Prior art keywords
rod
wall
bolt
pole
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122293063.9U
Other languages
Chinese (zh)
Inventor
张保文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongcheng Mechanical Engineering Co ltd
Original Assignee
Shandong Zhongcheng Mechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongcheng Mechanical Engineering Co ltd filed Critical Shandong Zhongcheng Mechanical Engineering Co ltd
Priority to CN202122293063.9U priority Critical patent/CN216155353U/en
Application granted granted Critical
Publication of CN216155353U publication Critical patent/CN216155353U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses adduction building tower crane attachment device, including building wall, the ring beam, first adhering to the pole, the threaded rod, the second adheres to the pole, the connecting rod, first plugboard, first reinforcing bolt, first built-in fitting, first U template, the second U template, the third adheres to the pole, the fourth adheres to the pole, the third U template, the fixed plate, first wear the wall bolt, the fourth U template, hollow column, the second reinforcing bolt, the fifth adheres to the pole, the second built-in fitting, the third reinforcing bolt, the attaching plate, the second plugboard, the second wears the wall bolt, third plugboard and fourth reinforcing bolt. Through fixed establishment's setting, through the effect of hollow post, increase bolted connection's screw thread passageway is strengthened to the second, and through two rigging boards with the fifth attached rod fix between two rigging boards, under the effect of second plugboard, the fifth attached rod is unable controls the back-and-forth movement, through the effect of second wall bolt, the position of fixed rigging board, and then promotes ring beam and building wall connection's stability.

Description

Adduction building tower crane attachment device
Technical Field
The application relates to the technical field of buildings, in particular to an adduction building tower crane attachment device.
Background
The tower crane is the most common hoisting equipment on the construction site, also called tower crane, and is used for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like for construction by the extension (height) of one section and one section (called standard section for short). The tower crane is an indispensable device on a construction site.
Along with the height continuous rising of tower crane, and then need certain tower crane attachment device, and current adduction building tower crane attachment device when the installation, the stability that ring beam and building wall are connected is relatively poor. Therefore, the adduction building tower crane attachment device is proposed to solve the problems.
Disclosure of Invention
Provide adduction building tower crane attachment means in this embodiment and be used for solving the current relatively poor problem of adduction building tower crane attachment means stability.
According to one aspect of the application, an adduction building tower crane attachment device is provided, and comprises a ring beam and a fixing mechanism, wherein two side walls of the ring beam are dislocated and fixedly connected with a third insertion plate, the third insertion plate is in threaded connection with a ring beam to form a fourth reinforcing bolt, the top of the ring beam on the right side in the two ring beams is fixedly connected with a first U-shaped plate, the first U-shaped plate is rotatably connected with one end of a fourth attachment rod, the other end of the fourth attachment rod is rotatably connected with a third U-shaped plate, the third U-shaped plate is fixedly connected with the side wall of a fixing plate, and the fixing plate is connected with a building wall through a first wall penetrating bolt;
fixing mechanism includes fourth U template, hollow post, second reinforcing bolt, fifth adheres to pole, second built-in fitting, third reinforcing bolt, attaching plate, second plugboard and second wall bolt, fourth U template with be located right side ring beam lateral wall fixed connection, fourth U template bottom and hollow post fixed connection, hollow post is linked together with the screw through-hole of fourth U template.
And furthermore, the two ring beams are positioned at the top of the ring beam on the left side and are fixedly connected with a second U-shaped plate, the second U-shaped plate is rotatably connected with one end of a third attachment rod, and the other end of the third attachment rod is rotatably connected with the side wall of a fourth attachment rod.
Furthermore, two ring beam side walls on the left side of the ring beam are connected with one end of a first attachment rod through bolts, the other end of the first attachment rod is fixedly connected with the other end of a threaded rod, the other end of the threaded rod is in threaded connection with the other end of a second attachment rod, the other end of the second attachment rod is rotatably connected with one end of a connecting rod, and the other end of the connecting rod is fixedly connected with a first plug board side wall.
Furthermore, a first embedded part and a second embedded part are fixedly arranged inside the building wall body, a first inserting plate is inserted into the side wall of the first embedded part, and the first inserting plate and the first embedded part are in threaded connection with a first reinforcing bolt.
Furthermore, the top of the second embedded part is attached to one end of a fifth attaching rod, the fifth attaching rod is in threaded connection with a third reinforcing bolt at one end of the second embedded part, the other end of the fifth attaching rod is in plug-in connection with the side wall of a fourth U-shaped plate, and the fourth U-shaped plate, the fifth attaching rod and the hollow column are in threaded connection with the second reinforcing bolt.
Further, the recess grafting second plugboard of fifth attachs pole lateral wall, second plugboard and attaching plate fixed connection, attaching plate lateral wall and the laminating of fifth attachs pole lateral wall, the spout sliding connection at attaching plate and second built-in fitting top, the wall bolt is worn to attaching plate symmetry threaded connection second.
Through the above-mentioned embodiment of this application, adopted fixed establishment, solved the relatively poor problem of current adduction building tower crane attachment device stability, gained better practical function.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic overall perspective view of an embodiment of the present application;
FIG. 2 is an enlarged view of a portion of the structure at A in FIG. 1 according to an embodiment of the present disclosure;
fig. 3 is a schematic front sectional view of a part of a ring beam according to an embodiment of the present application.
In the figure: 1. building a wall body; 2. a ring beam; 3. a first attachment bar; 4. a threaded rod; 5. a second attachment bar; 6. a connecting rod; 7. a first patch panel; 8. a first reinforcing bolt; 9. a first embedded part; 10. a first U-shaped plate; 11. a second U-shaped plate; 12. a third attachment bar; 13. a fourth attachment bar; 14. a third U-shaped plate; 15. a fixing plate; 16. a first through-wall bolt; 17. a fourth U-shaped plate; 18. a hollow column; 19. a second reinforcing bolt; 20. a fifth attachment bar; 21. a second embedded part; 22. a third reinforcing bolt; 23. attaching a plate; 24. a second patch panel; 25. a second through-wall bolt; 26. a third plugboard; 27. and a fourth reinforcing bolt.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
The fixing mechanism in this embodiment may be applied to various boards, for example, the following board is provided in this embodiment, and the fixing mechanism in this embodiment may be used to fix the following board.
The wood board comprises a body, wherein a connecting mechanism is arranged on the body. The connecting mechanism comprises connecting components arranged on two sides of the body, each connecting component comprises an inserting block integrally manufactured on the side wall of one side of the body, a through hole is formed in the body below the inserting block, and a second clamping block is integrally manufactured on the side wall of the through hole; a second clamping groove clamped with the inserting block on the adjacent body is formed in the side wall of the other side of the body, an adjusting block is integrally manufactured on the body below the second clamping groove, and a third clamping groove clamped with the second clamping block on the adjacent body is formed in the adjusting block; when the inserting block is clamped with the second clamping groove, and the second clamping block is clamped with the third clamping groove, the adjusting block is matched with the through hole, the body is matched with the adjacent body, one end of the body is fixedly connected with the adjusting rod, one end of the adjusting rod, which is far away from the body, is integrally provided with the connecting block, the cross section of the connecting block is trapezoidal, the cross section area of one end, which is far away from the adjusting rod, of the connecting block is larger than that of one end, which is close to the adjusting rod, of the connecting block, one end, which is far away from the adjusting rod, of the connecting block is fixedly connected with the connecting rod, one end, which is far away from the connecting block, of the connecting rod is fixedly connected with the first clamping block, the cross section area of the first clamping block is trapezoidal and has certain deformation capacity, and the cross section area of one end, which is far away from the connecting rod, of the first clamping block is smaller than that of one end, which is close to the connecting rod; a groove is formed in the body below the adjusting rod, a spring is fixedly connected to the bottom wall of the groove, and a positioning rod is fixedly connected to one end, away from the bottom wall of the groove, of the spring; the other end of the body is provided with a first sliding chute connected with the connecting block in a sliding manner, the side wall of the first sliding chute is provided with a first clamping groove clamped with the first clamping block, and the first clamping groove is communicated with the first sliding chute; set up the second spout that supplies the locating lever to slide and connect on the body of first spout below, set up the constant head tank with the locating lever joint on the lateral wall of second spout, and the degree of depth of constant head tank will be longer than the length of locating lever. When the first clamping block is clamped with the first clamping groove, the locking block is arranged between the connecting block and the first sliding groove, the cross section area of the locking block is U-shaped, the locking block is sleeved on the adjusting rod, the three end faces of the locking block can abut against the side wall of the first sliding groove, and the side wall close to the connecting block abuts against the connecting block.
Of course, the present embodiment can also be used for fixing wood boards with other structures. Here, a detailed description is omitted, and the fixing mechanism according to the embodiment of the present application is described below.
Referring to fig. 1-3, the adduction building tower crane attachment device comprises a ring beam 2 and a fixing mechanism, wherein the side walls of the two ring beams 2 are fixedly connected with a third plug board 26 in a staggered manner, the third plug board 26 is in threaded connection with the ring beam 2 through a fourth reinforcing bolt 27, the top of the ring beam 2 on the right side of the two ring beams 2 is fixedly connected with a first U-shaped plate 10, the first U-shaped plate 10 is rotatably connected with one end of a fourth attachment rod 13, the other end of the fourth attachment rod 13 is rotatably connected with a third U-shaped plate 14, the third U-shaped plate 14 is fixedly connected with the side wall of a fixing plate 15, and the fixing plate 15 is connected with a building wall 1 through a first wall penetrating bolt 16;
fixing mechanism includes fourth U template 17, hollow post 18, second reinforcing bolt 19, fifth attachment rod 20, second built-in fitting 21, third reinforcing bolt 22, attaching plate 23, second plugboard 24 and second through-wall bolt 25, fourth U template 17 with be located 2 lateral walls fixed connection of right side ring beam, fourth U template 17 bottom and hollow post 18 fixed connection, hollow post 18 is linked together with the screw through-hole of fourth U template 17, is convenient for through fixing mechanism's effect for when the second is worn the fixed attaching plate 23 of wall bolt 25, the position of fixed second plugboard 24, and then the position of fixed fifth attachment rod 20, and then promotes whole attachment device's stability.
The top of the two ring beams 2 positioned on the left side is fixedly connected with a second U-shaped plate 11, the second U-shaped plate 11 is rotatably connected with one end of a third attachment rod 12, the other end of the third attachment rod 12 is rotatably connected with the side wall of a fourth attachment rod 13, so that the connection of the ring beams 2 is improved under the action of the third attachment rod 12, and the ring beams 2 are further connected with a tower body better, the side walls of the two ring beams 2 positioned on the left side are connected with one end of a first attachment rod 3 through bolts, the other end of the first attachment rod 3 is fixedly connected with the other end of a threaded rod 4, the other end of the threaded rod 4 is in threaded connection with the other end of a second attachment rod 5, the other end of the second attachment rod 5 is rotatably connected with one end of a connecting rod 6, the other end of the connecting rod 6 is fixedly connected with the side wall of a first insertion plate 7, a first embedded part 9 and a second embedded part 21 are fixedly arranged inside the building wall body 1, the side wall of the first embedded part 9 is inserted with a first inserting plate 7, the first embedded part 9 and the first reinforcing bolt 8 are in threaded connection, so that under the action of the first embedded part 9, when a worker inserts the first inserting plate 7 into the first embedded part 9, the ring beam 2 is connected with the building wall 1 through the first attaching rod 3 and the second attaching rod 5 under the action of the first reinforcing bolt 8 so as to improve the stability of the ring beam 2, the top of the second embedded part 21 is attached to one end of a fifth attaching rod 20, one end of the fifth attaching rod 20 attached to the second embedded part 21 is in threaded connection with a third reinforcing bolt 22, the other end of the fifth attaching rod 20 is inserted with the side wall of a fourth U-shaped plate 17, the fifth attaching rod 20 and the hollow column 18 are in threaded connection with a second reinforcing bolt 19, a groove of the side wall of the fifth attaching rod 20 is inserted with a second inserting plate 24, second plugboard 24 and attaching plate 23 fixed connection, attaching plate 23 lateral wall and the laminating of the 20 lateral walls of fifth adhesion pole, the spout sliding connection at attaching plate 23 and the 21 top of second built-in fitting, wall bolt 25 is worn to attaching plate 23 symmetry threaded connection second, is convenient for through the effect of two attaching plates 23, and the position of the 20 one end of fixed fifth adhesion pole, and through the effect of hollow post 18, increases the screw thread passageway that the second reinforcing bolt 19 is connected, and then promotes the stability that the second reinforcing bolt 19 is connected to this promotes the stability that the second reinforcing bolt 19 fixes the fifth adhesion pole 20.
When the device is used, whether each device of the whole device can normally work is firstly checked, when each device can normally work, when a worker installs the whole attachment device, the stability of the splicing ring beam 2 is improved and the connectivity of the splicing ring beam 2 is improved through the action of the third attachment rod 12, so that the ring beam 2 is conveniently connected with a tower body better, when the fixing plate 15 is tightly attached to the building wall body 1, the fixing plate 15 is fixed on the outer side of the wall body through the first wall penetrating bolt 16, so that the first fixing of the ring beam 2 is completed, then when the worker inserts the first inserting plate 7 into the first embedded part 9, the ring beam 2 is connected with the building wall body 1 through the first attachment rod 3 and the second attachment rod 5 through the action of the first reinforcing bolt 8, so that the second fixing is performed, so that the stability of the connection of the ring beam 2 and the building wall body 1 is improved, then the staff inserts the recess of fourth U template 17 lateral wall with the one end of fifth adhesion rod 20 simultaneously, the laminating of fifth adhesion rod 20 and second built-in fitting 21 top, through the effect of second reinforcing bolt 19 and third reinforcing bolt 22, it is fixed for the first time to adhere to rod 20, through the effect of hollow post 18, increase the screw channel that second reinforcing bolt 19 is connected, and then promote the stability that second reinforcing bolt 19 is connected, through the effect of two rigging boards 23, fix fifth adhesion rod 20 between two rigging boards 23, and then through the effect of second plugboard 24, make fifth adhesion rod 20 can't control the back-and-forth movement, and through the effect of second wall bolt 25, the position of fixed rigging board 23, and then promote the stability that girl 2 is connected with building wall 1.
The application has the advantages that:
1. through the action of the fixing plate and the first embedded part, when the fixing plate is tightly attached to the building wall body, the fixing plate is fixed to the outer side of the wall body through the first wall penetrating bolt, so that the ring beam is fixed for the first time, and when the first inserting plate is inserted into the first embedded part, the ring beam is connected with the building wall body through the first attaching rod and the second attaching rod through the action of the first reinforcing bolt, so that the second time of fixing is performed, and the stability of connection between the ring beam and the building wall body is improved;
2. through fixed establishment's setting, through the effect of hollow post, increase bolted connection's screw thread passageway is strengthened to the second, and through two rigging boards with the fifth attached rod fix between two rigging boards, under the effect of second plugboard, the fifth attached rod is unable controls the back-and-forth movement, through the effect of second wall bolt, the position of fixed rigging board, and then promotes ring beam and building wall connection's stability.
The modules referred to are prior art and are fully implemented by those skilled in the art without undue experimentation, nor is the subject matter of the present application directed to software and process improvements.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (6)

1. Adduction building tower crane attachment means, its characterized in that: the building wall fixing device comprises ring beams (2) and a fixing mechanism, wherein the side walls of the two ring beams (2) are fixedly connected with a third plug-in board (26) in a staggered mode, the third plug-in board (26) is in threaded connection with the ring beams (2) through fourth reinforcing bolts (27), the top of the ring beam (2) on the right side of the two ring beams (2) is fixedly connected with a first U-shaped board (10), the first U-shaped board (10) is rotatably connected with one end of a fourth attachment rod (13), the other end of the fourth attachment rod (13) is rotatably connected with a third U-shaped board (14), the third U-shaped board (14) is fixedly connected with the side wall of a fixing plate (15), and the fixing plate (15) is connected with a building wall (1) through a first wall penetrating bolt (16);
fixing mechanism includes fourth U template (17), hollow post (18), second reinforcing bolt (19), fifth attached rod (20), second built-in fitting (21), third reinforcing bolt (22), attaching plate (23), second plugboard (24) and second through-wall bolt (25), fourth U template (17) with be located right side ring beam (2) lateral wall fixed connection, fourth U template (17) bottom and hollow post (18) fixed connection, hollow post (18) are linked together with the screw through-hole of fourth U template (17).
2. The adduction building tower crane attachment apparatus of claim 1, wherein: two ring roof beam (2) are located left ring roof beam (2) top and second U template (11) fixed connection, second U template (11) are connected with the one end rotation that the third adheres to pole (12), the other end and the third that the fourth adheres to pole (13) are connected with pole (12) lateral wall rotation.
3. The adduction building tower crane attachment apparatus of claim 2, wherein: two the ring roof beam (2) are located the left ring roof beam (2) lateral wall and pass through the bolt and be connected with the one end of first adhering to pole (3), the other end of first adhering to pole (3) and the other end fixed connection of threaded rod (4), the other end and the second of threaded rod (4) adhere to the other end threaded connection of pole (5), the second adheres to the other end of pole (5) and rotates with the one end of connecting rod (6) to be connected, the other end and the first plugboard (7) lateral wall fixed connection of connecting rod (6).
4. The adduction building tower crane attachment apparatus of claim 1, wherein: the building wall body (1) is internally and fixedly provided with a first embedded part (9) and a second embedded part (21), the side wall of the first embedded part (9) is inserted with a first inserting plate (7), and the first inserting plate (7) and the first embedded part (9) are in threaded connection with a first reinforcing bolt (8).
5. The adduction building tower crane attachment apparatus of claim 1, wherein: the top of the second embedded part (21) is attached to one end of a fifth attaching rod (20), one end of the fifth attaching rod (20) attached to the second embedded part (21) is in threaded connection with a third reinforcing bolt (22), the other end of the fifth attaching rod (20) is in plug-in connection with the side wall of a fourth U-shaped plate (17), and the fourth U-shaped plate (17), the fifth attaching rod (20) and a hollow column (18) are in threaded connection with a second reinforcing bolt (19).
6. The adduction building tower crane attachment apparatus of claim 1, wherein: the wall bolt is characterized in that a second plug board (24) is connected with a groove of a side wall of the fifth attaching rod (20) in an inserting mode, the second plug board (24) is fixedly connected with a binding board (23), the side wall of the binding board (23) is attached to the side wall of the fifth attaching rod (20), the binding board (23) is connected with the top of the second embedded part (21) in a sliding mode, and the binding board (23) is connected with the second wall bolt (25) in a symmetrical threaded mode.
CN202122293063.9U 2021-09-22 2021-09-22 Adduction building tower crane attachment device Active CN216155353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122293063.9U CN216155353U (en) 2021-09-22 2021-09-22 Adduction building tower crane attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122293063.9U CN216155353U (en) 2021-09-22 2021-09-22 Adduction building tower crane attachment device

Publications (1)

Publication Number Publication Date
CN216155353U true CN216155353U (en) 2022-04-01

Family

ID=80853358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122293063.9U Active CN216155353U (en) 2021-09-22 2021-09-22 Adduction building tower crane attachment device

Country Status (1)

Country Link
CN (1) CN216155353U (en)

Similar Documents

Publication Publication Date Title
CN210423957U (en) Gantry type support hanger and building using same
CN216155353U (en) Adduction building tower crane attachment device
CN208981650U (en) Positioning device
CN202064454U (en) Connecting element for building and beam column building structure system adopting same
CN212001633U (en) Temporary fixing structure for steel beam and profile steel concrete column
CN1472410A (en) Integral casting constructing method and template assembly thereof
CN207160418U (en) A kind of reinforced column constructing device of free removal template
CN212388591U (en) Retaining wall template assembly for high fill construction
DE19920032C2 (en) Process for producing a wall structure from prefabricated wall parts
DE10007450A1 (en) Mounting bracket system and method for fastening a prefabricated component to a building part using the mounting bracket system
CN219364962U (en) Assembled steel frame structure tie point
CN209760457U (en) steel bar formwork integrated wall and connecting beam splicing connection structure
CN215759948U (en) Keel structure for building engineering
CN213449189U (en) Parapet construction tool
EP2273212A2 (en) Fixing element for roof attachments, particularly solar assemblies, roof attachment with such fixing element and method for fixing a section of a solar assembly
CN206051218U (en) Machine-roomless lift car universal cord head fixing device
CN211974405U (en) Can have enough to meet need vertical joint bar positioning system that reserves
CN218708651U (en) Adjustable track hangs frock structure
EP4283064B1 (en) Method for embedding and fixing anchor rails in a building
CN219451263U (en) Combined steel beam
CN213626026U (en) Mounting, connecting and reinforcing structure for building steel structure
CN214833550U (en) Ridge connecting structure
CN203783142U (en) Steel die connecting structure
CN219993094U (en) Bolt-free building template
CN213509129U (en) Assembled steel construction floor for building engineering