre be equipped with and support sprocket wheel (3) (3 '), make chain (III) drive the pipe (27) of plastering and plaster up and down along frame along its running.One end of strut (15) is hinged on the horizontal stand (6), and the other end is equipped with outer support sprocket wheel, and (3 ") also are equipped with spring (14), and the other end of spring is connected on horizontal stand (6) face, and support chains (III) keeps tightness.The inside and outside rectangular frame that supports plastering plate (I) is high about 15 meters, is welded with the steel plate bar, highly locates to connect into the folding frame (8) that can roll over 90 ° by loose-leaf for about 05 meter apart from the inner frame top, and compression spring (9) is connected in top and the following position of break respectively.When ceiling plastering, earlier folding frame (8) to be rolled over to 90 ° of positions, the pipe (27) of will plastering moves to top folding frame (8) and locates, and uses the hand propelled frame, and multidirectional castor (1) (1 ') moves, and drives the pipe (27) of plastering and plasters.
Embodiment:
With the utility model push-and-pull behind the room, earlier hose coupling and mortar conveying pump (18) are connected, frame (II) is pushed against the operating position of requirement, adjust screw (20) and determine the thickness of plastering, the multidirectional castor of rotating band (1 ') adjustable rolled over support (16) again, make plummet (10) be positioned at scale (12) " 0 " scale, promptly frame is vertical.Open mortar conveying pump earlier, open switch (17) and starter motor or manual pulley (15) simultaneously, chain (III) operation drives the sprocket wheel (24) on the mortar tube (23), plastering plate (I) is started working, all can from bottom to top or from top to bottom, when plastering plate runs to ceiling or place, ground, transposition is bumped point (21) and is contacted ceiling or ground, just starting switch, pulling clamping plate (25), (25 '), (26) (26 '), at this moment switch (17) and motor (15) are closed, troweling machine is pushed into next working position again, starts switch (17) again and motor (15) begins to plaster, repeated multiple times can be plastered by the face of finishing the work like this.When the frame of finding to plaster outwards is offset, adjustablely roll over bolt (16) highly and will adjust immediately when seeing plummet (10) scale on the scale (12)>3 millimeters, make scale (12) reach " 0 " scale, to keep the verticality of frame.
Prove that through test-run a machine plastering plate has reached positive effect in the utility model, the speed of plastering is fast, and the one man operation per tour of plastering can reach 600m
2, improve 30 times of work efficiency than manual the plastering of people.And simple in structure, light flexibly, a people can operate and plaster and the conversion work place.Machinery plasters to have reduced needs a plurality of operating personnel of being equipped with simultaneously, has reduced to land ash, has saved material, and has improved working environment, greatly reduces physical labor intensity.The cost cost is lower.
Claims (5)
1, the interior plastering plate of a kind of housing construction, by plastering, support and running part are formed, it is characterized in that plastering plate (I) is with the perforated pipe (27) of plastering of long tube formula, be supported on the liftable cover machine drawing frame (II), drive its mobile voluntarily plastering by chain (III), the plastering plate (I) of doubly-linked long tube formula is become one by axially being connected with the pipe (27) of plastering that a long round eye is arranged by the mortar tube (23) of round metal control, baffle plate (28) is arranged, in liftable cover machine drawing frame (II) by the both sides angle less than 90 ° angle bar is in it, outer vertical rod (5 '), (5) with shoring (2), (2 ') and (
) make the framework that the interior overcoat of two rectangles draws, two multidirectional castors (1) are equipped with in its bottom, set bolt (7) is equipped with in inside and outside vertical rod (5 ') (5) lap-joint when drawing back, inside and outside vertical rod one side is equipped with plummet (10) and scale (12), screw (20) is equipped with in following fagging (2) bottom, driving chain (III) be supported on shoring (2), (
) the support sprocket wheel (3), (3 ') of centre and outer support sprocket wheel be (on 3 ").
2, plastering plate according to claim 1, sprocket wheel (24) is equipped with at the place in the middle of it is characterized in that mortar tube (23) back, two symmetrical fulcrums (22), (22 ') are equipped with in back of the body end place, the end of pipe (27) and a round eye clamping plate (25), (25 '), (26), (26 ') that an interior plug-in mounting rubber tile (29) respectively is housed, position up and down of plastering, plastering plate (I) end is equipped with transposition and bumps point (21).
3, plastering plate according to claim 1 and 2, the length of it is characterized in that plastering pipe (27) and mortar tube (23) is advisable with 05~08 meter metal circular tube, and also available polytetrafluoroethylmaterial material is made.
4, plastering plate according to claim 1, it is characterized in that outer vertical rod (5) 1/2nd highly the place fixed level support (6) arranged, be hinged with an end on its face respectively and be actively socketed on the strut (13) that adjustable supports (11) in the stull (2 ") and an end are equipped with outer support wheel (3 "), spring (14), its outer is equipped with multidirectional castor (1 ') adjustable and is rolled over support (16).
5, according to claim 1 or 4 described plastering plates, it is characterized in that inside and outside rectangular frame height is about 15 meters, the inner frame top is highly located for about 05 meter to connect into the folding frame (8) that can roll over 90 ° by loose-leaf, and compression spring (9) is connected in top and the following position of break respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92219489 CN2162495Y (en) | 1992-07-25 | 1992-07-25 | Long-tube type automatic inner plastering plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92219489 CN2162495Y (en) | 1992-07-25 | 1992-07-25 | Long-tube type automatic inner plastering plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2162495Y true CN2162495Y (en) | 1994-04-20 |
Family
ID=33766722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 92219489 Expired - Fee Related CN2162495Y (en) | 1992-07-25 | 1992-07-25 | Long-tube type automatic inner plastering plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2162495Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060802A (en) * | 2014-06-07 | 2014-09-24 | 申翰明 | Collapsible wall painting device |
-
1992
- 1992-07-25 CN CN 92219489 patent/CN2162495Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060802A (en) * | 2014-06-07 | 2014-09-24 | 申翰明 | Collapsible wall painting device |
CN104060802B (en) * | 2014-06-07 | 2016-06-08 | 申翰明 | The device of whitewashing a wall of a kind of telescopic type |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109095278B (en) | Building site uses abandonment cable coiling mechanism | |
CN205712146U (en) | A kind of side slope construction hoistable platform | |
CN2162495Y (en) | Long-tube type automatic inner plastering plate | |
CN207260528U (en) | A kind of construction automatic plastering machine | |
CN206886632U (en) | A kind of cable channel cover plate handling device | |
CN213234053U (en) | Construction waterproofing membrane laying device | |
CN214416772U (en) | Interior decoration finishing spraying device | |
CN214316561U (en) | Water-saving irrigation equipment is used in afforestation | |
JPH03110262A (en) | Scaffolding-less automatic coating device for cylindrical structure wall surface | |
CN210828211U (en) | Plastering plate and plastering machine | |
CN214213536U (en) | Municipal works are with vice body structure down | |
CN219261678U (en) | Outer wall decoration frame | |
CN113216567B (en) | Indoor roof plastering machine and method | |
CN215558728U (en) | Auxiliary assembly is laid to building engineering pipeline | |
CN221165658U (en) | Combined slag removing device | |
CN215107846U (en) | Steel structure column installation device | |
CN212104996U (en) | Plastering device for decoration engineering construction | |
JP2881677B2 (en) | Scaffolding equipment | |
CN213330052U (en) | Cement wall surface spraying device | |
CN220896274U (en) | Cable bridge connector | |
CN220565651U (en) | Building construction frame | |
CN219031575U (en) | Building support hoisting device for membrane building construction | |
CN213952472U (en) | Underground foreign matter fishing device for municipal works | |
CN221193202U (en) | Gutter aqueduct for diversion engineering | |
CN219851299U (en) | Mobile dust collecting device for maintaining channel slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |