CN215558728U - Auxiliary assembly is laid to building engineering pipeline - Google Patents
Auxiliary assembly is laid to building engineering pipeline Download PDFInfo
- Publication number
- CN215558728U CN215558728U CN202120985476.0U CN202120985476U CN215558728U CN 215558728 U CN215558728 U CN 215558728U CN 202120985476 U CN202120985476 U CN 202120985476U CN 215558728 U CN215558728 U CN 215558728U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- building engineering
- laying
- fixedly connected
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses an auxiliary device for laying a pipeline in construction engineering, which comprises a bottom plate, wherein an electric hydraulic telescopic rod is arranged at the upper end of the bottom plate, a placing plate is arranged at the telescopic end of the electric hydraulic telescopic rod, two mounting plates are vertically arranged at the upper end of the placing plate, the lower ends of the two mounting plates are fixedly connected with the upper end of the corresponding placing plate, a rotating rod is horizontally arranged between the two mounting plates, the left end and the right end of the rotating rod are respectively rotatably connected with the side walls of the corresponding mounting plates, two conveying rollers are arranged on the rotating rod, and the upper end of the placing plate is fixedly connected with a base. The device sets up a plurality of the device through the structure that sets up motor and transfer roller at freight train and assigned position and can realize having reduced staff's labour to can fix the pipeline through clamping mechanism, cooperate a plurality of the device, can realize the transport to the pipeline, improve the practicality of device.
Description
Technical Field
The utility model relates to the technical field of pipeline laying equipment, in particular to auxiliary equipment for pipeline laying in constructional engineering.
Background
The building engineering is an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings comprise top covers, beam columns, walls and foundations, and can form internal spaces, so that the engineering required by production, living, learning and public activities of people is met;
present when laying building engineering pipeline, be through the freight train with pipeline transport to assigned position, rethread staff carries to the place that needs laid the pipeline, lay through the pipe laying device at last, but it is very hard to carry the pipeline from the freight train through the staff, current shallow can't height-adjusting, need a plurality of staff to mutually support just can carry, a large amount of labours have been consumed, and pipeline transport needs the manual work to fix to the shallow on, the handling efficiency has also been reduced when having increased workman's labour.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a pipeline laying auxiliary device for construction engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a building engineering pipelaying auxiliary assembly, includes the bottom plate, electronic hydraulic telescoping rod is installed to the upper end of bottom plate, electronic hydraulic telescoping rod's flexible end is installed and is placed the board, the vertical two mounting panels, two of being equipped with in upper end of placing the board the lower extreme of mounting panel and the corresponding upper end fixed connection who places the board, two the level is equipped with the dwang between the mounting panel, both ends rotate with the lateral wall of the mounting panel that corresponds respectively about the dwang to be connected, install two transfer rollers on the dwang, the upper end fixedly connected with base of placing the board, the motor is installed to the upper end of base, the output shaft end of motor run through the mounting panel that corresponds and with the right-hand member fixed connection of dwang, two be equipped with clamping mechanism between the mounting panel.
Preferably, clamping mechanism includes that the level sets up double threaded rod and the guide bar in placing the board top, double threaded rod about both ends respectively with the mounting panel that corresponds about the lateral wall rotate be connected, the guide bar about both ends respectively with the mounting panel that corresponds about lateral wall fixed connection, symmetrical threaded connection has the movable block on the double threaded rod, the guide bar all runs through two movable blocks, two the upper end fixedly connected with fixed plate of movable block, the left end of double threaded rod runs through corresponding mounting panel and installs the rotation handle.
Preferably, the rotating handle is an L-shaped handle, and anti-skid rubber is mounted on the rotating handle.
Preferably, four self-locking universal wheels are installed at the lower end of the bottom plate, and the motor is a servo motor.
Preferably, two the transfer roller is T shape running roller, two the material of transfer roller is the stainless steel.
Preferably, the opposite sides of the two fixing plates are provided with arc-shaped grooves, and spongy cushions are arranged in the two arc-shaped grooves.
Compared with the prior art, the device has the advantages that:
1. according to the utility model, by arranging the structures such as the electric hydraulic telescopic rod, the placing plate, the mounting plate, the rotating rod, the conveying roller and the like, the height of the placing plate and the height of the conveying roller can be adjusted through the electric hydraulic telescopic rod, so that the proper position of the pipeline on the truck can be adjusted according to the requirement, and the pipeline on the truck can be conveniently carried by a worker.
2. According to the utility model, the clamping mechanism is arranged, the double-end threaded rod can be rotated by rotating the rotating handle, so that the two moving blocks on the double-end threaded rod move oppositely to fix the pipeline placed on the conveying roller, and the two ends of the pipeline can be fixed by using one device, so that the pipeline is convenient to carry.
3. The self-locking universal wheel and the motor are arranged, the device can be moved through the self-locking universal wheel, the device can be conveniently moved to a specified position to convey a pipeline, the motor is used, the pipeline does not need to be manually pushed, the labor force of workers is reduced, and the pipeline conveying efficiency is improved.
Drawings
FIG. 1 is a schematic structural diagram of a pipeline laying auxiliary device for construction engineering according to the present invention;
fig. 2 is a rear view of fig. 1.
In the figure: 1 bottom plate, 2 auto-lock universal wheels, 3 electronic hydraulic telescoping rod, 4 place the board, 5 mounting panels, 6 motors, 7 dwang, 8 transfer rollers, 9 guide bars, 10 double threaded rod, 11 movable blocks, 12 rotation handle, 13 fixed plates, 14 bases.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-2, a building engineering pipeline laying auxiliary device, comprising a bottom plate 1, wherein an electric hydraulic telescopic rod 3 is installed at the upper end of the bottom plate 1, a placing plate 4 is installed at the telescopic end of the electric hydraulic telescopic rod 3, the electric hydraulic telescopic rod 3 can be lifted to the placing plate 4 to a certain height, so that a worker can conveniently place a pipeline on a conveying roller 8, two mounting plates 5 are vertically arranged at the upper end of the placing plate 4, the lower ends of the two mounting plates 5 are fixedly connected with the upper end of the corresponding placing plate 4, a rotating rod 7 is horizontally arranged between the two mounting plates 5, the left end and the right end of the rotating rod 7 are respectively rotatably connected with the side wall of the corresponding mounting plate 5, two conveying rollers 8 are installed on the rotating rod 7, the two conveying rollers 8 are both T-shaped rollers, the two conveying rollers 8 are made of stainless steel, the service life of the device is prolonged, four self-locking universal wheels 2 are installed at the lower end of the bottom plate 1, the device is convenient to move and fix, the upper end of the placing plate 4 is fixedly connected with the base 14, the upper end of the base 14 is provided with the motor 6, the motor 6 is a servo motor, the motor 6 can adjust the rotating speed according to the actual requirement, and the tail end of the output shaft of the motor 6 penetrates through the corresponding mounting plate 5 and is fixedly connected with the right end of the rotating rod 7;
after board 4 will be placed and improve to suitable position, starter motor 6 can drive dwang 7 and rotate, and dwang 7 rotates and drives transfer roller 8 and rotate, with pipeline one end house again can convey the pipeline on the transfer roller 8, be worth noting, need a plurality of the device to cooperate, can be quick with the pipeline transport on the freight train to the position that the pipeline was laid to needs.
In the utility model, a clamping mechanism is arranged between two mounting plates 5, the clamping mechanism comprises a double-threaded rod 10 and a guide rod 9 which are horizontally arranged above a placing plate 4, the left end and the right end of the double-threaded rod 10 are respectively rotatably connected with the left side wall and the right side wall of the corresponding mounting plate 5, the left end and the right end of the guide rod 9 are respectively fixedly connected with the left side wall and the right side wall of the corresponding mounting plate 5, the double-threaded rod 10 is symmetrically and threadedly connected with moving blocks 11, the guide rod 9 penetrates through the two moving blocks 11, the upper ends of the two moving blocks 11 are fixedly connected with a fixed plate 13, the left end of the double-threaded rod 10 penetrates through the corresponding mounting plate 5 and is provided with a rotating handle 12, the rotating handle 12 is an L-shaped handle, anti-skid rubber is arranged on the rotating handle 12, the operation of workers is convenient, arc grooves are arranged on the opposite sides of the two fixed plates 13, sponge pads are arranged in the two arc grooves, and the workers can drive the double-threaded rod 10 to rotate by rotating the rotating handle 12, the double threaded rod 10 rotates to drive the two moving blocks 11 to move oppositely, so that the pipeline on the conveying roller 8 is fixed, the two ends of the pipeline can be fixed through the device, workers can conveniently move the pipeline, and the practicability of the device is improved.
When the device is used, after a pipeline is conveyed to a designated position by a truck, a plurality of the devices are placed between the truck and the position where the pipeline needs to be laid, the electric hydraulic telescopic rod 3 is started to lift the placing plate 4, so that a worker can place the pipeline on the truck on the conveying roller 8 conveniently, the starting motor 6 drives the rotating rod 7 to rotate at the moment, the conveying roller 8 on the rotating rod 7 rotates, the pipeline can be conveyed by friction force when the pipeline is placed on the conveying roller 8, the labor force required by the worker when the worker carries the pipeline to the designated position from the truck is reduced, the working efficiency is improved, in addition, when the carrying distance is longer, two devices can be used for respectively placing two ends of the pipeline on the conveying rollers 8 on the two devices, the double-end threaded rod 10 can be driven to rotate by rotating the rotating handle 12, the corresponding two moving blocks 11 move oppositely, and then the corresponding two fixing plates 13 are driven to fix the two ends of the pipeline, at the moment, the motor 6 can not be started, and the self-locking universal wheel 2 can move the pipeline, so that the practicability of the device is improved; the device sets up a plurality of the device through the structure that sets up motor 6 and transfer roller 8 at freight train and assigned position and can realize having reduced staff's labour to can fix the pipeline through clamping mechanism, cooperate a plurality of the device, can realize the transport to the pipeline, improve the practicality of device.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.
Claims (6)
1. The utility model provides a building engineering pipelaying auxiliary assembly, includes bottom plate (1), its characterized in that, electronic hydraulic telescoping rod (3) are installed to the upper end of bottom plate (1), the flexible end of electronic hydraulic telescoping rod (3) is installed and is placed board (4), the upper end of placing board (4) is vertical to be equipped with two mounting panels (5), two the lower extreme of mounting panel (5) and the upper end fixed connection who places board (4) that corresponds, two the level is equipped with dwang (7) between mounting panel (5), both ends rotate with the lateral wall of the mounting panel (5) that corresponds respectively about dwang (7) and are connected, install two transfer roller (8) on dwang (7), the upper end fixedly connected with base (14) of placing board (4), motor (6) are installed to the upper end of base (14), the output shaft end of motor (6) run through corresponding mounting panel (5) and with the right-hand member of dwang (7) And fixedly connected, and a clamping mechanism is arranged between the two mounting plates (5).
2. The auxiliary device for laying the pipeline in the building engineering according to claim 1, wherein the clamping mechanism comprises a double threaded rod (10) and a guide rod (9) which are horizontally arranged above the placing plate (4), the left end and the right end of the double threaded rod (10) are respectively and rotatably connected with the left side wall and the right side wall of the corresponding mounting plate (5), the left end and the right end of the guide rod (9) are respectively and fixedly connected with the left side wall and the right side wall of the corresponding mounting plate (5), the double threaded rod (10) is symmetrically and threadedly connected with moving blocks (11), the guide rod (9) penetrates through the two moving blocks (11), the upper ends of the two moving blocks (11) are fixedly connected with a fixing plate (13), and the left end of the double threaded rod (10) penetrates through the corresponding mounting plate (5) and is provided with a rotating handle (12).
3. A construction pipe laying auxiliary device according to claim 2, wherein said turning handle (12) is an L-shaped handle, and said turning handle (12) is mounted with an anti-slip rubber.
4. The auxiliary equipment for laying the pipeline in the building engineering according to claim 1, wherein four self-locking universal wheels (2) are installed at the lower end of the bottom plate (1), and the motor (6) is a servo motor.
5. The auxiliary equipment for laying the pipeline in the building engineering according to claim 1, wherein the two conveying rollers (8) are T-shaped rollers, and the two conveying rollers (8) are made of stainless steel.
6. The auxiliary equipment for laying pipe in building engineering according to claim 2, characterized in that the two fixing plates (13) are provided with arc-shaped grooves on opposite sides, and sponge cushions are arranged in the two arc-shaped grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120985476.0U CN215558728U (en) | 2021-05-10 | 2021-05-10 | Auxiliary assembly is laid to building engineering pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120985476.0U CN215558728U (en) | 2021-05-10 | 2021-05-10 | Auxiliary assembly is laid to building engineering pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215558728U true CN215558728U (en) | 2022-01-18 |
Family
ID=79859678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120985476.0U Expired - Fee Related CN215558728U (en) | 2021-05-10 | 2021-05-10 | Auxiliary assembly is laid to building engineering pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215558728U (en) |
-
2021
- 2021-05-10 CN CN202120985476.0U patent/CN215558728U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215558728U (en) | Auxiliary assembly is laid to building engineering pipeline | |
CN209144821U (en) | Gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket | |
CN206144559U (en) | Portable mining lifting support that fixes | |
CN105151772A (en) | Board carrying robot | |
CN206903168U (en) | A kind of movable up-down builds scaffold by laying bricks or stones | |
CN2858855Y (en) | Dual-purpose wall plastering machine | |
CN216361004U (en) | Construction bearing structure based on mountain area tunnel construction | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN104409997A (en) | Transformer substation power transformation and distribution room switch cabinet mounting system | |
CN211338709U (en) | Construction frame | |
CN202391084U (en) | Flat-scraping operating vehicle | |
CN210508277U (en) | Trowelling device | |
CN210315643U (en) | One-time in-place shaping installation equipment for large equipment | |
CN217174406U (en) | Steel box girder sliding device | |
CN112854697A (en) | Gantry type indoor automatic brick paving machine | |
CN219689280U (en) | Safe elevating gear of municipal building construction | |
CN219526131U (en) | Material lifting device for building construction | |
CN204917199U (en) | Panel transfer robot | |
CN216915961U (en) | A material handling equipment for municipal works | |
CN218149917U (en) | Composite hollow wall body installation device | |
CN110863660A (en) | Indoor wallboard installation device | |
CN108313921A (en) | A kind of automatic brick laying machine system | |
CN219296395U (en) | Arch skeleton bank protection prefabricated section handling device | |
CN217151136U (en) | Movable operation frame for constructional engineering | |
CN219219723U (en) | Waterproof, anti-corrosion and heat-preservation construction frame convenient for material transmission |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |